Urban ecologies landscapes of water pages

Page 1



LANDSCAPES OF WATER 23.04-02.05 Guest Instructors : Giambattista Zaccariotto Jan Stenersen



TROMSØ 69.6828° N, 18.9428° E



TOPOGRAPHY AND WATER BODIES


The urbanization on the Tromsø mainland originally stopped at the line of altitude at which water could be supplied by sole gravity.



WHAT ARE THE MAIN CHALLENGES FOR WATER (AND SNOW) MANAGEMENT ON TROMSテ郎A?


drainage blocked by frost and snow


snow removal, storage and cleaning from pollutants


sea level rise and increasing extreme weather events


THREE CASE STUDIES


3

2

1




1

ALFHEIM TO MACK


Bowen Cui Vlad Lachow Ronald van Schaik


Project Overview Catch and Transport Trenches

Stadium Terrain

Water System Functions:

Water System Functions:

- Improve water infiltration

- Improve water infiltration

- Collect and transport stormwater

- Collect stormwater

- Clean stormwater

- Stormwater cleaning system

Public Space Functions:

- Snow deposit melting system

- Improve the streetview

Public Space Functions: - Footballfield outside the stadium - Restructure Parkingspace

Swimmingpool Park Water System Functions: - Improve water infiltration - Collect stormwater Public Space Functions: - Solar terrace above the park

Backyard Trenches Water System Functions: - Improve water infiltration - Collect stormwater

- Recreation area with water streams and a pond, - Easy passasgeway for bikers and people on foot

Playground Park Museum park Water System Functions: - Improve water infiltration - Collect and store stormwater - Stormwater cleaning system

Water System Functions: - Improve water infiltration - Collect and store stormwater - Snow deposit melting system Public Space Functions:

Public Space Functions:

- Recreation area with water streams and a pond

- Recreation area with water streams and a pond

- Playground for kids.

- Outdoor exhibition space

- Relaxing sitting area


Current Situation

Satellite Photo

Pipe Network

To the Treatment Plant

Natural Water Flow

Roads and Parking


New Situation

Project Areas

1

2

3

4

Horizontal Trench System

Vertical Trench System

Total System


Future scenarios On open spaces

Water flow People flow


1 P

Swimming Pool Park

Slowdown Infiltration Collection Recreation Greenway


Analysis

Sections

nice view

trench+path Present situation

unaccessible (steep)

fast runoff

trench+pathpond platform

trench pomd+platform

Future scenario

trench+house


Conceptual Collage

pond

trench+path


trench

swimming pool

platform


P

2

Play-Ground

Storage Infiltration Spring Activities


Analysis Present situation

Winter Wind

Pipes

Flat Area

Nice View

Snow Depot

Ducks

Future scenario

Historical stream Pond

Bench terrace Play ground

Snow ground Sun-capture device


Conceptual Collage Summer scenario Pond

Play ground


Historical stream

Bench terrace


Conceptual Collage Winter scenario

Sun-ca Pond

Play ground


apture device Historical stream

Snow depot Bench terrace


P

3 Transport Corridor

Green Way


Bicycle Path

Pedestrian

Rainwater trench




2

LANDSCAPES OF SNOW


Victoria Cobeña Serrano Ona Flindall Joanna Gocałek


snow information

ESTIMATED TOTAL ‘NORMAL SNOWFALL’ NOV-APR: 1330MM = 532MM WATER

estimated total ‘normal snowfall’ on Tromsøya: 30 928 854m3

estimated total ‘normal snowfall’ within selected area: 5 433 490m3

estimated ‘snowfall’ for clearing within area of up to 521 000m3 on public roads alone

Tromsø kommune today removes an average of 45 000m3 snow to various depots

x 4000 of that an estimated 15-20 000m3 comes from our site

x 1800 currently an average of 14 000 m3 snow is dumped into Tromsøysundet every winter

x 1300


marine deposits

ground moraine / weathered material

end moraine

PERMIABILITY

PERMIABILITY

snow future

unpermiable surfaces - human activity


pollution and handling

Streets, parking lots and additional pollutions coming from the airport and comercial areas characterize high level of pollution.

Snow coming from the roads in residential areas, private housing with higher infiltration and absorption of pollutants to the soils during melting season.

Rapidly rising temperatures and higher activity on the surfaces generate a substantial volume of meltwater witch then wash tremendous amount of acumulated winter debris from street surfaces.


pollution and handling

POLLUTION POLLUTION LEVEL : LEVEL HIGH : HIGH

CURRENT HANDLING: CURRENT HANDLING: SEA AND LAND SEA AND DEPOT LAND DEPOT measurements measurements from Oslo give from estimated Oslo give figures estimated of figures of heavy metalls: heavy 960 µg/l metalls: 960 µg/l organic particles: organic 9196 particles: ng/l 9196 ng/l

Key pollutants: Key pollutants: PAH, heavyPAH, metalls, heavy glycol, metalls, formiat glycol, formiat

POLLUTION POLLUTION LEVEL : LEVEL LOW : LOW

CURRENT HANDLING: CURRENT HANDLING: ROADSIDEROADSIDE AND LANDAND DEPOT LAND DEPOT measurements measurements from Drammen from give Drammen estimated give figures estimated of figures of heavy metalls: heavy 65.1 µg/l metalls: 65.1 µg/l organic particles: organic 2100 particles: ng/l 2100 ng/l

Key pollutants: Key pollutants: NaCl, PAH, NaCl, particles PAH, particles

POLLUTION POLLUTION LEVEL : LEVEL HIGH : HIGH CURRENT HANDLING: CURRENT HANDLING: SEA AND LAND SEA AND DEPOT LAND DEPOT measurements measurements from Oslo give from estimated Oslo give figures estimated of figures of heavy metals:heavy 237 µg/l metals: 237 µg/l particles: 2467 particles: ng/l 2467 ng/l

PRESTVANNET PRESTVANNET Key pollutants: Key pollutants: Cu, Cr, Zn, PCB, Cu, Cr, PAH Zn, PCB, PAH


section

SYSTEM 1

SYSTEM 2

WETLAND LAKE BUILDING PERMABLE SURFACES ROADS AND CONCRETE SURFACES SEA


SYSTEM SYSTEM33

SNOW SNOWCLEANING CLEANINGSYSTEMS SYSTEMS ACCORDING ACCORDINGTO TOPOLUTIONS POLUTIONS AND ANDECOSYSTEM ECOSYSTEM SURFACES SURFACES FUTURE FUTURESEA SEALEVEL LEVEL SIMULATION SIMULATION SECTION SECTION


master plan

VIEW 2

ZOOM 2

ZOOM 1

tunnel VIEW 1

road system

main existing trail secondary existing trail new trail new water path conection with existing creek conection with existing trail

existing pipes (separated) overflow outlet piped conection existing dam

snow storage + treatment plant


PRESTVANNET

CLEANING SYSTEM

system diagram

SNOW DEPOT

REGULATOR: DAM

REGULATOR: OVEFLOW

OPEN STREAM REGULATOR: OVEFLOW

STORMWATER DRAINS

OPEN STREAM

REGULATOR: OVEFLOW

SNOW DEPOT SURFACE WATER

+1-2 째C

COOLING SYSTEM

REGULATOR: FRESH WATER

CLEANING

cold climate wetlands

SEA

suggested: sedges mix native to island

ex: Carex vesicaria, Carex aquatilis nutrient removal at +4 째C

The aerobic biofilter

(prior to the subsurface flow stage, is essential to remove BOD and achieve nitrification in a climate where the plants are dormant during the cold season)

1m

increased depth and insulation materials

natural iron or calcium rich sand


1 zoom

CLEANING 1 PHYTOREMEDIATION 2

RIVER

CLEANING 3 SAND FILTER CLE

A

PHY NING TOR E ME 2 DIAT

ION 1

CLEANING 4 SEDIMENTATION POND

CLEANING 1 PHYTOREMEDIATION 2


road road system system pedestrian pedestrian and cycling and cycling path path new water new water path path pipedpiped conection conection snowsnow storage storage + + treatment treatment plantplant

2 2 CLEANING INGING CLEAN CLEAN 3 3 CLEANING G 4G 4 CLEANIN CLEANIN PHYTOREMEDIATION PHYTOREMEDIATION 1 1 SEDIMENTATION POND POND SAND SANDSEDIMENTATION FILTER FILTER

DELIVERY DELIVERY


ow sn

ow sn

ted

llu po

ted

CLEACLE AN1ING 1 NING PHYTPOR HYETM OR EM EDI ATEDI AT2ION 2 ION

SEA SEA CLEANDE CLEANDE WATER WATER RUNNOF RUNNOF

3 NG 3 NING ANI CLEACLE NLING EAN2ING 2 CLEAC PHYTOREMEDIATION PHYTOREMEDIATION 2 PHYTOREMEDIATION 2 PHYTOREMEDIATION 1 1

wlkin

g cy clin g

wlkin

C SE LEA DIM NI N C EN G SE LEATATI 3 DIM NI ON EN NG 2 TA 3 TIO N2 llu po

g cy clin g

2 zoom

C C PH LEPH LE A YT NYT AN OR INOR IN EM G 2EM G 2 ED ED IAT IAT IO I N ON 1 1

SEDIM SEDIM ENTAE AT1ION 1 TNT ION CLEANIN CLEANIN G4 G4


road system road system pedestrian pedestrian and cycling andpath cycling path new water new path water path piped conection piped conection snow storage snow storage + + treatment treatment plant plant

4 NG 4 NING ANI CLEACLE SEDIMENTATION SEDIMENTATION PONDPOND

DELIVERY DELIVERY

NATURAL NATURAL STREAM STREAM


view

1

summer


view

1

winter



view

2

summer


3


Kristjan Breidfjord Wenjing Chen Eimear Tynan


Site Area: c o n t e x t Area 1

City C

entre

Sit

eA

re

a

Tromsøya

1km


Site Area: u p c l o s e

03

02 01 05

Focal Areas:

1. A neighbourhood - A house 2. A road - a green connection 3. A Green Corridor 4. A Street 5. A bus depot - a park

04



Focal Area: w a t er s y s t em s ov er v iew

Water systems:

1. Underground piped system (invisibe) 2. Surface water systems (visible) 3. New surface watersystems based on computer modelling* * AutoCAD Civil 3D was used to create a 3D model of the area followed by a water analysis of the surface drainage


BY AN AUTODESK EDUCATIONAL PRODUCT Area 01:PRODUCED A n eig hbourhood

Neighbourhood-present

Neighbourhood-future

Neighbourhood-future (Winter)

Rainwater from roofs collected locally; runoff from ground surfaces collected in shared green space

Neighbourhood-present

Snow deposits from roofs collected locally; Snow from ground surfaces collected in shared open space

Neighbourhood-future

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

50m

PRODUCED BY AN AUTODESK EDUCATIONAL PRODU

UCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED PRODUCED BY BY AN AN AUTODESK AUTODESK EDUCATIONAL EDUCATIONAL PRODUCT PRODUCT

Area 01: A h o u s e

PRODUCED PRODUCEDBY BYAN ANAUTODESK AUTODESKEDUCATIONAL EDUCATIONALPRODUCT PRODUCT

House-Neighbourhood water collection

House-Neighbourhood snow collection


Area 01: A n eig h bo u r h o o d Neighbourhood-present condition


Area 01: A n eig h b o u r h o o d Neighbourhood-future scenario


50m

100m

200m

300m

400m

500m

600m

700m

Water flows and collection areas were examined. The blue lines represent current streams of water; red lines represent computer generated water flows on the surface

Profile along road

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Road - Present situation

PRODUCED BY AN AUTODESK PRODUCEDEDUCATIONAL BY AN AUTODESK PRODUCT EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK PRODUCEDEDUCATIONAL BY AN AUTODESK PRODUCT EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Area 02: A R o ad - a g r e e n c o n n e c t i o n


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Area 02: A R o ad - a g r e e n c o n n e c t i o n

50m

100m

200m

300m

400m

500m

600m

700m

Road - Future use

10

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Road - Future design

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


GREEN CORRIDOR

GREEN CORRIDOR

ROAD

ROAD

Green Corridor - networks

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Area 03: A G reen C o r r i d o r RESIDENTIAL

500m

100m 50m

Present situation

Future scenario

Future scenario (Winter)


Area 03: A G r een C o r r i d o r Green Corridor - Profile

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Lagoon

RESIDENTIAL

GREEN CORRIDOR

GREEN CORRIDOR

ROAD

500m

PRODUCED BY AN AUTODESK EDUCATIONAL PRO

CED BY AN AUTODESK EDUCATIONAL PRODUCT

100m

ROAD


Area 03: A G r een C o r r i d o r Lagoon creation over time 0-5 years PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

200m

PRODUCED BY AN AUTODESK EDUCATIONA

100m

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PROD

5-20 years

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Lagoon creation over time

ODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Area 03: A G r een C o r r i d o r


Fixed island development and floating islands PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Lagoon creation over time

20 years +

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUC

Area 03: A G r een C o r r i d o r

RODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Area 03: A G reen C o r r i d o r

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Snow dumping in Winter

Street debris

PRODUCED PRODUCED BY AN AUTODESK BY AN AUTODESK EDUCATIONAL EDUCATIONAL PRODUCT PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED PRODUCED BY AN AUTODESK BY AN AUTODESK EDUCATIONAL EDUCATIONAL PRODUCT PRODUCT

Lagoon - the process


PRODUCED BY A

Area 04: A S t r eet Total Area 50,000 sq.m Hard surface 23,000 sq.m Soft surface 27,000 sq.m

2

600m 3

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

4

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

1

200m

100m

AL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


RESIDENTIAL RESIDENTIAL RESIDENTIAL

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Area 04: A S tr ee t

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED PRODUCED BY PRODUCED AN AUTODESK BY ANBY AUTODESK ANEDUCATIONAL AUTODESK EDUCATIONAL EDUCATIONAL PRODUCT PRODUCT PRODUCT


Area 04: A S t r eet Street- Present situation


Area 04: A S tr ee t Street- Future scenario


Area 05: B u s d ep o t

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Street- Present situation


Area 05: B u s d ep o t

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Street- Future scenario


Area 05: B u s d ep o t



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.