A Critical part of the Thermodynamic cycle
If one visits a power plant or cogeneration plant, the important extract of the hot well from the condenser is processed to the new generation steam cycle (Rankine cycle for power generation) by these condensate pumps. These are one of the critical and looked at equipment there. These are generally developed as multistage pumps, connected with numerous interlocks and controls. The grid connectivity of the unit is heavily depending on their performance. Normally the extract from the hot well is Demineralised (DM) water, hence these are termed as condensate pumps. These condensate pumps are always high capacity Condensate AC pumps. Any breakdown or shutdown of one of the three pumps with one as a standby one, affects the steam, coincidentally power generation. As generally built of alloy steel and high metals, their working life span is over a few decades, equivalent to that of the powerhouse. It requires a number of rounds of technical discussions to decide the specifications of these condensate pumps. Procurement Process To select the suppliers of these pumps and their long-term spares is a long drawn process. As one of the costliest equipment of the plant, it needs several rounds of bidding and evaluation before finalization. The website https://www.wholesalepumps.com/condensate-ac-pumps/