NOTES: SITE
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #: SCALE:
09/06/18 Project Number 1/4" = 1'-0"
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
COVER SHEET
SHEET NUMBER
8'x8'x8' TOOL SHED FOR EAST HILLS STUDIO BAYS. THE DESIGN CRITERIA IS TO CREATE A "IKEA" LIKE ASE OF FRABICATION TOOL SHED. GROUP 2 DESIGN CONCEPT IS A 3 PEICE BREAK A AWAY TOOL SHED CONSISTING OF 2 4'x4' QUADRANTS CONNECTING TO A LARGER 4'x8' MAIN SHED.
GROUP B
G001
NOTES: SITE
1
2
3
4
5
6
7
8
9
10
A SPONSORS
B
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
C GROUP # : TITLE
2 : ROTATE D STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
1
SITE PLAN SCALE: 1" = 60'-0"
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
MARVIN HALL
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #:
09/06/18 Project Number
SCALE:
1" = 60'-0"
DWG BY: QUINLIVAN, CHARLIE SHEET NAME
SITE PLAN SHEET NUMBER
EAST HILLS WAREHOUSE
GROUP B
G002
NOTES: SITE
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #:
SouthWest SCALE: N.T.S.
1
SouthEast SCALE: N.T.S.
Project Number
SCALE: DWG BY: QUINLIVAN, CHARLIE SHEET NAME
CONCEPT SOUTH VIEW SHEET NUMBER
2
12/09/18
GROUP B
A001
NOTES: SITE
SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #:
12/09/18 Project Number
SCALE: DWG BY: QUINLIVAN, CHARLIE
NorthEast SCALE: N.T.S.
1
NorthWest SCALE: N.T.S.
SHEET NAME
CONCEPT NORTH VIEW SHEET NUMBER
2
GROUP B
A002
NOTES: 1. LOCKERS 2. POWER TOOL CABINET 3. HANGING DRILL CABINET 4. LARGE SHELVING UNIT 5. WORK TABLE 6. PEG BOARD
SITE
SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
6
3 2
3
3
GROUP # : TITLE
3
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
5 1 A207
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
2
2 4
1
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
2
PROJECT TITLE
4
1 2
1
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
A206 PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number As indicated
DWG BY: QUINLIVAN, CHARLIE
ARCHITECTURAL FLOOR PLAN SCALE: 3/4" = 1'-0"
SHEET NAME
ARCHITECTURAL FLOOR PLAN SHEET NUMBER
1
GROUP B
A101
NOTES: NORTH AND SOUTH ELEVATION VIEWS ARE IDENTICAL FOR PORTABLE STATIONS 1 AND 2
SITE
SPONSORS
TOP. 8' - 1"
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
8' - 1"
7' - 4"
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE ARCH 509 FALL 2018
NORTH / SOUTH ELEVATION OF PORTABLE STATIONS 1 SCALE: 3/4" = 1'-0"
BOTTOM. 0' - 9" GROUND. 0' - 0"
PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number 3/4" = 1'-0"
DWG BY: QUINLIVAN, CHARLIE SHEET NAME
NORTH / SOUTH ELEVATION SHEET NUMBER
0' - 1"
0' - 9"
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
GROUP B
A201
NOTES: SITE
SPONSORS
.TOP TOP 8' - 1"
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
7' - 4"
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE ARCH 509 FALL 2018
WEST ELEVATION OF PORTABLE STATION 2 SCALE: 3/4" = 1'-0"
EAST ELEVATION OF PORTABLE STATION 1 SCALE: 3/4" = 1'-0"
BOTTOM 0' - 9" GROUND 0' - 0"
PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number 3/4" = 1'-0"
DWG BY: QUINLIVAN, CHARLIE SHEET NAME
EAST / WEST ELEVATIONS SHEET NUMBER
0' - 1"
0' - 9"
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
GROUP B
A202
NOTES: SITE
SPONSORS
TOP 8' - 1"
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
8' - 1"
7' - 4"
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE ARCH 509 FALL 2018
0' - 1"
0' - 9"
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
BOTTOM 0' - 9" GROUND 0' - 0"
PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number 3/4" = 1'-0"
DWG BY: QUINLIVAN, CHARLIE SHEET NAME
SOUTH ELEVATION OF WORKSTATION SCALE: 3/4" = 1'-0"
SOUTH ELEVATION SHEET NUMBER
1
GROUP B
A203
NOTES: SITE
SPONSORS
TOP 8' - 1"
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
8' - 1"
7' - 4"
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE ARCH 509 FALL 2018
0' - 1"
0' - 9"
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
BOTTOM 0' - 9" GROUND 0' - 0"
PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number 3/4" = 1'-0"
DWG BY: QUINLIVAN, CHARLIE SHEET NAME
NORTH ELEVATION OF WORKSTATION SCALE: 3/4" = 1'-0"
NORTH ELEVATION SHEET NUMBER
1
GROUP B
A204
NOTES: SITE
SPONSORS
TOP. .TOP 8' - 1"
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
8' - 1"
7' - 4"
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE ARCH 509 FALL 2018
0' - 1"
0' - 9"
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
.BOTTOM BOTTOM. 0' - 9" .GROUND GROUND. 0' - 0"
PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number 3/4" = 1'-0"
DWG BY: QUINLIVAN, CHARLIE
WEST ELEVATION OF WORKSTATION SCALE: 3/4" = 1'-0"
1
EAST ELEVATION OF WORKSTATION SCALE: 3/4" = 1'-0"
SHEET NAME
EAST / WEST ELEVATION SHEET NUMBER
2
GROUP B
A205
NOTES: SITE
SPONSORS
.TOP 8' - 1"
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2"X4"
2 : ROTATE
1/2" PLYWOOD STUDENTS
1/2" PLYWOOD
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE 8' - 1"
7' - 4"
1/2" PLYWOOD
2"X4"
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
DUPLEX OUTLET
PROJECT TITLE
3/4" PLYWOOD
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
2"X6" 1/2" PLYWOOD
0' - 9"
3" CASTER
.BOTTOM 0' - 9" .GROUND 0' - 0"
PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number 3/4" = 1'-0"
DWG BY: QUINLIVAN, CHARLIE SHEET NAME
EAST / WEST SECTION OF PORTABLE STATION 2 1 SCALE: 3/4" = 1'-0"
SHEET NUMBER
EAST / WEST SECTION
GROUP B
A206
NOTES: SITE
SPONSORS
TOP 8' - 1"
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE
2"X4" 2"X4" CEILING ANCHORS 1/2" PLYWOOD
STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
1/2" PLYWOOD
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE 8' - 1"
7' - 4"
1/2" PLYWOOD
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
1/2" PLYWOOD
3/4" PLYWOOD
PROJECT TITLE
1 S201
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
2"X6"
0' - 9"
3" CASTER
BOTTOM 0' - 9" GROUND 0' - 0"
PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number 3/4" = 1'-0"
DWG BY: QUINLIVAN, CHARLIE SHEET NAME
EAST / WEST SECTION SHEET NUMBER
EAST / WEST SECTION OF WORKSTATION 1 SCALE: 3/4" = 1'-0"
GROUP B
A207
NOTES: SITE
DIMENSIONS: DEPTH- 1' 1" WIDTH- 3' 3 1/2" HEIGHT'- 3' 6"
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #:
Project Number
SCALE:
1 1/2" = 1'-0"
DWG BY: NUTTER, JORDAN SHEET NAME
1
ISOMETRIC FABRICATION SCALE: 1 1/2" = 1'-0"
SHEET NUMBER
LOCKER
GROUP B
F001
NOTES: MATERIAL LIST: 1. 7 4'x8'x3/4" PLYWOOD
SITE
PARTS B AND C REPRESENT QUANTITY NEEDED FOR ONE LOCKER. WILL NEED TO REPEAT ONCE. THESE PARTS WILL BE CUT WITH A CNC MACHINE. ALL OTHER PARTS REPRESENT QUANTITY NEEDED FOR ONE LOCKER. WILL NEED TO BE FABRICATED TWICE. THESE PARTS WILL BE CUT WITH A TABLE SAW.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE 3' - 4 1/2" 3' - 4 1/2"
STUDENTS
1' - 3 1/2" TYP.
F F
F
F F
F
F F
G
C
3' - 2"
F
B
TYP.
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
0' - 0 3/4" TYP.
I
I
I
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
TYP.
I
TYP.
0' - 5"
H
TYP.
D D D D
H
3' - 4 1/2"
E
H
TYP.
H
1' - 1"
H
PROJECT INFO. DATE:
12/09/18
PROJECT #:
A
SCALE:
A
1' - 1"
TYP. TYP.
0' - 6 3/4"
0' - 8"
TYP.
3' - 3 1/2"
E
1' - 2 1/2"
H
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
Project Number 1/2" = 1'-0"
DWG BY: NUTTER, JORDAN SHEET NAME
LOCKERPARTS FBRICATION
3' - 4 1/2" TYP.
1
FABRICATION PEICES SCALE: 1/2" = 1'-0"
SHEET NUMBER
TYP.
TYP. TYP. TYP.
0' - 6 3/4" TYP.
1' - 0 1/4"
0' - 8" 0' - 8" 0' - 8"
TYP.
0' - 5"
0' - 2"
0' - 6 3/4" TYP.
GROUP B
F002
NOTES: 1) THE PIECE COUNTS ARE FOR ONE LOCKER 2) WILL NEED TO BE FABRICATED TWICE
SITE
SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
H (x8)
PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
E (x2)
PROJECT INFO. DATE:
12/09/18
PROJECT #:
G (X1)
SCALE:
Project Number 1" = 1'-0"
DWG BY: NUTTER, JORDAN
F (x8)
SHEET NAME
C (x3)
B (x6)
1
A (x2)
MATERIAL COUNT SCALE: 1" = 1'-0"
SHEET NUMBER
D (x4)
LOCKER- KIT OF PARTS
GROUP B
F003
NOTES: STEP 1: 1. COMPLETED PEICES ARE ASSEMBLY 1. 2. NAILS ARE SPACED 8" APART VERTICALLY. STEP 2: 1. COMPLETED PEICE IS ASSEMBLY 2. 2. USE WOOD GLUE TO ADHEAR PEICES TOGETHER.
SITE
SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
A
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
C C D
B
D
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
B
B B B
PROJECT TITLE ARCH 509 FALL 2018
D D
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
C B
A PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: NUTTER, JORDAN SHEET NAME
2
LOCKER STEP 2 SCALE: 1" = 1'-0"
1
LOCKER STEP 1 SCALE: 1" = 1'-0"
SHEET NUMBER
TYP. NAILING
LOCKERFABRICATION
GROUP B
F004
NOTES: STEP 3 & 4: 1. REPEAT THE NAILING PATTERN ON BOTH TOP AND BOTTOM.
SITE
SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
E
E
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
1 PROJECT TITLE ARCH 509 FALL 2018
2
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO.
1 E
DATE:
12/09/18
PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: NUTTER, JORDAN SHEET NAME
2
LOCKER STEP 4 SCALE: 1" = 1'-0"
1
LOCKER STEP 3 SCALE: 1" = 1'-0"
SHEET NUMBER
LOCKERFABRICATION
FRONT
GROUP B
F005
NOTES: STEP 5: 1. LAY THE COMPLETED PEICE FORM STEP 4 FRONT SIDE DOWN. 2. NAILS ARE SPACES 8" APART VERTICALY. 3. HORIZONTALY THE NAILS START 1" FROM THE SIDE BOARD AND THEN ARE 1' 5 1/2" TO THE NEXT NAIL.
SITE
SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
F
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
F
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
F
PROJECT TITLE
F
G
F
F
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
F PROJECT INFO. DATE:
12/09/18
F PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: NUTTER, JORDAN SHEET NAME
2
LOCKER STEP 6 SCALE: 1" = 1'-0"
1
LOCKER STEP 5 SCALE: 1" = 1'-0"
SHEET NUMBER
LOCKERFABRICATION
GROUP B
F006
NOTES: SITE
STEP 7: 1. PLACE HINGES 3/4" OFF TOP OR BOTTOM OF PARTS H AND I. 2. DRILL A 1" HOLE ON THE LOCK SIDE OF EVERY DOOR 1 1/2" OFF THE TOP AND SIDE.
SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
H/I
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
I
H
H
H
I
I
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
H
PROJECT TITLE
H/I
H
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
H
PROJECT INFO. DATE:
12/9/18
I PROJECT #: SCALE:
Project Number As indicated
DWG BY: NUTTER, JORDAN SHEET NAME
2
LOCKER STEP 8 SCALE: 1" = 1'-0"
1
LOCKER STEP 7 SCALE: 3" = 1'-0"
SHEET NUMBER
LOCKERFABRICATION
GROUP B
F007
NOTES: SITE
FROM HERE ON POWER TOOL CABINET WILL BE ABBREVIATED PTC DIMENSIONS: HEIGHT - 3' 4" WIDTH - 1' 7" DEPTH - 1' 0 3/4"
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/9/18
PROJECT #:
Project Number
SCALE: DWG BY: QUINLIVAN, CHARLIE SHEET NAME
3
POWER TOOL CABINET SCALE: N.T.S.
SHEET NUMBER
POWER TOOL CABINET
GROUP B
F101
NOTES: SITE
MATERIAL LIST: 1. 4 4'x8'x3/4" PLYWOOD PARTS A, C, E, G AND H REPRESENT QUANTITY NEEDED FOR ONE PTC. REPEAT FOUR TIMES. COMPONETS B, D, AND F REPRESENT QUANTITY FOR ALL FOUR PTCS. THEY WILL BE CUT WITH CNC MACHINE.
SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS
1' - 0"
F
D
F
F
B
B
B
0' - 8 3/4"
B
F
1' - 7"
3' - 4"
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
C
1' - 5 1/2"
1' - 6"
A
G
A
G
0' - 4" 0' - 3 1/2"
H
E
PROJECT TITLE
H
ARCH 509 FALL 2018 1' - 0"
D
B
0' - 8 3/4"
D
B
0' - 9 1/4"
1' - 0"
D
0' - 3 3/4"
0' - 0 3/4" TYP.
0' - 6 1/2"
0' - 8 5/8"
0' - 0 3/4" TYP.
TYP.
1' - 6"
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/9/18
PROJECT #: SCALE:
Project Number 1/2" = 1'-0"
DWG BY: QUINLIVAN, CHARLIE SHEET NAME
1
0' - 3 1/8"
PTC - PLYWOOD COMPONENTS SCALE: 1/2" = 1'-0"
PTC - PARTS FABRICATION SHEET NUMBER
0' - 7"
GROUP B
F102
NOTES: SITE
SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
AX2 EX1 FX1 DX1
BX2
CX1
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/9/18
PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: QUINLIVAN, CHARLIE SHEET NAME
1
PTC - COMPONENTS SCALE: 1" = 1'-0"
HX2
PTC - KIT OF PARTS SHEET NUMBER
GX2
GROUP B
F103
NOTES: SITE
SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS
A
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
B C
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
B PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
A
12/9/18
PROJECT #: SCALE:
Project Number 1 1/2" = 1'-0"
DWG BY: QUINLIVAN, CHARLIE SHEET NAME
2
PTC FABRICATION - STEP 2 SCALE: 1 1/2" = 1'-0"
1
PTC FABRICATION - STEP 1 SCALE: 1 1/2" = 1'-0"
SHEET NUMBER
PTC FABRICATION
GROUP B
F104
NOTES: SITE
SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
G
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
DEF H
PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
H
PROJECT INFO.
G
DATE:
12/9/18
PROJECT #:
D
SCALE:
F
2
PTC FABRICATION- STEP 4 SCALE: 1 1/2" = 1'-0"
1
PTC FABRICATION - STEP 3 SCALE: 1 1/2" = 1'-0"
1 1/2" = 1'-0"
DWG BY: QUINLIVAN, CHARLIE SHEET NAME
PTC FABRICATION SHEET NUMBER
E
Project Number
GROUP B
F105
NOTES: SITE
1. THIS CABINET WILL BE FABRICATED FOUR TIMES
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
B GROUP # : TITLE
F
2 : ROTATE STUDENTS
F C
C
E A
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
G
E
PROJECT TITLE
ARCH 509 FALL 2018
G
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number 3" = 1'-0"
DWG BY: TRISTYN DELGADO SHEET NAME
1
HANGING DRILL CABINET FABRICATION SCALE: 3" = 1'-0"
SHEET NUMBER
HANGING DRILL CABINET
GROUP B
F201
NOTES: SITE
1. THIS SHEET REPRESENTS THE MATERIALS NEEDED FOR ALL FOUR CABINETS. 2. CUT 1/4" HOLE WITH JIG SAW ON B PARTS TO ALLOW FOR ELECTRICAL CORDS
1' - 0"
3. 1 1/2" CHANNEL CUT FROM PVC PIPE
1' - 0"
0' - 1 1/2"
B
A
1' - 1"
A
0' - 4 15/16"
0' - 11"
SPONSORS
C
C
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
C
GROUP # : TITLE
B C
C
2 : ROTATE
C
STUDENTS
B
A
C
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
C
B
A
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
1/2" THICK PLYWOOD
0' - 10 1/2"
1' - 0"
0' - 11"
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
8' - 0"
D
D
E E
D
E E
F F
F F
0' - 1 5/8"
D 2"X4"X8'
PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
1' - 0" 10' - 0"
PROJECT INFO. DATE:
G 4" DIAMATER PVC PIPE
G
G
G
G
G
G
G
12/09/18
PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: TRISTYN DELGADO SHEET NAME
1
PARTS FABRICATION SCALE: 1" = 1'-0"
SHEET NUMBER
HANGING DRILL CABINET - PARTS FABRICATION GROUP B
F202
NOTES: SITE
1. THIS SHEET REPRESENTS THE MATERIALS NEEDED FOR ALL FOUR CABINETS.
2 5/8" SCREWS (X42)
3" SCREWS (X12)
1/2" SCREWS (X14)
SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS
G (X8)
D (X4)
E (X4)
C (X8)
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
G (X4) PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
1
KIT OF PARTS SCALE: 1 1/2" = 1'-0"
B (X4)
1 1/2" = 1'-0"
DWG BY: TRISTYN DELGADO SHEET NAME
HANGING DRILL CABINET SHEET NUMBER
A (X4)
Project Number
GROUP B
F203
NOTES: SITE
REPEAT FABRICATION FOUR TIMES
3
SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
C GROUP # : TITLE
C
2 : ROTATE
2 B C
F
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
F
4
TYP SIDE C CONNECTING STEPS 2 AND 3
STUDENTS
3 B CONNECTING TO C AND F
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
TWO SCREWS PLACED 3" FROM BACK AND FRONT ALONG 12" SIDE ON PIECE A
A
A
E
1 E
PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
G PROJECT INFO. DATE:
12/09/18
PROJECT #:
2 A TO G CONNECTION
1
E TO A CONNECTION
SCALE:
Project Number 1 1/2" = 1'-0"
DWG BY: TRISTYN DELGADO SHEET NAME
1
FABRICATION SCALE: 1 1/2" = 1'-0"
SHEET NUMBER
HANGING DRILL CABINET
GROUP B
F204
NOTES:
SITE
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/12
PROJECT #: SCALE:
SHELVING UNIT FINISHED SCALE: 1" = 1'-0"
1" = 1'-0"
DWG BY: KELLY, ALLISON SHEET NAME
SHELVING UNIT SHEET NUMBER
1
Project Number
GROUP B
F301
NOTES:
SITE
MATERIALS LIST: 1. 6 4' x 8' 3/4" PLYWOOD PARTS A, B, C, D, E, AND F WILL BE CUT WITH A CNC MACHINE. THE QUNATITIES OF B, C, D, E, AND F REPRESENT PARTS FOR 1 SHELVING UNIT. THESE PARTS WILL NEED TO BE FABRICATED TWICE.
1' - 8"
1' - 8" TYP.
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
D
3' - 1" 1' - 6 1/8"
1' - 5 7/8"
3' - 0 1/2"
1' - 6 1/8"
1' - 5 7/8"
0' - 11" 0' - 11"
0' - 11 1/4"
B
3' - 0 1/2"
1' - 1"
3' - 6"
0' - 8 3/4"
C
1' - 1"
E
A
3' - 1"
A
SPONSORS
0' - 11 1/4"
A
0' - 5 3/4"
A
GROUP # : TITLE
2 : ROTATE STUDENTS
0' - 11 1/2"
3' - 2"
TYP.
G
G
G
I
F
F
3' - 6"
1' - 8"
1' - 7 1/4"
G
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
1' - 8"
TYP.
H 1' - 8"
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
1' - 0"
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number 1/2" = 1'-0"
DWG BY: KELLY, ALLISON SHEET NAME
SHELVING UNIT - PARTS FABRICATION MATERIALS - SHELVING UNIT PLYWOOD LAYOUT 1 SCALE: 1/2" = 1'-0"
SHEET NUMBER
TYP. 1' - 0 1/4"
0' - 0 3/4"
0' - 5 3/4"
0' - 6 1/2"
PARTS G, H, AND I WILL BE CUT ON A TABLE SAW. THESE QUANTITIES REPRESENT PARTS FOR 1 SHELVING UNIT. THESE PARTS WILL NEED TO BE FABRICATED TWICE.
GROUP B
F302
NOTES:
SITE
QUANTITIES REPRESENT PART FOR ONE SHELVING UNIT.
A (2x)
B (1x)
C (1x)
D (1x)
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: KELLY, ALLISON SHEET NAME
E (1x)
F (2x)
G (4x)
H (1x)
I (1x)
1
SHELVING UNIT - COMPONENTS SCALE: 1" = 1'-0"
SHEET NUMBER
SHELVING UNIT - KIT OF PARTS
GROUP B
F303
NOTES:
SITE
STEP 1: 1. SCREWS ARE 1/4" UP FROM BOTTOM EDGE. 2. MIDDLE SCREW IS CENTERED. 3. TWO EDGE SCREWS ARE 1/4" AWAY FROM SIDES. 4. REPEAT ON BOTH SIDES.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
A GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
B
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #:
A
SCALE:
Project Number 1" = 1'-0"
DWG BY: KELLY, ALLISON SHEET NAME
1
SHELVING UNIT - STEP 1 SCALE: 1" = 1'-0"
SHEET NUMBER
SHELVING UNIT - FABRICATION
GROUP B
F304
NOTES:
SITE
STEP 2: 1. SCREWS ARE 1/4" UP FROM TOP EDGE. 2. MIDDLE SCREW IS CENTERED. 3. TWO EDGE SCREWS ARE 1/4" AWAY FROM SIDES. 4. REPEAT ON BOTH SIDES.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE C
STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: KELLY, ALLISON SHEET NAME
1
SHELVING UNIT - STEP 2 SCALE: 1" = 1'-0"
SHEET NUMBER
SHELVING UNIT - FABRICATION
GROUP B
F305
NOTES:
SITE
STEP 3: 1. SCREWS ARE 1'-3/4" UP FROM BOTTOM EDGE. 2. MIDDLE SCREW IS CENTERED. 3. TWO EDGE SCREWS ARE 1/4" AWAY FROM SIDES. 4. REPEAT ON BOTH SIDES.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018
D
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: KELLY, ALLISON SHEET NAME
1
SHELVING UNIT - STEP 3 SCALE: 1" = 1'-0"
SHEET NUMBER
SHELVING UNIT - FABRICATION
GROUP B
F306
NOTES:
SITE
STEP 4: 1. SCREWS ARE 1'-10 1/4" UP FROM BOTTOM EDGE. 2. MIDDLE SCREW IS CENTERED. 3. TWO EDGE SCREWS ARE 1/4" AWAY FROM SIDES. 4. REPEAT ON BOTH SIDES.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
E
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: KELLY, ALLISON SHEET NAME
1
SHELVING UNIT - STEP 4 SCALE: 1" = 1'-0"
SHEET NUMBER
SHELVING UNIT - FABRICATION
GROUP B
F307
NOTES:
SITE
STEP 5: 1. FOR F PIECES: A. SCREWS ARE 7.5" OFF CENTER, EDGE SCREWS ARE 2" AWAY FROM SIDES. B. REPEAT ON BOTTOM. 2. FOR G PIECE: A. SCREWS ARE CENTERED. B. EDGE SCREWS ARE 2" AWAY FROM SIDES. C. REPEAT ON BOTTOM.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
F F
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
H
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: KELLY, ALLISON SHEET NAME
1
SHELVING UNIT - STEP 5 SCALE: 1" = 1'-0"
SHEET NUMBER
SHELVING UNIT - FABRICATION
GROUP B
F308
NOTES:
SITE
STEP 6: 1. SLIDE IN G AND H PIECES. 2. WOOD GLUE EDGES GOING THROUGH INLETS.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
G
G
G
G
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: KELLY, ALLISON SHEET NAME
1
SHELVING UNIT - STEP 6 SCALE: 1" = 1'-0"
SHEET NUMBER
SHELVING UNIT - FABRICATION
GROUP B
F309
NOTES:
SITE
STEP 7: 1. SCREW ON BACK. 2. SCREWS ARE 1/4" DOWN AND ACROSS FROM EACH CORNER
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
I
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: Kelly, Allison SHEET NAME
1
SHELVING UNIT - STEP 7 SCALE: 1" = 1'-0"
SHEET NUMBER
SHELVING UNIT - FABRICATION
GROUP B
F310
NOTES: SITE
DIMENSIONS: HEIGHT - 3'-3" DEPTH - 3'-4 WIDTH - 0' 6 1/4"
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/9/18
PROJECT #:
Project Number
SCALE:
N.T.S.
DWG BY: BARGAS, ELAINA SHEET NAME
1
PEG BOARD ASSEMBLY
SHEET NUMBER
PEGBOARD
GROUP B
F401
NOTES: SITE
MATERIAL LIST FOR ONE PEGBOARD: 1. 1 4' x 8' x 1/4" SHEET OF PEGBOARD IS REQUIRED 2. 2 2" x 6" STUDS ARE REQUIRED
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
C
PROJECT TITLE
ARCH 509 FALL 2018
A
B 3' - 4"
3' - 4"
(2X) 3' - 1"
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/9/18
PROJECT #: SCALE:
Project Number 1/2" = 1'-0"
DWG BY: BARGAS, ELAINA SHEET NAME
PEGBOARD PARTS FABRICATION
1
PEGBOARD - PEGBOARD COMPONENT SCALE: 1/2" = 1'-0"
2
PEGBOARD - STUD COMPONENTS SCALE: 1/2" = 1'-0"
SHEET NUMBER
3' - 3"
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
GROUP B
F402
NOTES: SITE
FABRICATE ONE TIME
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
C (X1)
2 : ROTATE STUDENTS
A (X2)
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
B (X2)
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018
(X20)
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/9/18
PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: BARGAS, ELAINA SHEET NAME
PEGBOARD KIT OF PARTS
1
PEG BOARD KIT OF PARTS SCALE: 1" = 1'-0"
SHEET NUMBER
1.
GROUP B
F403
NOTES: SITE
STEP 2: 1. THE SCREW SHALL BE PLACED ALONG THE STUDS WITH A VERTICAL SPACING OF 1' - 0 1/2" 2. THE SCREW SHALL BE PLACED ALONG THE STUDS WITH A HORIZONTAL SPACING OF 1' - 1"
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS
B
C
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
A
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
A PROJECT TITLE
B
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/9/18
PROJECT #: SCALE:
Project Number 1" = 1'-0"
DWG BY: BARGAS, ELAINA SHEET NAME
2
PEG BOARD FABRICATION STEP 2
1
PEG BOARD FABRICATION STEP 1
SHEET NUMBER
PEGBOARD FABRICATION
GROUP B
F404
SITE
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #:
Project Number
SCALE: DWG BY: MCCUTCHEON, ROBERT SHEET NAME
1
Work Station Isco SCALE: N.T.S.
SHEET NUMBER
WORK TABLE
GROUP B
F501
NOTES: SITE
MATERIAL LIST: 1. 4'x8'x1/2" PLYWOOD(6X) 2. 4'x8'x3/4" PLYWOOD(1X)* 3. 2"x4"x8' STUD(12X)** *3/4" PLYWOOD IS USED TO CREATE ON OF THE FOUR F PARTS. **USE EXCESS STUDS TO CREATE MULTIPLE PARTS: • B=2"x4"x7.5"(10X) • G=2"x4"x6.5"(2X) • K=2"x4"x8.5"(2X)
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
1' - 5 1/2"
C
C
C
C
C
GROUP # : TITLE
2' - 8"
2 : ROTATE (2X)
0' - 6 1/2"
0' - 8 1/2"
STUDENTS L
L
H
H
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
2' - 8"
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
7' - 4"
2' - 8"
F
(4X)
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
3' - 6 1/2" 1' - 8 5/8"
J A
A
A
J
PROJECT INFO.
(5X)
DATE:
D
D
D
2' - 8"
0' - 8 3/4"
(3X)
(1X) 7' - 4"
0' - 7 7/8"
I
2
I
WORK TABLE - STUD COMPONENTS SCALE: 1/2" = 1'-0"
As indicated
WORK TABLE PARTS FABRICATION
0' - 10 3/4"
3' - 6 1/2"
SCALE:
Project Number
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
(4X)
E
12/09/18
PROJECT #:
(1X)
1
WORK TABLE - PLY WOOD COMPONENTS SCALE: 1/2" = 1'-0"
SHEET NUMBER
2' - 1"
GROUP B
F502
NOTES: SITE
SPONSORS
A(14X)
B(10X)
C(10X)
G(2X)
H(2X)
GROUP # : TITLE
I(2X)
2 : ROTATE
J(2X)
STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
D(8X)
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
E(4X)
F-1/2"(3)
K(2X)
L(2X)
F-3/4"(1)
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
1
WORK TABLE - KIT OF PARTS SCALE: 1/2" = 1'-0"
SHEET NUMBER
WORK TABLE KIT OF PARTS
GROUP B
F503
NOTES: SITE
STEP 1: 1. THIS ASSEMBLY WILL BE REPEATED 5 TIMES. 2. BEFORE PROCEEDING TO STEP 2, TAKE 3 OF THESE ASSEMBLIES AND TOE NAIL TO THE FLOOR OF WORK STATION POD. THE GAPS SHALL BE 20.5", 20", 20", 20.5". THESE MEASUREMENTS ARE TAKEN INTERIOR WALLS TO PLYWOOD SIDE OF ASSEMBLY. THE INTERIOR GAPS, THE GAP BETWEEN TWO ASSEMBLYS IS BASED ON PLYWOOD TO PLYWOOD MEASUREMENT.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE
STEP 3: 1. THIS ASSEMBLY WILL BE REPEATED TWICE.
C
STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
D
2
WORK TABLE - STEP 2 (ASSEMBLY 1) SCALE: 1" = 1'-0"
E D
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
F-1/2" PROJECT TITLE
ARCH 509 FALL 2018 E
D
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
A
B
PROJECT INFO. DATE:
12/09/18
PROJECT #: D
SCALE:
WORK TABLE - STEP 3 (ASSEMBLY 2) SCALE: 1" = 1'-0"
1
As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME A
WORK TABLE - STEP 1 SCALE: 1" = 1'-0"
WORK TABLE FABRICATION SHEET NUMBER
B
3
Project Number
C
GROUP B
F504
NOTES: SITE
STEP 4: 1. ATTACH ASSEMBLY 2 TO THE ASSEMBLY 1's THAT HAVE BEEN SCREWED DOWN TO THE FLOOR OF WORK STATION. 2. ANCHOR ASSEMBLY 2 TO INTERIOR WALLS OF WORK STATION.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
1
WORK TABLE - STEP 4 SCALE: 1" = 1'-0"
SHEET NUMBER
WORK TABLE FABRICATION
GROUP B
F505
NOTES: SITE
STEP 5 & 6 1. USE SAME SCREW PATTERN IN ASSEMBLY 2 FOR THE F PART BEING ATTACHED. 2. REPEAT PROCESS IN STEPS 1 AND 2 TO CREATE ASSEMBLY 3 AND ATTACHED 2 ASSEMBLY 2'S.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
F-1/2" PROJECT #:
Project Number
G SCALE:
H
A
As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
WORK TABLE FABRICATION
1
WORK TABLE - STEP 6 SCALE: 1" = 1'-0"
2
WORK TABLE - STEP 5 (ASSEMBLY 3) SCALE: 1" = 1'-0"
SHEET NUMBER
G
GROUP B
F506
NOTES: SITE
STEP 8: 1. ATTACH ASSEMBLY 4.
A I
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
J
GROUP # : TITLE
I A
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
WORK TABLE - STEP 7 (ASSEMBLY 4) 1 SCALE: 1" = 1'-0"
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
2
WORK TABLE - STEP 8 SCALE: 1" = 1'-0"
SHEET NUMBER
WORK TABLE FABRICATION
GROUP B
F507
NOTES: SITE
STEP 9 & 10: 1. USE SAME SCREW PATTERN AS IN STEP 7 TO ATTACH J ONTO ASSEMBLY 4. 2. USE SAME PROCESS AS STEPS 1 AND 2.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
J
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
K
L
PROJECT INFO. DATE:
12/09/18
PROJECT #:
Project Number
A SCALE:
1
WORK TABLE - STEP 10 SCALE: 1" = 1'-0"
2
WORK TABLE - STEP 9 SCALE: 1" = 1'-0"
WORK TABLE FABRICATION SHEET NUMBER
K
As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
GROUP B
F508
NOTES: SITE
STEP 11: 1. ATTACH ASSEMBLY 2 USING THE SAME PROCESS AS IN STEP 4.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
1
WORK TABLE - STEP 11 SCALE: 1" = 1'-0"
SHEET NUMBER
WORK TABLE FABRICATION
GROUP B
F509
NOTES: SITE
STEP 12: 1. USE SAME SCREW PATTERN AS IN STEP 3 TO ATTACH F-3/4".
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS
F
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE:
12/09/18
PROJECT #: SCALE:
Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
1
WORK TABLE - STEP 12 SCALE: 1" = 1'-0"
SHEET NUMBER
WORK TABLE FABRICATION
GROUP B
F510
NOTES: SITE
PORTABLE STATION WILL BE FABRICATED TWICE. THEY WILL BE CONSTRUCTED AS MIRRORED IMAGES OF ONE ANOTHER. THE ONLY STEP THAT IS AFFECTED BY THIS MIRRORED FABRICATION IS STEP 6. THE ALIGNMENT OF THE SHEATHING WILL BE REVERESED.
SPONSORS
FROM HERE ON PORTABLE STATION MAY BE ABBREVIATED PS.
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #:
12/09/18 Project Number
SCALE:
N.T.S.
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
2
PORTABLE STATION SHEATHING SCALE: N.T.S.
1
PORTABLE STATION FRAMING SCALE: N.T.S.
SHEET NUMBER
PORTABLE STATION
GROUP B
S001
NOTES: SITE
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #:
12/09/18 Project Number
SCALE:
N.T.S.
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
1
PS ASSEMBLY SCALE: N.T.S.
SHEET NUMBER
PS- KIT OF PARTS
GROUP B
S002
NOTES:
3' - 11 1/2" 4' - 0"
A
A:
A
J**:
(6X)
6' - 8 3/4"
(20X)
B 3' - 8 1/2"
C:
J
C
4' - 0"
B:
J
(2X)
(4X)
C
SPONSORS
3' - 4 1/2"
8' - 0"
PS - 2"x4" STUD PARTS 3 SCALE: 1/2" = 1'-0"
3' - 6"
0' - 9"
K: 3' - 1"
D
E
3' - 11 1/2"
3' - 0 1/2"
G
2 : ROTATE
F
(4X)
0' - 5 1/2"
F
(4X)
PS - 2"x6" STUD PARTS SCALE: 1/2" = 1'-0"
0' - 3 1/2"
2
H
0' - 5 1/2"
3' - 4 1/2"
4' - 0"
GROUP # : TITLE
3' - 3 1/2"
8' - 0"
4' - 0"
L:
4' - 0"
N:
(1X)
(4X)
(2X)
STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
6' - 11 3/4"
3' - 3 1/2"
O O
M:
PROJECT INFO.
O
DATE:
O
Q
Q
4' - 0"
0' - 8"
PROJECT #: P
4' - 0"
P
(1X)
(4X)
SCALE:
12/09/18 Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
PS - PARTS FABRICATION
1
PS - PLYWOOD PARTS SCALE: 1/2" = 1'-0"
SHEET NUMBER
** J PARTS WILL BE CUT FROM 1/2" PLYWOOD AND 3/4" PLYWOOD. THE TWO 3/4" PLYWOOD IS USED IN STEP 4. THE TWO 1/2" IS USED IN STEP 8.
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
(1X)
I
4' - 0"
I
0' - 4"
I:
0' - 4 1/2"
*MATERIAL QUANTITIES REFLECT THE FABRICATION OF BOTH PORTABLE STATIONS
SITE
0' - 4 3/4"
MATERIAL LIST*: 1. 2"x4"x8" STUD (X31) 2. HSS 2"x2"x1/8" (39' - 1") 3. 4'x8'x1/2" 3-PLY PLYWOOD (X13) 4. 4'x8'x3/4" PLYWOOD (X1)**
GROUP B
S003
NOTES: J - 1/2" (2X)
A(12X)
L(4X)
COMPONENT QUANTITIES REFLECT THE FABRICATION OF TWO MIRRORED PORTABLE STATIONS
SITE
B(20X)
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
C(8X)
D(4X)
GROUP # : TITLE M(4X) J - 3/4" (2X)
2 : ROTATE STUDENTS
E(4X)
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
F(8X)
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
G(4X) N(2X) K(2X)
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
H(4X) PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY I(2X) O(4X)
PROJECT INFO. DATE: PROJECT #:
12/09/18 Project Number
P(2X) SCALE:
1
PS - COMPONENTS SCALE: 1/2" = 1'-0"
Y (256X)
(3" WOOD SCREW)
Z (542X)
(2" WOOD SCREW)
PS - KIT OF PARTS SHEET NUMBER
Q(2X)
As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
GROUP B
S004
NOTES: REPEATS ALL STEPS FOR THE MIRRORED PORTABLE STATIONS UNLESS OTHERWISE NOTED.
SITE
ASSEMBLY 1: 1. REQUIRES PARTS Ax2, Bx5, AND Yx20. 2. B PARTS ARE SPACED EQUIDISTANT ALONG PARTS A BESIDES THE B PARTS THAT IS PERPENDICULAR TO THE REST. 3. DRILL K PARTS THROUGH PART A AND INTO PART B.
A
C
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
C
ASSEMBLY 2: 1. REQUIRES PARTS Ax2, Cx4, AND Yx16 2. C PARTS ARE SPACED EQUIDISTANT ALONG A PARTS. 3. DRILL K PARTS THROUGH PARTS A AND INTO PARTS C.
D
C A
C
E
F
SPONSORS
GROUP # : TITLE
2 : ROTATE
ASSEMBLY 3: 1. REQUIRES PARTS Ax2, Bx5, AND Yx20. 2. REPEAT STEPS FOR ASSEMBLY 1.
PS - ASSEMBLY 4 SCALE: 1/2" = 1'-0"
4
ASSEMBLY 4: 1. REQUIRES PARTS Dx2, Ex2, Fx4, Yx8, AND Zx16 TO FABRICATE 2 ASSEMBLIES. 2. DRILL K PARTS THROUGH PARTS D AND E ON A 45 DEGREE ANGLE WITH D BEING 5 1/2" OFF FROM EACH END. 3. DRILL L PARTS THROUGH PARTS E AND F.
PS - ASSEMBLY 2 SCALE: 1/2" = 1'-0"
2
STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
A
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
A
ASSEMBLY 5: 1. REQUIRES PARTS Gx2, Hx2, AND Yx8 TO FABRICATE 2 ASSEMBLIES. 2. DRILL K PARTS THROUGH G AND H ON A 45 DEGREE ANGLE WITH H BEING 5 1/2" OFF FROM EACH END.
B
PROJECT TITLE
B
ARCH 509 FALL 2018
B B
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
B B B B
B
B
PROJECT INFO. DATE: PROJECT #: SCALE: A
G
A
As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
3
PS - ASSEMBLY 3 SCALE: 1/2" = 1'-0"
1
PS - ASSEMBLY 1 SCALE: 1/2" = 1'-0"
SHEET NUMBER
PS - ASSEMBLY 5 SCALE: 1/2" = 1'-0"
Project Number
PS ASSEMBLIES
H
5
12/09/18
GROUP B
S005
NOTES: REPEATS ALL STEPS FOR THE MIRRORED PORTABLE STATION UNLESS OTHERWISE NOTED.
SITE
STEP 1: 1. REQUIRES ASSEMBLY 1x1, 2x1, AND PARTS Ix1, AND Yx11. 2. PART H IS PLACE 3' - 6" FROM BOTTOM OF ASSEMBLY 1 UP TO BOTTOM OF PART I. DRILL 2 Y PARTS THROUGH COMPONENT I INTO ASSEMBLY 1. 3. DRILL Y PARTS THROUGH ASSEMBLY 2 AND INTO ASSEMBLY 1.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
J
4
5 GROUP # : TITLE
STEP 2: 1. REQUIRES ASSEMBLY 3, AND COMPONENT Yx11. 2. REPEAT DRILLING PATTERN AS DONE IN STEP 1. 3. CREATES ASSEMBLY 6.
2 : ROTATE 4
PS - STEP 4 (ASSEMBLY 8) SCALE: 1/2" = 1'-0"
3
PS - STEP 3 (ASSEMBLY 7) SCALE: 1/2" = 1'-0"
STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
STEP 3: 1. REQUIRES ASSEMBLY 4x2, ASSEMBLY 5x2, AND PART Yx16. 2. FIT ASSEMBLY 5s ON TOP OF ASSEMBLY 4s AS SHOWN. 3. DRILL K PARTS THROUGH ASSEMBLY 5 INTO ASSEMBLY 4. 4. CREATES ASSEMBLY 7.
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
STEP 4: 1. REQUIRES ASSEMBLY 6, PART J*x1, AND Zx16. 2. PLACE PART J ATOP ASSEMBLY 6. 3. DRILL L PARTS THROUGH PART J AND IN ASSEMBLY 6 WITH A EDGE CLEARANCE OF 1". PROCEED WITH EQUAL SPACING. 4. CREATES ASSEMBLY 8
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
2
PROJECT TITLE
ARCH 509 FALL 2018
STEP 5: 1. REQUIRES ASSEMBLY 6, 8, AND COMPONENT Yx18. 2. DRILL L COMPONENTS THROUGH THE BASE PLATES OF ASSEMBLY 6 AND INTO ASSEMBLY 8. SCREW SPACING IS 6".
3
1
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #:
RE PE AT
*1/2" PART J.
I
SCALE:
12/09/18 Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
5
PS - STEP 5 SCALE: 1/2" = 1'-0"
2
PS - STEP 2 (ASSEMBLY 6) SCALE: 1/2" = 1'-0"
1
PS - STEP 1 SCALE: 1/2" = 1'-0"
SHEET NUMBER
PS FABRICATION
GROUP B
S006
NOTES: REPEATS ALL STEPS FOR THE MIRRORED PORTABLE STATIONS UNLESS OTHERWISE NOTED.
SITE
STEP 6: 1. REQUIRES PARTS Kx1, Lx2, AND Zx127. 2. ALIGN L COMPONENTS FLUSH WITH THE OPEN EDGE OF THE QUADRANT. POSITION THE L COMPONENTS SO THAT THERE IS A 3/4" LIP ABOVE ASSEMBLY 2. 3. DRILL Z PARTS THROUGH PART L AND INTO THE STRUCTURAL STUDS. THE SCREWS SHALL BE PLACED ALONG THE STUDS WITH A VERTICAL SPACING OF 8". THE SCREW PATTERN SHALL START IN ASSEMBLY 8 AND END IN ASSEMBLY 2. 4. ALIGN PART K WITH ONE EDGE FLUSH WITH PART L. POSITION PART K SO THAT THERE IS A 3/4" LIP ABOVE ASSEMBLY 2.* 5. DRILL Z PARTS THROUGH PART K AND IN THE STRUCTURAL STUDS. THE SCREW SHALL BE PLACED ALONG THE STUDS WITH A VERTICAL SPACING OF 8". tHE SCREW PATTERN SHALL START IN ASSEMBLY 8 AND END IN ASSEMBLY 2. THE HORIZONTAL SPACING FOR THE SCREWS IS 1' - 2".
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS
L
RE PE AT
N
STEP 7: 1. REQUIRES PARTS Mx2, Nx1, AND Zx80. 2. FIT M PARTS ALONG INTERIOR STUDS AND DRILL Z PARTS THROUGH INTO STRUCTURAL STUDS. THE VERTICAL SPACING SHALL BE 8". 3. FIT N PART ALONG CEILING JOISTS, AND DRILL Z PARTS INTO JOISTS.
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
K
PROJECT TITLE
ARCH 509 FALL 2018
M
*WHILE CONSTRUCTING THE MIRROED FRABRICATION OF QUARANT A, THE STEP IS OPPOSITE. ALIGN COMPONENT I WITH THE OPPOSITE J COMPONENT THAN WAS DONE PRIOR.
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
3
PS - STEP 7 SCALE: 1/2" = 1'-0"
1
PS - STEP 6 SCALE: 1/2" = 1'-0"
SHEET NUMBER
PS FABRICATION
GROUP B
S007
NOTES: REPEATS ALL STEPS FOR THE MIRRORED PORTABLE STATIONS UNLESS OTHERWISE NOTED.
SITE
STEP 8: 1. REQUIRES COMPONENTS J*x1, AND Zx32. 2. ALIGN G COMPONENT FLUSH WITH THE OPEN EDGE OF THE QUADRANT. THE COMPONENT SHALL BE POSITION SO THAT THERE IS A 1/2" LIP WITH THE EXTERIOR SHEATING. 3. DRILL L COMPONENTS THROUGH COMPONENT G AND INTO ASSEMBLY 2. THE SCREW SPACING ALONG THE 4' SIDE IS 10". THE SCREW SPACING ALONG THE 3' - 11 1/2" SIDE IS 10" - 1".
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE
STEP 9: 1. REQUIRES PARTS Ox2, Px1, AND Qx1. 2. SPIN PORTABLE STATION AROUND TO VIEW THE OPEN SIDE. USE A NAIL GUN AND FINISHING NAILS TO ATTACHED PARTS WHILE KEEPING EDGES FLUSH.
STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
*3/4" PART J.
J
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
Q
PROJECT TITLE
ARCH 509 FALL 2018
O
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
O
PROJECT INFO. DATE: PROJECT #: SCALE:
12/10/18 Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
PS FABRICATION
2
PS - STEP 9 SCALE: 1/2" = 1'-0"
1
PS - STEP 8 SCALE: 1/2" = 1'-0"
SHEET NUMBER
P
GROUP B
S008
NOTES: SITE
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number N.T.S.
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
2
QUADRANT B SHEATHING SCALE: N.T.S
1
QUADRANT B FRAMING SCALE: N.T.S
SHEET NUMBER
WORKSTATION
GROUP B
S101
NOTES: SITE
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number N.T.S.
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
1
QUADRANT B ASSEMBLY SCALE: N.T.S.
SHEET NUMBER
WORKSTATION KIT OF PARTS
GROUP B
S102
NOTES: 6' - 8 3/4"
MATERIAL LIST: 1. 2"x4"x8" STUD (24X) 2. 2"x6"x8" STUD (8X 3. 4'x8'x1/2" 3-PLY PLYWOOD (11X) 4. 4'x8'x3/4" PLYWOOD(1X)
A:
SITE
A
8' - 0"
(14X) O*:
4' - 0"
B:
B
(4X)
3' - 10 1/2"
C
C
(2X) 4' - 0"
C:
*PART O WILL BE FABRICATED 5 TIMES WITH 1/2" PLYWOOD AND 1 TIME WITH 3/4" PLYWOOD.
8' - 0"
D:
D
(6X)
SPONSORS
(1X)
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
7' - 9"
E:
E
(1X)
3' - 5 1/2"
F:
F
F
6' - 11 3/4"
(3X) P:
7' - 5"
G:
GROUP # : TITLE
G
2 : ROTATE
(2X)
1' - 8"
STUDENTS
H
H
H
H
3' - 8 1/2"
H:
(6X)
(6X)
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
(4X)
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
1' - 1"
S:
3
S
S
S
S
S
S
(2X)
QUAD B - WOOD STUD PARTS SCALE: 1/2" = 1'-0" 3' - 3 3/4"
J:
J
J
6' - 11 3/4"
8' - 0"
K:
K
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
Q:
(2X)
0' - 5 1/2"
L
L
L
L
L
L
(6X) 3' - 8"
L:
4' - 0"
M:
M
(2X)
(3X) PROJECT TITLE
3' - 1"
N
N
(3X)
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
WORKSTATION - 2"x6" STUD PARTS 2 SCALE: 1/2" = 1'-0"
7' - 4" 0' - 4 1/2"
7' - 4"
X
DATE: PROJECT #: SCALE: 3' - 8"
W
0' - 9"
V
PROJECT INFO.
R:
0' - 4 1/2"
V
(1X)
12/09/18 Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
WORKSTATION PARTS FABRICATION
(1X)
1
WORKSTATION - PLYWOOD PARTS SCALE: 1/2" = 1'-0"
SHEET NUMBER
N:
ARCH 509 FALL 2018
GROUP B
S103
NOTES: SITE A (14X)
O - 1/2"(5X)
Q (1X)
B (4X)
SPONSORS
C (2X)
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804 D (1X) R (1X)
GROUP # : TITLE
O - 3/4"(1X)
2 : ROTATE
E (1X)
STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
F (3X)
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
S (6X) G (2X)
P (2X)
T (110X)
(3" WOOD SCREW)
U (460X)
(2" WOOD SCREW)
H (6X)
V (2X)
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
J (4X) W (1X) PROJECT TITLE
ARCH 509 FALL 2018
K (2X) X (1X)
L (6X)
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #:
12/09/18 Project Number
M (6X) SCALE:
1
QUAD B - COMPONENTS SCALE: 1/2" = 1'-0"
WORKSTATION KIT OF PARTS SHEET NUMBER
M (6X)
As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
GROUP B
S104
NOTES: SITE
ASSEMBLY 1 (FABRICATE X2): 1. REQUIRES PARTS Ax4, Bx2, Tx20. 2. THE CENTER AND END A'S ARE SPACED EQUIDISTANT ALONG PART B. 3. THE LAST PART A IS LOCATED 3 1/2" FROM ONE END OF C.
C
M
L
J
ASSEMBLY 2: 1. REQUIRES PARTS Cx2, Dx1, Ex1, Fx3, Tx18. 2. G & D PARTS ARE SPACED EQUIDISTANT ALONG PART E.
L
F J
L
J
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
D
M
F
K
N
SPONSORS
L
C
L
GROUP # : TITLE
J M
K
2 : ROTATE
N L
QUAD B - ASSEMBLY 4 4 SCALE: 1/2" = 1'-0"
ASSEMBLY 4: 1. REQUIRES Jx4, Kx2, Lx6, Mx3, Nx3, AND Tx52. 2. J PARTS ARE POSITIONED 5 1/2" OFF EACH END OF PART K. 3. N PARTS ARE POSITION 5 1/2" OFF EACH END OF PARK M. 4. L PARTS ARE LOCATED ALONG THE CONNECTION AREAS.
2
WORKSTATION - ASSEMBLY 2 SCALE: 1/2" = 1'-0"
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
G
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
H
A
B
H
STUDENTS
H A A H
A
A A
H
A A
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
A H
A
PROJECT INFO. DATE: PROJECT #:
G
SCALE:
12/09/18 Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
B
3
WORKSTATION - ASSEMBLY 3 SCALE: 1/2" = 1'-0"
1
WORKSTATION - ASSEMBLY 1 SCALE: 1/2" = 1'-0"
WORKSTATION ASSEMBLY FABRICATION SHEET NUMBER
ASSEMBLY 3: 1. REQUIRES PARTS Ax6, Gx2, Hx6, Tx40, AND . 2. A PARTS ARE SPACED SO THAT THE GAPS ARE THE SAME AND EQUAL TO THE LENGHT OF PAR H. 3. 2 H PARTS ARE PLACED 8" FROM BOTTOM OF G TO TOP OF H. 4. 4 H PARTS ARE PLACED 35 3/4" FROM TOP OF G TO BOTTOM OF H. 5. DRILL Q PARTS IN AT A 45 DEGREE ANGLE THRU I INTO SHARED A PART. OFFSET SCREWS.
E
F
N
GROUP B
S105
NOTES: SITE
STEP 1: 1. REQUIRES ASSEMBLY 1x1, 2x1, AND PARTS Vx8. 2. DRILL S COMPONENTS WITH 4" SPACING. STEP 2: 1. REQUIRES ASSEMBLY 3x1 AND PART Tx12. 2. DRILLS S COMPONENTS WITH 4" SPACING.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
4
2 : ROTATE
QUAD B - STEP 4 (ASSEMBLY 6) SCALE: 1/2" = 1'-0"
3 STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
2
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
WORKSTATION - STEP 2 SCALE: 1/2" = 1'-0"
2
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
1
PROJECT INFO. DATE:
1
PROJECT #: SCALE:
12/09/18 Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
WORKSTATION FABRICATION
3
WORKSTATION - STEP 3 (ASSEMBLY 5) SCALE: 1/2" = 1'-0"
1
WORKSTATION - STEP 1 SCALE: 1/2" = 1'-0"
SHEET NUMBER
STEP 3: 1. REPEAT STEP 1. 2. CREATES ASSEMBLY 5. STEP 4: 1. REQUIRES ASSEMBLY 4x1, PARTS O - 3/4"x1, AND Ux35. 2. DRILL U PARTS THROUGH PART O AND INTO ASSEMBLY 4. SCREW SPACING ALONG SHORT SIDE IS 10" AND 8" ALONG LONG SIDE. ONLY DRILL DOWN CORNERS ALONG TWO SHORT EDGES AND ONE LONG EDGE TO ALLOW FOR SCREW SPACE IN LATER STEPS. 3. CREATES ASSEMBLY 6.
O
GROUP B
S106
NOTES: SITE
STEP 5: 1. REQUIRES ASSEMBLY 5x1, ASSEMBLY 6x1, AND PART Tx24. 2. ALIGN ASSEMBLY 5 ATOP ASSEMBLY 6 SO THAT THE EDGES ARE FLUSH. 3. DRILL U PARTS THROUGH THE BASE PLATES OF ASSEMBLY 5 INTO ASSEMBLY 6. SCREW SPACING IS 4".
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
STEP 6: 1. REQUIRES PARTS Ox4, AND Ux200. 2. PLACE O PARTS WITH 3/4" OVERHANG ABOVE TOP PLATES. ALIGN AND PLACE ACCORDINGLY. 3. DRILL U PARTS THROUGH O PARTS INTO STRUCTURAL STUDS. HORIZONTAL SCREW SPACING ON TOP AND BOTTOM PLATES IS 6". VERTICAL SCREW SPACING ALONG STUDS IS 8".
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY O
PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
2
WORKSTATION - STEP 6 SCALE: 1/2" = 1'-0"
1
WORKSTATION - STEP 5 SCALE: 1/2" = 1'-0"
SHEET NUMBER
WORKSTATION FABRICATION
GROUP B
S107
NOTES: SITE
STEP 7: 1. REQUIRES PARTS Px2, AND Ux88. 2. ALIGN P PARTS ALONG STRUCTURAL STUDS WITH A FLUSH EDGE ALONG OPEN FACE. 3. DRILL U PARTS THROUGH PART N INTO STRUCTURAL STUDS AND TOP PLATES. SCREW SPACING HORIZONTALLY IS 6". SCREW SPACING VERTICALLY IS 8".
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
STEP 8: 1. REQUIRES PARTS Qx2, AND Ux80. 2. ALIGN THE Q PARTS SIDE BY AGAINST BACK OF POD. 3. DRILL U PARTS THROUGH Q PARTS AND INTO STRUCTURAL STUDS AND TOP PLATES. SCREW SPACING HORIZONTALLY IS 6". SCREW SPACING VERTICALLY IS 8".
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
Q
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
P
Q
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
2
WORKSTATION - 8 SCALE: 1/2" = 1'-0"
1
WORKSTATION - 7 SCALE: 1/2" = 1'-0"
WORKSTATION FABRICATION SHEET NUMBER
AT PE RE
GROUP B
S108
NOTES: SITE
STEP 9: 1. REQUIRES PARTS Sx6, RX1, AND Ux30 STEP 9: 1. REQUIRES PARTS Ox1, AND Ux49. 2. PLACE PARTS O ATOP ASSEMBLY 2, RESULTING IN A 1/4" LIP ALONG 3 SIDES. 3. DRILL U PARTS THROUGH O AND INTO ASEMBLY 2. SCREW SPACING ALONG SHORTER MEMBER IS 10' 1/2". SCREW SPACING ALONG LONG MEMBERS IS 9".
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE S
STUDENTS S
GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.
S
R
O
S S
S
GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #: SCALE:
12/09/18 Project Number As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
1
WORKSTATION - STEP 10 SCALE: 1/2" = 1'-0"
2
WORKSTATION - STEP 9 SCALE: 1/2" = 1'-0"
SHEET NUMBER
WORKSTATION FABRICATION
GROUP B
S109
SITE
NOTES: STEP 11: 1. REQUIRES PARTS Vx2,Wx1, AND Xx1. 2. USE A NAIL GUN AND FINISHING NAILS TO ATTACHED PARTS WHILE KEEPING EDGES FLUSH.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
X
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
V
PROJECT TITLE
ARCH 509 FALL 2018
V
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
PROJECT INFO. DATE: PROJECT #:
12/09/18 Project Number
W SCALE:
As indicated
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
WORKSTATION - STEP 11 1 SCALE: 1/2" = 1'-0"
SHEET NUMBER
WORKSTATION FABRICATION
GROUP B
S110
NOTES: SITE
TYPICAL CASTER MOUNT DETAIL: 1. 3" SWIVEL CASTERS WITH TOTAL HEIGHT FROM FLOOR TO TOP OF CONNECTION BEING MINIMUM OF 3.75". 2. MOUNT CASTER TO TRIPLE LAYERED 2"x6" STUD BAS FRAME WITH CORRESPONDING LAG SCREWS. SEE CASTER MANUFACTUR FOR LAG SCREW SIZE.
SPONSORS
HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804
GROUP # : TITLE
2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE
3 LAYERED 2"x6" STUD BASE FRAME
GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG
PROJECT TITLE
ARCH 509 FALL 2018
0' - 4 1/2"
0' - 1 1/2"
TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY
0' - 9"
PROJECT INFO.
Project Number
0' - 3 3/4"
SCALE:
As indicated
SHEET NUMBER
DETAILS
0' - 1"
TYPICAL WHEEL CONNECTION SCALE: 3" = 1'-0"
PROJECT #:
09/04/18
DWG BY: MCCUTCHEON, ROBERT SHEET NAME
3" CASTER 1
DATE:
GROUP B
S201