509 Design Build

Page 1

NOTES: SITE

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #: SCALE:

09/06/18 Project Number 1/4" = 1'-0"

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

COVER SHEET

SHEET NUMBER

8'x8'x8' TOOL SHED FOR EAST HILLS STUDIO BAYS. THE DESIGN CRITERIA IS TO CREATE A "IKEA" LIKE ASE OF FRABICATION TOOL SHED. GROUP 2 DESIGN CONCEPT IS A 3 PEICE BREAK A AWAY TOOL SHED CONSISTING OF 2 4'x4' QUADRANTS CONNECTING TO A LARGER 4'x8' MAIN SHED.

GROUP B

G001


NOTES: SITE

1

2

3

4

5

6

7

8

9

10

A SPONSORS

B

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

C GROUP # : TITLE

2 : ROTATE D STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

1

SITE PLAN SCALE: 1" = 60'-0"

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

MARVIN HALL

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #:

09/06/18 Project Number

SCALE:

1" = 60'-0"

DWG BY: QUINLIVAN, CHARLIE SHEET NAME

SITE PLAN SHEET NUMBER

EAST HILLS WAREHOUSE

GROUP B

G002


NOTES: SITE

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #:

SouthWest SCALE: N.T.S.

1

SouthEast SCALE: N.T.S.

Project Number

SCALE: DWG BY: QUINLIVAN, CHARLIE SHEET NAME

CONCEPT SOUTH VIEW SHEET NUMBER

2

12/09/18

GROUP B

A001


NOTES: SITE

SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #:

12/09/18 Project Number

SCALE: DWG BY: QUINLIVAN, CHARLIE

NorthEast SCALE: N.T.S.

1

NorthWest SCALE: N.T.S.

SHEET NAME

CONCEPT NORTH VIEW SHEET NUMBER

2

GROUP B

A002


NOTES: 1. LOCKERS 2. POWER TOOL CABINET 3. HANGING DRILL CABINET 4. LARGE SHELVING UNIT 5. WORK TABLE 6. PEG BOARD

SITE

SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

6

3 2

3

3

GROUP # : TITLE

3

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

5 1 A207

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

2

2 4

1

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

2

PROJECT TITLE

4

1 2

1

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

A206 PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number As indicated

DWG BY: QUINLIVAN, CHARLIE

ARCHITECTURAL FLOOR PLAN SCALE: 3/4" = 1'-0"

SHEET NAME

ARCHITECTURAL FLOOR PLAN SHEET NUMBER

1

GROUP B

A101


NOTES: NORTH AND SOUTH ELEVATION VIEWS ARE IDENTICAL FOR PORTABLE STATIONS 1 AND 2

SITE

SPONSORS

TOP. 8' - 1"

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

8' - 1"

7' - 4"

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE ARCH 509 FALL 2018

NORTH / SOUTH ELEVATION OF PORTABLE STATIONS 1 SCALE: 3/4" = 1'-0"

BOTTOM. 0' - 9" GROUND. 0' - 0"

PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number 3/4" = 1'-0"

DWG BY: QUINLIVAN, CHARLIE SHEET NAME

NORTH / SOUTH ELEVATION SHEET NUMBER

0' - 1"

0' - 9"

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

GROUP B

A201


NOTES: SITE

SPONSORS

.TOP TOP 8' - 1"

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

7' - 4"

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE ARCH 509 FALL 2018

WEST ELEVATION OF PORTABLE STATION 2 SCALE: 3/4" = 1'-0"

EAST ELEVATION OF PORTABLE STATION 1 SCALE: 3/4" = 1'-0"

BOTTOM 0' - 9" GROUND 0' - 0"

PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number 3/4" = 1'-0"

DWG BY: QUINLIVAN, CHARLIE SHEET NAME

EAST / WEST ELEVATIONS SHEET NUMBER

0' - 1"

0' - 9"

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

GROUP B

A202


NOTES: SITE

SPONSORS

TOP 8' - 1"

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

8' - 1"

7' - 4"

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE ARCH 509 FALL 2018

0' - 1"

0' - 9"

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

BOTTOM 0' - 9" GROUND 0' - 0"

PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number 3/4" = 1'-0"

DWG BY: QUINLIVAN, CHARLIE SHEET NAME

SOUTH ELEVATION OF WORKSTATION SCALE: 3/4" = 1'-0"

SOUTH ELEVATION SHEET NUMBER

1

GROUP B

A203


NOTES: SITE

SPONSORS

TOP 8' - 1"

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

8' - 1"

7' - 4"

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE ARCH 509 FALL 2018

0' - 1"

0' - 9"

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

BOTTOM 0' - 9" GROUND 0' - 0"

PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number 3/4" = 1'-0"

DWG BY: QUINLIVAN, CHARLIE SHEET NAME

NORTH ELEVATION OF WORKSTATION SCALE: 3/4" = 1'-0"

NORTH ELEVATION SHEET NUMBER

1

GROUP B

A204


NOTES: SITE

SPONSORS

TOP. .TOP 8' - 1"

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

8' - 1"

7' - 4"

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE ARCH 509 FALL 2018

0' - 1"

0' - 9"

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

.BOTTOM BOTTOM. 0' - 9" .GROUND GROUND. 0' - 0"

PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number 3/4" = 1'-0"

DWG BY: QUINLIVAN, CHARLIE

WEST ELEVATION OF WORKSTATION SCALE: 3/4" = 1'-0"

1

EAST ELEVATION OF WORKSTATION SCALE: 3/4" = 1'-0"

SHEET NAME

EAST / WEST ELEVATION SHEET NUMBER

2

GROUP B

A205


NOTES: SITE

SPONSORS

.TOP 8' - 1"

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2"X4"

2 : ROTATE

1/2" PLYWOOD STUDENTS

1/2" PLYWOOD

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE 8' - 1"

7' - 4"

1/2" PLYWOOD

2"X4"

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

DUPLEX OUTLET

PROJECT TITLE

3/4" PLYWOOD

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

2"X6" 1/2" PLYWOOD

0' - 9"

3" CASTER

.BOTTOM 0' - 9" .GROUND 0' - 0"

PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number 3/4" = 1'-0"

DWG BY: QUINLIVAN, CHARLIE SHEET NAME

EAST / WEST SECTION OF PORTABLE STATION 2 1 SCALE: 3/4" = 1'-0"

SHEET NUMBER

EAST / WEST SECTION

GROUP B

A206


NOTES: SITE

SPONSORS

TOP 8' - 1"

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE

2"X4" 2"X4" CEILING ANCHORS 1/2" PLYWOOD

STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

1/2" PLYWOOD

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE 8' - 1"

7' - 4"

1/2" PLYWOOD

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

1/2" PLYWOOD

3/4" PLYWOOD

PROJECT TITLE

1 S201

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

2"X6"

0' - 9"

3" CASTER

BOTTOM 0' - 9" GROUND 0' - 0"

PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number 3/4" = 1'-0"

DWG BY: QUINLIVAN, CHARLIE SHEET NAME

EAST / WEST SECTION SHEET NUMBER

EAST / WEST SECTION OF WORKSTATION 1 SCALE: 3/4" = 1'-0"

GROUP B

A207


NOTES: SITE

DIMENSIONS: DEPTH- 1' 1" WIDTH- 3' 3 1/2" HEIGHT'- 3' 6"

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #:

Project Number

SCALE:

1 1/2" = 1'-0"

DWG BY: NUTTER, JORDAN SHEET NAME

1

ISOMETRIC FABRICATION SCALE: 1 1/2" = 1'-0"

SHEET NUMBER

LOCKER

GROUP B

F001


NOTES: MATERIAL LIST: 1. 7 4'x8'x3/4" PLYWOOD

SITE

PARTS B AND C REPRESENT QUANTITY NEEDED FOR ONE LOCKER. WILL NEED TO REPEAT ONCE. THESE PARTS WILL BE CUT WITH A CNC MACHINE. ALL OTHER PARTS REPRESENT QUANTITY NEEDED FOR ONE LOCKER. WILL NEED TO BE FABRICATED TWICE. THESE PARTS WILL BE CUT WITH A TABLE SAW.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE 3' - 4 1/2" 3' - 4 1/2"

STUDENTS

1' - 3 1/2" TYP.

F F

F

F F

F

F F

G

C

3' - 2"

F

B

TYP.

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

0' - 0 3/4" TYP.

I

I

I

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

TYP.

I

TYP.

0' - 5"

H

TYP.

D D D D

H

3' - 4 1/2"

E

H

TYP.

H

1' - 1"

H

PROJECT INFO. DATE:

12/09/18

PROJECT #:

A

SCALE:

A

1' - 1"

TYP. TYP.

0' - 6 3/4"

0' - 8"

TYP.

3' - 3 1/2"

E

1' - 2 1/2"

H

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

Project Number 1/2" = 1'-0"

DWG BY: NUTTER, JORDAN SHEET NAME

LOCKERPARTS FBRICATION

3' - 4 1/2" TYP.

1

FABRICATION PEICES SCALE: 1/2" = 1'-0"

SHEET NUMBER

TYP.

TYP. TYP. TYP.

0' - 6 3/4" TYP.

1' - 0 1/4"

0' - 8" 0' - 8" 0' - 8"

TYP.

0' - 5"

0' - 2"

0' - 6 3/4" TYP.

GROUP B

F002


NOTES: 1) THE PIECE COUNTS ARE FOR ONE LOCKER 2) WILL NEED TO BE FABRICATED TWICE

SITE

SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

H (x8)

PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

E (x2)

PROJECT INFO. DATE:

12/09/18

PROJECT #:

G (X1)

SCALE:

Project Number 1" = 1'-0"

DWG BY: NUTTER, JORDAN

F (x8)

SHEET NAME

C (x3)

B (x6)

1

A (x2)

MATERIAL COUNT SCALE: 1" = 1'-0"

SHEET NUMBER

D (x4)

LOCKER- KIT OF PARTS

GROUP B

F003


NOTES: STEP 1: 1. COMPLETED PEICES ARE ASSEMBLY 1. 2. NAILS ARE SPACED 8" APART VERTICALLY. STEP 2: 1. COMPLETED PEICE IS ASSEMBLY 2. 2. USE WOOD GLUE TO ADHEAR PEICES TOGETHER.

SITE

SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

A

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

C C D

B

D

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

B

B B B

PROJECT TITLE ARCH 509 FALL 2018

D D

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

C B

A PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: NUTTER, JORDAN SHEET NAME

2

LOCKER STEP 2 SCALE: 1" = 1'-0"

1

LOCKER STEP 1 SCALE: 1" = 1'-0"

SHEET NUMBER

TYP. NAILING

LOCKERFABRICATION

GROUP B

F004


NOTES: STEP 3 & 4: 1. REPEAT THE NAILING PATTERN ON BOTH TOP AND BOTTOM.

SITE

SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

E

E

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

1 PROJECT TITLE ARCH 509 FALL 2018

2

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO.

1 E

DATE:

12/09/18

PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: NUTTER, JORDAN SHEET NAME

2

LOCKER STEP 4 SCALE: 1" = 1'-0"

1

LOCKER STEP 3 SCALE: 1" = 1'-0"

SHEET NUMBER

LOCKERFABRICATION

FRONT

GROUP B

F005


NOTES: STEP 5: 1. LAY THE COMPLETED PEICE FORM STEP 4 FRONT SIDE DOWN. 2. NAILS ARE SPACES 8" APART VERTICALY. 3. HORIZONTALY THE NAILS START 1" FROM THE SIDE BOARD AND THEN ARE 1' 5 1/2" TO THE NEXT NAIL.

SITE

SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

F

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

F

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

F

PROJECT TITLE

F

G

F

F

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

F PROJECT INFO. DATE:

12/09/18

F PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: NUTTER, JORDAN SHEET NAME

2

LOCKER STEP 6 SCALE: 1" = 1'-0"

1

LOCKER STEP 5 SCALE: 1" = 1'-0"

SHEET NUMBER

LOCKERFABRICATION

GROUP B

F006


NOTES: SITE

STEP 7: 1. PLACE HINGES 3/4" OFF TOP OR BOTTOM OF PARTS H AND I. 2. DRILL A 1" HOLE ON THE LOCK SIDE OF EVERY DOOR 1 1/2" OFF THE TOP AND SIDE.

SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

H/I

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

I

H

H

H

I

I

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

H

PROJECT TITLE

H/I

H

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

H

PROJECT INFO. DATE:

12/9/18

I PROJECT #: SCALE:

Project Number As indicated

DWG BY: NUTTER, JORDAN SHEET NAME

2

LOCKER STEP 8 SCALE: 1" = 1'-0"

1

LOCKER STEP 7 SCALE: 3" = 1'-0"

SHEET NUMBER

LOCKERFABRICATION

GROUP B

F007


NOTES: SITE

FROM HERE ON POWER TOOL CABINET WILL BE ABBREVIATED PTC DIMENSIONS: HEIGHT - 3' 4" WIDTH - 1' 7" DEPTH - 1' 0 3/4"

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/9/18

PROJECT #:

Project Number

SCALE: DWG BY: QUINLIVAN, CHARLIE SHEET NAME

3

POWER TOOL CABINET SCALE: N.T.S.

SHEET NUMBER

POWER TOOL CABINET

GROUP B

F101


NOTES: SITE

MATERIAL LIST: 1. 4 4'x8'x3/4" PLYWOOD PARTS A, C, E, G AND H REPRESENT QUANTITY NEEDED FOR ONE PTC. REPEAT FOUR TIMES. COMPONETS B, D, AND F REPRESENT QUANTITY FOR ALL FOUR PTCS. THEY WILL BE CUT WITH CNC MACHINE.

SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS

1' - 0"

F

D

F

F

B

B

B

0' - 8 3/4"

B

F

1' - 7"

3' - 4"

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

C

1' - 5 1/2"

1' - 6"

A

G

A

G

0' - 4" 0' - 3 1/2"

H

E

PROJECT TITLE

H

ARCH 509 FALL 2018 1' - 0"

D

B

0' - 8 3/4"

D

B

0' - 9 1/4"

1' - 0"

D

0' - 3 3/4"

0' - 0 3/4" TYP.

0' - 6 1/2"

0' - 8 5/8"

0' - 0 3/4" TYP.

TYP.

1' - 6"

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/9/18

PROJECT #: SCALE:

Project Number 1/2" = 1'-0"

DWG BY: QUINLIVAN, CHARLIE SHEET NAME

1

0' - 3 1/8"

PTC - PLYWOOD COMPONENTS SCALE: 1/2" = 1'-0"

PTC - PARTS FABRICATION SHEET NUMBER

0' - 7"

GROUP B

F102


NOTES: SITE

SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

AX2 EX1 FX1 DX1

BX2

CX1

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/9/18

PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: QUINLIVAN, CHARLIE SHEET NAME

1

PTC - COMPONENTS SCALE: 1" = 1'-0"

HX2

PTC - KIT OF PARTS SHEET NUMBER

GX2

GROUP B

F103


NOTES: SITE

SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS

A

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

B C

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

B PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

A

12/9/18

PROJECT #: SCALE:

Project Number 1 1/2" = 1'-0"

DWG BY: QUINLIVAN, CHARLIE SHEET NAME

2

PTC FABRICATION - STEP 2 SCALE: 1 1/2" = 1'-0"

1

PTC FABRICATION - STEP 1 SCALE: 1 1/2" = 1'-0"

SHEET NUMBER

PTC FABRICATION

GROUP B

F104


NOTES: SITE

SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

G

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

DEF H

PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

H

PROJECT INFO.

G

DATE:

12/9/18

PROJECT #:

D

SCALE:

F

2

PTC FABRICATION- STEP 4 SCALE: 1 1/2" = 1'-0"

1

PTC FABRICATION - STEP 3 SCALE: 1 1/2" = 1'-0"

1 1/2" = 1'-0"

DWG BY: QUINLIVAN, CHARLIE SHEET NAME

PTC FABRICATION SHEET NUMBER

E

Project Number

GROUP B

F105


NOTES: SITE

1. THIS CABINET WILL BE FABRICATED FOUR TIMES

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

B GROUP # : TITLE

F

2 : ROTATE STUDENTS

F C

C

E A

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

G

E

PROJECT TITLE

ARCH 509 FALL 2018

G

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number 3" = 1'-0"

DWG BY: TRISTYN DELGADO SHEET NAME

1

HANGING DRILL CABINET FABRICATION SCALE: 3" = 1'-0"

SHEET NUMBER

HANGING DRILL CABINET

GROUP B

F201


NOTES: SITE

1. THIS SHEET REPRESENTS THE MATERIALS NEEDED FOR ALL FOUR CABINETS. 2. CUT 1/4" HOLE WITH JIG SAW ON B PARTS TO ALLOW FOR ELECTRICAL CORDS

1' - 0"

3. 1 1/2" CHANNEL CUT FROM PVC PIPE

1' - 0"

0' - 1 1/2"

B

A

1' - 1"

A

0' - 4 15/16"

0' - 11"

SPONSORS

C

C

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

C

GROUP # : TITLE

B C

C

2 : ROTATE

C

STUDENTS

B

A

C

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

C

B

A

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

1/2" THICK PLYWOOD

0' - 10 1/2"

1' - 0"

0' - 11"

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

8' - 0"

D

D

E E

D

E E

F F

F F

0' - 1 5/8"

D 2"X4"X8'

PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

1' - 0" 10' - 0"

PROJECT INFO. DATE:

G 4" DIAMATER PVC PIPE

G

G

G

G

G

G

G

12/09/18

PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: TRISTYN DELGADO SHEET NAME

1

PARTS FABRICATION SCALE: 1" = 1'-0"

SHEET NUMBER

HANGING DRILL CABINET - PARTS FABRICATION GROUP B

F202


NOTES: SITE

1. THIS SHEET REPRESENTS THE MATERIALS NEEDED FOR ALL FOUR CABINETS.

2 5/8" SCREWS (X42)

3" SCREWS (X12)

1/2" SCREWS (X14)

SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS

G (X8)

D (X4)

E (X4)

C (X8)

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

G (X4) PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

1

KIT OF PARTS SCALE: 1 1/2" = 1'-0"

B (X4)

1 1/2" = 1'-0"

DWG BY: TRISTYN DELGADO SHEET NAME

HANGING DRILL CABINET SHEET NUMBER

A (X4)

Project Number

GROUP B

F203


NOTES: SITE

REPEAT FABRICATION FOUR TIMES

3

SPONSORS HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

C GROUP # : TITLE

C

2 : ROTATE

2 B C

F

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

F

4

TYP SIDE C CONNECTING STEPS 2 AND 3

STUDENTS

3 B CONNECTING TO C AND F

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

TWO SCREWS PLACED 3" FROM BACK AND FRONT ALONG 12" SIDE ON PIECE A

A

A

E

1 E

PROJECT TITLE ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

G PROJECT INFO. DATE:

12/09/18

PROJECT #:

2 A TO G CONNECTION

1

E TO A CONNECTION

SCALE:

Project Number 1 1/2" = 1'-0"

DWG BY: TRISTYN DELGADO SHEET NAME

1

FABRICATION SCALE: 1 1/2" = 1'-0"

SHEET NUMBER

HANGING DRILL CABINET

GROUP B

F204


NOTES:

SITE

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/12

PROJECT #: SCALE:

SHELVING UNIT FINISHED SCALE: 1" = 1'-0"

1" = 1'-0"

DWG BY: KELLY, ALLISON SHEET NAME

SHELVING UNIT SHEET NUMBER

1

Project Number

GROUP B

F301


NOTES:

SITE

MATERIALS LIST: 1. 6 4' x 8' 3/4" PLYWOOD PARTS A, B, C, D, E, AND F WILL BE CUT WITH A CNC MACHINE. THE QUNATITIES OF B, C, D, E, AND F REPRESENT PARTS FOR 1 SHELVING UNIT. THESE PARTS WILL NEED TO BE FABRICATED TWICE.

1' - 8"

1' - 8" TYP.

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

D

3' - 1" 1' - 6 1/8"

1' - 5 7/8"

3' - 0 1/2"

1' - 6 1/8"

1' - 5 7/8"

0' - 11" 0' - 11"

0' - 11 1/4"

B

3' - 0 1/2"

1' - 1"

3' - 6"

0' - 8 3/4"

C

1' - 1"

E

A

3' - 1"

A

SPONSORS

0' - 11 1/4"

A

0' - 5 3/4"

A

GROUP # : TITLE

2 : ROTATE STUDENTS

0' - 11 1/2"

3' - 2"

TYP.

G

G

G

I

F

F

3' - 6"

1' - 8"

1' - 7 1/4"

G

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

1' - 8"

TYP.

H 1' - 8"

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

1' - 0"

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number 1/2" = 1'-0"

DWG BY: KELLY, ALLISON SHEET NAME

SHELVING UNIT - PARTS FABRICATION MATERIALS - SHELVING UNIT PLYWOOD LAYOUT 1 SCALE: 1/2" = 1'-0"

SHEET NUMBER

TYP. 1' - 0 1/4"

0' - 0 3/4"

0' - 5 3/4"

0' - 6 1/2"

PARTS G, H, AND I WILL BE CUT ON A TABLE SAW. THESE QUANTITIES REPRESENT PARTS FOR 1 SHELVING UNIT. THESE PARTS WILL NEED TO BE FABRICATED TWICE.

GROUP B

F302


NOTES:

SITE

QUANTITIES REPRESENT PART FOR ONE SHELVING UNIT.

A (2x)

B (1x)

C (1x)

D (1x)

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: KELLY, ALLISON SHEET NAME

E (1x)

F (2x)

G (4x)

H (1x)

I (1x)

1

SHELVING UNIT - COMPONENTS SCALE: 1" = 1'-0"

SHEET NUMBER

SHELVING UNIT - KIT OF PARTS

GROUP B

F303


NOTES:

SITE

STEP 1: 1. SCREWS ARE 1/4" UP FROM BOTTOM EDGE. 2. MIDDLE SCREW IS CENTERED. 3. TWO EDGE SCREWS ARE 1/4" AWAY FROM SIDES. 4. REPEAT ON BOTH SIDES.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

A GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

B

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #:

A

SCALE:

Project Number 1" = 1'-0"

DWG BY: KELLY, ALLISON SHEET NAME

1

SHELVING UNIT - STEP 1 SCALE: 1" = 1'-0"

SHEET NUMBER

SHELVING UNIT - FABRICATION

GROUP B

F304


NOTES:

SITE

STEP 2: 1. SCREWS ARE 1/4" UP FROM TOP EDGE. 2. MIDDLE SCREW IS CENTERED. 3. TWO EDGE SCREWS ARE 1/4" AWAY FROM SIDES. 4. REPEAT ON BOTH SIDES.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE C

STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: KELLY, ALLISON SHEET NAME

1

SHELVING UNIT - STEP 2 SCALE: 1" = 1'-0"

SHEET NUMBER

SHELVING UNIT - FABRICATION

GROUP B

F305


NOTES:

SITE

STEP 3: 1. SCREWS ARE 1'-3/4" UP FROM BOTTOM EDGE. 2. MIDDLE SCREW IS CENTERED. 3. TWO EDGE SCREWS ARE 1/4" AWAY FROM SIDES. 4. REPEAT ON BOTH SIDES.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018

D

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: KELLY, ALLISON SHEET NAME

1

SHELVING UNIT - STEP 3 SCALE: 1" = 1'-0"

SHEET NUMBER

SHELVING UNIT - FABRICATION

GROUP B

F306


NOTES:

SITE

STEP 4: 1. SCREWS ARE 1'-10 1/4" UP FROM BOTTOM EDGE. 2. MIDDLE SCREW IS CENTERED. 3. TWO EDGE SCREWS ARE 1/4" AWAY FROM SIDES. 4. REPEAT ON BOTH SIDES.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

E

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: KELLY, ALLISON SHEET NAME

1

SHELVING UNIT - STEP 4 SCALE: 1" = 1'-0"

SHEET NUMBER

SHELVING UNIT - FABRICATION

GROUP B

F307


NOTES:

SITE

STEP 5: 1. FOR F PIECES: A. SCREWS ARE 7.5" OFF CENTER, EDGE SCREWS ARE 2" AWAY FROM SIDES. B. REPEAT ON BOTTOM. 2. FOR G PIECE: A. SCREWS ARE CENTERED. B. EDGE SCREWS ARE 2" AWAY FROM SIDES. C. REPEAT ON BOTTOM.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

F F

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

H

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: KELLY, ALLISON SHEET NAME

1

SHELVING UNIT - STEP 5 SCALE: 1" = 1'-0"

SHEET NUMBER

SHELVING UNIT - FABRICATION

GROUP B

F308


NOTES:

SITE

STEP 6: 1. SLIDE IN G AND H PIECES. 2. WOOD GLUE EDGES GOING THROUGH INLETS.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

G

G

G

G

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: KELLY, ALLISON SHEET NAME

1

SHELVING UNIT - STEP 6 SCALE: 1" = 1'-0"

SHEET NUMBER

SHELVING UNIT - FABRICATION

GROUP B

F309


NOTES:

SITE

STEP 7: 1. SCREW ON BACK. 2. SCREWS ARE 1/4" DOWN AND ACROSS FROM EACH CORNER

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

I

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: Kelly, Allison SHEET NAME

1

SHELVING UNIT - STEP 7 SCALE: 1" = 1'-0"

SHEET NUMBER

SHELVING UNIT - FABRICATION

GROUP B

F310


NOTES: SITE

DIMENSIONS: HEIGHT - 3'-3" DEPTH - 3'-4 WIDTH - 0' 6 1/4"

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/9/18

PROJECT #:

Project Number

SCALE:

N.T.S.

DWG BY: BARGAS, ELAINA SHEET NAME

1

PEG BOARD ASSEMBLY

SHEET NUMBER

PEGBOARD

GROUP B

F401


NOTES: SITE

MATERIAL LIST FOR ONE PEGBOARD: 1. 1 4' x 8' x 1/4" SHEET OF PEGBOARD IS REQUIRED 2. 2 2" x 6" STUDS ARE REQUIRED

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

C

PROJECT TITLE

ARCH 509 FALL 2018

A

B 3' - 4"

3' - 4"

(2X) 3' - 1"

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/9/18

PROJECT #: SCALE:

Project Number 1/2" = 1'-0"

DWG BY: BARGAS, ELAINA SHEET NAME

PEGBOARD PARTS FABRICATION

1

PEGBOARD - PEGBOARD COMPONENT SCALE: 1/2" = 1'-0"

2

PEGBOARD - STUD COMPONENTS SCALE: 1/2" = 1'-0"

SHEET NUMBER

3' - 3"

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

GROUP B

F402


NOTES: SITE

FABRICATE ONE TIME

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

C (X1)

2 : ROTATE STUDENTS

A (X2)

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

B (X2)

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018

(X20)

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/9/18

PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: BARGAS, ELAINA SHEET NAME

PEGBOARD KIT OF PARTS

1

PEG BOARD KIT OF PARTS SCALE: 1" = 1'-0"

SHEET NUMBER

1.

GROUP B

F403


NOTES: SITE

STEP 2: 1. THE SCREW SHALL BE PLACED ALONG THE STUDS WITH A VERTICAL SPACING OF 1' - 0 1/2" 2. THE SCREW SHALL BE PLACED ALONG THE STUDS WITH A HORIZONTAL SPACING OF 1' - 1"

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS

B

C

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

A

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

A PROJECT TITLE

B

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/9/18

PROJECT #: SCALE:

Project Number 1" = 1'-0"

DWG BY: BARGAS, ELAINA SHEET NAME

2

PEG BOARD FABRICATION STEP 2

1

PEG BOARD FABRICATION STEP 1

SHEET NUMBER

PEGBOARD FABRICATION

GROUP B

F404


SITE

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #:

Project Number

SCALE: DWG BY: MCCUTCHEON, ROBERT SHEET NAME

1

Work Station Isco SCALE: N.T.S.

SHEET NUMBER

WORK TABLE

GROUP B

F501


NOTES: SITE

MATERIAL LIST: 1. 4'x8'x1/2" PLYWOOD(6X) 2. 4'x8'x3/4" PLYWOOD(1X)* 3. 2"x4"x8' STUD(12X)** *3/4" PLYWOOD IS USED TO CREATE ON OF THE FOUR F PARTS. **USE EXCESS STUDS TO CREATE MULTIPLE PARTS: • B=2"x4"x7.5"(10X) • G=2"x4"x6.5"(2X) • K=2"x4"x8.5"(2X)

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

1' - 5 1/2"

C

C

C

C

C

GROUP # : TITLE

2' - 8"

2 : ROTATE (2X)

0' - 6 1/2"

0' - 8 1/2"

STUDENTS L

L

H

H

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

2' - 8"

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

7' - 4"

2' - 8"

F

(4X)

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

3' - 6 1/2" 1' - 8 5/8"

J A

A

A

J

PROJECT INFO.

(5X)

DATE:

D

D

D

2' - 8"

0' - 8 3/4"

(3X)

(1X) 7' - 4"

0' - 7 7/8"

I

2

I

WORK TABLE - STUD COMPONENTS SCALE: 1/2" = 1'-0"

As indicated

WORK TABLE PARTS FABRICATION

0' - 10 3/4"

3' - 6 1/2"

SCALE:

Project Number

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

(4X)

E

12/09/18

PROJECT #:

(1X)

1

WORK TABLE - PLY WOOD COMPONENTS SCALE: 1/2" = 1'-0"

SHEET NUMBER

2' - 1"

GROUP B

F502


NOTES: SITE

SPONSORS

A(14X)

B(10X)

C(10X)

G(2X)

H(2X)

GROUP # : TITLE

I(2X)

2 : ROTATE

J(2X)

STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

D(8X)

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

E(4X)

F-1/2"(3)

K(2X)

L(2X)

F-3/4"(1)

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

1

WORK TABLE - KIT OF PARTS SCALE: 1/2" = 1'-0"

SHEET NUMBER

WORK TABLE KIT OF PARTS

GROUP B

F503


NOTES: SITE

STEP 1: 1. THIS ASSEMBLY WILL BE REPEATED 5 TIMES. 2. BEFORE PROCEEDING TO STEP 2, TAKE 3 OF THESE ASSEMBLIES AND TOE NAIL TO THE FLOOR OF WORK STATION POD. THE GAPS SHALL BE 20.5", 20", 20", 20.5". THESE MEASUREMENTS ARE TAKEN INTERIOR WALLS TO PLYWOOD SIDE OF ASSEMBLY. THE INTERIOR GAPS, THE GAP BETWEEN TWO ASSEMBLYS IS BASED ON PLYWOOD TO PLYWOOD MEASUREMENT.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE

STEP 3: 1. THIS ASSEMBLY WILL BE REPEATED TWICE.

C

STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

D

2

WORK TABLE - STEP 2 (ASSEMBLY 1) SCALE: 1" = 1'-0"

E D

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

F-1/2" PROJECT TITLE

ARCH 509 FALL 2018 E

D

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

A

B

PROJECT INFO. DATE:

12/09/18

PROJECT #: D

SCALE:

WORK TABLE - STEP 3 (ASSEMBLY 2) SCALE: 1" = 1'-0"

1

As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME A

WORK TABLE - STEP 1 SCALE: 1" = 1'-0"

WORK TABLE FABRICATION SHEET NUMBER

B

3

Project Number

C

GROUP B

F504


NOTES: SITE

STEP 4: 1. ATTACH ASSEMBLY 2 TO THE ASSEMBLY 1's THAT HAVE BEEN SCREWED DOWN TO THE FLOOR OF WORK STATION. 2. ANCHOR ASSEMBLY 2 TO INTERIOR WALLS OF WORK STATION.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

1

WORK TABLE - STEP 4 SCALE: 1" = 1'-0"

SHEET NUMBER

WORK TABLE FABRICATION

GROUP B

F505


NOTES: SITE

STEP 5 & 6 1. USE SAME SCREW PATTERN IN ASSEMBLY 2 FOR THE F PART BEING ATTACHED. 2. REPEAT PROCESS IN STEPS 1 AND 2 TO CREATE ASSEMBLY 3 AND ATTACHED 2 ASSEMBLY 2'S.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

F-1/2" PROJECT #:

Project Number

G SCALE:

H

A

As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

WORK TABLE FABRICATION

1

WORK TABLE - STEP 6 SCALE: 1" = 1'-0"

2

WORK TABLE - STEP 5 (ASSEMBLY 3) SCALE: 1" = 1'-0"

SHEET NUMBER

G

GROUP B

F506


NOTES: SITE

STEP 8: 1. ATTACH ASSEMBLY 4.

A I

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

J

GROUP # : TITLE

I A

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

WORK TABLE - STEP 7 (ASSEMBLY 4) 1 SCALE: 1" = 1'-0"

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

2

WORK TABLE - STEP 8 SCALE: 1" = 1'-0"

SHEET NUMBER

WORK TABLE FABRICATION

GROUP B

F507


NOTES: SITE

STEP 9 & 10: 1. USE SAME SCREW PATTERN AS IN STEP 7 TO ATTACH J ONTO ASSEMBLY 4. 2. USE SAME PROCESS AS STEPS 1 AND 2.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

J

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

K

L

PROJECT INFO. DATE:

12/09/18

PROJECT #:

Project Number

A SCALE:

1

WORK TABLE - STEP 10 SCALE: 1" = 1'-0"

2

WORK TABLE - STEP 9 SCALE: 1" = 1'-0"

WORK TABLE FABRICATION SHEET NUMBER

K

As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

GROUP B

F508


NOTES: SITE

STEP 11: 1. ATTACH ASSEMBLY 2 USING THE SAME PROCESS AS IN STEP 4.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

1

WORK TABLE - STEP 11 SCALE: 1" = 1'-0"

SHEET NUMBER

WORK TABLE FABRICATION

GROUP B

F509


NOTES: SITE

STEP 12: 1. USE SAME SCREW PATTERN AS IN STEP 3 TO ATTACH F-3/4".

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS

F

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE:

12/09/18

PROJECT #: SCALE:

Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

1

WORK TABLE - STEP 12 SCALE: 1" = 1'-0"

SHEET NUMBER

WORK TABLE FABRICATION

GROUP B

F510


NOTES: SITE

PORTABLE STATION WILL BE FABRICATED TWICE. THEY WILL BE CONSTRUCTED AS MIRRORED IMAGES OF ONE ANOTHER. THE ONLY STEP THAT IS AFFECTED BY THIS MIRRORED FABRICATION IS STEP 6. THE ALIGNMENT OF THE SHEATHING WILL BE REVERESED.

SPONSORS

FROM HERE ON PORTABLE STATION MAY BE ABBREVIATED PS.

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #:

12/09/18 Project Number

SCALE:

N.T.S.

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

2

PORTABLE STATION SHEATHING SCALE: N.T.S.

1

PORTABLE STATION FRAMING SCALE: N.T.S.

SHEET NUMBER

PORTABLE STATION

GROUP B

S001


NOTES: SITE

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #:

12/09/18 Project Number

SCALE:

N.T.S.

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

1

PS ASSEMBLY SCALE: N.T.S.

SHEET NUMBER

PS- KIT OF PARTS

GROUP B

S002


NOTES:

3' - 11 1/2" 4' - 0"

A

A:

A

J**:

(6X)

6' - 8 3/4"

(20X)

B 3' - 8 1/2"

C:

J

C

4' - 0"

B:

J

(2X)

(4X)

C

SPONSORS

3' - 4 1/2"

8' - 0"

PS - 2"x4" STUD PARTS 3 SCALE: 1/2" = 1'-0"

3' - 6"

0' - 9"

K: 3' - 1"

D

E

3' - 11 1/2"

3' - 0 1/2"

G

2 : ROTATE

F

(4X)

0' - 5 1/2"

F

(4X)

PS - 2"x6" STUD PARTS SCALE: 1/2" = 1'-0"

0' - 3 1/2"

2

H

0' - 5 1/2"

3' - 4 1/2"

4' - 0"

GROUP # : TITLE

3' - 3 1/2"

8' - 0"

4' - 0"

L:

4' - 0"

N:

(1X)

(4X)

(2X)

STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

6' - 11 3/4"

3' - 3 1/2"

O O

M:

PROJECT INFO.

O

DATE:

O

Q

Q

4' - 0"

0' - 8"

PROJECT #: P

4' - 0"

P

(1X)

(4X)

SCALE:

12/09/18 Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

PS - PARTS FABRICATION

1

PS - PLYWOOD PARTS SCALE: 1/2" = 1'-0"

SHEET NUMBER

** J PARTS WILL BE CUT FROM 1/2" PLYWOOD AND 3/4" PLYWOOD. THE TWO 3/4" PLYWOOD IS USED IN STEP 4. THE TWO 1/2" IS USED IN STEP 8.

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

(1X)

I

4' - 0"

I

0' - 4"

I:

0' - 4 1/2"

*MATERIAL QUANTITIES REFLECT THE FABRICATION OF BOTH PORTABLE STATIONS

SITE

0' - 4 3/4"

MATERIAL LIST*: 1. 2"x4"x8" STUD (X31) 2. HSS 2"x2"x1/8" (39' - 1") 3. 4'x8'x1/2" 3-PLY PLYWOOD (X13) 4. 4'x8'x3/4" PLYWOOD (X1)**

GROUP B

S003


NOTES: J - 1/2" (2X)

A(12X)

L(4X)

COMPONENT QUANTITIES REFLECT THE FABRICATION OF TWO MIRRORED PORTABLE STATIONS

SITE

B(20X)

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

C(8X)

D(4X)

GROUP # : TITLE M(4X) J - 3/4" (2X)

2 : ROTATE STUDENTS

E(4X)

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

F(8X)

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

G(4X) N(2X) K(2X)

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

H(4X) PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY I(2X) O(4X)

PROJECT INFO. DATE: PROJECT #:

12/09/18 Project Number

P(2X) SCALE:

1

PS - COMPONENTS SCALE: 1/2" = 1'-0"

Y (256X)

(3" WOOD SCREW)

Z (542X)

(2" WOOD SCREW)

PS - KIT OF PARTS SHEET NUMBER

Q(2X)

As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

GROUP B

S004


NOTES: REPEATS ALL STEPS FOR THE MIRRORED PORTABLE STATIONS UNLESS OTHERWISE NOTED.

SITE

ASSEMBLY 1: 1. REQUIRES PARTS Ax2, Bx5, AND Yx20. 2. B PARTS ARE SPACED EQUIDISTANT ALONG PARTS A BESIDES THE B PARTS THAT IS PERPENDICULAR TO THE REST. 3. DRILL K PARTS THROUGH PART A AND INTO PART B.

A

C

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

C

ASSEMBLY 2: 1. REQUIRES PARTS Ax2, Cx4, AND Yx16 2. C PARTS ARE SPACED EQUIDISTANT ALONG A PARTS. 3. DRILL K PARTS THROUGH PARTS A AND INTO PARTS C.

D

C A

C

E

F

SPONSORS

GROUP # : TITLE

2 : ROTATE

ASSEMBLY 3: 1. REQUIRES PARTS Ax2, Bx5, AND Yx20. 2. REPEAT STEPS FOR ASSEMBLY 1.

PS - ASSEMBLY 4 SCALE: 1/2" = 1'-0"

4

ASSEMBLY 4: 1. REQUIRES PARTS Dx2, Ex2, Fx4, Yx8, AND Zx16 TO FABRICATE 2 ASSEMBLIES. 2. DRILL K PARTS THROUGH PARTS D AND E ON A 45 DEGREE ANGLE WITH D BEING 5 1/2" OFF FROM EACH END. 3. DRILL L PARTS THROUGH PARTS E AND F.

PS - ASSEMBLY 2 SCALE: 1/2" = 1'-0"

2

STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

A

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

A

ASSEMBLY 5: 1. REQUIRES PARTS Gx2, Hx2, AND Yx8 TO FABRICATE 2 ASSEMBLIES. 2. DRILL K PARTS THROUGH G AND H ON A 45 DEGREE ANGLE WITH H BEING 5 1/2" OFF FROM EACH END.

B

PROJECT TITLE

B

ARCH 509 FALL 2018

B B

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

B B B B

B

B

PROJECT INFO. DATE: PROJECT #: SCALE: A

G

A

As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

3

PS - ASSEMBLY 3 SCALE: 1/2" = 1'-0"

1

PS - ASSEMBLY 1 SCALE: 1/2" = 1'-0"

SHEET NUMBER

PS - ASSEMBLY 5 SCALE: 1/2" = 1'-0"

Project Number

PS ASSEMBLIES

H

5

12/09/18

GROUP B

S005


NOTES: REPEATS ALL STEPS FOR THE MIRRORED PORTABLE STATION UNLESS OTHERWISE NOTED.

SITE

STEP 1: 1. REQUIRES ASSEMBLY 1x1, 2x1, AND PARTS Ix1, AND Yx11. 2. PART H IS PLACE 3' - 6" FROM BOTTOM OF ASSEMBLY 1 UP TO BOTTOM OF PART I. DRILL 2 Y PARTS THROUGH COMPONENT I INTO ASSEMBLY 1. 3. DRILL Y PARTS THROUGH ASSEMBLY 2 AND INTO ASSEMBLY 1.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

J

4

5 GROUP # : TITLE

STEP 2: 1. REQUIRES ASSEMBLY 3, AND COMPONENT Yx11. 2. REPEAT DRILLING PATTERN AS DONE IN STEP 1. 3. CREATES ASSEMBLY 6.

2 : ROTATE 4

PS - STEP 4 (ASSEMBLY 8) SCALE: 1/2" = 1'-0"

3

PS - STEP 3 (ASSEMBLY 7) SCALE: 1/2" = 1'-0"

STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

STEP 3: 1. REQUIRES ASSEMBLY 4x2, ASSEMBLY 5x2, AND PART Yx16. 2. FIT ASSEMBLY 5s ON TOP OF ASSEMBLY 4s AS SHOWN. 3. DRILL K PARTS THROUGH ASSEMBLY 5 INTO ASSEMBLY 4. 4. CREATES ASSEMBLY 7.

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

STEP 4: 1. REQUIRES ASSEMBLY 6, PART J*x1, AND Zx16. 2. PLACE PART J ATOP ASSEMBLY 6. 3. DRILL L PARTS THROUGH PART J AND IN ASSEMBLY 6 WITH A EDGE CLEARANCE OF 1". PROCEED WITH EQUAL SPACING. 4. CREATES ASSEMBLY 8

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

2

PROJECT TITLE

ARCH 509 FALL 2018

STEP 5: 1. REQUIRES ASSEMBLY 6, 8, AND COMPONENT Yx18. 2. DRILL L COMPONENTS THROUGH THE BASE PLATES OF ASSEMBLY 6 AND INTO ASSEMBLY 8. SCREW SPACING IS 6".

3

1

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #:

RE PE AT

*1/2" PART J.

I

SCALE:

12/09/18 Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

5

PS - STEP 5 SCALE: 1/2" = 1'-0"

2

PS - STEP 2 (ASSEMBLY 6) SCALE: 1/2" = 1'-0"

1

PS - STEP 1 SCALE: 1/2" = 1'-0"

SHEET NUMBER

PS FABRICATION

GROUP B

S006


NOTES: REPEATS ALL STEPS FOR THE MIRRORED PORTABLE STATIONS UNLESS OTHERWISE NOTED.

SITE

STEP 6: 1. REQUIRES PARTS Kx1, Lx2, AND Zx127. 2. ALIGN L COMPONENTS FLUSH WITH THE OPEN EDGE OF THE QUADRANT. POSITION THE L COMPONENTS SO THAT THERE IS A 3/4" LIP ABOVE ASSEMBLY 2. 3. DRILL Z PARTS THROUGH PART L AND INTO THE STRUCTURAL STUDS. THE SCREWS SHALL BE PLACED ALONG THE STUDS WITH A VERTICAL SPACING OF 8". THE SCREW PATTERN SHALL START IN ASSEMBLY 8 AND END IN ASSEMBLY 2. 4. ALIGN PART K WITH ONE EDGE FLUSH WITH PART L. POSITION PART K SO THAT THERE IS A 3/4" LIP ABOVE ASSEMBLY 2.* 5. DRILL Z PARTS THROUGH PART K AND IN THE STRUCTURAL STUDS. THE SCREW SHALL BE PLACED ALONG THE STUDS WITH A VERTICAL SPACING OF 8". tHE SCREW PATTERN SHALL START IN ASSEMBLY 8 AND END IN ASSEMBLY 2. THE HORIZONTAL SPACING FOR THE SCREWS IS 1' - 2".

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS

L

RE PE AT

N

STEP 7: 1. REQUIRES PARTS Mx2, Nx1, AND Zx80. 2. FIT M PARTS ALONG INTERIOR STUDS AND DRILL Z PARTS THROUGH INTO STRUCTURAL STUDS. THE VERTICAL SPACING SHALL BE 8". 3. FIT N PART ALONG CEILING JOISTS, AND DRILL Z PARTS INTO JOISTS.

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

K

PROJECT TITLE

ARCH 509 FALL 2018

M

*WHILE CONSTRUCTING THE MIRROED FRABRICATION OF QUARANT A, THE STEP IS OPPOSITE. ALIGN COMPONENT I WITH THE OPPOSITE J COMPONENT THAN WAS DONE PRIOR.

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

3

PS - STEP 7 SCALE: 1/2" = 1'-0"

1

PS - STEP 6 SCALE: 1/2" = 1'-0"

SHEET NUMBER

PS FABRICATION

GROUP B

S007


NOTES: REPEATS ALL STEPS FOR THE MIRRORED PORTABLE STATIONS UNLESS OTHERWISE NOTED.

SITE

STEP 8: 1. REQUIRES COMPONENTS J*x1, AND Zx32. 2. ALIGN G COMPONENT FLUSH WITH THE OPEN EDGE OF THE QUADRANT. THE COMPONENT SHALL BE POSITION SO THAT THERE IS A 1/2" LIP WITH THE EXTERIOR SHEATING. 3. DRILL L COMPONENTS THROUGH COMPONENT G AND INTO ASSEMBLY 2. THE SCREW SPACING ALONG THE 4' SIDE IS 10". THE SCREW SPACING ALONG THE 3' - 11 1/2" SIDE IS 10" - 1".

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE

STEP 9: 1. REQUIRES PARTS Ox2, Px1, AND Qx1. 2. SPIN PORTABLE STATION AROUND TO VIEW THE OPEN SIDE. USE A NAIL GUN AND FINISHING NAILS TO ATTACHED PARTS WHILE KEEPING EDGES FLUSH.

STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

*3/4" PART J.

J

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

Q

PROJECT TITLE

ARCH 509 FALL 2018

O

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

O

PROJECT INFO. DATE: PROJECT #: SCALE:

12/10/18 Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

PS FABRICATION

2

PS - STEP 9 SCALE: 1/2" = 1'-0"

1

PS - STEP 8 SCALE: 1/2" = 1'-0"

SHEET NUMBER

P

GROUP B

S008


NOTES: SITE

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number N.T.S.

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

2

QUADRANT B SHEATHING SCALE: N.T.S

1

QUADRANT B FRAMING SCALE: N.T.S

SHEET NUMBER

WORKSTATION

GROUP B

S101


NOTES: SITE

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number N.T.S.

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

1

QUADRANT B ASSEMBLY SCALE: N.T.S.

SHEET NUMBER

WORKSTATION KIT OF PARTS

GROUP B

S102


NOTES: 6' - 8 3/4"

MATERIAL LIST: 1. 2"x4"x8" STUD (24X) 2. 2"x6"x8" STUD (8X 3. 4'x8'x1/2" 3-PLY PLYWOOD (11X) 4. 4'x8'x3/4" PLYWOOD(1X)

A:

SITE

A

8' - 0"

(14X) O*:

4' - 0"

B:

B

(4X)

3' - 10 1/2"

C

C

(2X) 4' - 0"

C:

*PART O WILL BE FABRICATED 5 TIMES WITH 1/2" PLYWOOD AND 1 TIME WITH 3/4" PLYWOOD.

8' - 0"

D:

D

(6X)

SPONSORS

(1X)

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

7' - 9"

E:

E

(1X)

3' - 5 1/2"

F:

F

F

6' - 11 3/4"

(3X) P:

7' - 5"

G:

GROUP # : TITLE

G

2 : ROTATE

(2X)

1' - 8"

STUDENTS

H

H

H

H

3' - 8 1/2"

H:

(6X)

(6X)

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

(4X)

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

1' - 1"

S:

3

S

S

S

S

S

S

(2X)

QUAD B - WOOD STUD PARTS SCALE: 1/2" = 1'-0" 3' - 3 3/4"

J:

J

J

6' - 11 3/4"

8' - 0"

K:

K

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

Q:

(2X)

0' - 5 1/2"

L

L

L

L

L

L

(6X) 3' - 8"

L:

4' - 0"

M:

M

(2X)

(3X) PROJECT TITLE

3' - 1"

N

N

(3X)

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

WORKSTATION - 2"x6" STUD PARTS 2 SCALE: 1/2" = 1'-0"

7' - 4" 0' - 4 1/2"

7' - 4"

X

DATE: PROJECT #: SCALE: 3' - 8"

W

0' - 9"

V

PROJECT INFO.

R:

0' - 4 1/2"

V

(1X)

12/09/18 Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

WORKSTATION PARTS FABRICATION

(1X)

1

WORKSTATION - PLYWOOD PARTS SCALE: 1/2" = 1'-0"

SHEET NUMBER

N:

ARCH 509 FALL 2018

GROUP B

S103


NOTES: SITE A (14X)

O - 1/2"(5X)

Q (1X)

B (4X)

SPONSORS

C (2X)

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804 D (1X) R (1X)

GROUP # : TITLE

O - 3/4"(1X)

2 : ROTATE

E (1X)

STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

F (3X)

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

S (6X) G (2X)

P (2X)

T (110X)

(3" WOOD SCREW)

U (460X)

(2" WOOD SCREW)

H (6X)

V (2X)

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

J (4X) W (1X) PROJECT TITLE

ARCH 509 FALL 2018

K (2X) X (1X)

L (6X)

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #:

12/09/18 Project Number

M (6X) SCALE:

1

QUAD B - COMPONENTS SCALE: 1/2" = 1'-0"

WORKSTATION KIT OF PARTS SHEET NUMBER

M (6X)

As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

GROUP B

S104


NOTES: SITE

ASSEMBLY 1 (FABRICATE X2): 1. REQUIRES PARTS Ax4, Bx2, Tx20. 2. THE CENTER AND END A'S ARE SPACED EQUIDISTANT ALONG PART B. 3. THE LAST PART A IS LOCATED 3 1/2" FROM ONE END OF C.

C

M

L

J

ASSEMBLY 2: 1. REQUIRES PARTS Cx2, Dx1, Ex1, Fx3, Tx18. 2. G & D PARTS ARE SPACED EQUIDISTANT ALONG PART E.

L

F J

L

J

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

D

M

F

K

N

SPONSORS

L

C

L

GROUP # : TITLE

J M

K

2 : ROTATE

N L

QUAD B - ASSEMBLY 4 4 SCALE: 1/2" = 1'-0"

ASSEMBLY 4: 1. REQUIRES Jx4, Kx2, Lx6, Mx3, Nx3, AND Tx52. 2. J PARTS ARE POSITIONED 5 1/2" OFF EACH END OF PART K. 3. N PARTS ARE POSITION 5 1/2" OFF EACH END OF PARK M. 4. L PARTS ARE LOCATED ALONG THE CONNECTION AREAS.

2

WORKSTATION - ASSEMBLY 2 SCALE: 1/2" = 1'-0"

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

G

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

H

A

B

H

STUDENTS

H A A H

A

A A

H

A A

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

A H

A

PROJECT INFO. DATE: PROJECT #:

G

SCALE:

12/09/18 Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

B

3

WORKSTATION - ASSEMBLY 3 SCALE: 1/2" = 1'-0"

1

WORKSTATION - ASSEMBLY 1 SCALE: 1/2" = 1'-0"

WORKSTATION ASSEMBLY FABRICATION SHEET NUMBER

ASSEMBLY 3: 1. REQUIRES PARTS Ax6, Gx2, Hx6, Tx40, AND . 2. A PARTS ARE SPACED SO THAT THE GAPS ARE THE SAME AND EQUAL TO THE LENGHT OF PAR H. 3. 2 H PARTS ARE PLACED 8" FROM BOTTOM OF G TO TOP OF H. 4. 4 H PARTS ARE PLACED 35 3/4" FROM TOP OF G TO BOTTOM OF H. 5. DRILL Q PARTS IN AT A 45 DEGREE ANGLE THRU I INTO SHARED A PART. OFFSET SCREWS.

E

F

N

GROUP B

S105


NOTES: SITE

STEP 1: 1. REQUIRES ASSEMBLY 1x1, 2x1, AND PARTS Vx8. 2. DRILL S COMPONENTS WITH 4" SPACING. STEP 2: 1. REQUIRES ASSEMBLY 3x1 AND PART Tx12. 2. DRILLS S COMPONENTS WITH 4" SPACING.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

4

2 : ROTATE

QUAD B - STEP 4 (ASSEMBLY 6) SCALE: 1/2" = 1'-0"

3 STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

2

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

WORKSTATION - STEP 2 SCALE: 1/2" = 1'-0"

2

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

1

PROJECT INFO. DATE:

1

PROJECT #: SCALE:

12/09/18 Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

WORKSTATION FABRICATION

3

WORKSTATION - STEP 3 (ASSEMBLY 5) SCALE: 1/2" = 1'-0"

1

WORKSTATION - STEP 1 SCALE: 1/2" = 1'-0"

SHEET NUMBER

STEP 3: 1. REPEAT STEP 1. 2. CREATES ASSEMBLY 5. STEP 4: 1. REQUIRES ASSEMBLY 4x1, PARTS O - 3/4"x1, AND Ux35. 2. DRILL U PARTS THROUGH PART O AND INTO ASSEMBLY 4. SCREW SPACING ALONG SHORT SIDE IS 10" AND 8" ALONG LONG SIDE. ONLY DRILL DOWN CORNERS ALONG TWO SHORT EDGES AND ONE LONG EDGE TO ALLOW FOR SCREW SPACE IN LATER STEPS. 3. CREATES ASSEMBLY 6.

O

GROUP B

S106


NOTES: SITE

STEP 5: 1. REQUIRES ASSEMBLY 5x1, ASSEMBLY 6x1, AND PART Tx24. 2. ALIGN ASSEMBLY 5 ATOP ASSEMBLY 6 SO THAT THE EDGES ARE FLUSH. 3. DRILL U PARTS THROUGH THE BASE PLATES OF ASSEMBLY 5 INTO ASSEMBLY 6. SCREW SPACING IS 4".

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

STEP 6: 1. REQUIRES PARTS Ox4, AND Ux200. 2. PLACE O PARTS WITH 3/4" OVERHANG ABOVE TOP PLATES. ALIGN AND PLACE ACCORDINGLY. 3. DRILL U PARTS THROUGH O PARTS INTO STRUCTURAL STUDS. HORIZONTAL SCREW SPACING ON TOP AND BOTTOM PLATES IS 6". VERTICAL SCREW SPACING ALONG STUDS IS 8".

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY O

PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

2

WORKSTATION - STEP 6 SCALE: 1/2" = 1'-0"

1

WORKSTATION - STEP 5 SCALE: 1/2" = 1'-0"

SHEET NUMBER

WORKSTATION FABRICATION

GROUP B

S107


NOTES: SITE

STEP 7: 1. REQUIRES PARTS Px2, AND Ux88. 2. ALIGN P PARTS ALONG STRUCTURAL STUDS WITH A FLUSH EDGE ALONG OPEN FACE. 3. DRILL U PARTS THROUGH PART N INTO STRUCTURAL STUDS AND TOP PLATES. SCREW SPACING HORIZONTALLY IS 6". SCREW SPACING VERTICALLY IS 8".

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

STEP 8: 1. REQUIRES PARTS Qx2, AND Ux80. 2. ALIGN THE Q PARTS SIDE BY AGAINST BACK OF POD. 3. DRILL U PARTS THROUGH Q PARTS AND INTO STRUCTURAL STUDS AND TOP PLATES. SCREW SPACING HORIZONTALLY IS 6". SCREW SPACING VERTICALLY IS 8".

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

Q

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

P

Q

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

2

WORKSTATION - 8 SCALE: 1/2" = 1'-0"

1

WORKSTATION - 7 SCALE: 1/2" = 1'-0"

WORKSTATION FABRICATION SHEET NUMBER

AT PE RE

GROUP B

S108


NOTES: SITE

STEP 9: 1. REQUIRES PARTS Sx6, RX1, AND Ux30 STEP 9: 1. REQUIRES PARTS Ox1, AND Ux49. 2. PLACE PARTS O ATOP ASSEMBLY 2, RESULTING IN A 1/4" LIP ALONG 3 SIDES. 3. DRILL U PARTS THROUGH O AND INTO ASEMBLY 2. SCREW SPACING ALONG SHORTER MEMBER IS 10' 1/2". SCREW SPACING ALONG LONG MEMBERS IS 9".

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE S

STUDENTS S

GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E.

S

R

O

S S

S

GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018 TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #: SCALE:

12/09/18 Project Number As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

1

WORKSTATION - STEP 10 SCALE: 1/2" = 1'-0"

2

WORKSTATION - STEP 9 SCALE: 1/2" = 1'-0"

SHEET NUMBER

WORKSTATION FABRICATION

GROUP B

S109


SITE

NOTES: STEP 11: 1. REQUIRES PARTS Vx2,Wx1, AND Xx1. 2. USE A NAIL GUN AND FINISHING NAILS TO ATTACHED PARTS WHILE KEEPING EDGES FLUSH.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

X

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

V

PROJECT TITLE

ARCH 509 FALL 2018

V

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

PROJECT INFO. DATE: PROJECT #:

12/09/18 Project Number

W SCALE:

As indicated

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

WORKSTATION - STEP 11 1 SCALE: 1/2" = 1'-0"

SHEET NUMBER

WORKSTATION FABRICATION

GROUP B

S110


NOTES: SITE

TYPICAL CASTER MOUNT DETAIL: 1. 3" SWIVEL CASTERS WITH TOTAL HEIGHT FROM FLOOR TO TOP OF CONNECTION BEING MINIMUM OF 3.75". 2. MOUNT CASTER TO TRIPLE LAYERED 2"x6" STUD BAS FRAME WITH CORRESPONDING LAG SCREWS. SEE CASTER MANUFACTUR FOR LAG SCREW SIZE.

SPONSORS

HARBOR FRIEGHT MENARDS LUTRON HOME DEPOT STUDIO 804

GROUP # : TITLE

2 : ROTATE STUDENTS GROUP 1 ABBOTT,REID BEHBAHANI,ALI FARAJ BLAKE,JOSH LEONARD BURKE,DAKOTA J SMITH,MICHAEL ROSS,LUKE E. GROUP 2 BARGAS,ELAINA M DELGADO,TRISTYN RENAE KELLY,ALLISON R MCCUTCHEON,ROBERT A NUTTER,JORDAN LEANN QUINLIVAN,CHARLIE

3 LAYERED 2"x6" STUD BASE FRAME

GROUP 3 ALM,SASH COLEMAN,CAROLINE E GUY,CARSON CHARLES ROSS,LUKE E. SAENZ-LARA,ALEJANDRO MUSTAFA,AMEENAH SUN,YUANG

PROJECT TITLE

ARCH 509 FALL 2018

0' - 4 1/2"

0' - 1 1/2"

TOOL COMPARTMENTS EAST HILLS DEISNG/BUILD FACILITY

0' - 9"

PROJECT INFO.

Project Number

0' - 3 3/4"

SCALE:

As indicated

SHEET NUMBER

DETAILS

0' - 1"

TYPICAL WHEEL CONNECTION SCALE: 3" = 1'-0"

PROJECT #:

09/04/18

DWG BY: MCCUTCHEON, ROBERT SHEET NAME

3" CASTER 1

DATE:

GROUP B

S201


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.