Portfolio 2024

Page 1


PORTFOLIO ARCHITECTURE

ÁLVARO RODRÍGUEZ

Project Size

Stages

Place Year

AUSTIN FRIARS

Office Refurbishment and Top Extension

8000 m2

Concept and Technical Design (Proyecto

The City of London, London, UK

2022 - Now Interior Refurbishment

Company Stiff + Trevillion Architects

Located in the heart of the City of London, the scheme proposes the refurbishment of a existing 5-storey office building, a new office amenity space at lower ground floor, a new end of trip facilities at basement floor and a new rooftop extension

CGI showing North West Massing Revit Architecture + 3ds Max
Básico y de Ejecución)

5.36 Building A

Project

Size

Place Stages

Year

Company

BARLBY NEW HOMES

Residential scheme and Sports Hall

80 Homes, 9000 m2

Concept and Technical Design (Proyecto Básico y Ejecución)

Notthing Hill, London UK

2021

Stiff + Trevillion Architects

The project consist of the provision of Social and Private Homes as well as a Sports Hall for the abjacent School and the Community

This development offers a unique opportunity to create high quality and sustainable housing for the borough. Also, the scheme creates ammenity areas for the community.

Facing Brickwork
Existing School New Indoors Sports Hall

Project

Place

Size

Stages

Year

Company

BASILDON TOWN SQUARE NORTH

Mixed use development

Basildon, UK

535 Flats, 30208 m2

Concept Design (Proyecto Básico)

2020

Makower Architects

Two of the main aspirations of this project is the revival of the existing public spaces of Basildon Town Centre and the creation of a new skyline, symbolising the town´s new era.

FORMER NESTLÉ FACTORY

London, UK

8100 m2

Technical Design, Construction (Proyecto de Ejecución y Construcción)

2017 - currently

Company

Makower Architects

The former Nestlé factory that once produced chocolate and coffee, is a feature of the local community and the proposals have been designed to honour the heritage of the site.

The development of 1,380 homes and 4 large industrial units is an exemplar urban renewal project that works creatively to allow new homes and industrial development to co-exist harmoniously on site.

Project Place

Size

Stages

Year

Company

LONDON CITY ISLAND

Housing development of 1000 units

London, UK

1000 Flats, 50000 m2

Technical Design, Construction (Proyecto de Ejecución y Construcción) 2016 - currently Acanthus LW

This project is part of a masterplan which includes 10 residential buildings, offices and retail.

The project utilises a modern, prefabricated construction method whereby all major structural elements are constructed off site at a factory in the Netherlands.

Prefabricated Facade Panel: Aprox 40 minits to put into place

LONDON CITY ISLAND

Project Place Size Year

BRUSSELS SOUTH AIRPORT EXPANSION

Expansion of terminal building at Brussels South Charleroi Airport

Charleroi, Belgium

6000 m2

2010-2015 Stages Company in collaboration

Concept Design, Technical Design and Construction (Proyecto Básico, Proyecto de Ejecución y Construcción)

AERTEC Solutions

The main ideas used to generate the design of the building conform to the following criteria:

- Provide continuity to the expansion space volumes with respect to the existing terminal

- Optimise the processes within the building

Airport Extension

Area: 6000 m2

Capacity: 8 million people per year together with main airport

Departing Passengers

Arriving Passengers

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.