2nd Quarter, CY 2022 PPMC Accomplishment Report

Page 1

CAMARINES NORTE PMC’s 2nd QUARTER ACCOMPLISHMENT REPORT, CY 2022


Physical and Financial Accomplishment, 2nd Quarter, CY 2022

TOTAL PERCENTAGE AS TO THE NUMBER OF NGAs and LGUs COMPLETED, ON-GOING AND SUSPENDED PROJECTS, 2ND QUARTER, CY 2022

TOTAL PERCENTAGE AS TO THE COST (PhP M) OF NGAs and LGUs COMPLETED, ON-GOING AND SUSPENDED PROJECTS, 2ND QUARTER, CY 2022


“Participants deepened understanding on RBME via local road governance using RPMES as the monitoring system towards strengthening institutional capacity of provincial governments in RBME”

Attended Training on RBME Guide for Local Road Governance May 4-6, 2022 | online webinar


2nd QUARTER MEETING M AY 1 9 , 2 0 2 2 | S P S e s s i o n H a l l Daet, Camarines Norte

EnP TEODY LICARTE PO IV/Acting Asst.PPDC

ENGR. CHINGLOU INDIAS Acting MPDC

MR. ARIES QUERUBIN OPAcctg. Representative

ENGR. OLIVEN OCO OPAg Representative

EnP MACARIO TOTANES MPDC Mercedes

ENGR. MAAY SA NTILLAN MPDC Basud

MR. BENEDICTO PALMARES PFAC Chairperson


3

RESOLUTIONS PASSED NO.

TITLE

Date Approved

PPMC Actions/Remarks

Res. No. 02

A RESOLUTION ADOPTING THE GUIDELINES FOR May 19, 2022 THE RESULTS-BASED MONITORING AND EVALUATION (RBME) OF LGU INFRASTRUCTURE 2nd Quarter 2022 PROJECTS (RLIPs).

Forwarded to the Provincial Development Council and all concerned for their information and appropriate action.

Res. No. 03

A RESOLUTION APPROVING THE LIST OF PROJECTS TO BE MONITORED AND / OR EVALUATED AND THE RESPECTIVE SCHEDULE OF THE EXIT CONFERENCE BY THE PROVINCIAL PROJECT MONITORING COMMITTEE (PPMC) FOR THE 2nd QUARTER, FY 2022.

May 19, 2022

Furnished the Provincial Development Council (PDC), PPMC and all other concerns for their information and appropriate action

Res. No. 04

A RESOLUTION AMENDING AND APPROVING THE REVISED GUIDELINES ON THE SEARCH FOR OUTSTANDING MUNICIPAL PROJECT MONITORING COMMITTEES (MPMCs), PROVINCE OF CAMARINES NORTE.

May 19, 2022

Furnished the Provincial Development Council (PDC), Municipal PMCs (MPMCs), of this province and all other concerns for their information


JUNE 03, 2022

Received Awards During the RDC Full Council Meeting

EnP Macario B. Totanes, MPDC received the award of Mercedes LPMC as Highest Scorer (municipal level) and PhP20,000.00 cash

prize.

Engr. Chinglou Indias, Acting MPDC received the award of Capalonga LPMC as Second Rank (municipal level) and PhP15,000.00 cash prize.

EnP Teodoro Licarte, Acting Asst. PPDC received the award of Camarines Norte PPMC as Highest Scorer LPMC (provincial level) and PhP20,000.00 cash prize.


JUNE 08-10, 2022 List of Projects Monitored | Inspected

17

Project Name 1. 2. 3. 4. 5. 6. 7. 8. 9.

CONCRETING OF ROAD AGRICULTURAL MACHINERIES FUNDED BY OPAPP ROAD OPENING / CONCRETING OF BARANGAY ROAD CONSTRUCTION OF BARANGAY HEALTH STATION IN PUROK 4 CONSTRUCTION OF BARANGAY HEALTH STATION CONSTRUCTION OF FMR IN PUROK 1-6 CONSTRUCTION OF FARM-TO-MARKET ROAD CONSTRUCTION OF MULTI-PURPOSE HALL CONCRETING OF ROAD

10. 11. 12. 13.

CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION OF HEALTH STATION IN PUROK 2 Construction of Water System in Purok 2 CONSTRUCTION OF FAM-TO-MARKET ROAD IN PUROK 1-6

Location Bgy. Camagsaan, Capalonga, Camarines Norte Bgy. Camagsaan, Capalonga, Camarines Norte Barangays Villa Belen-San Antonio-Mabini, Capalonga Barangay Villa Belen, Capalonga, Camarines Norte Barangay San Antonio, Capalonga, Camarines Norte Barangay Binawangan, Capalonga, Camarines Norte Barangay Binawangan, Capalonga, Camarines Norte Barangay Alayao, Capalonga, Camarines Norte Barangays Alayao, San Roque, San Isidro Road, Capalonga, Camarines Norte Barangay Catioan, Capalonga, Camarines Norte Barangay Lukbanan, Capalonga, Camarines Norte Barangay Lukbanan, Capalonga Barangay Lukbanan, Capalonga, Camarines Norte

14. CONSTRUCTION OF FMR with Line Canal 15. ELECTRIFICATION PROJECT IN PUROK 1-5

Barangay Guissican, Labo, Camarines Norte Barangay Guisican, Labo, Camarines Norte

16. IMPROVEMENT OF BARANGAY HEALTH CENTER IN PUROK 2 17. CONSTRUCTION OF LEVEL 2 WATER SYSTEM

Barangay Bayabas, Labo, Camarines Norte Barangay Bulala, Sta. Elena, Camarines Norte


JUNE 13-14, 2022 List of Projects Monitored | Inspected Project Name

8

Location 1. UPGRADING OF CADAWINGAN - GUINATUNGAN Barangay Guinatungan and Plaridel, ROAD Basud, Camarines Norte 2. REHABILITATION / REPAIR / RECONSTRUCTION Barangay Matoog-toog, Mercedes, OF MP BLDG. / EVACUATION CTR. Camarines Norte 3. CONSTRUCTION OF RIVER CONTROL PROJECT Barangay Mampurog, San Lorenzo Ruiz, Camarines Norte 4. CONSTRUCTION OF RIVER CONTROL

Barangay Iraya Sur, San Vicente, Camarines Norte

5. REHABILITATION / REPAIR / RECONSTRUCTION Barangay Borabod, Daet, Camarines OF MP BLDG. / EVACUATION CTR. Norte 6. REHABILITATION / REPAIR / RECONSTRUCTION Barangay Bagongbayan, Jose OF MP BLDG. / EVACUATION CTR. Panganiban, Camarines Norte 7. REHABILITATION / REPAIR / RECONSTRUCTION Barangay Submakin, Labo, Camarines OF MP BLDG. / EVACUATION CTR. Norte 8. EGAY for Trees Project

Barangay Guisican, Labo, Camarines Norte


CONCRETING OF ROAD Barangays Alayao, San Roque, San Isidro Road, Capalonga, Camarines Norte TITLE OF PROJECT:

Concreting of Road

LOCATION/LENGTH:

Barangay San Roque, Capalonga / 2.290LM.x 5m road & 1.0m shoulder on both sides

PROJECT DESCRIPTION:

Site 1: Sta. 0+000 – 1+386.60 Site 2: Sta. 0+000 – 0+903.40 Single Barrel RCBC: 7.90m; 7.60m; 11.10m; 7.60m; 7.60m; 10.64m

AMOUNT/COMP. DATE:

PhP96,027,590.25 / 269 CD

CONTRACTOR:

CENTERWAYS Const. & Devt., Inc.


CONCRETING OF ROAD Barangays Alayao, San Roque, San Isidro Road, Capalonga, Camarines Norte TITLE OF PROJECT:

Concreting of Road

LOCATION:

Barangay San Roque, Capalonga

MAJOR FINDINGS / ISSUES:

 Electrical post was located in the road carriageway;  presence of transverse cracks in the PCCP which need to be sealed to prevent entry of moisture into the subgrade thru the cracks and further ravelling of the cracks;  the project was suspended due to peace and order situation  due to the incident of the burning of 2 equipment owned by the Contractor, their employees / workers were forced to resign due to harrasment incidence.

ACTION TAKEN / RECOMMENDATIONS:

 The LPMC Team agreed to furnish the DPWH copy of the report for their information and appropriate action.  the PPMC agreed to asked some advise from the RPMC.

EMPL. GENERATED:

 25

SLIPPAGE:

 2.02

ACCOMPLISHMENT:

 85.7%

STATUS:

Suspended


CONCRETING OF ROAD Barangays Alayao, San Roque, San Isidro Road, Capalonga, Camarines Norte


CONCRETING OF ROAD Barangays Alayao, San Roque, San Isidro Road, Capalonga, Camarines Norte


EXIT MEETING June 16, 2022 | SP Session Hall Daet, Camarines Norte


JULY 13-14, 2022 CONDUCTED JOINT PROJECT MONITORING (RPMC and CAMARINES NORTE PMC) Courtesy Call and briefing with Hon. Gov. Ricarte R. Padilla, RPMC, Camarines Norte PMC and PPDO Staff

Courtesy Call and briefing with Hon. Mayor Jojo H. Francisco; RPMC; Camarines Norte PMC and DPWH Region 5


CONDUCTED JOINT PROJECT MONITORING (RPMC and CAMARINES NORTE PMC) Courtesy Call and briefing with President Marlo Dela Cruz of CNSC; RPMC; Camarines

Norte

PMC

and

DPWH

Camarines Norte.

Courtesy Call and briefing with Hon. Mayor Ma. Jhoana C. Ong; RPMC; Camarines Norte PMC and DA-PRDP NPCO and DA-PRDP RPCO.


EXIT MEETING June 14, 2022 | @Pleytu


CAMARINES NORTE PMC’s 3rd Quarter Proposed Activities 3rd Quarter Camarines Norte PMC Meeting Project Inspection / Monitoring Exit Meeting Report Preparation and Submission to RPMC and to other concerned agencies Attendance to RPMC Quarterly Meeting


ACTION REQUESTED: For Information