M Transportation Terminal:: Sami Hasan

Page 1

+

b.arch

05

+ +

+

+

+

+

+

+

+

gateway to the city

multimodal transportation terminal

Academic Project | Project Yr.: Level 5, Term 2 (Studio X), Project Duration: 12 weeks

site: Tongi, Dhaka, Bangladesh issue

The center of gravity of downtown activities for Greater Dhaka city is gradually shifting north to Joydevpur and Eastward. The inter-district public transportation for north-east bound districts (Greater Mymensingh) should be restricted at the edge of the greater Metropolitan to avoid more congestion at inner city traffic. Rather an interchange to city bus service will provide the link to the centre of the city.


N63

TONGI Railway Junction

EASTERN BYPASS-1

N63

b.arch

PROPOSED TERMINAL

ZIA International Airport

05

north-bound districts narshingdi

tongi rail station

+

N63

GABTOLI

tongi bus stand

N63

Inter-District Bus Terminal (west bound districts)

MOHAKHALI Inter-District Bus Terminal (north bound districts)

KAMALAPUR Inter-CITY Rail-station

abdullahpur bus stand

(central rail station)

ashulia

FULBARIA CIty Bus Terminal (CIty service terminal)

SAYEDABAD Inter-District Bus Terminal (east bound districts)

N63

SADARGHAT Inter-District River Port (south bound districts)

Dhaka

N63

4.

residential industrial commercial

5.

6.

road water

azampur bus stand

7.

images: | 4 land-use pattern | 5 accessibility | 6 major destination | 7 existing inter-changes | 8 site and surroundings | 9 SPZ plan showing the inner and outer zone coverage

Part II : programme generation

Site Evaluation A set of criteria was developed to evaluate the site depending on the following matrix: Accessibility - Ridership Demand - Modes Served - Proximity to transportation Interchanges - Access from Adjacent Streets - Proximity to Other Major Destinations - Quality of Pedestrian Environment and Access Site Configuration/Issues - Ability to Accommodate Transportation Program - Opportunity for Creation of Important Civic Structure

8.

Environmental Constraints - Compatibility with Surrounding Land Uses - Impact on/Compatibility with Historic Buildings/Districts - Other Environmental Considerations

9.

For the project assumed Inner Zone =

SPZ 14

Outer Zone =

SPZ 12

Tongi SPZ 13.2 Uttara/ Airport Eastern Suburbs SPZ 19 RAJUK East SPZ 14.5 Tongi/ Gazipur Fringe SPZ 17.3 Flood zone west

Calculated population in 2016 a) Inner Zone= 8,36,960+2,69,080 b) Outer Zone= 5,55,220+2,68,440+1,60,340+3,68,480 ++ Calculated users +

. SPZ planning (1991-2016) ++ DITS Mid Term Report +

project fact

= 11,33,040 = 13,52,480

Program Outline mode of transport Inter-District bus

routes 16

no of Bus 400 buses

Frequency 25 bus/hour

City service

13

200 buses

20 bus/hour

River Taxi service

02

40 ferry

4 taxi/hour

termini for north-bound route

Component of the Terminal user 1) Water Bus & Taxi 1,36,789 2) Bus 1,36,789 3) Local Bus 68,394

percentage 40% 40% 20%


05


05


b.arch

05 6

R

7 4

3

2

V

E

1 9

+

I

12

13

R

9

8

10

13

11

++plan

ground level plan

considerations

> services

2 5

> atrium

2

1 5

5

5

> zoning

atrium +12 main main axis

3 inter-district arrival lounge 4 inter-district departure lounge 5 city service

11 taxi point

river-taxi lounge control tower main entrance secondary entrance 10 car park

6 7 8 9

12 plaza 13 landscaped area 14 bus parking depot

> internal circulation

+ section

through main atrium 7 5

6

CITY BUS

TO DHAKA

SHERPUR

10

1

8

14

4 3


b.arch

05

The formal expression was reflecting the building's function of mobility. Large spanned trusses and curved roof was the visual impression of man's development of technologies. It also gave the impression of urban morphology for the newcomers coming from countryside. Access Different overpass and underpass was placed to act as intake points for the pedestrians. Also provision for easy access of cab and private vehicles were made.

All services under one roof can ensure fluent and efficient circulation for the vehicles of different modes and their users. The terminal would act as an important interchange hub for the transportation arteries at the edge of the city, while marking the access point to the metropolis

+


b.arch

05 truss system

A structural system was needed to develop, which would cover a large span of 135' with extension of about 72' on each side. Curved bonesection were used as members to develop a three-dimensional and composite truss system to covered the required space- volume of 134' by 75' .

+ truss system

the truss system contains the space volume of the main atrium space


b.arch

04


M. URBAN DESIGN

B. ARCHITECTURE

Master of Urban Design, The University of Hong Kong sami@hku.hk, sami0397@yahoo.com www.geocities.com/sami0397

S

Mohammad Sami Al Hasan

E

DESIGN PORTFOLIO

A

urban+arch