YOUTH CENTRE: Malaysia Youth Creative and Innovative Hub | Architectural Studio 5

Page 1


SITE ANALYSIS AND SYNTHESIS

Kepong Metropolitan Park Is Located Near To The Border Of Kuala Lumpur  Selangor Site Is Zoned Under Recreational Area

Sports

KEY PLAN

EVENTS

OPPORTUNITY Presence of various activities in Kepong Metropolitan Park can make proposed building lively.

FOOD STALLS

PLAYGROUND

RECREATIONAL

KITE PARK

IMPLEMENTATION Proposed several spaces for access to the public to integrate with Youth Center Participant.


SITE ANALYSIS AND SYNTHESIS

View Maximizing view towards KMP as it provide positive view of community activity. +VE

Wind Flow Passive cooling technique can be applied resulting in comfortable indoor temperature and atmosphere PADESTRIAN

+VE

Traffic Flow Maximizing the use of facilities by pedestrian through connectivity of spaces with wide entries

+VE VIEW KMP

+VE VIEW KITE PARK


YOUTH ISSUE - UNEMPLOYMENT Young people make up a majority of Unemployed graduates (2018)

Unemployed graduates, by age group (% of total unemployed graduates)

50 45 40 35 30 25 20 15 10 5 0 <25

25-34

35-44

>44

Data : DOSM, Authors calculations Note : 2018 figures

Youth unemployment poses pressing challenges for Malaysia. Structural problems deriving from education quality deficiencies, skills mismatch, and low-quality jobs have stressed labor markets in recent years and are compounded by imminent recession. One way to reduce unemployment : Promotes creating own ventures

Sources https://www.bfm.my/podcast/morning-run/morning-brief/mb-malaysiaabove-average-youth-unemployment


YOUTH CENTER PROPOSAL

MALAYSIA YOUTH CREATIVE AND INNOVATIVE HUB INTENTION A vibrant and sustainable Startup and Social Enterprise ecosystem built on impact driven innovation, creativity and inclusivity.

PLATFORM Creating platform for youth to start creating their ventures that have a real impact on helping unemployed people

MENTORSHIP Get youth a step closer towards attaining entrepreneurial dream by connecting with skillful and seasoned entrepreneurs from various backgrounds

ENTREPRENEURSHIP A structured training programmed to help Aspiring to Experienced Entrepreneurs in elevating the entrepreneurial mindset

MARKET Provide opportunity to the youth participants to market their products produces in this youth center to the KMP public.


TARGET USER

School Nearby Programmed collaboration with Y.C

KMP Public Visitor Unity between youth and community

Youth around Malaysia Joined workshop and activities at Y.C and stay overnight at hostel provided

COLLABORATION RESIDENTIAL

COMMERCIAL

INSTITUTIONS

SERVICES

INDUSTRIAL

RECREATIONAL


PROGRAMMED SPACE CONCENTRATION - Seminar room

COMMUNICATION -

Collaborative learning area -exhibition area

WORKING -

MARKET

Co-working area Prototype making workshop

-

Central Plaza

CASE STUDY Merck Innovation Center / HENN Address Frankfurter Strae 250, 64293 Darmstadt, Germany Year 2018

Client Merck KGaA Area GFA 21 950 m

Every level has two work areas, positioned diagonally vis--vis one another. Each workspace is designed to provide for a project group consisting of external and internal staff, cooperating on innovations either on a temporary or a project basis. Concentration and meeting rooms are arranged along the facade and on the mezzanines. The ground floor contains a caf, a lounge and an auditorium; the first upper storey a library and open workstations; the top floor accommodates a workshop.

Sources https://www.world-architects.com/en/henn-munchen/project/merck-innovation-center


The Concept Of

‘FLYING HIGH’ Inspired by the Kite Flying at Kepong Metropolitan Park

Shown Indirectly

Shown Directly

Another meaning : be very successful; prosper.

Principle ; Hierarchy | Rhythm

Creating Spaces that supports youth empowerment to develop their skills

Space resulting successful youth with skills and career

scale perspective space

Building Talent Generating Future

Building standing out boldly with a sloping form that gives the feeling of a flying form about to soar up to the skies.


FORM DEVELOPMENT

Site Volume 3000sqm build up area

Greenery Continue the greenery around the site to the building vertically and horizontally

Axis Line Public permeable communal line created

Zoning Public, Semi Public, Semiprivate and Private

Slanting Form To create the visual of soaring upwards Massing Model The uniquely inverted roof structure in this design gives it a neo-contemporary approach with a fresh perception of the traditional roof.


SITE PLAN SCALE 1:500


SITE PLAN SCALE 1:500


1. Foyer 2. Reception 3. Administration 4. Hostel Lobby 5. Central Plaza 6.Gym 7. Caf 8. Kitchen 9. Laundromat

Back of House 10. TNB Substation 11. MDF Room 12. MSB 13. Genset 14. Utility 15. Water Pump Room 16. Janitor 17. Refuse Chamber

GROUND FLOOR PLAN SCALE 1:200


Hostel Block 18. Twin Sharing Ensuite 19. Storeroom Youth Center Facilities 20. Collaborative Learning 21. Product Exhibition Space 22. Prototype Making Workshop 23. Meeting Room

24. Pantry 25. Surau

FIRST FLOOR PLAN SCALE 1:200


Hostel Block 26. TV Room and Pantry 27. 4 Pax Room 28. 6 Pax Room Youth Center Facilities 29. Open Plan Co-Working Area 30. Seminar Room 31. Resource Center

32. Office Area 33. Manager Room

SECOND FLOOR PLAN SCALE 1:200


Hostel Block 26. TV Room and Pantry Youth Center Facilities 27. 4 Pax Room 28. 6 Pax Room

29. Water Tank

THIRD FLOOR PLAN SCALE 1:200


HOSTEL ROOM LAYOUT



SECTIONAL PERSEPECTIVE


East Elevation SCALE 1:250

West Elevation SCALE 1:250


SPATIAL REQUIREMENTS FOR Y.CENTRE Space

Description/ Function

Main Reception

Foyer Info /Reception Centre Café/Kitchen Toilet (M/F) Surau (M/F)

3 2

27 (M/F) 50 (M/F)

Area (sq.m) 42 25 130 40 35

Sub-Total Recreational/ Cultural Facilities

Central Plaza Activities Rooms

Sub-Total Administration

5nos 50 95 80 65 200 75 110 18 893

Lobby Check-in Counter Laundromat Hostel Rooms Twin Sharing Ensuite 4 pax (M/F) 6 pax (M/F) Pantry/ TV Room Shared Toilets/Showers

1no 15nos (30 pax) 10nos (40 pax) 12nos (72 pax)

50 13 24 20 20 20

2nos 4nos

35 30

1no

27 40 38 28 10

300 200 240

1017 Manager Working Area General Office Meeting Room Pantry

1no 1no 1no

Sub-Total Total NFA Circulation 25% TNB, Switch Room, GenSet, MDF, Refuse, Pump Room, Water Tank, Loading/Unloading, Storage Total GFA Outdoor Recreational Parking

120 100 417

200

Seminar Room 30pax Collaborative Learning Area Workshop + utility room Exhibition space Co-Working Space Learning Resource Center 1no Gymnasium, 40 pax Changing Room (M/F) Lockers/ Showers/ Toilets Sub-Total Accommodation

Area (sq.m)

Open to public Cars Motorcycles/Bicycles 40 nos (2 OKU) 40 nos

143 2,470 500 105

3,075 1,647













Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.