Table of contents Resume
page 2
Apparatus; Master's degree thesis project Architectural design studio for complex construction 2 [2019-2020] Prof. FRANCESCA BATTISTI
page 4
Assemblage Architectural design studio for complex construction 1 [2019] Prof. FRANCESCA BATTISTI, Prof. JOZEF COENEN
page 35
Asymptote Architecture construction studio [2018-2019] Prof. GIAN LUCA BRUNETTI, Prof. GIACOMO BOFFI
page 54
Anamnesis Architectural design studio 3 [2017-2018] Prof. CAMILLO MAGNI, Prof. ANDREA DE MATTEIS
page 70
Memoir Milan International Architectural Design Workshop [2020] Prof. THIERRY LAGRANGE
page 89
Architectural design starts with an endeavor to achieve a sensible comprehension of context. It is an essential step before going through the design process. To accomplish this, I concentrate on some fundamental aspects of the project, like program requirements, urban context, and social considerations. Each project is a multifarious challenge that requires a certain level of research. I've always taken advantage of autodidacticism to reach a profound understanding of distinct aspects of the project. Architecture comes along with Construction. The structure, constructional techniques, and materiality form the essence of Architecture.
2
Amir Sheykhan Born in Tehran, 10/08/1987 Address: Schönießer Str. 5 Berlin Via Cavezzali. 6 Milano Phone: +49 174 451 8297 +39 392 181 9935 E-mail: amir_sheykhan@outlook.com Linkedin: linkedin.com/in/amir-sheykhan Instagram: amirsheykhan.arch
Education: Universität der Künste Berlin [from 09/2020] - [to 07/2021] Erasmus exchange program Politecnico di Milano [from 09/2018] - [to 10/2021] Master's degree in Architecture – Building Architecture Subject of the Thesis project: Life science campus - Universität Basel Degree evaluation: 110/110 con Lode Politecnico di Milano [from 09/2015] - [to 07/2018] Bachelor’s degree in Architecture – Architectural Design Subject of the Thesis research: Social Regeneration Degree evaluation: 110/110 Azad University IAU [from 09/2005] - [to 07/2010] Bachelor’s degree in Mechanical engineering – Solid design Subject of the Thesis project: Design and construction of electricity-generating pavement Thesis project evaluation: 20/20 Professional Experience: [from 03/2021] - [to 09/2021] Internship, LIN Architects I have joined the team that was working on the competitions in the office. I had the opportunity to work on projects of different scales and types. [from 08/2018] - [to 02/2019] Architect In this period I have developed a resort complex in collaboration with a private developer in Iran. I developed the Design strategy and the Masterplan of the project. [from 02/2018] - [to 04/2018] Internship, Architect Giovanni Bassi studio During this experience I have been participating in the design process of public buildings. [from 06/2013] - [to 07/2015] Project supervisor I have worked as a construction consultant and project supervisor with the ARNA group (real estate development) in Tehran. Language skills English - Italian - German - Persian Digital skills Revit - Rhino - Autocad - MidasGen - Excel - Illustrator - Photoshop - Vray
3
4
5
6
7
An in-depth study throughout the classical shapes used over the history of Institutional "Campu research, typologies, has led to a proposal of a traditional Quadrangle for the future campus. The p splitting it into four individual elements embracing a court symbolic of the last "tile" completing th relations with the city. A formal axis is due created through the university core up to the city m higher Apparatus of Campuses in the Canton of Basel Stadt. A formal axis is due created thro eventually the new Quadrangle a part of higher Apparatus of Campuses in the Canton of Basel St
8
Site plan - scale 1:2000
Urban niche - responding to context
uses Architecture" and of academic, didactic and project reinterprets the Quadrangle morphology he existing University Campus and reshaping its making eventually the new Quadrangle a part of ough the university core up to the city making tadt.
9
Axonometric view 10
11
Photomontage, Type studies
Two Laboratories 'Temples’, equal in appearance but not in dimensions, are constructed by Vierendeel trusses system over each oor that enables the creation of spacious laboratory areas without any support required, lets space to the variety of building services and turns the future faculties into a very efficient "research machines". In the focal point of the new urban complex, the Library is hovering on the ground as a monument apprising of the knowledge. 12
Plan, First oor
0 3 7
Finally, the fourth element is the common facilities central building facing St. Johanns Ring and weaving the whole to one, unique, architectonic entity. The ground oor level is Arcaded over all the perimeter of the compound to enliven an enhanced relationship with the residential vicinity.
13
15m
14
15
Bottom-up axonometric view 16
17
Manifesto
18
19
Maquette - Scale 1:500
20
21
22
Apparatus - The main piazza
23
24
Apparatus - Central library, Atrium
25
Apparatus - Central building
26
Apparatus - Public exhibition area
27
28
Apparatus - Chemistry faculty, Atrium
29
30
Apparatus - Central Building, Seminar rooms
31
Apparatus - Physics faculty, Roof terrace and seminar rooms
32
Apparatus - Physics faculty, Common area
33
34
35
36
37
38
39
Plan, Ground Floor 40
0
41
2
5
10m
42
43
Project Program and structural components A1. Roof, Concrete Slab 200 mm A2. Concrete Girders A3. Mega-Beams 2m X 400mm A4. Structural Ceiling B.1 Third Floor B.1.1 Roof Top Lounge B.1.2 Technical Room B.1.3 Oɝces A.1
B.2 Seconed Floor B.2.1 Workshops B.2.2 Theatre Hall B.2.3 Building Services
A.2
B.3 First Floor B.3.1 Foyer B.3.1 Guarda-Robba B.3.3 Stoarge rooms B.3.2 Rehearsals room B.3.3 Open air Foyer B.4 Concrete Girders
A.3 A.4
B.1
B.2
B.3 B.4
B.5
B.5 Basment Floor B.5.1 Below ground piazza B.5.2 open 24H Multimedia room B.5.3 Study hall and Lobby B.5.4 Archive B.5.5 Mensa + Canteen B.5.6 Kitchen (Mensa) B.5.7 Services B.5.8 Exhibition Gallery B.5.9 Presentation Room B.5.10 Conferences Rooms
Exploded axonometric view
44
East elevation
West elevation
North elevation
South elevation 0
45
5
15
30m
Urban section 46
0 47
4
10
20m
Elevation - Detail section
50mm Insulation Board Ribbed Concrete Slab
Steel Outrigger Reactable Blinders Auxiliery Structure of Screen Horizontal Mullions seperating Glass 12 mm Structural Glazed Monolithic Glass
25mm Double Glazed Laminated Glass Swinging Window Galvenized Steel Maintenance CatWalk Extruded Aluminium Unit Frame Stainless Steel support structure structure Floating Flooring 100mm
Wall Cladding Window Sealent Thermal Insulation Polyurethane 10mm
48
28.00
24.00
20.00
15.00
10.00
5.00
0.00
-5.00
49
Maquette - Scale 1:200
50
51
Maquette- Scale 1:200
52
Maquette- Scale 1:200
53
54
55
The Auditorium is hovering above the remnants of a concrete resrvoir which was used to maintain chemical substances; its previous function has been the main factor to contaminate the soil. Through this intervention, we will create an architectural solution to the specic circumstances of this site.
56
The Auditorium Hovering above the old concrete reservoir The Patio
57
The courtyard and patio are positioned lateral to the Auditorium and circulation through the project is mainly regulated by these two voids.
58
To reach the main foyer there are two choices; .The main ramp that links directly the foyer and the outside space .Through the courtyard
59
60
61
Manifesto
62
63
64
65
details aa
66
1
3
2
4 5 6 7 8
details aa
1:20
1 wooden acoustic panel, ame retardant and waterproof 15mm
5 40/40/8 mm steel prole; 50/374.5 mm steel channel
2 steel support for vertical louvre
6 horizontal steel structural framing
3 4 mm wooden sheet, 20 mm mineral-bre insulation
7 40/500 mm translucent polycarbonate multi-wall panel
4 wooden structural framing
8 column: 500/500 mm concrete
67
Main courtyard
68
69
70
71
72
73
Anamnesis is an attempt to reactivate the archeological site as a valuable public space and urban amenity which can have a fundamental role in the revitalization of the contemporary city. This proposal consists of a set of three architectural interventions: -Exhibition gallery to shelter the ruins of the Bal temple that scattered on site after the explosion in 2015. this intervention marks the periphery of Bel Temples peristyle. -House of prayer which bridges over the historical wall. This intervention hosts two praying halls located on the two sides of the historic wall for Muslims and Christians. -Memorial for the victims of the Syrian civil war. A bridge starts on the western gate of the historic city of Palmyra, close to the Diocletian camp, goes over the Afqa river. The bridge ends at the entrance of a grotto and eventually reaches for the Necropoli of Palmyra.
74
75
76
Photomontage, Exhibition area
77
Photomontage, Memorial
78
Photomontage, Praying house
79
Maquette Interventions on the Archeological site
80
81
Exhibition
82
House of prayer
83
84
Memorial
85
Memorial
86
House of prayer
Memorial
87
88
89
90
91
92
93
Architectural portfolio, October 2021