VERTICAL LIVING: THA DIN DAENG CONDOMINIUM

Page 1

THADINDEANGCONDOMINIUM THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023
THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023 RESIDENTIALAREA & COMMERCIALAREA

RESIDENTIAL FACILITYPROGRAMING

RESIDENTIALUNIT

LOBBYINCLUDINGJURISTICOFFICE, SERVICE,ANDPUBLICTOILET

UNDERGROUNDPARKING

TOTALAREA:9932.44sqm.

SALEABLEAREA:4552.15sqm.

NON-SALEABLEAREA:5380.29sqm.

GFA:10940.44sqm.

EFFICIENCY:44.24%

POOLDECKWITHPUBLICBATHROOM

TOTALAREA:1008sqm.

SALEABLEAREA:288sqm.

NON-SALEABLEAREA:720sqm.

1. 2. 3.
RESTURANT CAFE MINIMART PHARMACY LAUNDRY FITNESS
SWIMMINGPOOL
1. 2. 3. 4. 5. 6. 7. 8.
COMMERCIAL FACILITYPROGRAMING
THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023

UNIT

STUDIO:23UNIT

SINGLEBEDROOM(A):25UNIT

SINGLEBEDROOM(B):9UNIT

DOUBLEBEDROOM:26UNIT

TOTAL:83UNIT

THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023
THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023 TEMPERATURERANGE WINDVELOCITY GROUNDTEMPERATURE AVERAGERANGEWHICHGIVE NOSIGNOFEXTREMECLIMATE CONDITIONOFSITE 1. 2. 3.

SITE

ACCESSEDBYTHADINDAENG

ROADWITHTHEPOTENTIALOF

PUBLICTRANSPORTSUCHAS

THADINDAENGPIER, KLONGSANBTSSTATION,AND TRANSPORTVEHICLE.

SURROUNDEDBY COMMERCIALSPACEAS

MARKETANDMINIMARTFOR THECONVINENICEONBASIC HUMANNEED.

TARGETGROUPCANBE
THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023
USER PREFERPUBLICTRANSPORT ANDCOMMERCIALAREA.THE
CONSIDEREDASMIDDLE CLASS.
CONCEPTUAL DIAGRAM SITEINSPIRATION INCLUDEGRIDLINE SAPARATESECTION 1. 2. 3. BYTHISMETHOD, ITGENERATEAN IDEAONTHEFORM OFTHEBUILDING THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023

UNITPLAN

THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023

2nd-4thFLOORPLAN

THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023

5th-6thFLOORPLAN

THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023

ROOFPLAN

THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023

BYTHEARRANGEMENT,EVERYUNITCANRECIEVETHERIVERVIEWBYITSELF.

ELEVATIONA

THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023

THEFINISHINGMATERIALCANBEOPTIONASALUMINIUMCOMPOSITE,TILE,BRICK,ORWITHC-CHANELTOHIDE

THESTRUCTURE

ELEVATIONB

THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023

ELEVATIONC

THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023

ELEVATIOND

THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023

SECTIONA

THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023

SECTIONB

THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023

STRUCTURE ANDSYSTEM

POST-TENSION

STRUCTUREWITHTHE COLUMNOF1000x300 mm.

FLOORTOFLOOR:3.5m.

FLOORTOCEILING:2.9m.

THECENTEROF

PLUMBINGAND ELECTRICALSYSTEMARE ONTHEGROUNDFLOOR

TOBESUITABLEFOR MAINTANACE

THADINDAENGCONDOMINIUM VERTICALLIVING AMORNPONGASAWAPONGPULLKIT64120500023 INSTRUTOR:ELLIOTTVOTH ARC343ARCHITECTUREDESIGNSTUDIOIIISEMESTER1/2023

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.