Amr Ah. Gouda, Architectural work Portfolio

Page 1

A M R

A H .

A R C H I T E C T U R E

G O U D A P O R T F O L I O


HOSPITALITY

RESIDENTIAL SAMI SHAABAN VILLA (LP1-5)

…………..…………..

CONTENTS

WAJANAT VILLA (LP1-5)

…………..…………..

AL-HAMRA SQUARE (LP3-5)

…………..…………..

2

4 6

DAR OM HANY HOTEL (LP1-5)

…………..…………..

DYAR AL JAFARIAH HOTEL (LP1-5)

…………..…………..

21

RETAIL AL-AMIR SULTAN SHOPPING CENTER (LP1-5)

OFFICE

20

…………..…………..

23

MISCELLANEOUS AL-THANAYAN OFFICE VILLA (LP1-5)

…………..…………..

8

AL-SHARBATLY OFFICE BUILDING (LP1-5)

…………..…………..

10

HOTEL ENTRANCE (LP1-2)

……....………...…....

COMMERCIAL CHAMBER OF JEDDAH (LP1-2)

…………..…………..

12

ERFAN HOSPITAL (LP1-2)

……....…..…..

COMMERCIAL CHAMBER OF MECCA (LP1-2)

…………..…………..

14

SOFITEL HOTEL (LP1-2)

……....…..…..

16

SHOPPING CENTER 1 (LP1-2)

…………..…..

18

SHOPPING CENTER 2 (LP1-2)

……....…..…..

BIN DAWOOD SUPERMAKET (LP1-2)

……....…..…..

AL-MOFTY OFFICE BUILDING (LP1-5) AL-MORGAN OFFICE BUILDING(LP1-5)

…………..…………..

…………..…………..

25


RESIDENTIAL


2

SAMI SHAABAN VILLA, JEDDAH, SAUDI ARABIA SPINE Architecture and Engineering, 2012 (LP1-5). The project was a teamwork and my responsibilities included faรงades design and construction drawings. The villa overlooks the Red Sea directly.

Side Elevation

Entrance Elevation

WALL SECTION


3 ^

Ground Floor Plan

The concrete work of the villa was already finished, when we started working on the project. Our scope of work was to redesign the plans and elevations. Most of the additions were made using steel frames.

First Floor Plan


4 WAJANAT VILLA, JEDDAH SAUDI ARABIA SPINE Architecture and Engineering, 2011 (LP1-5). The project was a teamwork and my duties included concept design, design development, and construction drawings. The villa has an internal planted court located behind its main stair and directly in front of its main entrance.

Ground Floor Plan

SECTION D-D


5 ^

WALL SECTION

EAST ELEVATION

NORTH WEST ELEVATION


6 AL-HAMRA SQUARE, JEDDAH, SAUDI ARABIA SPINE Architecture and Engineering and Saudi Building and Construction Management (SBCM), 2011 (LP3-5). Teamwork and my duties included construction drawings . The project is a residential complex with four buildings. Each building has three apartments per floor and a penthouse at it top. The four buildings are gathered around a small internal court with small garden, seatings and kids playing area.

Typical Floor Plan (of one building)

Elevation 1

Elevation 2


OFFICE


8 AL-THANAYAN OFFICE VILLA, JEDDAH, SAUDI ARABIA

SPINE Architecture and Engineering, 2010 (LP1-5). The project was teamwork and my responsibilities included concept design, design development, 3D-modelling, and presentation. The total built area is 1062 sq meters. The building has a modern style that relies on the intersections of a number of rectangular forms and an L-shape shade marking its entrance.

Main Elevation

Side Elevation


9

Instead of placing parking spaces in front of the building like the neighboring buildings, a green area and a water element were provided to emphasize the entrance and improve the users’ view users. The building is already constructed and operational. The internal working area was designed as an open plan office to increase interaction, productivity, and flexibility. The working area has good natural lighting.

SECTION B-B


10

AL-SHARBATLY OFFICE BUILDING, JEDDAH, SAUDI ARABIA SPINE Architecture and Engineering, 2009 (LP1-5). The project was a teamwork and my responsibilities included concept design, modelling, presentation, design development, and construction drawings. The project is a mixed tower with two basements and 13 floors holding retail and office spaces.

GROUND FLOOR PLAN

FIRST FLOOR PLAN

WALL SECTION


11

STAIR DETAIL

EAST ELEVATION

STAIR DETAIL

ELEVATOR DETAIL

METAL STRUCTURE DETAIL

SECTION A-A


12

COMMERCIAL CHAMBER OF JEDDAH, JEDDAH, SAUDI ARABIA

SPINE Architecture and Engineering, and Nawaf Attar Architectural Consultants, 2012 (LP1-2). The proposal is an individual work and my responsibilities included concept design, 3D-modelling, and presentation. It was submitted in a limited competition for designing an extension to the existing commercial chamber.


13

The new building was designed as a modern light house with smooth lines. It contrasts the rigid lines and form of the existing building. The two buildings were bound together with an elevated link and an oriental pattern covering both.

Water elements, green areas, and shades from flying slabs and the elevated link sooth the high weather temperature and improve the walking experience. The oriental pattern partially shades the facades and decrease solar radiation.


14 COMMERCIAL CHAMBER OF MECCA, MECCA, SAUDI ARABIA SPINE Architecture and Engineering, and Nawaf Attar Architectural Consultants, 2011 (LP1-2) The proposal is an individual work and my responsibilities included concept design, 3D-modelling, and presentation.

The building aimed to deliver an iconic form with a modern from and clear lines combined with a traditional tinge. The latter was made by using an oriental pattern that convers parts of the faรงades. Beside its aesthetics it a passive measure to decrease energy consumption by decreasing the external openings and solar radiation. Moreover, Multiple measures were adopted to naturally sooth the high weather temperature and assure good natural lighting including internal courts, floor plates with small depths, water elements, and shaded facades.


15

PV panels were used on the roof to generate a part of energy needed by the building. A semi-shaded roof garden was provided to increase the amiability of building to its users and it works with the white roof in decreasing the heat island effect.

No surface parking spaces were provided in front of the building and were substituted by green areas to improve walkability. A few number of surface parking spaces were provided at the back of the building, in addition to an underground parking.


16 AL-MOFTY OFFICE BUILDING, JEDDAH, SAUDI ARABIA SPINE Architecture and Engineering, 2009 (LP1-5). The project was a teamwork and my responsibilities included concept design, modelling, presentation, design development, and construction drawings. The project is a mixed use 12-storey building that includes retail, office and residential spaces. It was designed as twin towers to maximize natural lighting and provide a good view for most offices. The towers are connected by a naturally link that overlooks the city. Each typical floor holds six open plan offices. The ground floor is a retail space and the top two floors hold a penthouse.

Side Elevation

Main Elevation


17

Typical Floor Plan

Penthouse First Floor


18

AL-MORGAN OFFICE BUILDING, JEDDAH, SAUDI ARABIA SPINE Architecture and Engineering, 2009 (LP1-5). The project was a teamwork and my responsibilities included concept design, modelling, presentation, design development, and construction drawings.

FIRST FLOOR PLAN

SOUTH ELEVATION

SECTION C-C

STAIRS DETAIL



20 DAR OM HANY HOTEL, MECCA, SAUDI ARABIA

The site shape was irregular with an area of 225 sq meters. The building is located in one of the most expensive areas in the world where a one sq meter of land can cost up to 400,000 $ (in the vicinity of Grand Mosque in Mecca). Accordingly, every sq centimeter counted and had to be leveraged while keeping wasted areas had to be minimum. The final typical floor plan accommodated eight rooms per floor.

SPINE Architecture and Engineering, 2009 (LP1-5). The project was a teamwork and my responsibilities included concept design, 3d-modelling, presentation, design development, and construction drawings. The Building was constructed in 2010. Typical Floor Plan

Main Elevation


21 DYAR AL JAFARIAH HOTEL, MECCA, SAUDI ARABIA SPINE Architecture and Engineering, 2009 (LP1-5).

The project was a teamwork and my responsibilities included concept design, modelling, presentation, design development, and construction drawings. The building has 13-stories that holds 44 rooms per floor, retail spaces, and a restaurant. The project design and construction had a compressed time schedule to catch the Hajj season of 2011. The building is currently operational.

Typical Floor Plan

Main Elevation

Ground Floor Plan


RETAIL


23 AL-AMIR SULTAN SHOPPING CENTER, JEDDAH, SAUDI ARABIA

SPINE Architecture and Engineering, 2012 (LP1-2). The project was a Teamwork and my duties included concept design, 3D-modelling, and presentation for a traditional proposal. In addition to participating in the concept development of the other two proposals.

The project location overlooks one of the most important commercial streets of Jeddah. Multiple proposals with different styles that varied between traditional, hi-tech, and modern, were developed to satisfy the client’s requirements.



25

HOTEL ENTRANCE, JEDDAH, SAUDI ARABIA

ERFAN HOSPITAL, JEDDAH, SAUDI ARABIA (faรงades renovation)

SOFITEL HOTEL, JEDDAH, SAUDI ARABIA (faรงades renovation)

Individual work/ concept design, 3Dmodelling, and presentation (LP1-2).

Teamwork/ concept design, 3D-modelling, and presentation (LP1-2).

Individual work/ concept design, 3Dmodelling, and presentation (LP1-2).

SHOPPING CENTER 1, JEDDAH, SAUDI ARABIA

SHOPPING CENTER 2, JEDDAH, SAUDI ARABIA

BIN DAWOOD SUPERMARKET, JEDDAH, SAUDI ARABIA

Teamwork/ concept design, 3D-modelling, and presentation (LP1-2).

Individual work/ concept design, 3Dmodelling, and presentation (LP1-2).

Individual work/ concept design(LP1-2).


A M R

A H .

G O U D A

HĂźgelschanze 19, 13585 Berlin, DE +49 (0)17621774284 amr.gouda@eng.asu.edu.eg


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.