Amr Farag - Architecture Portfolio

Page 1

PORTFOLIO

AMR FARAG ARCHITECT


RESUME 1

JINAN SCIENCE & TECHNOLOGY PARK

CSCEC 3

QILIAN RESEARCH& TECHNOLOGY ISLAND

CSCEC 9

RESIDENTIAL BUILDING

ontents

ELEGANTRY

KORBA HEIGHTS (K 06)

ACADEMIC PROJECT 13 Arkan Consultants 19 ARKAN Consultants 25


WHITE CITY

ACADEMIC PROJECT 31

VILLA

INTERIOR RECEPTION & Kitchen

PRIVATE PROJECT 37

PRIVATE PROJECT 41

INTERIOR RECEPTION

PRIVATE PROJECT 45

Costa Coffee

PRIVATE PROJECT 49

Classic Villa

PRIVATE PROJECT 50


Contacts Telephone +8613162413001 Email Amrfarag135@gmail.com Address Shanghai, China. Linkedin /AMRFARAG

EDUCATION 2010 - 2015 BACHELORES DEGREE Al-Azhar University (Egypt) B.Sc. in Architecture , Faculty of Engineering. GRADUATION PROJECT Project (Development of the new Suez canal axis) I was awarded with ‘’Very Good’’ .

Info. Nationality Egyptian

LANGUAGES

Driving License Millitary Status

Arabic

Egyption Completed

English

Intersts

AMR FARAG About me I’m a 28 years old an Architect at CSCEC, Based in Shanghai, China. I have been working at CSCEC since December 2018. I see myself as a motivated person which faces every challenge that comes on his way .

Résumé

I seek to be an architect who provides orginal designs and solutions that respond to the demands of contemporary society. I have a positive attitude also i find it easy to communicate with different people. Here You can find out my attitude, design skills, presentation and my knowledge of different Architecture software.

PROFESSIONAL SKILLS

Reading and Crochet

WORK EXPERIENCE 12/2018 - NOW

AutoCAD Revit

CSCEC China Shanghai Architectural Design & Research Institute Co., LTD

3DS MAX

Architect -Projects Scale -Mixed Use Area (DAO Panama Tower in Panama) (Shepherd’s Zhongtian Land in LanZhou, China) -Research And Technology Area (Jinan Science and Technology Park in Jinan, China) (Qilian Island in China)

Photoshop Lightroom Illustratortor InDesign SketchUp M.Office Plugins

Vray

-Preparation of conceptual design of the projects such as Studies, Layouts, Elevations and Plans. -Preparation of design developmet drawings. -prepare the working drawing that can be used; by a contractor to construct the works, or by suppliers to fabricate components of the works.


8/2017 - 11/2018

7-8/2014

ARKAN CONSULTANTS

Misr Petroleum

Junior Architect

Trainee

-Projects Scale -Residential Compound (KORBA HEIGHTS AT NEW HELIOPOLIS) -Commercial &Clinical Malls (ELEGANTRY AND NORTH PLUS AT NEW CAIRO) -Preparation of design developmet drawings. -prepare the working drawing that can be used; by a contractor to construct the works, or by suppliers to fabricate components of the works. or to assemble or install components.

12/2016 - 8/2017

EL-Sarh Contracting Site Architect (VILLA 279&280 AT SOUTHERN ACADEMY ,NEW CAIRO) (VILLA 169 AT WEST GOLF ,NEW CAIRO) management of the site including supervising and monitoring the site labour force . AutoCad , Calculating the materials , Ensure that All materials Are used , Resolving the site problems .

(Office building At Musturud) management of the site including supervising and monitoring the site labour force . 7-8/2013

AL-Huda (construction) Trainee (Two Residential building At New Cairo) management of the site including supervising and monitoring the site labour force . AutoCad , Calculating the materials , Ensure that All materials Are used , Resolving the site problems . 7/2012

DETAC (Construction & Trading) Trainee (General Authority for Investment and Free Zones) management of the site including supervising and monitoring the site labour force .

VOLUNTEER EXPERIENCE 7/2015 - 10/2015

9/2013

AL-Huda (construction)

Resala Charity Organization

Junior Architect

Volunteer

(VETERINARY HOSPITAL AT MAADI) Involved in Conceptual Design process .

(The Seaside Oasis) A Camp for three days to help poor people at the Egyptian western Desert to find a safe place to live.

CERTIFICATIONS & REFERENCES Available upon request.


JINAN SCIENCE AND TECHNOLOGY PARK

3 Location:

Jinan, China.

Client:

SDIFDC

Area:

135000 m2

Year:

2020

Software:

AutoCAD, 3DS MAX, SketchUP, Illustrator, Photo Shop.

Description:

Our project was a sequence of phases to create a new technology and innovation hub at Jinan City with total area 900,000 m2 , Our focused area divided to 2 kind of Researches, The first one is a trade zone for Food and Drugs researches and the second one is a Platform for animal Researches.

Functional Zoning

Responsibilities: Main Axis Our team has 4 Architects, Firstly I go through finding a similar projects for some R&D which shows us the thick lines for the project then I started to work with one colleauge to have a 2D Masterplan and from that masterplan we put an imagination for the platform by designing the pubilc areas and the facade.

Masterplan Total Area Masterplan


4 Design Process

Green Corridor

Sky Corridor

Creating Gardens

Terraces

Landmark

Courtyard

Functions

Labratories

Commercial

Links

Service Building


5

JINAN SCIENCE AND TECHNOLOGY PARK

Planning Process

Fire Fighting Network

Car Flow

Parking

Pedestrian Flow

Skyline

Bird Eye View


6

Architectural Plan


7 Sky Corridor

JINAN SCIENCE AND TECHNOLOGY PARK

Topography Design -We aim to Create a combination between work, Leisure and communication atmosphere. -Sink Plaza, Courtyards, Roof garden and sky corridors which create a superb work environment.

Group Buildings

Key Plan Centeral Plaza

Courtyard

0.00 +7.00 +7.00 0.00

0.00 -4.00

-4.00

-4.00

Sink Plaza


8

Topography Design -We aim to Create a combination between work, Leisure and communication atmosphere. -Sink Plaza, Courtyards, Roof garden and sky corridors which create a superb work environment.

Sky Corridor

Key Plan

Hill Garden

+7.00

0.00

4.00

0.00 -4.00

0.00 0.00 -4.00

Multifunctional Garden

Main Plaza


QILIAN RESEARCH& TECHNOLOGY ISLAND

9 Location:

Jining, China.

Client: Area:

The ShanDong Provincial People’s Government 1120000 m2

Year:

2019

Software:

AutoCAD, 3DS MAX, SketchUP, Illustrator, Photo Shop.

Description:

Our project is settled in Shandong province which is a comprehensive experimental zone for the conversion of new and old kinetic energy, we aim to deliver a good idea for Science and technology hubs which can be a role model for the same project around china.

Jining Airport

Jining North Railway Station

Jining East Railway Station

Site

Jining Qufu Airport

Site location and connectivity to other cities

Site Exhibition

Responsibilities:

Research Office Area

Mixeduse Area

Site location and surrounding main roads

Research and Innovation Service Area

Our team has 4 Architects, Our main Responsibility was to develop the masterplan which has been done by Tongji Architecture Firm, I started to work on 3 options for the landmark Building, Also I had to put an imagination for the city Skyline and Façade.

Research and Innovati Area Leisure Green Axis

Mixeduse Area Mixeduse Area

Leisure Green Axis

Site 商

Site location and surround

Industrial Park Green Area Residential Public Facility Business Area

Design Concept


10

Overall View

ion Service

A A

Masterplan

Section A-A


11

QILIAN RESEARCH& TECHNOLOGY ISLAND

Building Function

Building Height

0-30m 30-60m 60-90m 90-150m

Landmark Building

Pedestrian Bridge

Open Space Courtyards View Corridors

Cultural& Leisure Park

Central Park

Chuangxian Park

Waterfront Park

Technology Art Park

Bird Eye View


12


ESIDENTIAL BUILDING

13 Location:

Giza, Egypt.

Client:

Academic Project

Area:

1200 m2

Year:

2013

Software:

REVIT, 3DS MAX, Photo Shop.

Description:

Residential building located in Giza, Egypt.

Responsibilities: -Exterior and Interior Design. -Modeling&Visualizing.


14

-

N -

-

-

-

www.autodesk.com/revit

Pr

-

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

Da

Dr

Ch

Sc

03 GR (furnished)

No.

1

05 typical (furnished)

1 1 :Floor Typical 100

Description

Date

04 CO (furnished) 1 : 100

Owner Project Name Unnamed


RESIDENTIAL BUILDING

15

Ma


ain Elevation

16

West Elevation


RESIDENTIAL BUILDING

17

Back Elevation

Sectio


on

18

Section


19 Location:

Cairo,Egypt

Client:

UDG

Area:

20000 m2

Year:

2017

Software:

AutoCAD

Description:

Elegantry is an iconic business hub located in New Cairo. It offers administrative offices, commercials and medical clinics with a full range of facilities located in one building.

Responsibilities: -Compiling data for architectural plans,specitictions and reports .

ELEGANTRY

-Preparation of design development . -prepare the working drawing that can be used; by a contractor to construct the works, or by suppliers to fabricate components of the works .


20

Dimention Plan

Ceiling Plan


21

LEGANTRY

Flooring Plan

Furnished Plan


22

1

Y-13

Y-13

2

X-04

X-05

X-06

2

Y-14

Y-14

Y-15

Y-15

X-01

X-02

X-03

X-04

X-05

X-06

02

Main Elevation

X-04

X-05

X-06

Y-15

Y-14

Y-13

Y-12

Y-11

ELEG

ELEG

ELEG

ELEG

ELEG

-6.40

-6.40 F.F.L

F.F.L

PUMP ROOM B3 009

-10.35

-10.40

F.F.L

F.F.L

-10.30 F.F.L

-10.35 F.F.L

-11.00 T.O.S.S

04

03

Sectional Elevation X-02

X-03

X-04

1

Details Y-15

Y-14

Y-13

Y-12

Y-11


23 1

X-13

X-14

X-15

X15'

--

--

--

--

X-16

X-17

X-18

--

--

--

PAINT

X-19

X-20

--

--

CLADDDING X-20'

X-21

--

--

CLADDDING TOP OF PARAPET +15.35

L 3 +14.05 T.O.SS

CW02

CW03

CW04

CW05

L2 +10.05 F.F.L

X-06

X-07

X-08

X-09

X-10

X-11

X-12

--

--

--

--

--

--

--

L1 +6.05 F.F.L

GR +1.85 F.F.L

TOP OF PARAPET +0.85

CLADDDING

CW01

-1.45 F.F.L -2.35

-2.50

F.F.L

B1 -2.50

F.F.L

F.F.L

INTERNAL ELEVATION

LEGANTRY

Internal Elevation X-06

X-07

X-08

X-09

X-10

X-11

X-12

X-13

X-14

X-15

X15'

X-16

X-17

X-18

X-19

X-20

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

CW11

CW11

CW11

CW11

CW11

CW11 CW11

CW11

CW11

CW11

CW11

CW11

CW11 CW11

CW11

CW10 CW10

CW10

CW01

CW07

CW05

CW04

CW01

CW04

CW05

CW01

CW04

CW05

CW01

CW05

CW01

CW04

CW01

CW04

CW04

CW05 CW05

CW01

CW04

CW01

CW04

X-13

X-14

X-15

X15'

X-16

X-17

X-18

X-19

X-20

--

--

--

--

--

--

--

--

--

CW01

Detailed Plan

CW04

CW01

CW08 CW01 CW01

CW01

CW04

CW05

CW04

CW05

CW04

CW04

CW01

CW05

CW01

CW05

CW05

CW04

CW04

CW01

CW01

CW04

CW01

CW09 CW05

CW04

CW05

CW04

CW01

CW05

CW01

CW01

CW04

CW04 CW04

CW10 Details

CW11


1

4 1:5

1

-

-

T

-

-

T

T

1:5

1:5

1

4 1:5

T

1

1

1:5

1 1:5

1:5

25

26

25

26

25

26

25

26

--

--

--

--

--

--

--

--

1:5

24

D

F.F.L -4.11

F.F.L +8.12

F.F.L -2.50

-

-

S

S

R

F.F.L +10.05

-

--

-

S

UP

-

-

R

R

FLOORING

-

04

2

1

-

-

05

06

F.F.L +7.96

--

R

R

--

--

R

R

--

--

R --

W.C

W.C

TYP. 067

TYP. 067

+5.45 F.F.L

W.C

+5.45 F.F.L

+5.45 F.F.L

TYP. 067

+2.80 F.C.L

UP

-

-

R

R

FLOORING

-

04

1:25

ELEG_AST_404

R

-TYP. 067

ELEG_AST_505

F.F.L -4.44

1

R W.C

S

ELEG_AST_505

5

S

S

S

S

S

S

S

--

--

--

--

--

--

--

--

T

T

T

T

T

T

T

T

--

--

--

--

--

--

C

--

-

-

05

06 25

1:25

ELEG_AST_404

DETAILED PLAN @ LEVEL B2 -6.40

S

--

DETAILED PLAN @ LEVEL L1 +5.45

1

ELEG_AWA_169

-

-

T

-

T

26

25

--

--

DIMENTION PLAN@ LEVEL TYP.

26 --

2

FLOORING PLAN@ LEVEL TYP.

ELEG_AWA_169

1:25

3

25

26

--

--

ELEG_AWA_169

1:25

--

1

25

1

--

4

1:5

REFLECTED CEILING@ LEVEL TYP.

ELEG_AWA_167

1:25

4

26

--

1:5

FURNITURE PLAN@ LEVEL TYP.

1:5

1:25

-

T

T

5

F.F.L +4.27

F.F.L -7.88

5 1:5

6

6

1:5

7

7

1:10

1:10

1:5

1:5

F.F.L -6.40

-

-

S

F.F.L +6.05

-

S

-

S

ELEG_AST_505

S

ELEG_AST_505

1

F.F.L -8.38

F.F.L +3.79

1

UP

-

-

R

R

UP

-

-

R

R

WIRE-MESH WELDED TO STEEL PLATE STEEL TUBE Ø 50mm. DIA 50mm STEEL RAIL 50 mm DIA. PAINTED STEEL PIPE

FLOORING

-

04

-

-

05

06

FLOORING

-

04

-

-

05

06

DIA. 25mm STEEL PIPE POST WELDED TO STEEL PLATE B

STEEL BRACKETS SCREWED TO WALL 1:25

ELEG_AST_404

1

1:25

ELEG_AST_404

4

DETAILED PLAN @ LEVEL B3 -10.35

FLANGE COVER GLUED TO BRACKET

DETAILED PLAN @ LEVEL GR +1.25

STEEL PLATE 150X150X4mm. ANCHORED TO WALL

-

-

-

T

T

T

-

ELEVATION SCALE 1:25

A

T

DIA. 25mm STEEL PIPE POST WELDED TO STEEL PLATE

CONCRETE BASE

F.F.L -0.07 5

INTERNAL ELEVATION (1)

ELEG_AWA_169

F.F.L -10.20

-

S

-

-

S

S

ELEG_AST_505

F.F.L +1.85

F.F.L -8.38

F.F.L -0.55

1

UP

ELEG_AWA_169

1:25

R

R

R

R

FLOORING

-

-

05

-

FLOORING

FLOORING

-

06

04

02

03

05

06

-

-

R

-

-

05

04

6

1:5

1:10

1:5

11 1:5

09

10

1:5

06 05

10

1:5

1:5

08

04

NOTE: GALVANIZED STEEL TO BE USED AT ESCAPE STAIRS STAINLESS STEEL TO BE USED AT MAIN STAIRS

5 09

08 -

-

10mm THICK STEEL PLATE ANCHORED TO CONC. FAIRFACE CONCRETE

SCALE 1:10

Wet Area

-

04

1:25

SECTION

UP

-

01

ELEG_AWA_169

1:25

CONCRETE WITH SMOOTH SURFACE AND EPOXY SEALER FINISH FLANGE COVER

INTERNAL ELEVATION (3)

-

-

Stair

7

INTERNAL ELEVATION (2)

S

ELEG_AST_505

1

6

11

1:5

1:5

1:5

05

R

-

-

+12.01 F.F.L

1

UP

ELEG_AST_505

S -

S

06

05

04

-

-

-

-

+14.15 F.F.L

+12.18 F.F.L

L4 +17.55 T.O.SS

T

T

-

-

PAINT

1

DETAILED PLAN @ LEVEL L3 +13.45

ELEG_AST_405

1:25

-PART 1

+14.15

L3 +14.15 F.F.L

F.F.L

+1.85

GR +1.85 F.F.L

F.F.L

08

09 1:5

06

05

04

-

-

-

F.F.L L4 +17.55 T.O.SS

-0.55 F.F.L

L3 +14.15 F.F.L

+10.05

L2 +10.05 F.F.L

F.F.L

L2 +10.05 F.F.L

-2.50

B1 -2.50 F.F.L

F.F.L

L1 +6.05 F.F.L

+8.12 F.F.L

-4.11

PART 2 PART 1

GR +1.85 F.F.L

F.F.L -4.44 F.F.L

+6.05

B1 -2.50 F.F.L

L1 +6.05 F.F.L

F.F.L

B2 -6.40 F.F.L

B2 -6.40 F.F.L +4.27 B3 -10.35 T.O.SS

F.F.L

PAINT

+3.79

-7.88

F.F.L

F.F.L -8.38 2

DETAILED SECTION

ELEG_AST_405

F.F.L

1:100

PART 2 --

Stair (Detailed Sec.)

10 1:5

+12.18 F.F.L

-0.07

Details

1:5


25 Y-08

Y-07

k06

Y-06

k06

Y-05

k06

Y-04

k06

Location:

Cairo,Egypt

Client:

HDG

Area:

42,000 m2

Y-03

k06

4

Y-02

k06

4

PAINT

PAINT

Y-01

k06

k06

3 +23.60 TOP OF PARAPET

PAINT

PAINT

+21.90 TOP OF PARAPET

+20.35

+20.20 TOP OF PARAPET

TOP OF PARAPET

ROOF +19.40 F.F.L

50 MM GROOVE

L 6 +16.20 LOUVERS

CLADDING

F.F.L

PAINT

METAL

Year:

2017

Software:

AUTOCAD

Description:

Korba Heights falls in new Heliopolis city, covering an area of roughly 42,000 square meters in a prominent and visible location directly connected to the downtown.

L5 +13.00 F.F.L CLADDING

L4 +9.80 F.F.L

L3 +6.60 F.F.L

L2 +3.40 F.F.L

PAINT

PAINT

L1 +0.20 F.F.L

-3.25 T.O.S.S

GR -3.00 F.F.L GR -3.75 F.F.L

-7.35 T.O.S.S

B

-7.50

F.F.L

Responsibilities: -Compiling data for architectural plans,specitictions and reports.

KORBA HEIGHTS

-Exterior and Interior Design. -Modeling. -Prepare the working drawing.


26 01

02

03

04

05

05

GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.

D

05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D

07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .

C

C

MODIFICATIONS REV

DESCRIPTION

BY

DATE

10 09 08 07 06 05 04 03 02 01 00

-----------------

-----------------

-----------------

-----

11-1-2018

FOR INFORMATION

B K19

K1 K20

K14

K21

K18

K2

K17

K3

K16

K4

K5

K15

K6

K13

K12

K11

K10

K9

K8

K7

PROJECT :

B

KORBA HEIGHTS OWENER :

Heliopolis Developers Group A

MAIN CONSULTANT :

A

SHEET TITLE BUILDING K_06 BASEMENT LEVEL FLOOR PLAN -7.50

DWG SIZE A

DRAWING NUMBER

1

CHECKED

:

1:50 APPROVED : 01

Dimention Plan

02

03

04

05

05

DWG REV

K06_APS_ 101_B -7.50

0

CAD FILE NAME DESGIN &DRAWN BY:

00

K06_APS_ 101_B -7.50.dwg AMR MUSTAFA NADA EZAT MONA GOMAA MOHAMED NAGUIP

ALI ABDELAZIZ

MOHAMED TITO MOSTAFA MAGDY DOHA SHALPI AMINA SHAKER

DRAWING SCALE 1:50

S.N. 001 11/01/2018

REV DATE PROJECT NO :

16002


27 01

02

03

04

05

05

GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.

Y-01

Y-01

k06

k06

1

Y-03 k06

Y-05

Y-04

Y-07

Y-06

k06

k06

2

03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN.

Y-08

k06

k06

k06

04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.

D

1

05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.

+23.60

06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT.

TOP OF PARAPET D

07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION .

+21.90 TOP OF PARAPET

PAINT

08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL .

PAINT

PAINT

+20.35 TOP OF PARAPET

09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .

+20.20 TOP OF PARAPET

ROOF +19.40 F.F.L

C

L 6 +16.20 F.F.L CLADDING

L5 +13.00 C

F.F.L

L4 +9.80 F.F.L

LOUVERS 50 MM GROOVE

METAL

L3 +6.60 PAINT

PAINT

F.F.L

MODIFICATIONS REV

DESCRIPTION

10 09 08 07 06 05 04 03 02 01 00

PAINT

L2 +3.40

------------------FOR INFORMATION

BY

DATE

-------------------

------------------11-1-2018

F.F.L B K19

K1 K20

K21

K18

K2

K17

K3

K16

K4

K14

K5

K15

L1 +0.20 K6

K13

F.F.L K12

K11

K10

K9

K8

K7

PROJECT :

KORBA HEIGHTS

B

KORBA

GR -3.00

-3.30 T.O.S.S

F.F.L

HEIGHTS

GR -3.75 F.F.L

OWENER :

Heliopolis Developers Group A

MAIN CONSULTANT :

-7.35 F.F.L

A

-7.50 F.F.L

B

-7.50

F.F.L

SHEET TITLE BUILDING K_6 ELEVATION (1)

DWG SIZE A

ELEVATION

1

DRAWING NUMBER K6-AES-201

0

CAD FILE NAME

1:50

DESGIN &DRAWN BY:

CHECKED

:

APPROVED : 01

Main Elevation

02

03

04

05

05

DWG REV 00

K06_AES_201.dwg AMR MUSTAFA NADA EZAT MONA GOMAA MOHAMED NAGUIP

ALI ABDELAZIZ

DRAWING SCALE 1:50

S.N. 001 11/01/2018

REV DATE MOHAMED TITO MOSTAFA MAGDY DOHA SHALPI AMINA SHAKER

PROJECT NO :

16002


28 X-15

X-14

X-13

X-12

X-11

k06

k06

k06

k06

k06

X-010 1

k06

X-09

X-08

X-07

X-06

X-05

X-04

X-03

k06

k06

k06

k06

k06

k06

k06

X-02

X-01

k06

k06

PAINT

+23.60 TOP OF PARAPET

PAINT

PAINT

D

+21.90 TOP OF PARAPET PAINT

PAINT

PAINT

+20.20 TOP OF PARAPET PAINT PAINT 50 MM GROOVE

C

LOUVERS

20 MM GROOVE

METAL

B

+0.85 F.F.L +0.20 F.F.L

+0.10 F.F.L

-3.25

-3.25

T.O.S.S

T.O.S.S

-6.20 F.F.L

-7.35

-7.50 F.F.L

F.F.L

A

Side Elevation

Dimention Plan

Y-01

Y-02

Y-03

Y-04

Y-05

Y-06

Y-07

K06

K06

K06

K06

K06

K06

K06

+23.30

Y-08

Y-09

Y-10

Y-11

Y-12

K06

K06

K06

K06

K06

T.O.S.S

+21.90 TOP OF PARAPET

+20.65 +20.35

PAINT

T.O.S.S

+20.20

TOP OF PARAPET

TOP OF PARAPET

ROOF +19.40 F.F.L

BEDROOM L6

M.BEDROOM

00

L6

BEDROOM

00

L6

BEDROOM

00

L6

00

PAINT

L 6 +16.20 F.F.L +21.42 F.F.L

BEDROOM L5

M.BEDROOM

00

L5

BEDROOM

00

L5

BEDROOM

00

L5

00

L5 +13.00

2 K06-AST-503

F.F.L

DETAILED PLAN @ LEVEL B1 1:25

+18.22 F.F.L

BEDROOM L4

M.BEDROOM

00

L4

BEDROOM

00

L4

BEDROOM

00

L4

00

L4 +9.80 F.F.L +15.02 F.F.L

BEDROOM L3

M.BEDROOM

00

L3

BEDROOM

00

L3

BEDROOM

00

L3

00

L3 +6.60 F.F.L +11.82 F.F.L

BEDROOM L2

M.BEDROOM

00

L2

BEDROOM

00

L2

BEDROOM

00

L2

00

L2 +3.40 F.F.L +8.62 F.F.L

BEDROOM L1

M.BEDROOM

00

L1

3

00

K06-AST-503

ENTRANCE L1

DETAILED PLAN @ LEVEL GR & L2 TO L6 1:25

00

L1 +0.20 F.F.L +5.42 F.F.L

STORAGE GR

00

STORAGE GR

00

KITCHEN GR

BATH

00

GR

00

STORAGE GR

00

STORAGE GR

00

STORAGE GR

00

GR -3.00 F.F.L GR -3.75

-4.18

F.F.L

F.F.L

-6.20 F.F.L

-7.35 F.F.L

B

-7.50

F.F.L

Section

Garbage chute 1

DETAILED SECTION

4

DETAILED PLAN @ LEVEL L1

5

DETAILED SECTION PART 1OF2

5

DETAILED SECTION PART 2OF2


29 01

02

03

04

05

05

GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.

D

05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D

07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .

C

2

DETAILED PLAN @ LEVEL B1

K06_AST_501

1:25

C

MODIFICATIONS REV

DESCRIPTION

10 09 08 07 06 05 04 03 02 01 00

BY

DATE

11-1-2018

FOR INFORMATION

B K19

K1 K20

3

K21

K18

K2

K17

K3

K16

K4

DETAILED PLAN @ LEVEL GR TO L6

K06_AST_501

1:25

K14

K5

K15

K6

K13

K12

K11

K10

K9

K8

K7

PROJECT :

KORBA HEIGHTS

B

KORBA HEIGHTS OWENER :

Heliopolis Developers Group A

MAIN CONSULTANT :

A

SHEET TITLE BUILDING K_06 SECTIONS

DWG SIZE A

DRAWING NUMBER K06-AST-501

0

CAD FILE NAME

4

DETAILED SECTION

K15_AST_501

4

TYP. STAIR DETAILED SECTION

K06_AST_501

1:50

5

DETAILED SECTION PART 1OF2

K06_AST_501

1:10

5

K06_AST_501

1:10

1:10

CHECKED

:

APPROVED : 01

Stair

02

03

04

05

05

DWG REV 00

K06_AST-501

DESGIN &DRAWN BY:

DETAILED SECTION PART 2OF2

NADA EZAT MONA GOMAA MOHAMED NAGUIP AMR MUSTAFA ALI ABDELAZIZ

DRAWING SCALE

S.N. 001

1:25 REV DATE

MOHAMED TITO DOHA SHALPI AMINA SHAKER MOSTAFA MAGDY

11/01/2018

PROJECT NO :

16002


30 01

02

03

04

05

05

GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.

D

05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D

07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .

C

C

MODIFICATIONS REV

BY

DESCRIPTION

10 09 08 07 06 05 04 03 02 01 00

DATE

11-1-2018

FOR INFORMATION

B K19

K1 K20

K21

K18

K2

K17

K3

K16

K4

K14

K5

K15

K6

K13

K12

K11

K10

K9

K8

K7

PROJECT :

B

KORBA HEIGHTS OWENER :

Heliopolis Developers Group A

MAIN CONSULTANT :

A

SHEET TITLE BUILDING K_06 DOOR & WINDOWS

DWG SIZE A

DRAWING NUMBER

1

CHECKED

1:50 01

Doors and Windows

02

:

APPROVED : 03

04

05

05

DWG REV

K00-ASD-SCHEDULE DOOR -701

0

CAD FILE NAME DESGIN &DRAWN BY:

00

DOOR & WINDOWS NADA EZAT MONA GOMAA MOHAMED NAGUIP MOSTAFA MAGDY ALI ABDELAZIZ

DRAWING SCALE

S.N. 001

1 : 50

11/01/2018

REV DATE MOHAMED TITO DOHA SHALPI AMINA SHAKER AMR MUSTAFA

PROJECT NO :

16002


31 Location:

Sinai,Egypt

Client:

Academic Project

Area:

1,000,000 m2

Year:

2015

Software:

REVIT, Photo Shop.

Description:

White city (A research city to develop the new suez canal axis).

Responsibilities:

WHITE CITY

-MasterPlanning. -Exterior and Interior Design. -Modeling&Visualizing.

Project Location Area Tabulation : Total Area : 400.000 M Sqm . Components : 1Research center : 7000 Sqm . 2 floors . 2Convention Center : 6500 Sqm . 3 floors . 3Plaza’s Restaurant : 1000 Sqm . 2 floors . 4Office Building : 25000 Sqm . 10 floors . 5Shopping Center : 25000 Sqm . 1 floor . 6Residential Building : 2250 Sqm . 3 floors. 7Villa : 13000 Sqm . 8Parking : 20000 Sqm . 9Hotel : 35000 Sqm. 14 floors. 10- Researcher’s Motel : 3650 Sqm . 5 floors .

Area tabulation


32

<Research Center Unit

No.

Area sqm

Administration Meeting Room Game Room Computer lab. Ballroom Lab. Class 1 Class 2 Library 1St floor Library 2Nd floor

1 2 1 1 1 6 3 2 1 1

35 X 12 10 X 20 16.5 X 11 16 X 12 30 X 25 16 X 11 10 x 10 10 X 20 12 X 30 25 X 30

3 4 1 1 4 zones

15 X 10 12 X 8 6.5 X 12 35 X 15 40 X 10

1 1 1 2 1 6 4 2

45 X 25 25 X 25 15 X 25 14.5 X 25 12 X 15 7.75 X 6.5 9.5 X 7.75 5 X 8.5

Room

300

Royal Suite

2

Amdassador Suite

3

Diplomatic Suite

15

Executive Suite

25

Ballroom Kitchen Laundry Storage Restaurant Bar Gym & Spa Administration Business Offices

1 1 1 1 2 1 1 1 1

54 Sqm for unit 324 Sqm for unit 216 Sqm for unit 162 Sqm for unit 108 Sqm for unit 25 x 50 18 X 15 12 X 16 12 X 16 40 X 15 12.5 X 12.5 25 X 20 20 X 15 20 X 15

<Museum Hall 1 Hall 2 Hall 3 Projector Room Kids zone <Convention Center Hall1 1St floor Hall1 2Nd floor Hall 2 Hall 3 Administration Meeting Room1 Meeting Room2 Rest Room

<Hotel

LayOut


WHITE CITY

33

Master plan

Section


34


WHITE CITY

35

Plans

Section


36


37 Location:

Giza, Egypt

Client:

Eng . Mahmoud Nasr

Area:

600 m2

Year:

2013

Software:

REVIT

Description:

Responsibilities: -Compiling data for architectural plans,specitictions and reports . -Exterior and Interior Design. -Modeling

Villa

-Prepare the working drawing.


38 1

2

3

4

10.52

5.00 0.73

3.48

4.00

1.76

0.56

5.23

1

2

004-AES_201

3

4

1

2 005-ASS-301

2

004-AES_201

2

3

005-ASS-301 3.48

2

11.32

1.76 5.00

0.73

4.00

4

2

10.52

5.00

0.56

3.48

1.76

5.23 6.09

5.23

0.40

A

A

0.16 0.27

0.28

1.25

2.00

0.40

4.94

004-AES_201 2

0.85

4.71

2

4.94

9.94

4.37

005-ASS-301

0.29

2.13

4.00

2.13

0.44

B

BED ROOM

B

6.84

6.98

12

A

3.39

4.94

0.56

0.36

3.53

0.80

0.05

1.00

2.47

0.68

0.52

D2

2.01

2.26

C 1.21

6.34

0.70

24.54 1.09

1.57 0.68

4.37

4.84

4.37

4.84 7.58

5.34

2.13

0.29 2.13

3.74

3.05

0.29

1.69 0.13 3.75

H

2.35

2.35

4.41

2.35

4.41

H

G

1.69

4.44

1.19

2.25

0.35

23.96

25.34

3.08

24.14

0.66 1.20

1.56

H

2.89

TERRACE 20

0.35 0.37

4.75

0.80

3.31

3.31

1.16

D6

3.88

4.04

0.70

9 D14

0.80 0.98

0.70

W2

G

2.49

0.65 0.72 1.12

TOILET 2.16

1.69

0.70

W2

3.14

2.00

0.16

19

D7

0.10

0.80

1.10

2.13

1.05 0.80 0.08

1.69

0.34 0.94

F

0.12

0.80 0.60 0.95

KITCHEN

0.44

LIVING ROOM

G

1.09

0.45

1.30

5

F

22

0.80

1.93

0.89

W2

005-ASS-301

0.95

3.84

1

LAUNDRY

F

GAURD ROOM 10

D2

OFFICE

1.06

18

2.16

D2 ENTRANCE

3.11

W3

4.56

1.16

0.25

0.18 0.70

1.84

23

21

0.80

D7

0.60

1.06 1.86

2.02 0.70

1.12

6.66 0.28

0.10

0.94

2.35

1.56 3.26

0.56

0.18

UP

I

I

W3

0.79 0.27

1.69

0.16

0.50

2.35

7

0.94

ENTRANCE

0.79 4.41

I

0.76

0.61

1.80

0.62

0.90

3.95

5.00

0.67

3.48

I

0.59

1.76

0.40

0.13

9.48 0.61

1.80

4.84

0.42

4.62

5.00

W3 0.92

0.62

0.90

0.79

1.69

5.00

1.08

1.76

3.48

1.76

0.13

0.61

1.07

3.48

D

E

0.10

0.27

D7

1.27

1.12

8

3.88

2.66

1.09

1.66

0.52 0.27 0.80

0.80

W5

BED ROOM 1.80

4.37

1.68 0.28

UP

1.93

0.65

3.10

2.28

3.50

3.44

005-ASS-301

1.34

1.08

6

1.12

1.77

TOILET

E

DN

17 3.28

1.48

1.84

5.37 1.60

D2 2.76

TOILET

1.18

0.73

1.65 4.37

1.06

2.05 2.13

0.80

0.10

1

1.60

W5

3004-AES_201

D

0.80

Room

0.95

1.18

2

1.90

4.04

0.22

KITCHEN

005-ASS-301

H

25

0.10

1.66

0.44 0.80 0.99 24.14 0.78

1.28

1.87

1.80 0.85 0.28

0.68

1.96

11

G

0.52

W2

4.56

CORRIDOR

W2

DRESSING

24

0.80 1.12

16

E

1

0.22

0.27

1.47

2.15

4.05 0.74

1.56 0.70 0.12

0.24

0.28

1.04

W4

1.08

TOILET

D

0.80

1.09

0.38 0.80 0.38

24.54

0.67

4

UP

F

W3

D2

1.09

0.80

D2

0.70

DN

LOBBY

3

3.48

E

D2

3.28

3004-AES_201

2.22

TOILET D7

D

3.53

Room D7 1.50

4.05

0.80

W2

2.47

4.71

24.54

4.72 2.25

5.00

-

1.00

-

-

3004-AES_201 0.05

C

C

21.34

0.68

C

-

W2

4.05

15

26

5.11

6.46

W3

TOILET

5.32

-

3.72

1.80

2.50

-

27

2.37

D7 LOBBY

BED ROOM

0.89

13.03

1

3.97

1.11

4.05

1.38

RECEPTION

0.80

2.07

6.45

2.00

10.62

6.45

0.80

D2

0.96

14 W1

0.18

D7

TOILET

13.03

0.70

1.24 1.76

7.69

0.80

3.39

W2

1.54 3.84

0.10 0.06

1.00

13

6.45

6.45

DRESSING

1.76

B

3.66

3.66

B

11.45

28

1.16

8.90

1.25

0.70

2.00

2.13

2.13

1.25

7.69

MASTER B.ROOM

0.16 0.28

8.52

0.27

7.81

4.00

4.71

0.78

0.44

0.29

A

0.40

9.48

1

0.02

1 9.48

004-AES_201

1

1

2

3

4

004-AES_201

1

2

3

4

004-AES_201

1

2

3

4

03 RF +6.75

01 GR +0.15

Dimention Plans 1

2

2

3

4

I

H

G

F

E

D

C

B

A

005-ASS-301

1

1.10

6.75 mF.F.L. 0.50m S.S.L. 2.64

0.60 0.31 0.34

1.57

0.60

0.50m S.S.L.

0.31 0.34

0.60 0.31 0.34

1.10

0.60 0.23 0.31 0.34

6.75 mF.F.L.

0.78

0.80

1.60

7.85

0.76

3.50 mF.F.L. 3.40 mS.S.L.

6.60

1.99

1.25

2.55

0.24

3.40 mS.S.L.

0.250.16

7.85 6.60

0.18 0.41

3.50 mF.F.L.

ELEVATIONS

1.01

3.05

1.41

1.60 1.05

0.80 1.07

0.18

0.15

0.15

2.70

3.08

2.69

0.15 mF.F.L. 0.50m S.S.L.

0.15

0.18

0.86

1.41

0.24

1.94

6.43

0.76

0.18

0.18

0.80

1.41

1.18

2.00

1.39

0.60

0.82

0.60 0.31 0.34

005-ASS-301

0.15 mF.F.L. 0.50m S.S.L.


ELEVATIONS 2.49

3.50 mF.F.L. 7.85

0.60

A A

B B

C C

D

E

F F

G G

H H

I I

LAYOUT E

2 3

F G H

0.50m S.S.L. 1.10

0.31 0.34

-

3.40

2.08

1

6.75

1.41

2.64

0.80

005-ASS-301

3

3.20

0.80

1.99

blanket pill Line01 Box02 pillo C hamferBox hamferBo0 ow 01

2

0.92

-

1.41

2.64

0.80

D

1.01

1.99

C

2.25

B

2.08

0.60

0.160.34

blanket pill Line01 Box02 pillo C hamferBox hamferBo0 ow 01

1

0.15

0.15 mF.F.L. 1.41

0.15

0.50m S.S.L. 0.60

6.75 mF.F.L.

0.31 0.34

Furnished Plans

0.18

2.49

1.39

0.60

0.31 0.34

0.55

1.10

0.60

0.31 0.34

0.55

A

0.80

3.40

1.30

1

0.80

4.42

8.27

0.90

2

6.60

5.60

0.90

2

1.07

--3.20

0.60

3

0.15

2.20

4

0.15 0.30

0.00

ow 01 hamferBox hamferBo0 blanket pill Line01 Box02 pillo C

Villa

39 4

---

-

2

004-AES_201 2

004-AES_2014 -

DN

E

D

005-ASS-301

1

004-AES_201

1

4

005-ASS-301

005-ASS-301

1

I

6.75 mF.F.L. 0.50m S.S.L.

3.40 mS.S.L. 3.50 mF.F.L. 3.40 mS.S.L.

0.15 mF.F.L. 0.50m S.S.L.


40 A

4

B

C

D

E

F

0.08 2.20

0.97

0.08 2.20

0.97

0.07

0.92

0.98

0.50m S.S.L.

2.20

2.91 1.63

3.40 mS.S.L.

0.90

1.07

0.25

0.25

6.60

3.40 mS.S.L. 5.60

6.60

7.70

1.10

3.50 mF.F.L. 3.50 mF.F.L.

1.22

1.07

I

6.75 mF.F.L.

2.20

0.97 0.08

2.20

1.41

H

0.34

3 005-ASS-301

G

1.10

0.08

0.83

0.97

0.31

0.50m S.S.L.

0.36

6.75 mF.F.L.

0.55 0.15 0.50

1.10

1.10

005-ASS-301

1.10

005-ASS-301

0.94

1

0.97

3

0.08

2 2

0.34

1

0.40

0.15

0.18

0.15 mF.F.L. 0.50m S.S.L.

0.15 mF.F.L.

0.30

0.76

0.91

0.84

2.20

2.20

1.06

3.35

1.37

3.35

1.96 1.22

4.18

0.08

2.28

0.50m S.S.L.

0.13

0.19

0.07

SECTIONS

A

0.35

1.02

0.49

2cm groove

0.34 0.53

00 ° 40.

6.75 mF.F.L. 0.50m S.S.L.

5cm Thermal Insulation

2cm Water Insulation

Water Level 0.15 mF.F.L.

2.72

DETAILED SE

2.50

0.05

0.50m S.S.L.

2 cm Ceramic tiles 25cm *25cm 2 cm Cement Mortar 6 cm Sand

0.10

2 cm Water Insulation

SWIMMING POOL


41 Location:

Cairo, Egypt

Client:

Mervat Halim

Area:

52 m2

Year:

2018

Software:

Revit & 3DS MAX & PHOTOSHOP

Description:

Interior Reception

RECEPTION & kitchen

Responsibilities: -Interior Design. -Modeling & visualizing.


42


RECEPTION & kitchen

43


44


45 Location:

Cairo, Egypt.

Client:

Private Project

Area:

54 m2

Year:

2017

Software:

AUTOCAD & 3DS MAX & PHOTOSHOP

Description:

Interior Reception

Responsibilities:

RECEPTION

-Interior Design. -Modeling & visualizing.


46


RECEPTION

47


48


49

Responsibilities: -Extrior Design. -Modeling & visualizing.


50


AMR FARAG Amrfarag135@gmail.com +8613162413001

2020


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.