PORTFOLIO
AMR FARAG ARCHITECT
RESUME 1
JINAN SCIENCE & TECHNOLOGY PARK
CSCEC 3
QILIAN RESEARCH& TECHNOLOGY ISLAND
CSCEC 9
RESIDENTIAL BUILDING
ontents
ELEGANTRY
KORBA HEIGHTS (K 06)
ACADEMIC PROJECT 13 Arkan Consultants 19 ARKAN Consultants 25
WHITE CITY
ACADEMIC PROJECT 31
VILLA
INTERIOR RECEPTION & Kitchen
PRIVATE PROJECT 37
PRIVATE PROJECT 41
INTERIOR RECEPTION
PRIVATE PROJECT 45
Costa Coffee
PRIVATE PROJECT 49
Classic Villa
PRIVATE PROJECT 50
Contacts Telephone +8613162413001 Email Amrfarag135@gmail.com Address Shanghai, China. Linkedin /AMRFARAG
EDUCATION 2010 - 2015 BACHELORES DEGREE Al-Azhar University (Egypt) B.Sc. in Architecture , Faculty of Engineering. GRADUATION PROJECT Project (Development of the new Suez canal axis) I was awarded with ‘’Very Good’’ .
Info. Nationality Egyptian
LANGUAGES
Driving License Millitary Status
Arabic
Egyption Completed
English
Intersts
AMR FARAG About me I’m a 28 years old an Architect at CSCEC, Based in Shanghai, China. I have been working at CSCEC since December 2018. I see myself as a motivated person which faces every challenge that comes on his way .
Résumé
I seek to be an architect who provides orginal designs and solutions that respond to the demands of contemporary society. I have a positive attitude also i find it easy to communicate with different people. Here You can find out my attitude, design skills, presentation and my knowledge of different Architecture software.
PROFESSIONAL SKILLS
Reading and Crochet
WORK EXPERIENCE 12/2018 - NOW
AutoCAD Revit
CSCEC China Shanghai Architectural Design & Research Institute Co., LTD
3DS MAX
Architect -Projects Scale -Mixed Use Area (DAO Panama Tower in Panama) (Shepherd’s Zhongtian Land in LanZhou, China) -Research And Technology Area (Jinan Science and Technology Park in Jinan, China) (Qilian Island in China)
Photoshop Lightroom Illustratortor InDesign SketchUp M.Office Plugins
Vray
-Preparation of conceptual design of the projects such as Studies, Layouts, Elevations and Plans. -Preparation of design developmet drawings. -prepare the working drawing that can be used; by a contractor to construct the works, or by suppliers to fabricate components of the works.
8/2017 - 11/2018
7-8/2014
ARKAN CONSULTANTS
Misr Petroleum
Junior Architect
Trainee
-Projects Scale -Residential Compound (KORBA HEIGHTS AT NEW HELIOPOLIS) -Commercial &Clinical Malls (ELEGANTRY AND NORTH PLUS AT NEW CAIRO) -Preparation of design developmet drawings. -prepare the working drawing that can be used; by a contractor to construct the works, or by suppliers to fabricate components of the works. or to assemble or install components.
12/2016 - 8/2017
EL-Sarh Contracting Site Architect (VILLA 279&280 AT SOUTHERN ACADEMY ,NEW CAIRO) (VILLA 169 AT WEST GOLF ,NEW CAIRO) management of the site including supervising and monitoring the site labour force . AutoCad , Calculating the materials , Ensure that All materials Are used , Resolving the site problems .
(Office building At Musturud) management of the site including supervising and monitoring the site labour force . 7-8/2013
AL-Huda (construction) Trainee (Two Residential building At New Cairo) management of the site including supervising and monitoring the site labour force . AutoCad , Calculating the materials , Ensure that All materials Are used , Resolving the site problems . 7/2012
DETAC (Construction & Trading) Trainee (General Authority for Investment and Free Zones) management of the site including supervising and monitoring the site labour force .
VOLUNTEER EXPERIENCE 7/2015 - 10/2015
9/2013
AL-Huda (construction)
Resala Charity Organization
Junior Architect
Volunteer
(VETERINARY HOSPITAL AT MAADI) Involved in Conceptual Design process .
(The Seaside Oasis) A Camp for three days to help poor people at the Egyptian western Desert to find a safe place to live.
CERTIFICATIONS & REFERENCES Available upon request.
JINAN SCIENCE AND TECHNOLOGY PARK
3 Location:
Jinan, China.
Client:
SDIFDC
Area:
135000 m2
Year:
2020
Software:
AutoCAD, 3DS MAX, SketchUP, Illustrator, Photo Shop.
Description:
Our project was a sequence of phases to create a new technology and innovation hub at Jinan City with total area 900,000 m2 , Our focused area divided to 2 kind of Researches, The first one is a trade zone for Food and Drugs researches and the second one is a Platform for animal Researches.
Functional Zoning
Responsibilities: Main Axis Our team has 4 Architects, Firstly I go through finding a similar projects for some R&D which shows us the thick lines for the project then I started to work with one colleauge to have a 2D Masterplan and from that masterplan we put an imagination for the platform by designing the pubilc areas and the facade.
Masterplan Total Area Masterplan
4 Design Process
Green Corridor
Sky Corridor
Creating Gardens
Terraces
Landmark
Courtyard
Functions
Labratories
Commercial
Links
Service Building
5
JINAN SCIENCE AND TECHNOLOGY PARK
Planning Process
Fire Fighting Network
Car Flow
Parking
Pedestrian Flow
Skyline
Bird Eye View
6
Architectural Plan
7 Sky Corridor
JINAN SCIENCE AND TECHNOLOGY PARK
Topography Design -We aim to Create a combination between work, Leisure and communication atmosphere. -Sink Plaza, Courtyards, Roof garden and sky corridors which create a superb work environment.
Group Buildings
Key Plan Centeral Plaza
Courtyard
0.00 +7.00 +7.00 0.00
0.00 -4.00
-4.00
-4.00
Sink Plaza
8
Topography Design -We aim to Create a combination between work, Leisure and communication atmosphere. -Sink Plaza, Courtyards, Roof garden and sky corridors which create a superb work environment.
Sky Corridor
Key Plan
Hill Garden
+7.00
0.00
4.00
0.00 -4.00
0.00 0.00 -4.00
Multifunctional Garden
Main Plaza
QILIAN RESEARCH& TECHNOLOGY ISLAND
9 Location:
Jining, China.
Client: Area:
The ShanDong Provincial People’s Government 1120000 m2
Year:
2019
Software:
AutoCAD, 3DS MAX, SketchUP, Illustrator, Photo Shop.
Description:
Our project is settled in Shandong province which is a comprehensive experimental zone for the conversion of new and old kinetic energy, we aim to deliver a good idea for Science and technology hubs which can be a role model for the same project around china.
Jining Airport
Jining North Railway Station
Jining East Railway Station
Site
Jining Qufu Airport
Site location and connectivity to other cities
Site Exhibition
Responsibilities:
Research Office Area
Mixeduse Area
Site location and surrounding main roads
Research and Innovation Service Area
Our team has 4 Architects, Our main Responsibility was to develop the masterplan which has been done by Tongji Architecture Firm, I started to work on 3 options for the landmark Building, Also I had to put an imagination for the city Skyline and Façade.
商
Research and Innovati Area Leisure Green Axis
Mixeduse Area Mixeduse Area
Leisure Green Axis
Site 商
Site location and surround
商
Industrial Park Green Area Residential Public Facility Business Area
Design Concept
10
Overall View
ion Service
A A
Masterplan
Section A-A
11
QILIAN RESEARCH& TECHNOLOGY ISLAND
Building Function
Building Height
0-30m 30-60m 60-90m 90-150m
Landmark Building
Pedestrian Bridge
Open Space Courtyards View Corridors
Cultural& Leisure Park
Central Park
Chuangxian Park
Waterfront Park
Technology Art Park
Bird Eye View
12
ESIDENTIAL BUILDING
13 Location:
Giza, Egypt.
Client:
Academic Project
Area:
1200 m2
Year:
2013
Software:
REVIT, 3DS MAX, Photo Shop.
Description:
Residential building located in Giza, Egypt.
Responsibilities: -Exterior and Interior Design. -Modeling&Visualizing.
14
-
N -
-
-
-
www.autodesk.com/revit
Pr
-
Consultant Address Address Phone Fax e-mail
Consultant Address Address Phone Fax e-mail
Consultant Address Address Phone Fax e-mail
Consultant Address Address Phone Fax e-mail
Da
Dr
Ch
Sc
03 GR (furnished)
No.
1
05 typical (furnished)
1 1 :Floor Typical 100
Description
Date
04 CO (furnished) 1 : 100
Owner Project Name Unnamed
RESIDENTIAL BUILDING
15
Ma
ain Elevation
16
West Elevation
RESIDENTIAL BUILDING
17
Back Elevation
Sectio
on
18
Section
19 Location:
Cairo,Egypt
Client:
UDG
Area:
20000 m2
Year:
2017
Software:
AutoCAD
Description:
Elegantry is an iconic business hub located in New Cairo. It offers administrative offices, commercials and medical clinics with a full range of facilities located in one building.
Responsibilities: -Compiling data for architectural plans,specitictions and reports .
ELEGANTRY
-Preparation of design development . -prepare the working drawing that can be used; by a contractor to construct the works, or by suppliers to fabricate components of the works .
20
Dimention Plan
Ceiling Plan
21
LEGANTRY
Flooring Plan
Furnished Plan
22
1
Y-13
Y-13
2
X-04
X-05
X-06
2
Y-14
Y-14
Y-15
Y-15
X-01
X-02
X-03
X-04
X-05
X-06
02
Main Elevation
X-04
X-05
X-06
Y-15
Y-14
Y-13
Y-12
Y-11
ELEG
ELEG
ELEG
ELEG
ELEG
-6.40
-6.40 F.F.L
F.F.L
PUMP ROOM B3 009
-10.35
-10.40
F.F.L
F.F.L
-10.30 F.F.L
-10.35 F.F.L
-11.00 T.O.S.S
04
03
Sectional Elevation X-02
X-03
X-04
1
Details Y-15
Y-14
Y-13
Y-12
Y-11
23 1
X-13
X-14
X-15
X15'
--
--
--
--
X-16
X-17
X-18
--
--
--
PAINT
X-19
X-20
--
--
CLADDDING X-20'
X-21
--
--
CLADDDING TOP OF PARAPET +15.35
L 3 +14.05 T.O.SS
CW02
CW03
CW04
CW05
L2 +10.05 F.F.L
X-06
X-07
X-08
X-09
X-10
X-11
X-12
--
--
--
--
--
--
--
L1 +6.05 F.F.L
GR +1.85 F.F.L
TOP OF PARAPET +0.85
CLADDDING
CW01
-1.45 F.F.L -2.35
-2.50
F.F.L
B1 -2.50
F.F.L
F.F.L
INTERNAL ELEVATION
LEGANTRY
Internal Elevation X-06
X-07
X-08
X-09
X-10
X-11
X-12
X-13
X-14
X-15
X15'
X-16
X-17
X-18
X-19
X-20
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
CW11
CW11
CW11
CW11
CW11
CW11 CW11
CW11
CW11
CW11
CW11
CW11
CW11 CW11
CW11
CW10 CW10
CW10
CW01
CW07
CW05
CW04
CW01
CW04
CW05
CW01
CW04
CW05
CW01
CW05
CW01
CW04
CW01
CW04
CW04
CW05 CW05
CW01
CW04
CW01
CW04
X-13
X-14
X-15
X15'
X-16
X-17
X-18
X-19
X-20
--
--
--
--
--
--
--
--
--
CW01
Detailed Plan
CW04
CW01
CW08 CW01 CW01
CW01
CW04
CW05
CW04
CW05
CW04
CW04
CW01
CW05
CW01
CW05
CW05
CW04
CW04
CW01
CW01
CW04
CW01
CW09 CW05
CW04
CW05
CW04
CW01
CW05
CW01
CW01
CW04
CW04 CW04
CW10 Details
CW11
1
4 1:5
1
-
-
T
-
-
T
T
1:5
1:5
1
4 1:5
T
1
1
1:5
1 1:5
1:5
25
26
25
26
25
26
25
26
--
--
--
--
--
--
--
--
1:5
24
D
F.F.L -4.11
F.F.L +8.12
F.F.L -2.50
-
-
S
S
R
F.F.L +10.05
-
--
-
S
UP
-
-
R
R
FLOORING
-
04
2
1
-
-
05
06
F.F.L +7.96
--
R
R
--
--
R
R
--
--
R --
W.C
W.C
TYP. 067
TYP. 067
+5.45 F.F.L
W.C
+5.45 F.F.L
+5.45 F.F.L
TYP. 067
+2.80 F.C.L
UP
-
-
R
R
FLOORING
-
04
1:25
ELEG_AST_404
R
-TYP. 067
ELEG_AST_505
F.F.L -4.44
1
R W.C
S
ELEG_AST_505
5
S
S
S
S
S
S
S
--
--
--
--
--
--
--
--
T
T
T
T
T
T
T
T
--
--
--
--
--
--
C
--
-
-
05
06 25
1:25
ELEG_AST_404
DETAILED PLAN @ LEVEL B2 -6.40
S
--
DETAILED PLAN @ LEVEL L1 +5.45
1
ELEG_AWA_169
-
-
T
-
T
26
25
--
--
DIMENTION PLAN@ LEVEL TYP.
26 --
2
FLOORING PLAN@ LEVEL TYP.
ELEG_AWA_169
1:25
3
25
26
--
--
ELEG_AWA_169
1:25
--
1
25
1
--
4
1:5
REFLECTED CEILING@ LEVEL TYP.
ELEG_AWA_167
1:25
4
26
--
1:5
FURNITURE PLAN@ LEVEL TYP.
1:5
1:25
-
T
T
5
F.F.L +4.27
F.F.L -7.88
5 1:5
6
6
1:5
7
7
1:10
1:10
1:5
1:5
F.F.L -6.40
-
-
S
F.F.L +6.05
-
S
-
S
ELEG_AST_505
S
ELEG_AST_505
1
F.F.L -8.38
F.F.L +3.79
1
UP
-
-
R
R
UP
-
-
R
R
WIRE-MESH WELDED TO STEEL PLATE STEEL TUBE Ø 50mm. DIA 50mm STEEL RAIL 50 mm DIA. PAINTED STEEL PIPE
FLOORING
-
04
-
-
05
06
FLOORING
-
04
-
-
05
06
DIA. 25mm STEEL PIPE POST WELDED TO STEEL PLATE B
STEEL BRACKETS SCREWED TO WALL 1:25
ELEG_AST_404
1
1:25
ELEG_AST_404
4
DETAILED PLAN @ LEVEL B3 -10.35
FLANGE COVER GLUED TO BRACKET
DETAILED PLAN @ LEVEL GR +1.25
STEEL PLATE 150X150X4mm. ANCHORED TO WALL
-
-
-
T
T
T
-
ELEVATION SCALE 1:25
A
T
DIA. 25mm STEEL PIPE POST WELDED TO STEEL PLATE
CONCRETE BASE
F.F.L -0.07 5
INTERNAL ELEVATION (1)
ELEG_AWA_169
F.F.L -10.20
-
S
-
-
S
S
ELEG_AST_505
F.F.L +1.85
F.F.L -8.38
F.F.L -0.55
1
UP
ELEG_AWA_169
1:25
R
R
R
R
FLOORING
-
-
05
-
FLOORING
FLOORING
-
06
04
02
03
05
06
-
-
R
-
-
05
04
6
1:5
1:10
1:5
11 1:5
09
10
1:5
06 05
10
1:5
1:5
08
04
NOTE: GALVANIZED STEEL TO BE USED AT ESCAPE STAIRS STAINLESS STEEL TO BE USED AT MAIN STAIRS
5 09
08 -
-
10mm THICK STEEL PLATE ANCHORED TO CONC. FAIRFACE CONCRETE
SCALE 1:10
Wet Area
-
04
1:25
SECTION
UP
-
01
ELEG_AWA_169
1:25
CONCRETE WITH SMOOTH SURFACE AND EPOXY SEALER FINISH FLANGE COVER
INTERNAL ELEVATION (3)
-
-
Stair
7
INTERNAL ELEVATION (2)
S
ELEG_AST_505
1
6
11
1:5
1:5
1:5
05
R
-
-
+12.01 F.F.L
1
UP
ELEG_AST_505
S -
S
06
05
04
-
-
-
-
+14.15 F.F.L
+12.18 F.F.L
L4 +17.55 T.O.SS
T
T
-
-
PAINT
1
DETAILED PLAN @ LEVEL L3 +13.45
ELEG_AST_405
1:25
-PART 1
+14.15
L3 +14.15 F.F.L
F.F.L
+1.85
GR +1.85 F.F.L
F.F.L
08
09 1:5
06
05
04
-
-
-
F.F.L L4 +17.55 T.O.SS
-0.55 F.F.L
L3 +14.15 F.F.L
+10.05
L2 +10.05 F.F.L
F.F.L
L2 +10.05 F.F.L
-2.50
B1 -2.50 F.F.L
F.F.L
L1 +6.05 F.F.L
+8.12 F.F.L
-4.11
PART 2 PART 1
GR +1.85 F.F.L
F.F.L -4.44 F.F.L
+6.05
B1 -2.50 F.F.L
L1 +6.05 F.F.L
F.F.L
B2 -6.40 F.F.L
B2 -6.40 F.F.L +4.27 B3 -10.35 T.O.SS
F.F.L
PAINT
+3.79
-7.88
F.F.L
F.F.L -8.38 2
DETAILED SECTION
ELEG_AST_405
F.F.L
1:100
PART 2 --
Stair (Detailed Sec.)
10 1:5
+12.18 F.F.L
-0.07
Details
1:5
25 Y-08
Y-07
k06
Y-06
k06
Y-05
k06
Y-04
k06
Location:
Cairo,Egypt
Client:
HDG
Area:
42,000 m2
Y-03
k06
4
Y-02
k06
4
PAINT
PAINT
Y-01
k06
k06
3 +23.60 TOP OF PARAPET
PAINT
PAINT
+21.90 TOP OF PARAPET
+20.35
+20.20 TOP OF PARAPET
TOP OF PARAPET
ROOF +19.40 F.F.L
50 MM GROOVE
L 6 +16.20 LOUVERS
CLADDING
F.F.L
PAINT
METAL
Year:
2017
Software:
AUTOCAD
Description:
Korba Heights falls in new Heliopolis city, covering an area of roughly 42,000 square meters in a prominent and visible location directly connected to the downtown.
L5 +13.00 F.F.L CLADDING
L4 +9.80 F.F.L
L3 +6.60 F.F.L
L2 +3.40 F.F.L
PAINT
PAINT
L1 +0.20 F.F.L
-3.25 T.O.S.S
GR -3.00 F.F.L GR -3.75 F.F.L
-7.35 T.O.S.S
B
-7.50
F.F.L
Responsibilities: -Compiling data for architectural plans,specitictions and reports.
KORBA HEIGHTS
-Exterior and Interior Design. -Modeling. -Prepare the working drawing.
26 01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
D
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D
07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .
C
C
MODIFICATIONS REV
DESCRIPTION
BY
DATE
10 09 08 07 06 05 04 03 02 01 00
-----------------
-----------------
-----------------
-----
11-1-2018
FOR INFORMATION
B K19
K1 K20
K14
K21
K18
K2
K17
K3
K16
K4
K5
K15
K6
K13
K12
K11
K10
K9
K8
K7
PROJECT :
B
KORBA HEIGHTS OWENER :
Heliopolis Developers Group A
MAIN CONSULTANT :
A
SHEET TITLE BUILDING K_06 BASEMENT LEVEL FLOOR PLAN -7.50
DWG SIZE A
DRAWING NUMBER
1
CHECKED
:
1:50 APPROVED : 01
Dimention Plan
02
03
04
05
05
DWG REV
K06_APS_ 101_B -7.50
0
CAD FILE NAME DESGIN &DRAWN BY:
00
K06_APS_ 101_B -7.50.dwg AMR MUSTAFA NADA EZAT MONA GOMAA MOHAMED NAGUIP
ALI ABDELAZIZ
MOHAMED TITO MOSTAFA MAGDY DOHA SHALPI AMINA SHAKER
DRAWING SCALE 1:50
S.N. 001 11/01/2018
REV DATE PROJECT NO :
16002
27 01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM.
Y-01
Y-01
k06
k06
1
Y-03 k06
Y-05
Y-04
Y-07
Y-06
k06
k06
2
03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN.
Y-08
k06
k06
k06
04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
D
1
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND.
+23.60
06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT.
TOP OF PARAPET D
07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION .
+21.90 TOP OF PARAPET
PAINT
08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL .
PAINT
PAINT
+20.35 TOP OF PARAPET
09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .
+20.20 TOP OF PARAPET
ROOF +19.40 F.F.L
C
L 6 +16.20 F.F.L CLADDING
L5 +13.00 C
F.F.L
L4 +9.80 F.F.L
LOUVERS 50 MM GROOVE
METAL
L3 +6.60 PAINT
PAINT
F.F.L
MODIFICATIONS REV
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
PAINT
L2 +3.40
------------------FOR INFORMATION
BY
DATE
-------------------
------------------11-1-2018
F.F.L B K19
K1 K20
K21
K18
K2
K17
K3
K16
K4
K14
K5
K15
L1 +0.20 K6
K13
F.F.L K12
K11
K10
K9
K8
K7
PROJECT :
KORBA HEIGHTS
B
KORBA
GR -3.00
-3.30 T.O.S.S
F.F.L
HEIGHTS
GR -3.75 F.F.L
OWENER :
Heliopolis Developers Group A
MAIN CONSULTANT :
-7.35 F.F.L
A
-7.50 F.F.L
B
-7.50
F.F.L
SHEET TITLE BUILDING K_6 ELEVATION (1)
DWG SIZE A
ELEVATION
1
DRAWING NUMBER K6-AES-201
0
CAD FILE NAME
1:50
DESGIN &DRAWN BY:
CHECKED
:
APPROVED : 01
Main Elevation
02
03
04
05
05
DWG REV 00
K06_AES_201.dwg AMR MUSTAFA NADA EZAT MONA GOMAA MOHAMED NAGUIP
ALI ABDELAZIZ
DRAWING SCALE 1:50
S.N. 001 11/01/2018
REV DATE MOHAMED TITO MOSTAFA MAGDY DOHA SHALPI AMINA SHAKER
PROJECT NO :
16002
28 X-15
X-14
X-13
X-12
X-11
k06
k06
k06
k06
k06
X-010 1
k06
X-09
X-08
X-07
X-06
X-05
X-04
X-03
k06
k06
k06
k06
k06
k06
k06
X-02
X-01
k06
k06
PAINT
+23.60 TOP OF PARAPET
PAINT
PAINT
D
+21.90 TOP OF PARAPET PAINT
PAINT
PAINT
+20.20 TOP OF PARAPET PAINT PAINT 50 MM GROOVE
C
LOUVERS
20 MM GROOVE
METAL
B
+0.85 F.F.L +0.20 F.F.L
+0.10 F.F.L
-3.25
-3.25
T.O.S.S
T.O.S.S
-6.20 F.F.L
-7.35
-7.50 F.F.L
F.F.L
A
Side Elevation
Dimention Plan
Y-01
Y-02
Y-03
Y-04
Y-05
Y-06
Y-07
K06
K06
K06
K06
K06
K06
K06
+23.30
Y-08
Y-09
Y-10
Y-11
Y-12
K06
K06
K06
K06
K06
T.O.S.S
+21.90 TOP OF PARAPET
+20.65 +20.35
PAINT
T.O.S.S
+20.20
TOP OF PARAPET
TOP OF PARAPET
ROOF +19.40 F.F.L
BEDROOM L6
M.BEDROOM
00
L6
BEDROOM
00
L6
BEDROOM
00
L6
00
PAINT
L 6 +16.20 F.F.L +21.42 F.F.L
BEDROOM L5
M.BEDROOM
00
L5
BEDROOM
00
L5
BEDROOM
00
L5
00
L5 +13.00
2 K06-AST-503
F.F.L
DETAILED PLAN @ LEVEL B1 1:25
+18.22 F.F.L
BEDROOM L4
M.BEDROOM
00
L4
BEDROOM
00
L4
BEDROOM
00
L4
00
L4 +9.80 F.F.L +15.02 F.F.L
BEDROOM L3
M.BEDROOM
00
L3
BEDROOM
00
L3
BEDROOM
00
L3
00
L3 +6.60 F.F.L +11.82 F.F.L
BEDROOM L2
M.BEDROOM
00
L2
BEDROOM
00
L2
BEDROOM
00
L2
00
L2 +3.40 F.F.L +8.62 F.F.L
BEDROOM L1
M.BEDROOM
00
L1
3
00
K06-AST-503
ENTRANCE L1
DETAILED PLAN @ LEVEL GR & L2 TO L6 1:25
00
L1 +0.20 F.F.L +5.42 F.F.L
STORAGE GR
00
STORAGE GR
00
KITCHEN GR
BATH
00
GR
00
STORAGE GR
00
STORAGE GR
00
STORAGE GR
00
GR -3.00 F.F.L GR -3.75
-4.18
F.F.L
F.F.L
-6.20 F.F.L
-7.35 F.F.L
B
-7.50
F.F.L
Section
Garbage chute 1
DETAILED SECTION
4
DETAILED PLAN @ LEVEL L1
5
DETAILED SECTION PART 1OF2
5
DETAILED SECTION PART 2OF2
29 01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
D
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D
07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .
C
2
DETAILED PLAN @ LEVEL B1
K06_AST_501
1:25
C
MODIFICATIONS REV
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
BY
DATE
11-1-2018
FOR INFORMATION
B K19
K1 K20
3
K21
K18
K2
K17
K3
K16
K4
DETAILED PLAN @ LEVEL GR TO L6
K06_AST_501
1:25
K14
K5
K15
K6
K13
K12
K11
K10
K9
K8
K7
PROJECT :
KORBA HEIGHTS
B
KORBA HEIGHTS OWENER :
Heliopolis Developers Group A
MAIN CONSULTANT :
A
SHEET TITLE BUILDING K_06 SECTIONS
DWG SIZE A
DRAWING NUMBER K06-AST-501
0
CAD FILE NAME
4
DETAILED SECTION
K15_AST_501
4
TYP. STAIR DETAILED SECTION
K06_AST_501
1:50
5
DETAILED SECTION PART 1OF2
K06_AST_501
1:10
5
K06_AST_501
1:10
1:10
CHECKED
:
APPROVED : 01
Stair
02
03
04
05
05
DWG REV 00
K06_AST-501
DESGIN &DRAWN BY:
DETAILED SECTION PART 2OF2
NADA EZAT MONA GOMAA MOHAMED NAGUIP AMR MUSTAFA ALI ABDELAZIZ
DRAWING SCALE
S.N. 001
1:25 REV DATE
MOHAMED TITO DOHA SHALPI AMINA SHAKER MOSTAFA MAGDY
11/01/2018
PROJECT NO :
16002
30 01
02
03
04
05
05
GENERAL NOTE : 01. ALL DRAWINGS AND COPIES THEREOF ARE INSTRUMRNTS OF SERVICE AND AS SUCH REMAIN THE SOLE PROPERTY OF THE MAIN CONSULTANT FIRM. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. ALL COPIES ARE TO BE RETURNED OR SUITABLY ACCOUNTED FOR THE MAIN CONSULTANT FIRM UPON COMPLETION OF THE WORKS. 02. THESE DRAWINGS MAY NOT BE REPRODUCED BY ANY MEANS WITHOUT PRIOR WRITTEN APPROVAL FROM THE MAIN CONSULTANT FIRM. 03. DIMENSIONS ON THE DRAWINGS ARE NOT TO BE SCALED, ONLY STATED DIMENSIONS ARE TO BE TAKEN. 04. ALL DIMENSIONS ON THE DRAWINGS ARE IN METERS. NOTE: (millmeter) OR (inch) WILL BE MENTIONED IF USED.
D
05. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF AND RESOLVED BY THE MAIN CONSULTANT FIRM BEFORE THE WORKS ARE PUT IN HAND. 06. CONTRACTOR SHOULD HAVE AGOOD KNOWLEDGE OF ALL PROJECT IN ALL DEVESIONS BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT. D
07. BEFORE STARTING CONSTRUCTION OF ANY PART OF THE PROJECT CONTRACTOR SHOULD HAVE A FULLY UNDERSTOOD OF THE RELATION BETWEEN THIS PART AND ALL PARTS AROUND IT. HE ALSO SHOULD HAVE A HARD COPY OF THE LISENCE TO CAN ARRANGE THE STAGES OF OF CONSTRUCTION . 08. ALL SPECIAL ITEMS LIKE ELEVATORS ,CURTAIN ,METAIL CLAADING ...ETC SHOULD BE RESTUDY BY CONTRACTORS AND SUPPLAYER AND SUPMIT SAMPLE AND DETAILED DRAWINGS FOR APPROVAL . 09. CONTRACTOR SHOULD ARRANGE TO MAKE ATEMPRARORY OPENING 2*4M IN PUMP ROOM SLAB BEFORE INSTALING THE EQUPEMENTS IN THE ROOM AS PER CONSTRUCTION ASSETS .
C
C
MODIFICATIONS REV
BY
DESCRIPTION
10 09 08 07 06 05 04 03 02 01 00
DATE
11-1-2018
FOR INFORMATION
B K19
K1 K20
K21
K18
K2
K17
K3
K16
K4
K14
K5
K15
K6
K13
K12
K11
K10
K9
K8
K7
PROJECT :
B
KORBA HEIGHTS OWENER :
Heliopolis Developers Group A
MAIN CONSULTANT :
A
SHEET TITLE BUILDING K_06 DOOR & WINDOWS
DWG SIZE A
DRAWING NUMBER
1
CHECKED
1:50 01
Doors and Windows
02
:
APPROVED : 03
04
05
05
DWG REV
K00-ASD-SCHEDULE DOOR -701
0
CAD FILE NAME DESGIN &DRAWN BY:
00
DOOR & WINDOWS NADA EZAT MONA GOMAA MOHAMED NAGUIP MOSTAFA MAGDY ALI ABDELAZIZ
DRAWING SCALE
S.N. 001
1 : 50
11/01/2018
REV DATE MOHAMED TITO DOHA SHALPI AMINA SHAKER AMR MUSTAFA
PROJECT NO :
16002
31 Location:
Sinai,Egypt
Client:
Academic Project
Area:
1,000,000 m2
Year:
2015
Software:
REVIT, Photo Shop.
Description:
White city (A research city to develop the new suez canal axis).
Responsibilities:
WHITE CITY
-MasterPlanning. -Exterior and Interior Design. -Modeling&Visualizing.
Project Location Area Tabulation : Total Area : 400.000 M Sqm . Components : 1Research center : 7000 Sqm . 2 floors . 2Convention Center : 6500 Sqm . 3 floors . 3Plaza’s Restaurant : 1000 Sqm . 2 floors . 4Office Building : 25000 Sqm . 10 floors . 5Shopping Center : 25000 Sqm . 1 floor . 6Residential Building : 2250 Sqm . 3 floors. 7Villa : 13000 Sqm . 8Parking : 20000 Sqm . 9Hotel : 35000 Sqm. 14 floors. 10- Researcher’s Motel : 3650 Sqm . 5 floors .
Area tabulation
32
<Research Center Unit
No.
Area sqm
Administration Meeting Room Game Room Computer lab. Ballroom Lab. Class 1 Class 2 Library 1St floor Library 2Nd floor
1 2 1 1 1 6 3 2 1 1
35 X 12 10 X 20 16.5 X 11 16 X 12 30 X 25 16 X 11 10 x 10 10 X 20 12 X 30 25 X 30
3 4 1 1 4 zones
15 X 10 12 X 8 6.5 X 12 35 X 15 40 X 10
1 1 1 2 1 6 4 2
45 X 25 25 X 25 15 X 25 14.5 X 25 12 X 15 7.75 X 6.5 9.5 X 7.75 5 X 8.5
Room
300
Royal Suite
2
Amdassador Suite
3
Diplomatic Suite
15
Executive Suite
25
Ballroom Kitchen Laundry Storage Restaurant Bar Gym & Spa Administration Business Offices
1 1 1 1 2 1 1 1 1
54 Sqm for unit 324 Sqm for unit 216 Sqm for unit 162 Sqm for unit 108 Sqm for unit 25 x 50 18 X 15 12 X 16 12 X 16 40 X 15 12.5 X 12.5 25 X 20 20 X 15 20 X 15
<Museum Hall 1 Hall 2 Hall 3 Projector Room Kids zone <Convention Center Hall1 1St floor Hall1 2Nd floor Hall 2 Hall 3 Administration Meeting Room1 Meeting Room2 Rest Room
<Hotel
LayOut
WHITE CITY
33
Master plan
Section
34
WHITE CITY
35
Plans
Section
36
37 Location:
Giza, Egypt
Client:
Eng . Mahmoud Nasr
Area:
600 m2
Year:
2013
Software:
REVIT
Description:
Responsibilities: -Compiling data for architectural plans,specitictions and reports . -Exterior and Interior Design. -Modeling
Villa
-Prepare the working drawing.
38 1
2
3
4
10.52
5.00 0.73
3.48
4.00
1.76
0.56
5.23
1
2
004-AES_201
3
4
1
2 005-ASS-301
2
004-AES_201
2
3
005-ASS-301 3.48
2
11.32
1.76 5.00
0.73
4.00
4
2
10.52
5.00
0.56
3.48
1.76
5.23 6.09
5.23
0.40
A
A
0.16 0.27
0.28
1.25
2.00
0.40
4.94
004-AES_201 2
0.85
4.71
2
4.94
9.94
4.37
005-ASS-301
0.29
2.13
4.00
2.13
0.44
B
BED ROOM
B
6.84
6.98
12
A
3.39
4.94
0.56
0.36
3.53
0.80
0.05
1.00
2.47
0.68
0.52
D2
2.01
2.26
C 1.21
6.34
0.70
24.54 1.09
1.57 0.68
4.37
4.84
4.37
4.84 7.58
5.34
2.13
0.29 2.13
3.74
3.05
0.29
1.69 0.13 3.75
H
2.35
2.35
4.41
2.35
4.41
H
G
1.69
4.44
1.19
2.25
0.35
23.96
25.34
3.08
24.14
0.66 1.20
1.56
H
2.89
TERRACE 20
0.35 0.37
4.75
0.80
3.31
3.31
1.16
D6
3.88
4.04
0.70
9 D14
0.80 0.98
0.70
W2
G
2.49
0.65 0.72 1.12
TOILET 2.16
1.69
0.70
W2
3.14
2.00
0.16
19
D7
0.10
0.80
1.10
2.13
1.05 0.80 0.08
1.69
0.34 0.94
F
0.12
0.80 0.60 0.95
KITCHEN
0.44
LIVING ROOM
G
1.09
0.45
1.30
5
F
22
0.80
1.93
0.89
W2
005-ASS-301
0.95
3.84
1
LAUNDRY
F
GAURD ROOM 10
D2
OFFICE
1.06
18
2.16
D2 ENTRANCE
3.11
W3
4.56
1.16
0.25
0.18 0.70
1.84
23
21
0.80
D7
0.60
1.06 1.86
2.02 0.70
1.12
6.66 0.28
0.10
0.94
2.35
1.56 3.26
0.56
0.18
UP
I
I
W3
0.79 0.27
1.69
0.16
0.50
2.35
7
0.94
ENTRANCE
0.79 4.41
I
0.76
0.61
1.80
0.62
0.90
3.95
5.00
0.67
3.48
I
0.59
1.76
0.40
0.13
9.48 0.61
1.80
4.84
0.42
4.62
5.00
W3 0.92
0.62
0.90
0.79
1.69
5.00
1.08
1.76
3.48
1.76
0.13
0.61
1.07
3.48
D
E
0.10
0.27
D7
1.27
1.12
8
3.88
2.66
1.09
1.66
0.52 0.27 0.80
0.80
W5
BED ROOM 1.80
4.37
1.68 0.28
UP
1.93
0.65
3.10
2.28
3.50
3.44
005-ASS-301
1.34
1.08
6
1.12
1.77
TOILET
E
DN
17 3.28
1.48
1.84
5.37 1.60
D2 2.76
TOILET
1.18
0.73
1.65 4.37
1.06
2.05 2.13
0.80
0.10
1
1.60
W5
3004-AES_201
D
0.80
Room
0.95
1.18
2
1.90
4.04
0.22
KITCHEN
005-ASS-301
H
25
0.10
1.66
0.44 0.80 0.99 24.14 0.78
1.28
1.87
1.80 0.85 0.28
0.68
1.96
11
G
0.52
W2
4.56
CORRIDOR
W2
DRESSING
24
0.80 1.12
16
E
1
0.22
0.27
1.47
2.15
4.05 0.74
1.56 0.70 0.12
0.24
0.28
1.04
W4
1.08
TOILET
D
0.80
1.09
0.38 0.80 0.38
24.54
0.67
4
UP
F
W3
D2
1.09
0.80
D2
0.70
DN
LOBBY
3
3.48
E
D2
3.28
3004-AES_201
2.22
TOILET D7
D
3.53
Room D7 1.50
4.05
0.80
W2
2.47
4.71
24.54
4.72 2.25
5.00
-
1.00
-
-
3004-AES_201 0.05
C
C
21.34
0.68
C
-
W2
4.05
15
26
5.11
6.46
W3
TOILET
5.32
-
3.72
1.80
2.50
-
27
2.37
D7 LOBBY
BED ROOM
0.89
13.03
1
3.97
1.11
4.05
1.38
RECEPTION
0.80
2.07
6.45
2.00
10.62
6.45
0.80
D2
0.96
14 W1
0.18
D7
TOILET
13.03
0.70
1.24 1.76
7.69
0.80
3.39
W2
1.54 3.84
0.10 0.06
1.00
13
6.45
6.45
DRESSING
1.76
B
3.66
3.66
B
11.45
28
1.16
8.90
1.25
0.70
2.00
2.13
2.13
1.25
7.69
MASTER B.ROOM
0.16 0.28
8.52
0.27
7.81
4.00
4.71
0.78
0.44
0.29
A
0.40
9.48
1
0.02
1 9.48
004-AES_201
1
1
2
3
4
004-AES_201
1
2
3
4
004-AES_201
1
2
3
4
03 RF +6.75
01 GR +0.15
Dimention Plans 1
2
2
3
4
I
H
G
F
E
D
C
B
A
005-ASS-301
1
1.10
6.75 mF.F.L. 0.50m S.S.L. 2.64
0.60 0.31 0.34
1.57
0.60
0.50m S.S.L.
0.31 0.34
0.60 0.31 0.34
1.10
0.60 0.23 0.31 0.34
6.75 mF.F.L.
0.78
0.80
1.60
7.85
0.76
3.50 mF.F.L. 3.40 mS.S.L.
6.60
1.99
1.25
2.55
0.24
3.40 mS.S.L.
0.250.16
7.85 6.60
0.18 0.41
3.50 mF.F.L.
ELEVATIONS
1.01
3.05
1.41
1.60 1.05
0.80 1.07
0.18
0.15
0.15
2.70
3.08
2.69
0.15 mF.F.L. 0.50m S.S.L.
0.15
0.18
0.86
1.41
0.24
1.94
6.43
0.76
0.18
0.18
0.80
1.41
1.18
2.00
1.39
0.60
0.82
0.60 0.31 0.34
005-ASS-301
0.15 mF.F.L. 0.50m S.S.L.
ELEVATIONS 2.49
3.50 mF.F.L. 7.85
0.60
A A
B B
C C
D
E
F F
G G
H H
I I
LAYOUT E
2 3
F G H
0.50m S.S.L. 1.10
0.31 0.34
-
3.40
2.08
1
6.75
1.41
2.64
0.80
005-ASS-301
3
3.20
0.80
1.99
blanket pill Line01 Box02 pillo C hamferBox hamferBo0 ow 01
2
0.92
-
1.41
2.64
0.80
D
1.01
1.99
C
2.25
B
2.08
0.60
0.160.34
blanket pill Line01 Box02 pillo C hamferBox hamferBo0 ow 01
1
0.15
0.15 mF.F.L. 1.41
0.15
0.50m S.S.L. 0.60
6.75 mF.F.L.
0.31 0.34
Furnished Plans
0.18
2.49
1.39
0.60
0.31 0.34
0.55
1.10
0.60
0.31 0.34
0.55
A
0.80
3.40
1.30
1
0.80
4.42
8.27
0.90
2
6.60
5.60
0.90
2
1.07
--3.20
0.60
3
0.15
2.20
4
0.15 0.30
0.00
ow 01 hamferBox hamferBo0 blanket pill Line01 Box02 pillo C
Villa
39 4
---
-
2
004-AES_201 2
004-AES_2014 -
DN
E
D
005-ASS-301
1
004-AES_201
1
4
005-ASS-301
005-ASS-301
1
I
6.75 mF.F.L. 0.50m S.S.L.
3.40 mS.S.L. 3.50 mF.F.L. 3.40 mS.S.L.
0.15 mF.F.L. 0.50m S.S.L.
40 A
4
B
C
D
E
F
0.08 2.20
0.97
0.08 2.20
0.97
0.07
0.92
0.98
0.50m S.S.L.
2.20
2.91 1.63
3.40 mS.S.L.
0.90
1.07
0.25
0.25
6.60
3.40 mS.S.L. 5.60
6.60
7.70
1.10
3.50 mF.F.L. 3.50 mF.F.L.
1.22
1.07
I
6.75 mF.F.L.
2.20
0.97 0.08
2.20
1.41
H
0.34
3 005-ASS-301
G
1.10
0.08
0.83
0.97
0.31
0.50m S.S.L.
0.36
6.75 mF.F.L.
0.55 0.15 0.50
1.10
1.10
005-ASS-301
1.10
005-ASS-301
0.94
1
0.97
3
0.08
2 2
0.34
1
0.40
0.15
0.18
0.15 mF.F.L. 0.50m S.S.L.
0.15 mF.F.L.
0.30
0.76
0.91
0.84
2.20
2.20
1.06
3.35
1.37
3.35
1.96 1.22
4.18
0.08
2.28
0.50m S.S.L.
0.13
0.19
0.07
SECTIONS
A
0.35
1.02
0.49
2cm groove
0.34 0.53
00 ° 40.
6.75 mF.F.L. 0.50m S.S.L.
5cm Thermal Insulation
2cm Water Insulation
Water Level 0.15 mF.F.L.
2.72
DETAILED SE
2.50
0.05
0.50m S.S.L.
2 cm Ceramic tiles 25cm *25cm 2 cm Cement Mortar 6 cm Sand
0.10
2 cm Water Insulation
SWIMMING POOL
41 Location:
Cairo, Egypt
Client:
Mervat Halim
Area:
52 m2
Year:
2018
Software:
Revit & 3DS MAX & PHOTOSHOP
Description:
Interior Reception
RECEPTION & kitchen
Responsibilities: -Interior Design. -Modeling & visualizing.
42
RECEPTION & kitchen
43
44
45 Location:
Cairo, Egypt.
Client:
Private Project
Area:
54 m2
Year:
2017
Software:
AUTOCAD & 3DS MAX & PHOTOSHOP
Description:
Interior Reception
Responsibilities:
RECEPTION
-Interior Design. -Modeling & visualizing.
46
RECEPTION
47
48
49
Responsibilities: -Extrior Design. -Modeling & visualizing.
50
AMR FARAG Amrfarag135@gmail.com +8613162413001
2020