CONTENT Emergy Analysis and Accounting PERFORMANCE THEATRE MEBD Fall 2014
Energy Simulation and Analysis RESIDENCE MEBD Fall 2014
Design Studio - in progress RESEARCH CENTRE
MEBD Spring 2015
Thesis PERFORMING ARTS ACADEMY
B.ARCH Spring 2013
Urban Analysis and Design URBAN REDEVELOPMENT B.ARCH Fall 2012
Professional Apprenticeship EDUCATIONAL INSTITUTE B.ARCH Fall 2011
JAMESTOWN, NEW YORK
RESEARCH CENTRE
SEMESTER : FINAL SPRING 2015
01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00
60
-10
-20 01/01 01/03 01/05 01/07 01/09 01/11 01/13 01/15 01/18 01/20 01/22 01/24 01/26 01/28 01/30 02/01 02/04 02/06 02/08 02/10 02/12 02/14 02/16 02/18 02/21 02/23 02/25 02/27 03/01 03/03 03/05 03/07 03/10 03/12 03/14 03/16 03/18 03/20 03/22 03/24 03/27 03/29 03/31 04/02 04/04 04/06 04/08 04/10 04/13 04/15 04/17 04/19 04/21 04/23 04/25 04/27 04/30 05/02 05/04 05/06 05/08 05/10 05/12 05/14 05/17 05/19 05/21 05/23 05/25 05/27 05/29 05/31 06/03 06/05 06/07 06/09 06/11 06/13 06/15 06/17 06/20 06/22 06/24 06/26 06/28 06/30 07/02 07/04 07/07 07/09 07/11 07/13 07/15 07/17 07/19 07/21 07/24 07/26 07/28 07/30 08/01 08/03 08/05 08/07 08/10 08/12 08/14 08/16 08/18 08/20 08/22 08/24 08/27 08/29 08/31 09/02 09/04 09/06 09/08 09/10 09/13 09/15 09/17 09/19 09/21 09/23 09/25 09/27 09/30 10/02 10/04 10/06 10/08 10/10 10/12 10/14 10/17 10/19 10/21 10/23 10/25 10/27 10/29 10/31 11/03 11/05 11/07 11/09 11/11 11/13 11/15 11/17 11/20 11/22 11/24 11/26 11/28 11/30 12/02 12/04 12/07 12/09 12/11 12/13 12/15 12/17 12/19 12/21 12/24 12/26 12/28 12/30
D E S I G N D E V E LO PM E N T
PV Panel - Based on Radiation Analysis
Total shell area without frame
PV Glass Wind 79,859.78 sqft 32,245.03 sqft 13,650.45 sqft 63.50 % 25.64 % 10.85 %
70
Legend
PV Panel
ILLUMINANCE STUDY Glass Panel - Based on Daylight Analysis
Glass Wind
RADIATION ANALYSIS
PV Panels
Panels
Glass
Wind Vent (Upper Layer) South Wall
Insulation (below PV Panels)
Adding Lobby
Frame Existing Building
Skin Development
Site Boundary
125,755.27 sqft
SHELL (NATURAL)
SHELL (UNCONDITIONED)
SHELL (CONDITIONED)
SHELL (UNCONDITIONED_VENTILATION)
SHELL (UNCONDITIONED_VENTILATION_SHADING)
SHELL (UNCONDITIONED_VENTILATION_SHADING_INSULATION+DOUBLE PANE LOWE GLASS)
SHELL (UNCONDITIONED_VENTILATION_SHADING_INSULATION+TRIPLE PANE LOWE GLASS)
50
40
30
20
10
0
ENERGY
ENERGY GENERATED FROM PV PANELS ON THE ROOF
80 ft
Total Floor Area 76,479.36 sqft Total shell area without frame 125,755.27 sqft PV 79,859.78 sqft 63.50 % Glass 32,245.03 sqft 25.64 % Wind 13,650.45 sqft 10.85 % PV Efficiency : 21.5% Energy Generated from PV 7,084,521.16 kbtu/year 92.63 kbtu/sqft/year
575 ft 165 ft
Total Site Area : 68560 sq. ft.
Energy Consumption of Building 135,542.09 kbtu/year
ENERGY CONSUMPTION WITH AND WITHOUT THE SHELL
Terraced Spaces functioning alternately as Classrooms or Workshops
Energy Distribution
120,000.00
Total Energy
250,000.00 80,000.00
cooling heating
60,000.00
lighting equipment 40,000.00
Energy Consumption - kbtu/year
Energy Consumption - kbtu/year
100,000.00
200,000.00
150,000.00 215,453.54 100,000.00 135,542.09
50,000.00
20,000.00
Existing
Existing
STRUCTURE
New
New total
View of Private Atrium from Auditorium's front exit
View of Public Atrium from Auditorium's front exit
PHILADELPHIA, PENNSYLVANIA
RESIDENCE Simulation and Analysis of base house, to propose new design, on the bases of : Energy Consumption, Day-lighting and Air - flow
PROPOSED HOUSE
BASE HOUSE
SITE
SEMESTER : FIRST FALL 2014
Analysis based on Energy Consumption
207 S 45th Street
Co-ordinates : Latitude : 39.954764째 N Longitude : 75.21149째 W
Garage
Plan
N
N
Plan
Bedroom Bed- Bed- Dining room room room Bedroom Bath Lobby
Living room
Kitchen Bedroom
View - Base House
Dining room Living room
Bedroom
Kitchen Bedroom
Bedroom
Bedroom
Bedroom
Roof Plan
BASE HOUSE
View - Proposed House
PROPOSED HOUSE Windows and openings were rearranged. Skylights were added. Overhangs and fins were redesigned considering wind factors and orientation.
Analysis based on Day-Lighting Day-Light Factor
Analysis based on Air - flow Summer Study
Illuminance
Winter Study Windows and openings were not provided on the NW side to prevent cold winds from entering the house in the winter months. Most windows and openings were provided on the SW and NE side, with gardens and open areas to diffuse heat in the summer months.
EMERGY ANALYSIS AND ACCOUNTING
PERFORMANCE THEATRE
CONTEXT
To create a better quality of life it is important to consider the footprint left behind not only by the industry but also by the people using them and their evolution.
SITUATION IN A CONTEXT OF USE AND EXCHANGE
SEMESTER : FIRST FALL 2014
Cultural Context
Social Context
Economic Context EMERGY ACCOUNTING
All factors and data for construction, utilities, labour, occupation and capacities are taken into consideration while calculating the building weight. Case Study : KIMMEL CENTER, Philadelphia, PA
Initial Emergy Accounting : 68,503,391,113 After Sustainability Measures : 163,630,444
EMERGY DIAGRAM OF A THEATRE
Time
Direct Relationship between two
Indirect Relationship between two
Balancing Loop
Effect of Sales
Quality
SYSTEMS DIAGRAM OF A THEATRE
Time
Reinforcing Loop
Effect of External System
Effect of Gap
CONCEPT AND VIEWS
SITE PLAN
LANDMARK PEDESTRIAN MOVEMENT ACTIVITY VEHICULAR MOVEMENT
3/13/2015
Scan-1018.jpg
3/13/2015
Scan-1018.jpg
3/13/2015
3/13/2015 3/13/2015
Scan-1019.jpg
Scan-1018.jpg
https://docs.google.com/file/d/0B7-VMc9SXLLKWmJYR0FkRG9uMlU/edit
3/13/2015
1/1
https://docs.google.com/file/d/0B7-VMc9SXLLKWmJYR0FkRG9uMlU/edit
Scan- 1019.jpg
https://docs.google.com/file/d/0B7-VMc9SXLLKWmJYR0FkRG9uMlU/edit
https://docs.google.com/file/d/0B7-VMc9SXLLKWmJYR0FkRG9uMlU/edit
1/1
https://docs.google.com/file/d/0B7-VMc9SXLLKWmJYR0FkRG9uMlU/edit
https://docs.google.com/file/d/0B7-VMc9SXLLKWmJYR0FkRG9uMlU/edit
1/1
FALL 2011