Amrita Ghosh | UPenn | MEBD

Page 1



CONTENT Emergy Analysis and Accounting PERFORMANCE THEATRE MEBD Fall 2014

Energy Simulation and Analysis RESIDENCE MEBD Fall 2014

Design Studio - in progress RESEARCH CENTRE

MEBD Spring 2015

Thesis PERFORMING ARTS ACADEMY

B.ARCH Spring 2013

Urban Analysis and Design URBAN REDEVELOPMENT B.ARCH Fall 2012

Professional Apprenticeship EDUCATIONAL INSTITUTE B.ARCH Fall 2011


JAMESTOWN, NEW YORK

RESEARCH CENTRE

SEMESTER : FINAL SPRING 2015


01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00 13:00:00 16:00:00 19:00:00 22:00:00 01:00:00 04:00:00 07:00:00 10:00:00

60

-10

-20 01/01 01/03 01/05 01/07 01/09 01/11 01/13 01/15 01/18 01/20 01/22 01/24 01/26 01/28 01/30 02/01 02/04 02/06 02/08 02/10 02/12 02/14 02/16 02/18 02/21 02/23 02/25 02/27 03/01 03/03 03/05 03/07 03/10 03/12 03/14 03/16 03/18 03/20 03/22 03/24 03/27 03/29 03/31 04/02 04/04 04/06 04/08 04/10 04/13 04/15 04/17 04/19 04/21 04/23 04/25 04/27 04/30 05/02 05/04 05/06 05/08 05/10 05/12 05/14 05/17 05/19 05/21 05/23 05/25 05/27 05/29 05/31 06/03 06/05 06/07 06/09 06/11 06/13 06/15 06/17 06/20 06/22 06/24 06/26 06/28 06/30 07/02 07/04 07/07 07/09 07/11 07/13 07/15 07/17 07/19 07/21 07/24 07/26 07/28 07/30 08/01 08/03 08/05 08/07 08/10 08/12 08/14 08/16 08/18 08/20 08/22 08/24 08/27 08/29 08/31 09/02 09/04 09/06 09/08 09/10 09/13 09/15 09/17 09/19 09/21 09/23 09/25 09/27 09/30 10/02 10/04 10/06 10/08 10/10 10/12 10/14 10/17 10/19 10/21 10/23 10/25 10/27 10/29 10/31 11/03 11/05 11/07 11/09 11/11 11/13 11/15 11/17 11/20 11/22 11/24 11/26 11/28 11/30 12/02 12/04 12/07 12/09 12/11 12/13 12/15 12/17 12/19 12/21 12/24 12/26 12/28 12/30

D E S I G N D E V E LO PM E N T

PV Panel - Based on Radiation Analysis

Total shell area without frame

PV Glass Wind 79,859.78 sqft 32,245.03 sqft 13,650.45 sqft 63.50 % 25.64 % 10.85 %

70

Legend

PV Panel

ILLUMINANCE STUDY Glass Panel - Based on Daylight Analysis

Glass Wind

RADIATION ANALYSIS

PV Panels

Panels

Glass

Wind Vent (Upper Layer) South Wall

Insulation (below PV Panels)

Adding Lobby

Frame Existing Building

Skin Development

Site Boundary

125,755.27 sqft

SHELL (NATURAL)

SHELL (UNCONDITIONED)

SHELL (CONDITIONED)

SHELL (UNCONDITIONED_VENTILATION)

SHELL (UNCONDITIONED_VENTILATION_SHADING)

SHELL (UNCONDITIONED_VENTILATION_SHADING_INSULATION+DOUBLE PANE LOWE GLASS)

SHELL (UNCONDITIONED_VENTILATION_SHADING_INSULATION+TRIPLE PANE LOWE GLASS)

50

40

30

20

10

0


ENERGY

ENERGY GENERATED FROM PV PANELS ON THE ROOF

80 ft

Total Floor Area 76,479.36 sqft Total shell area without frame 125,755.27 sqft PV 79,859.78 sqft 63.50 % Glass 32,245.03 sqft 25.64 % Wind 13,650.45 sqft 10.85 % PV Efficiency : 21.5% Energy Generated from PV 7,084,521.16 kbtu/year 92.63 kbtu/sqft/year

575 ft 165 ft

Total Site Area : 68560 sq. ft.

Energy Consumption of Building 135,542.09 kbtu/year

ENERGY CONSUMPTION WITH AND WITHOUT THE SHELL

Terraced Spaces functioning alternately as Classrooms or Workshops

Energy Distribution

120,000.00

Total Energy

250,000.00 80,000.00

cooling heating

60,000.00

lighting equipment 40,000.00

Energy Consumption - kbtu/year

Energy Consumption - kbtu/year

100,000.00

200,000.00

150,000.00 215,453.54 100,000.00 135,542.09

50,000.00

20,000.00

Existing

Existing

STRUCTURE

New

New total

View of Private Atrium from Auditorium's front exit

View of Public Atrium from Auditorium's front exit


PHILADELPHIA, PENNSYLVANIA

RESIDENCE Simulation and Analysis of base house, to propose new design, on the bases of : Energy Consumption, Day-lighting and Air - flow

PROPOSED HOUSE

BASE HOUSE

SITE

SEMESTER : FIRST FALL 2014

Analysis based on Energy Consumption

207 S 45th Street

Co-ordinates : Latitude : 39.954764째 N Longitude : 75.21149째 W

Garage

Plan

N

N

Plan

Bedroom Bed- Bed- Dining room room room Bedroom Bath Lobby

Living room

Kitchen Bedroom

View - Base House

Dining room Living room

Bedroom

Kitchen Bedroom

Bedroom

Bedroom

Bedroom

Roof Plan

BASE HOUSE

View - Proposed House

PROPOSED HOUSE Windows and openings were rearranged. Skylights were added. Overhangs and fins were redesigned considering wind factors and orientation.


Analysis based on Day-Lighting Day-Light Factor

Analysis based on Air - flow Summer Study

Illuminance

Winter Study Windows and openings were not provided on the NW side to prevent cold winds from entering the house in the winter months. Most windows and openings were provided on the SW and NE side, with gardens and open areas to diffuse heat in the summer months.


EMERGY ANALYSIS AND ACCOUNTING

PERFORMANCE THEATRE

CONTEXT

To create a better quality of life it is important to consider the footprint left behind not only by the industry but also by the people using them and their evolution.

SITUATION IN A CONTEXT OF USE AND EXCHANGE

SEMESTER : FIRST FALL 2014

Cultural Context

Social Context

Economic Context EMERGY ACCOUNTING

All factors and data for construction, utilities, labour, occupation and capacities are taken into consideration while calculating the building weight. Case Study : KIMMEL CENTER, Philadelphia, PA

Initial Emergy Accounting : 68,503,391,113 After Sustainability Measures : 163,630,444


EMERGY DIAGRAM OF A THEATRE

Time

Direct Relationship between two

Indirect Relationship between two

Balancing Loop

Effect of Sales

Quality

SYSTEMS DIAGRAM OF A THEATRE

Time

Reinforcing Loop

Effect of External System

Effect of Gap


CONCEPT AND VIEWS


SITE PLAN






LANDMARK PEDESTRIAN MOVEMENT ACTIVITY VEHICULAR MOVEMENT


3/13/2015

Scan-1018.jpg

3/13/2015

Scan-1018.jpg

3/13/2015

3/13/2015 3/13/2015

Scan-1019.jpg

Scan-1018.jpg

https://docs.google.com/file/d/0B7-VMc9SXLLKWmJYR0FkRG9uMlU/edit

3/13/2015

1/1

https://docs.google.com/file/d/0B7-VMc9SXLLKWmJYR0FkRG9uMlU/edit

Scan- 1019.jpg

https://docs.google.com/file/d/0B7-VMc9SXLLKWmJYR0FkRG9uMlU/edit

https://docs.google.com/file/d/0B7-VMc9SXLLKWmJYR0FkRG9uMlU/edit

1/1

https://docs.google.com/file/d/0B7-VMc9SXLLKWmJYR0FkRG9uMlU/edit

https://docs.google.com/file/d/0B7-VMc9SXLLKWmJYR0FkRG9uMlU/edit

1/1


FALL 2011



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.