“Despite the headline numbers of a lower production than we would’ve liked, I actually think Yanfolila’s come a long way in terms of us overcoming operational challenges and setting up the mine for a better place in the future,” Hummingbird Resources CEO Dan Betts tells RGN after an unpredictably challenging 2020, not just for the West Africa-based gold producer but for all companies around the world. Having said that, logistical issues across Africa heightened by the COVID-19 pandemic were felt acutely by Hummingbird (particularly in the second quarter of 2020), on top of the impact of the worldwide public health crisis. Hummingbird also watched a military coup unfold in Mali – the host country of its flagship Yanfolila Gold Project. Thankfully, the political transition brought no disruption to Yanfolila’s gold output, but it served as a reminder of the jurisdictional risk involved with operating in Africa. But, it was the border closure issues associated with COVID-19 that were more detrimental to Hummingbird’s production profile last year (2020 output totalled 101,069 ounces of gold, compared to the forecasted 110-125,000 ounces at the start of the year), with various supply chain holdups necessitating changes to the mine plan at Yanfolila. YANFOLILA MINE CAMP, MALI


MINING | HUMMINGBIRD RESOURCES

In spite of all these impediments to growth last year, long-term CEO Betts points to significant developments made by the company outside of the Yanfolila mine, namely the acquisition of the Kouroussa Gold Project in Guinea from junior explorer Cassidy Gold Corp in June 2020, and the advancement of the Dugbe Gold Project in Liberia, following an earn-in arrangement with TSXV-listed Pasofino Gold. “Those developments, coupled with the aggressive exploration we completed at Yanfolila to extend the mine life and move it towards underground mining, demonstrate that there are a lot of exciting things happening, and a lot of growth and value to be unlocked from here,” he says.

Extending Yanfolila At the end of March 2021, Hummingbird announced the ARIAL SHOTS OF DUGBE CAMP IN LIBERIA

discovery of new resources at


YANFOLILA EXPLORATION

Yanfolila following exploration

which haven’t been mined yet

“The Sanioumale East deposit

drilling work in 2020, which

called Sanioumale East and

is now over 200,000 ounces

was the first year that the

Sanioumale West.

and open in every direction

company had committed

with some really stunning

to a sustained exploration

At Sanioumale West, the infill

intersections. We’re drilling

campaign at the mine.

drilling added 26,200 ounces

there now aggressively, and I

of gold to the total mineral

think that could prove to be a

The US$5 million drill

resource estimate of 164,200

very exciting source of future

campaign focused on three

ounces, a moderate increase

feed for the mine.”

main targets: Resource growth

by all accounts. However, the

at the underground section

big upside came at Sanioumale

Meanwhile, the Komana East

of Komana East – which has

East, where over 150,000

Underground development is

provided the main open pits

ounces were discovered during

being dubbed as the long-term

for the mine to date – and

the drill programme.

future mine life of Yanfolila,

two deposits further North

after the drilling provided


MINING | HUMMINGBIRD RESOURCES

Hummingbird is to finalise the mining licence with the government before it can start in earnest on the ground. Having said that, the firm has started detailed FEED and trade-off studies for the flowsheet modelling of the proposed operation. “All that detailed work is being locked down as we speak: the footprint for the mine, the land acquisition plans, social engagement projects and the exploration. For me, exploration is most important because this project has evidence that the main pit

“When you get into

stunning grades and I think

remains open at depth.

underground mining, you’re

we can build a relatively cheap

Hummingbird is currently

not going to have a 10-year

and effective plant based on

working through all economic

mine life, you’re going to prove

our experience at Yanfolila.”

valuations and optimisation

it up as you go. But I think

studies for the underground

these orebodies should go

Kouroussa and Yanfolila

operation.

on and on and sustain a base

share several similarities in

load feed for the mill for many

terms of the scale of both

years to come.”

projects, the metallurgical

“As the Komana East pit gets deeper, narrower and the strip increasingly certain that the

Preparing Kouroussa

continued orebodies will

Shifting over to Guinea

sustain underground mining,”

and the Kouroussa project,

Betts says. “So it’s now about

the immediate priority for

ratio goes up, it’s becoming

optimising how we do that.

flowsheets and process plant design, while Hummingbird can extract synergies in maintenance services and


product component supply given that Guinea and Mali share a malleable trading border. Exploration planning has also commenced on several high priority targets at Kouroussa in order to increase the current resource base of 1.18 million ounces at over 3 g/t. “If we start the exploration now and build on that story as we’re developing the project to extend the mine life, all we’re really doing is creating value,” Betts reiterates.

H UM M I N GBI RD RES O U R C ES AT A G L A N C E

STOCK TICKER: AIM:HUM MARKET CAPITALISATION: £77 million (as of April 01, 2021) aj

DUGBE CAMP, LIBERIA


MINING | HUMMINGBIRD RESOURCES

Partnering with Pasofino Over at the Dugbe Gold Project in Liberia – Hummingbird’s original West African asset – Betts is suitably impressed with the work being completed by partner Pasofino Gold, who acquired Hummingbird’s former partner, ARX Resources, on the project in September 2020. Pasofino agreed to continue the terms of the existing earnin agreement, which will see the company undertake a mutually agreed exploration programme at Dugbe and complete a definitive feasibility study for a 49% interest in the project, with Hummingbird maintaining the 51% controlling stake. During the first six months of the partnership, Pasofino has

ALTUS S

focused on organising logistics around the Dugbe project in order to get exploration up and running. This has involved rebuilding roads, bridges and the mining camps.


“The Dugbe project is in a remote area of Eastern Liberia, albeit very close to a port as the crow flies. That logistical work has been completed and they’ve now got four rigs at site and are motoring away with exploration work and getting good results which are starting to come out to the market. “I think everyone wrote Dugbe off, and it’s obviously got a place in our heart given that is where we started. The guys at Pasofino are very professional, competent and

“The plan was always to find a gold project, build a gold project and use the cash flow from the gold project to build a gold company. It’s never a straight road, there’s always going to be hiccups and we’ve got the scars to prove it now” – Dan Betts, Hummingbird Resources CEO


MINING | HUMMINGBIRD RESOURCES

across the Yanfolila site, which involved the rehabilitation of over 8,000 trees. However, Betts believes the biggest success story in the community is the market gardens project. “We have overseen the employment of over 800 women in self-sustaining work at these market gardens where they are selling produce to us and into the communities. These individuals now see this as a way of earning a livelihood that can endure long after the mine is finished.”

DAN BETTS, HUMMINGBIRD RESOURCES CEO

Betts is also keen to highlight Hummingbird’s pioneering

have a great track record of

centres on the altruistic work

Single Mine Origin (SMO) gold

building value in assets, either

it accomplishes in the local

initiative. SMO provides a way

through developing or selling

environment and communities

of tracing gold from source

them. I think there’s a real

in the Sikasso region where

at a responsible mine that

opportunity for Hummingbird

Yanfolila is located. In 2020,

complies with international

shareholders to attain some

the company threw itself

best practice principles – such

value here that’s not seen in

into COVID-related relief and

as the World Gold Council’s

the share price.”

assistance measures while

RGMPs or IFC Performance

maintaining its regular ESG-

Standards – all the way

focused work programmes.

through to refinery and the

ESG excellence Another source of constant pride at Hummingbird

manufacturing process into Hummingbird commenced a new tree planting initiative

the jewellery industry.


HUMMINGBIRD RESOURCES MARKET GARDENS INITIATIVE IN MALI

He explains how the consumer

because the sector is awesome

where the mine is. I

of SMO-certified gold will be

in the ESG work it does in

fundamentally believe mining

able to scan a QR code on the

remote communities, yet often

can do that in a way no other

product which details the exact

hides its credentials under a

industry can. Hopefully with

journey the gold has taken

bushel because people like to

SMO gold we can showcase

from the Yanfolila mine all the

slam mining.

that to the retail world and

way to their finger, in the case of a ring.

it then becomes a retail-led “Mining is not sustainable, you dig a resource out the

initiative.”

“If we can help roll that out,

ground and it’s gone, but it’s

Bright horizons

I think it can help promote

how you do this in a way that

Despite seeing a weaker gold

the whole mining industry,

improves the livelihoods of the

price so far in 2021, and hence

communities and environment


MINING | HUMMINGBIRD RESOURCES

DAN BETTS WITH MARKET GARDENERS IN MALI

a lower share price in line with

straight road, there’s always

Strategically, Hummingbird

the market correction, Betts

going to be hiccups and we’ve

has never been in a better

has plenty of reasons to be

got the scars to prove it now.

place, Betts proclaims. The

optimistic given Hummingbird

company will pay off all

is on track with regards to

“But I think we are getting

outstanding debt later this year

building a multi-asset gold

better and better and that gives

and it has made exploration

company in West Africa.

us the platform to grow. We’ve

progress at Yanfolila, while

got the second project and an

making solid advances at its

“The plan was always to find

organic growth pipeline in the

other gold projects in Guinea

a gold project, build a gold

region, which has tremendous

and Liberia.

project and use the cash flow

opportunities; lots of gold, lots

from the gold project to build

of discoveries.”

a gold company. It’s never a


Published by Anderson Murray Media Ltd

To tell the resource market your story, contact: editorial@resourceglobalnetwork.com

WWW.RESOURCEGLOBALNETWORK.COM


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.