RGN | Hummingbird Resources

Page 1

WWW.RESOURCEGLOBALNETWORK.COM


MINING | Hummingbird Resources

HUMMINGBIRD RESOURCES


Resource Global Network

Pouring first gold at Yanfolila


MINING | Hummingbird Resources

At the start of 2017, RGN spoke to Hummingbird Resources as the West Africa-focused gold miner began to accelerate its flagship low cost, high grade Yanfolila Gold Project in Mali. In little under a year, the AIM-listed outfit has accomplished a long list of undertakings that have taken the project off the ground, from construction and electrification of the plant, building the camp, commissioning of the mill, mobilisation of the mining fleet, local recruitment, training and much more. At the end of Q3, Hummingbird began mining operations at Yanfolila ahead of an anticipated first entry into production by year end. Managing director Daniel Betts talks RGN through Hummingbird’s busy year, explaining how he and his team have ensured the project will be delivered on time and on budget.

The team So often in these near-term developments it is the organisational strength of the managing team that dictates the overall strength of the project, and this notion was not lost on Betts when it came to assembling a senior management team.


Resource Global Network


MINING | Hummingbird Resources


Resource Global Network “I think we have got the structure right in terms of Hummingbird having a VP for all the major disciplines be that the EPCM, the SHEC, operations, geology and some of those people have been with me for a long time,” says Betts. For example, VP SHEC (safety, health, environment, consultancy) David Hebditch has worked with Betts for several years prior to his arrival on the Yanfolila project, including on the Dugbe Gold Project in Liberia, Hummingbird’s other major gold development in West Africa. Another staunch member of the team is VP Operations William Cook who is responsible for the ongoing running and development of Hummingbird’s operational capability in Mali and Liberia, and has been with the company since the beginning. However, the company has also brought in fresh blood such as Murray Paterson, VP Geology, Wayne Galea, VP EPCM and Shaun Bunn, Senior VP Project Delivery, who have each made significant overseeing contributions to the overall ramp-up in activities at Yanfolila over the last year. The construction of a clearly-defined and compartmentalised management team has allowed the company to maintain a high degree of control over the many different elements of the project, meaning that no detail (however fine or glaring) has escaped the attentions of a Hummingbird supervisor.


FEW MINING CONTRACTORS KNOW AFRICA LIKE WE DO, OR HOW TO HELP YOU MINE MORE. There are three things you want in your surface mining contractor: flexibility, efficiency and safety. With African Mining Services you get all three. Outsource your mining operation to us and get a complete mining lifecycle service without having to finance or maintain a huge mining fleet. You get a company whose single focus is surface mining, who knows African mining conditions and how to mine productively in remote and difficult areas. Lastly, you get a contractor who has an enviable safety record because it takes the time to care and skill its workforce. Want more? Contact your nearest AMS office.

GET TO KNOW US AT AMSGH.COM

BRINGING MORE TO MINING


ResourceGlobal GlobalNetwork Network Resource

This level of transparency in Hummingbird’s

Major milestone

work has taken on even greater importance

“AMS are very professional, they know exactly

in recent months with the entry of the

what they are doing and run lots of mining

contract mining team African Mining Services

operations in West Africa, but ultimately they

(AMS) on to the project.

are bringing in a $100 million mining fleet and it changes the dynamic of your team and

Overall, Betts believes the transition from

the way you operate as a company massively.

construction of the plant to mobilisation of

the mining fleet has been a smooth one,

“How we have integrated with AMS, managed

which is a testament to the disciplined

the contact with them and ultimately worked

overarching management structure already

together, is a major milestone for the

in place prior to the arrival of AMS.

company. We are currently getting through

“I GUESS THE PROOF IN THE PUDDING OF OUR WORK IS THE FACT THAT WE ARE GOING TO DELIVER ON TIME AND ON BUDGET AND THAT’S A PRETTY RARE FEAT SO I’VE GOT TO BE HAPPY” DAN BETTS, MANAGING DIRECTOR


MINING | Hummingbird Resources

the strip, have accessed ore and the ROM

so I’ve got to be happy.” After first pour in

pad has been completed.”

December, Yanfolila’s first year capacity will reach 132,000oz au, according to the project’s

Over three million tonnes of material was

2016 definitive feasibility study.

removed and transported during the initial process of top-fill strip mining to prepare the

The DFS was followed up by an optimised

open pit ahead of first pour in December,

new mine schedule outlining the financial

a target which was achieved on time to the

metrics of the project, which revealed a low

delight of Betts.

AISC of $695/oz and after-tax IRR of 60% at a $1,250 gold price. At this price Yanfolila will

“I guess the proof in the pudding of our work

generate over $70 million of free cash flow a

is the fact that we are going to deliver on time year. and on budget and that’s a pretty rare feat


Australian Resource Business Global Network

As if these encouraging returns weren’t

struggle to raise the capital to build that plant

satisfying enough for Hummingbird,

on its own.

Yanfolila’s production profile is set to be further boosted over the next decade by the

“But, based on the current metrics we think

recent deal struck with African Gold Group

we can beneficiate by concentrating that ore

for a conditional 50% interest in the nearby

at site before trucking it to our Yanfolila mine

Kobada Gold Project.

and running it through our CIL circuit, which would take a lot of the capital costs out of

The Kobada project has a measured,

building a standalone mine.

indicated and inferred gold resource of 2.2 million oz (Moz), including 511,000oz

“Effectively overnight we’ve got an additional

of reserves all within trucking distance

resource of 2.2 million ounces and we can

to Yanfolila’s processing plant, which

show the world that Yanfolila is not a short-

provides a tantalising scenario involving the

term project.

transportation of concentrate. “If we can get it to 10 years and 150,000oz a “I think it is one of those rare things in life

year by bleeding in a higher concentrate feed,

where it is a win-win,” proclaims Betts.

then we’ve got a very significant mine on our

“Kobada is a low grade deposit and would

hands.”

128


Let’s create a powerful partnership We’ve been delivering power for more than 50 years to satisfy the needs of customers in the mining industry – tailored to unique requirements, in harsh environments and remote locations. We have the world’s largest fleet of classleading generators and hybrid packages, but it’s our global network, our bespoke and cost-effective packages, rapid deployment, enviable safety record and local employee policy that will give you the peace of mind to get your job done. Your partner in mining across Africa SN: +221 33 859 21 10 CI: +225 21 27 09 75 CR: +237 678 26 56 95

KE: +254 707 000 888 TZ: +255 222 773 521 ZA: +27 861 244 735

Visit us at aggreko.com to get in touch


Resource Global Network

TIMELAPSE VIDEO YANFOLILA GOLD MINE

Cora Gold

“We had a fantastic portfolio of exploration

Turning away from the Yanfolila project and

licenses but just didn’t have the bandwidth or

towards Hummingbird’s exploration activity,

the budget to explore and they’ve just been

the company struck a significant deal with

sitting there for the last 18 months,” explains

fellow junior Cora Gold, which also has a

Betts.

presence in the Yanfolila Gold Belt across

Mali and Senegal.

“The period of stagnation was frustrating as we like to work our ground hard and give

Ahead of Cora’s listing on the AIM,

ourselves a chance at making the next big

Hummingbird agreed to put some of its own

discovery.”

exploration targets into Cora’s portfolio in return for 33% of the company’s shares.

However, under a JV with Cora (a company

“FROM HUMMINGBIRD’S POINT OF VIEW THIS DEAL WITH CORA GOLD BECOMES AN ARMS-LENGTH EXPLORATION INCUBATOR FOR US AND I QUITE LIKE THE MODEL” DAN BETTS, MANAGING DIRECTOR


MINING | Hummingbird Resources


Resource Global Network

Betts has known for a long time) the

As Hummingbird enters into production at

company has been able to free up its

Yanfolila, maintains its position in Liberia at

exploration bandwidth and funding.

the Dugbe project and keeps its exploration

“From Hummingbird’s point of view this

targets open through the shared ownership

deal becomes an arms-length exploration

deal with Cora, Betts reflects on where he

incubator for us and I quite like the model to

wants to take the firm in the coming years.

be honest. “My vision is to build the most profitable, “It lets us focus on growing a mining

efficient gold company I can build and that

company, developing Yanfolila and Kobada

doesn’t need to be just in West Africa. This

but it also gives us access to exploration

is to be driven by the quality of the resource

which is where Hummingbird came from and

and any differentiators our team can bring to

is the bedrock of the industry. We certainly

the table to deliver those resources.”

want to be involved in exploration and I think this is a neat way to do this.”

b a r j


Published by Anderson Murray Media Ltd

To tell the resource market your story, contact: jacob@resourceglobalnetwork.com

WWW.RESOURCEGLOBALNETWORK.COM


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.