Tietto Minerals successfully floated on the ASX in January 2018, raising $6 million through the issue of 30 million shares in its IPO. After seven years under private operation the decision to go public was made in September 2017 by the board of directors – whom collectively boast over a century of experience in mineral exploration. Tietto’s story began in 2010 with two projects in Liberia before expanding into Côte d’Ivoire two years later, following the conclusion of the Ivorian crisis. Since then, progress in Côte d’Ivoire has taken place at a fast pace, spearheaded by the rapid development of Tietto’s flagship Abujar gold project, where the company’s current JORC resource originates from. The first exploration licence of the Abujar project was applied for by Tietto with its

was very clear to us where the mineralisation

joint venture partner in March 2014, and by

was taking place at Abujar,” says Tietto’s

September of the same year the company

managing director Caigen Wang. “At least a

received a license for the middle tenement

portion of the mineralisation is shown at the

- which hosts the JORC Resource and

surface by previous artisanal workings.”

numerous drilling targets. Therefore, it has been somewhat fortuitous “Due to previous large-scale artisanal

for Tietto that the prior work of small-

workings around a few kilometres strike, it

scale artisanal miners across the tenement


Resource Global Network

has exposed mineralisation at surface,

artisanal workings clearly show part of the

particularly as Wang proposes that the

mineralisation from surface and heading

average time taken to identify mineralisation

downwards. That’s one of the main reasons

at a grassroots exploration project is usually

why we are progressing the Abujar project so

around two years.

rapidly.”

“In the case of Abujar, we save at least two

JORC Inferred Resource

years in identifying mineralisation before

The maiden JORC Inferred Resource

starting resource definition drilling, as the

estimation of 10.4 Mt @ 2.1 g/t Au for


MINING |Tietto Minerals

FEW MINING CONTRACTORS KNOW AFRICA LIKE WE DO, OR HOW TO HELP YOU MINE MORE. There are three things you want in your surface mining contractor: flexibility, efficiency and safety. With African Mining Services you get all three. Outsource your mining operation to us and get a complete mining lifecycle service without having to finance or maintain a huge mining fleet. You get a company whose single focus is surface mining, who knows African mining conditions and how to mine productively in remote and difficult areas. Lastly, you get a contractor who has an enviable safety record because it takes the time to care and skill its workforce. Want more? Contact your nearest AMS office.

GET TO KNOW US AT AMSGH.COM

BRINGING MORE TO MINING 703,600 oz was delivered in December 2016

a strike length of 1,000 metres – an exciting

from 13,000 metres of drilling within a small

result indeed.

portion of known artisanal working areas in the middle tenement.

The next step for Tietto is to target a new resource area to the South of the main

Since this announcement, the company has

resource: “Our recent drilling beyond the

continued drilling several new targets within

strike of the existing JORC resource towards

the tenement with the aim of further building

the South gave us very good intersections

the resource. Over the last four years, all

and multiple drilling targets for further

drilling activity has been conducted by major

resource definition.

West African contractor Geodrill, with the most recent campaign completed in Q1 2018.

“But the few holes we drilled at a shallow depth of 50 metres gave us very good

The Q1 campaign focused on digging

intersections. The areas named Pischon

deeper holes in the current JORC Resource

South and Golikro will form our next major

area and delivered some very positive and

increase in resources.”

encouraging results according to Wang. Tietto managed to hit high grade gold intercepts at

For these upcoming drill programmes, Tietto

an extended depth of 200-250 metres over

has elected Ausdrill as its drilling partner of


Resource Global Network

choice. Ausdrill has been operating in West

provide a high grade gold mine is there for

Africa for many years, but only recently

all to see, but how viable is Côte d’Ivoire as a

expanded their business into Côte d’Ivoire.

mining jurisdiction?

Tietto will become their first drilling service client in the nation, when they undertake the

The mining industry was only meaningfully

next round of drilling for over 50,000 metres.

opened up to foreign investors in 2014, when a new mining code was introduced. The

Overall, the short-term target for Tietto at

new code stipulated a range of legislative

Abujar hinges on further expanding the

measures including an attractive five-year

resource, which could potentially be doubled

corporate tax free exemption for mining

or even tripled up to around two million

companies, followed by a 25% corporate tax

oz before the company commences a pre-

rate and a 3% government royalty rate.

feasibility study.

Operating in Côte d’Ivoire

“Cote d’Ivoire was already a relatively developed country in Africa, [before the new mining code] particularly in West Africa. The

With high grade mineralisation being

country has very good infrastructure thanks

identified with every additional drill

to its very developed agricultural industry.”

programme, the potential for Abujar to


MINING |Tietto Minerals

The gold mining sector is also well

the fact the artisanal mining provides the

established, with five mines currently

only means of income for many vulnerable

producing and operated by a number of

citizens.

international companies including Endeavour Mining and Randgold Resources. These

Supporting local people

mines produced approximately 800,000 oz

“In order to provide support to local people

of gold last year. “So, we do have numerous

who operate in small-scale artisanal mining,

good examples of modern mining operations

the government has set up special zones

producing gold in Cote d’Ivoire,” Wang adds.

which are only for small-scale mining licenses. So, for the major licence areas, no

Furthermore, the Ivorian Government,

small-scale mining activity should take place.

particularly the Ministry of Mines, has been working hard to manage the sensitive issue

“Likewise, within the designated areas for

of small-scale and illegal mining within the

small-scale mining activities, no company

country’s mineral belts.

is allowed to apply for major exploration licenses,” explains Tietto’s managing director.

In response to conflict-driven mining practises, the government has not been

Tietto itself is also supporting local people

afraid to use military force in order to dispel

through its company employment policy.

and close down illegal operations, however

“The first thing we did was try to maximise

the government is also acutely aware of

the local employment of our geologists and


ResourceGlobal GlobalNetwork Network Resource


MINING |Tietto Minerals

technicians working on the ground. Whether

Cestos projects were resumed in March 2018

they are full time or casual, they are all

after an extended hiatus.

Ivorian. The geological foundations of the projects are “Ivorian geologists have good expertise due

sound, with significant gold mineralisation

to their training and work experience with

identified over a long distance of strike from

a number of major international mining

the company’s preliminary work at both

companies that operate in Cote d’Ivoire,

projects. However, Tietto has its work set

Burkina Faso and Mali,” he continues.

out in Liberia, with both projects located in a remote part of the country.

“We have a local specialised technical team of personnel available in the country which is

Wang admits that infrastructural

our first choice for our employment.”

development in the region is minimal,

The Liberian projects With the rapid pace of development taking

therefore significant improvements will need to be made to support the potential gold mining operations.

place in Cote d’Ivoire, it is easy to forget that Tietto’s original projects are in neighbouring

“Nonetheless, the progress has been quite

Liberia. Field activities at the Dube South and

significant this year and we are going to


Resource Global Network

announce our results in September/October.

into other parts of the region, but for now the

Our aim for the Liberian projects is to define

MD is keeping his feet firmly on the ground.

a minimum of three drilling targets for each project before the next dry season which is

“As a mining engineer myself, I believe that

November this year.

the company’s primary purpose is to build a producing mine. That’s our current aim

“At that time, we will arrange a test drill

and we are quite confident that with the

campaign for both Liberian projects with

advanced status of our Abujar project and

multiple drilling targets on each project.

the related upside there, as well as the two

Overall, we are confident that we should have

Liberian projects, we will be able to build a

good success on each of the two projects.”

mine or mines in West Africa in a few years’ time.”

As a West Africa-focused junior explorer, Wang reveals that Tietto does harbour motives to expand its mineral exploration

ASX:TIE


Published by Anderson Murray Media Ltd

To tell the resource market your story, contact: editorial@resourceglobalnetwork.com

WWW.RESOURCEGLOBALNETWORK.COM


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.