STRUCTURAL CONSOLIDATION IDEAS
1 - INTRODUCTION 2 - URBAN INSERTION
STRUCTURAL CONSOLIDATION IDEAS
Advertisement
WALL CONSOLIDATION IDEAS WALL CONSOLIDATION
3 - TIMELINE PHASES 4 - PHASES OF INTERVENTION 5 - CASTLE INTERVENTION 6 - CONCLUSION
The Rocca has patches on the walls that are “bulging”. The two layers of stones are falling appart. The exterior level is heavely damaged or destroyed. This is problematic for multiple reasons : fragilization of the parts structurally sollicited, infiltration of water but also of vegetation, rats, dust, the stones are supporting each other so that kind of damage expendS, the missing stones make the surrounding strones fall too. This problem can happen for different reason and is common, usually the structure moves or is sollicitated in inadequate way (we can think here about the hearthquake) and the internal forces bulge the walls until the stones finally fall. One recognized and sure solution is to : 1. clean as much as possible the exposed internal layer 2. reconstruct the missing part reinforcing by transversal stones called header stones. For non completly destroyed part header stones can be used too, replacing stones or injecting cement.
Source : ASSOCIATION POUR LA CONNAISSANCE, LA SAUVEGARDE, LA MISE EN VALEUR DE L’ARCHITECTURE & DES SITES RURAUX EN BRETAGNE ARTS MURTS DE VANDÉE ORIGINAL STATE OF THE WALL
DAMAGED STATE, BULGDING
STATE AFTER REPAIRATION Interior layer of the wall
Exposed interior layer of the wall Exterior layer of the wall
Damaged exterior layer of the wall
Header stones making the link betweend the two layers and strenghtening the wall
1 - INTRODUCTION 2 - URBAN INSERTION 3 - TIMELINE PHASES 4 - PHASES OF INTERVENTION 5 - CASTLE INTERVENTION 6 - CONCLUSION
STRUCTURAL CONSOLIDATION IDEAS REFURBISHMENT OF BATTLEMENTS REFURBISHMENT OF BATTLEMENTS
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/052aad7ff8b3987e1439e9d5c45b6c9b.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/3590f3c7e7046adf04808d881936c6fe.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/29f393b1679a753004357278f58ba60b.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/26f474d7b45cd5444613a9cd4fcef732.jpeg?width=720&quality=85%2C50)
AXONOMETRIC VIEW OF TOWER
ORIGINAL STATE OF TOWER BATTLEMENTS
AFTER RENOVATION OF TOWER BATTLEMENTS ORIGINAL STATE OF THE BATTLEMENT ( 1:25)
STATE AFTER REPAIRATION OF BATTLEMENT (1:25)
1 - INTRODUCTION 2 - URBAN INSERTION
CIRCULAR TOWER
3 - TIMELINE PHASES 4 - PHASES OF INTERVENTION 5 - CASTLE INTERVENTION 6 - CONCLUSION
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/f1c10bb5f0e90f8c5ca1ad74c438192b.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/e7689278e86c8f9510d74417953ef470.jpeg?width=720&quality=85%2C50)
1 - INTRODUCTION 2 - URBAN INSERTION
STRUCTURAL CONSOLIDATION IDEAS
CIRCULAR TOWER
3 - TIMELINE PHASES 4 - PHASES OF INTERVENTION 5 - CASTLE INTERVENTION 6 - CONCLUSION
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/a81f23bf2d7d200482f851002edda94f.jpeg?width=720&quality=85%2C50)
1 - INTRODUCTION 2 - URBAN INSERTION
STRUCTURAL CONSOLIDATION IDEAS
CIRCULAR TOWER
3 - TIMELINE PHASES 4 - PHASES OF INTERVENTION 5 - CASTLE INTERVENTION 6 - CONCLUSION
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/9774def91f27de9a605735a31cb34935.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/b85ba867566217aec0969e80b2b0edb6.jpeg?width=720&quality=85%2C50)
1 - INTRODUCTION 2 - URBAN INSERTION 3 - TIMELINE PHASES 4 - PHASES OF INTERVENTION 5 - CASTLE INTERVENTION 6 - CONCLUSION
STRUCTURAL CONSOLIDATION IDEAS
CIRCULAR TOWER DETAILS
01 - COVER-250 X 50 MM MS BOX SECTION PAINTED WITH ANTI-CORROSION PAINT 02 - STEEL BEAM - MS BOX SECTION OF SIZE 175X75MM ATTACHED TO THE VERTICAL SUPPORTS 03 - METAL CLIP WELDED TO THE STEEL BEAM TO SUPPORT THE WOODEN LOUVERS 04 - WOOD LOUVERS OF SIZE 85 X 25MM IN ELEVATION 05 - COVER - MS BOX SECTION IN ELEVATION 06 - STEEL BEAM IN ELEVATION 07 - WOOD LOVERS IN ELEVATION 08 - VERTICAL SUPPORT MADE OF 2 BOX SECTIONS CLAD WITH METAL SHEET
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/457baa7e0abda0d1eb802648776852d3.jpeg?width=720&quality=85%2C50)
1 - LOUVER
01 - MSBOX SECTION 30 X 30 MM HANDRAIL 02 - WOODEN PANELS SCREWED TO THE METAL BALUSTERS 03 - MS BOX SECTION 30 X 30 MM VERTICAL SUPPORT 80MM C/C WELDED TO THE STEEL BEAM 04 - WOODEN PANELS IN ELEVATION 05 - C SECTION TO COVER THE FLOOR SIDES 06 - C SECTION IN ELEVATION 07 - PERFORATED METAL FLOORING 09 - STEEL COLUMN IN ELEVATION. 08 & 10 - STEEL BEAM 01 - METAL SHEET PANEL 80 MM 02 - BULK FIBRE INSULATION 172 MM 03 - STEEL BEAM - MS BOX SECTION OF SIZE 150 X 150 MM ATTACHED TO THE WALL 04 - INTERIOR FINISH - GYPSUM BOARD CEILING 05 - CUSTOM MADE FLASHING CONNECTS TO WALL & GUTTER 06 - WATER PROOF MEMBRANE RUNS BELOW GUTTER 07 - BEAM PROJECTING INTO THE MASONRY WALL TO STRENGTHEN THE WALL & ATTACHED TO STRUCTURE OF CIRCULAR TOWER 08 - WALL STIFFENER CONNECTED TO THE BEAMS FROM THE EXTERNAL SIDE OF THE WALL 09 - CIRCULAR TOWER - COLUMN IN ELEVATION.
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/28887a88f3b3472d8e94f2643576c7cf.jpeg?width=720&quality=85%2C50)
2 - ROOF DETAIL
01- MASONRY WALL 02 - PERFORATED METAL FLOORING 03 & 04 - STEEL BEAMS 05 - BEAM PROJECTING INTO THE MASONRY WALL TO STRENGTHEN THE WALL & ATTACHED TO STRUCTURE OF CIRCULAR TOWER 06 - WALL STIFFENER CONNECTED TO THE BEAMS FROM THE EXTERNAL SIDE OF THE WALL 07 - CIRCULAR TOWER - COLUMN IN ELEVATION.
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/815c737662e028a77fa233e51959f2a2.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/b61b88c86b5ac44f6d440a6ccb73b490.jpeg?width=720&quality=85%2C50)
1 - INTRODUCTION 2 - URBAN INSERTION 3 - TIMELINE PHASES 4 - PHASES OF INTERVENTION 5 - CASTLE INTERVENTION 6 - CONCLUSION
STRUCTURAL CONSOLIDATION IDEAS
CIRCULAR TOWER
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/283a93e05826617f1a2777ca135c2f64.jpeg?width=720&quality=85%2C50)
01- MASONRY WALL 02 - PERFORATED METAL FLOORING 03 & 04 - STEEL BEAMS 05 - BEAM PROJECTING INTO THE MASONRY WALL TO STRENGTHEN THE WALL 06 - WALL STIFFENER CONNECTED TO THE BEAMS FROM THE EXTERNAL SIDE OF THE WALL
6 - FLOOR DETAIL
01 - METAL SHEET PANEL 80 MM 02 - BULK FIBRE INSULATION 172 MM 03 - STEEL BEAM - MS BOX SECTION OF SIZE 150 X 150 MM ATTACHED TO THE WALL 04 - INTERIOR FINISH - GYPSUM BOARD CEILING 05 - STEEL PURLIN 172 X 100 MM 06 - CUSTOM MADE FLASHING CONNECTS TO WALL & GUTTER 07 - CUSTOM MADE GUTTER IN 2 MM POWDER COATED STEEL 250 X 250 MM 08 - WATER PROOF MEMBRANE RUNS BELOW GUTTER 09 - BEAM PROJECTING INTO THE MASONRY WALL TO STRENGTHEN THE WALL 10 - WALL STIFFENER CONNECTED TO THE BEAMS FROM THE EXTERNAL SIDE OF THE WALL
![](https://assets.isu.pub/document-structure/211111112224-c18f739e73e29d0e3f304fe6c079337b/v1/973b4894fe761ce505e72f5efca92e48.jpeg?width=720&quality=85%2C50)