Design Architect
SA CO M P N L ST E PE R . N U O RM C T T F I IT O O IN N R G. O R
SITE PLAN NOTES:
FLOOR PLAND AND ROOF PLAN NOTES:
01. PLANS ARE DESIGNED TO 2015 INTERNATIONAL BUILDING CODES. CONTRACTOR TO VERIFY PLANS CONFORM TO LOCAL BUILDING STANDARDS PRIOR TO CONSTRUCTION.
GENERAL NOTES: 01. PLANS ARE DESIGNED TO 2015 INTERNATIONAL BUILDING CODES. CONTRACTOR TO VERIFY PLANS CONFORM TO LOCAL BUILDING STANDARDS PRIOR CONSTRUCTION.
WALL AND PARTITION NOTES: 01. INSTALL ALL 'ZIP' SHEATING ON WALLS IN HORIZONTAL ORIENTATION, RUNNING PERPENDICULAR TO THE WOOD STUD WALLS.
02. GENERAL CONTRACTOR SHALL VERIFY ALL EXISITNG CONDITIONS IN FIELDD AND NOTIFY OWNER AND ARCHITECT OF ANY DISCREPANCIES IN THE PLANS.
02. INSTALL ALL PEEL AND STICK MEMBRANE OVER ALL JOINTS, HORIZONTAL AND VERTICAL, BETWEEM 'ZIP' SHEATING PANELS. INSTALL PEEL AND STICK MEMBRANE OVER ALL 'ZIP' SHEATING AT WINDOW SILLS AND JAMBS.
04. GENERAL CONTRACTOR SHALL VERIFY ROOF OVERHANG ALLOWANCES WITH THE CITY PRIOR TO CONSTRUCTION. 05. ALL DESIGN WORK BEYOND THE PROPERTY LINE OF THE PROJECT, INLCUDING ANY CIVIL ENGINEERING WORK, SHALL BE BY OTHERS.
06. GENERAL CONTRACTOR SHAALL VERIFY POSITIVE DRAINAGE, AT LEAST THREE INCHES EVERY TEN FEET, AWAY FROM BUILDING LINE IN ALL DIRECTIONS. 07. GENERAL CONTRACTOR SHALL REFERENCE CIVIL ENGINEERING DRAWINGS FOR ALL CIVIL AND SITE UTILITY WORK.
03. GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT AND OWNER OF ANY DISCREPANCIES BETWEEN THE DRAWINGS AND OTHER TRADES 04. GENERAL CONTRACTOR SHALL COORDINATE INSTALLATION OF APPLIANCES AND FIXTURES WITH SUB-CONTRACTOR TRADES BASED ON SELECTIONS. INSTALL ALL FIXTURES AND APPLIANCES PER MANUFACTURER'S RECOMMENDATIONS. CONTACT ARCHITECT PRIOR TO INSTALLATION IF OWNER SUBSTITUTIONS AFFECT DESIGN. 05. INSTALL INWALL BLOCKING AS REQUIRED FOR ALL FIXTURES, APPLIANCES AND ACCESSORIES AS REQUIRED TO SUPPORT SAID ITEMS.
06. DO NOT SCALE DRAWINGS. IF REQUIRED DIMENSIONS ARE NOT INDICATED, GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT FOR RESOLUTION.
The original of this drawing is 18''x24''. If thish copy is any other size it has either been reduced or enlarged. Take appropriate precautions accodringly.
GSPublisherVersion 0.0.100.99
03. ALL INTERIOR PARTITIONS ARE 2X4s EXCEPT FOR PLUMBING WALLS AND POCKET DOOR WALLS WHICH SHALL BE 2X6s, UNLESS NOTED OTHERWISE.
02. ALL SUPPORT TRUSSES USED IN THE DESIGN WILL EITHER BE COMERCIALLY BOUGHT OR DESIGNED BY A LICENSED PROFESSIONAL. 03. GENERAL CONTRACTOR SHALL VERIFY THE BILL OF QUANTITY PRIOR TO STARTING CONSTRUCTION. 04. THE BILL OF QUANTITY PROVIDED IS GENERAL AND CONTAINS ALL THE MAJOR MATERIALS. GENERAL CONTRACTOR IS RESPONSIBLE FOR SUPPLEMENTING IT WITH ANY REQUIRED ADDITIONS.
Cabin House 1.0 ProjectInformation
03. GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT AND OWNER OF ANY DISCREPANCIES BETWEEN THE DRAWINGS AND OTHER TRADES
01. FOUNDATION DEPTH, DESIGN, REINFORCEMENT TYPE AND AMOUNT, AS WELL AS ALL FOUNDATION RELATED DESIGN WORK WILL BE HANDLED BY A LICENSED PROFESSIONAL
FINISH NOTES: 01. ALL INTERIOR WALLS AND CEILINGS SHALL BE GYPSUM BOARD IN ACCORDANCE WITH FIRE RATING REQUIRED BY APPLICABLE CODE.
Author: Arch. Andrei Vasilief
Cover Drawing Information
02. GENERAL CONTRACTOR SHALL VERIFY ALL EXISITNG CONDITIONS IN FIELD AND NOTIFY OWNER AND ARCHITECT OF ANY DISCREPANCIES IN THE PLANS.
GENERAL NOTES:
G101
2
B
1
17'-4" 17'-4"
2
11"
18' 17'-4" 11'-1"
2'-6" 5'
King post W02
W02 2'-6" 5'
A
King post
F04
10"
A
2'-6" 5'
2'-6" 5'
A
HP | Sill 2'
4'-4"
7'-1" 8'
3'-2"
Animo Regis SRL
King post
Asphalt shingles A
FL.:
10"
Laundry
4
FL.:
49 sq ft
P.: 31'-10.9"
Tiles D02
N.A:
18 sq ft
P.: 17'-1.1"
Plumbing
W01 Dim.5' x 5'
+8'-3"
-4"
5
Tiles
N.A:
D02 2'-6" 7'
7'-1"
7'-1"
W4'-6"
11'-10" Bathroom
W01 Dim.5' x 5'
W01 Dim.5' x 5' +8' 1 Roof framing
+7'
King post
F06
King post
B
B
Wooden siding
SA CO M P N L ST E PE R . N U O RM C T T F I IT O O IN N R G. O R
B
1'
+15' 3 Roof
HP | Sill 2'
10"
B
+14'-10"
3'-2"
8'-1" 7'-1"
1
Design Architect
N
B
2'-6" 7'
N
King post
Jack studs
King post
+2'
Island or dining table
5' 7'
±0'
F03
Open plan living room
West Elevation 3/8" = 1'-0"
Jack studs
64'-2.0"
5' 7'
A
+14'-10"
+15' 3 Roof
F05
D03
D03
2'-6" 7'
2'-6" 7'
2'-10"
D
257 sq ft
P.:
Fireplace
D
N.A:
100 -
-1'
5' 7'
5' 5'
Parquet
D01
HP | Sill 2'
W01
A
FL.:
C
E
2'-6" 13'-9" 30'
Jack studs
F01
±0' 0 Ground floor -1' -1 Foundation
-1'
1
A
D
5' 7'
+0'
D01
HP | Sill 2'
W01
5' 5'
16'
2'-6"
30'
W
C
7'-6" 5' 5'
A
C
E
W
29'-4" 13'-9"
C
13'-9" 29'-4"
6'-3" 5' 5'
EI01
King post
Asphalt shingles
D
King post
King post
Study
10"
Parquet
N.A:
42 sq ft
Bedroom 2
P.: 26'-4.5"
5'-6"
1'-7"
84 sq ft
King post
HP | Sill 2'
5' 5' W01
F02
1'
5' 5'
6'-1" 17'-2" 18'
5' 5'
1
1'
S
N
1
2
1'
9'
20' 17'-4"
9'
1'
7'-1"
7'-1"
6'-3"
6'-3"
30'
7'-6"
1
100 -
±0'
5'
5'
7'-0"
2'-6"
Interior solid leaf side hung door
7'
2
2'-6"
7'-0"
2'-6"
Interior solid leaf sliding door
7'
2
2'-6" 2'-6"
+8' 1 Roof framing
W01
5
5'-0"
5'-0"
5' 5'
W02
2
5'-0"
2'-6"
2'-6" 2'-6"
Double side hung window
N
Side hung window with 1 opening
13
-4"
100 -
South Elevation 3/8" = 1'-0"
E
W02 Dim.2'-6" x 5'
+8'-3"
E
1'
9'
17'-4" 20'
1
W02 Dim.2'-6" x 5'
Roof framing 3/8" = 1'-0"
100 -
+8' 1 Roof framing
Wooden siding
9'
+2'
1'
±0' -1'
2 S
B
+15' 3 Roof
D
+7'
8'-8"
±0' 0 Ground floor -1' -1 Foundation
A
8'-6"
D
8'-6"
D
The original of this drawing is 36''x48''. If thish copy is any other size it has either been reduced or enlarged. Take appropriate precautions accordingly.
GSPublisherVersion 0.0.100.99
5'-0"
ProjectInformation
A
2 S
W01 Dim.5' x 5'
+14'-10"
E
17'-4"
7'-0"
Glazed exterior side hung double door
B
Etaj | Upper floor 3/8" = 1'-0"
100 -
±0' 0 Ground floor -1' -1 Foundation
North Elvation 3/8" = 1'-0"
Cabin House 1.0
Design Architect: Arch. Andrei Vasilief
Foundation | Floor | Roof Plans Drawing Information
A
1'
E
Wooden siding
D03
1'
Truss
2
Description
2'-6"
C
30'
C
32'
C
1'
Top plate
8'-8"
W01 Dim.5' x 5' +7'
1'
1' 11" 11" 11" 11" 11" 11" 11" 1' 9" 1' 8'-6"
1'
Truss
D02
B
7'-6"
Rafter
D01
-1'
1'
Top plate
8'-6" 1' 11" 11" 11" 11" 11" 11" 11" 1' 9" 1'
D
B
1'
Ridge beam
ID
+2'
E
Truss
1'
A
1' 9" 1'-6" 11" 11" 11" 11" 1' 13'-9" 29'-4"
Rafter
1'
W
C
B
29'-4" 13'-9"7" 1' 1' 9" 11" 11" 11" 11" 11" 1'
B
+15' 3 Roof
A
+8'-3"
W
Rafter
Top plate
A
1' 10" 10" 10" 10" 10" 10" 1' 7'-1"
A
7'-1" 1' 10" 10" 10" 10" 10" 10" 1'
A
+14'-10"
Door and window schedule Plan Frontal Pcs. Height Width view view
5'
8'-8"
East Elevation 3/8" = 1'-0"
B
1'
8'-8"
100 -
1'
17'-4"
±0' 0 Ground floor -1' -1 Foundation
B
Parter | Ground floor 3/8" = 1'-0"
2
-4"
2
B
1
±0'
3'-2"
Foundation 100 3/8" = 1'-0" -
N
3'-2"
7'
PLEASE NOTE: Amount and type of rebar in the concrete slab will be determined by a licenced professional, i.e. structural engineer.
B
100 -
Wooden siding
E
5'
S
+7'
E
2
+8' 1 Roof framing
HP | Sill 2'
32'
1
+8'-3"
D01 Dim.5' x 7'
King post
W01
17'-4" 17'-4"
D01 Dim.5' x 7'
10"
10"
E
N.A:
10'-11"
5' 5'
E
Parquet
P.: 37'-1.5"
King post
E
FL.:
9'-5" 8'-6"
5' 5'
FL.:
8'
HP | Sill 2'
W01
8'-6" 5' 5'
8'-6"
8'-6"
3
A101 3/8" =
1'-0"
4/28/2022
D08 PLEASE NOTE: Trusses will either be commercially purchased or designed by a licensed professional, i.e. a structural engineer
D07
+8' Roof framing
D11
Truss will be designed by a licenced professional or commercially bought
+8' Roof framing
D03
D05 D04
D02
D03
D06
D10
D09
D02
D09
±0' Ground floor -1' Foundation
7'-6" 5' 5'
2'-10"
6'-3" 5' 5'
2'-6"
Electrical schedule
A
C
ID
7'-1" 8'
Pcs.
Plan view
Details
2
Double socket
14
1'
10"
EWL
W01
5' 5'
WL
2'-6" 5'
2'-6" 5'
W02
16'
4'-4"
WL
D03
8'
EWL
2'-8"
1'-10"
2'
Hanging light
2
1'-10"
1'-11"
Hanging from the ceiling
H
Built in refrigerator
2
2
11'-10"
WL
WL
1
Kitchen built-in light
1
Built into the kitchen
2
Hanging from ceiling
B
18' 17'-4" 11'-1"
EWL
WL
2
H
H
2
Wall light
9
1'-10"
2'
1'-10"
1'-11"
Light switch
2
10'-11"
8
Cooktop base Dishwasher
3'
2
P
2'-8"
Switch
Storage
1'
Sink
Pendant Light
Backsplash
7'
Junction box
10"
EWL
2
701 Furniture schedule
701 Furniture schedule
701 Furniture schedule
701 Furniture schedule
ID
ID
ID
ID
Plan view
6'-8"
2'
1
Island or dining table
1
Shower cabin
1
10'-1"
Toillet
1
1
1
A
B
C
-1'
A
D
E
Coffee table
1
2'
Single vanity
1
1
7'-10"
4'
Wardrobe
1
7'-10"
2'-7"
2'
Indoor heat pump unit
1
Stool
4
Washer and dryer
1
1'-5"
W 2'
19
The original of this drawing is 24''x36''. If thish copy is any other size it has either been reduced or enlarged. Take appropriate precautions accordingly.
701 -
Cabin House 1.0
2'-10"
7'-10"
9'
4'-3"
Fireplace
Wall mounted TV
1'-11"
Carpet
7'-1"
8'-1" 7'-1"
Plan view
1'-2"
1'-5"
2'-5"
1
6'-8"
1
Double bed with bedside tables
6'-7"
2'
3'-2"
Armchair
-4"
5' 7'
Desk with chair
Pcs.
Furniture schedule 1' = 1'-0"
Drawing Information
1
Plan view
5'-4"
3'-2"
3'-2"
3'-2"
2'-6" 13'-9" 30'
2'-4"
2
1'
5' 7'
EWL
5' 7'
EWL
D01
3 seater sofa
Pcs.
2"
10"
2
2
D01
5' 7'
Pcs.
WL
WL
10"
1'
2
Electrical plan 3/8" = 1'-0"
9'-5" 8'-6"
Plan view
1'-8"
Pcs.
1'-10"
2'-6" 5'
W02
2'-6" 5'
Kitchen elevation 3/4" = 1'-0"
ProjectInformation
43
HP | Sill 2'
4'-6"
D02
+0'
WL
P
P
2'-6" 7'
EI01 -
2
2
D03
HP | Sill 2'
W01
5' 5'
2'-6" 7'
Attached to interior wall
WL
2'
6'-1" 17'-2" 18'
B
5' 5'
Built-in hood Storage
Built in LED light
HP | Sill 2'
D02
2'-6" 7'
WL
2'-6" 7'
6
Exterior architectural lighting, attached to the facade
HP | Sill 2'
5'-6"
2
10"
HP | Sill 2'
2
W01
5' 5'
5' 5'
HP | Sill 2'
1
11"
2
1'
1
HP | Sill 2'
Exterior wall light
Storage
8"
EWL
5' 5'
10"
W01
5' 5'
W01
Section B 3/8" = 1'-0"
Range hood exhaust
2'-1"
1'-7"
B
A
D
E
0. -
8'-6" 5' 5'
PLEASE NOTE: Amount and type of rebar in the concrete slab will be determined by a licenced professional, i.e. structural engineer.
100 -
Section A 3/8" = 1'-0"
30'
D01
2'
100 -
2'
D01
2'
±0' Ground floor -1' Foundation
GSPublisherVersion 0.0.100.99
Design Architect
+15' Roof
SA CO M P N L ST E PE R . N U O RM C T T F IT IO O IN N R G. O R
+15' Roof
Author: Arch. Andrei Vasilief
Sections | Electrical Layout | Kitchen Elevation | Furniture Schedule
A102
3/8" = 1'-0", 3/4" = 1'-0", 1' = 1'-0"
6" 11" 1'-1"
5'-4"
1'-1"
5"
1'-5"
11"
1'
2'
1'
Trimmer stud
Cripple stud
5'-4"
Sole plate
1'
11"
11"
11"
11"
11"
11"
11"
1'
6"
5'-4"
10" 10" 6"
5'-4" Jack studs
5"
1'
10" 10" 10" 10" 10" 10"
1'
Cripple stud
2"
2"
F02 -
F03 -
Framing elevation | Exterior wall 2/4 3/8" = 1'-0"
Framing elevation | Exterior wall 3/4 3/8" = 1'-0"
2"
Top plate
4"
1'
9"
4"
Framing elevation | Exterior wall 1/4 3/8" = 1'-0"
9"
5"
Rough sill
2x6 stud
King post
Sole plate
1'-6"
2" 1'-6"
2"
F01 -
11"
4"
4"
Rough sill
Design Architect
4"
3'-11"
7'
5'-4"
Blocking stud
2x6 stud
King post
Exterior door header
8'
6" 10" 10"
4"
Top plate
Window header
5'
5'-4"
4"
1'
Window header
5"
Top plate
King post
2"
Top plate
5'
1'
King post
8'
8'
10" 10" 10" 10" 10" 10"
Blocking stud
4"
4"
SA CO M P N L ST E . PE R N U O RM C T T F IT IO O IN N R G. O R 4" 2"
1'
4"
2x6 stud
1'
Blocking stud
King post
11"
1'
1'
1'
1'
6" 6"
1'
1'
1'
1'
11"
Rough sill
2'-9"
Interior door header
2x3 stud
6"
Interior door header
Cripple stud
1'-3"
2'-10"
10" 11" 11" 11" 8" 1'-1" 11" 10"
2'-10" 10" 11" Jack studs
4"
Top plate
Blocking stud
Top plate
Blocking stud
King post
Top plate
7'-1"
2'-10"
5'
Window header 6"
Interior door header
Blocking stud
2'-10"
11"
10" 11"
11"
11"
11"
11"
11"
11"
11"
11" 10"
2'-10"
Sole plate
1'-6"
Sole plate
11"
Bill of quantities 1/2 | cubic feet
1
Interior door header
---
2'-10.0"
2
King post 17
6"
6"
2"
8
3"
6"
4
2"
2
Jack studs
8'-2.3"
---
7'-11.5"
---
8'-5.5"
Ridge beam
2"
56
---
2 2
4
---
9
10'-6.3"
6"
6"
1276'-2.6"
Cubic feet materials 1' = 1'-0"
Bill of quantities 2/2 | square feet Storey
Surface
---
1/2'' Gypsum board
Ground floor
2,203.6
-----
1/2'' Gypsum board
Roof
2,210.2
---
Exterior floor finish
Ground floor
100.2
---
16'-8.9"
Exterior wooden siding
Ground floor
642.3
---
28'-9.0"
Floor tile
Ground floor
73.6
---
1'-10.2"
---
16'-9.0"
Interior wall paint
Ground floor
1,166.9
Polyethylene moisture barrier
Ground floor
853.1
Roof
766.8
2'-6.1"
1
4'-5.5"
29
7'-4.7"
317
8'-0.5"
8'-10.2"
Material name
---
4'-5.5"
Roof tiles
---
8'-0.5"
Vapour barrier
Ground floor
628.5
---
1'-10.2"
---
28'-9.0"
Vapour barrier
Roof
687.8
---
16'-9.0"
Wall tile
Ground floor
405.3
Wooden parquet
Ground floor
406.9
Trimmer stud
The original of this drawing is 24''x36''. If thish copy is any other size it has either been reduced or enlarged. Take appropriate precautions accordingly.
GSPublisherVersion 0.0.100.99
1222'-9.7"
B01 -
---
Top plate
4
Rafter
701 -
3"
4
1
3'-2.4"
152.4
Frame elements schedule 1' = 1'-0"
B02 -
Square feet materials 1' = 1'-0"
Cabin House 1.0 ProjectInformation
5'-0.0"
---
Ground floor
Author: Arch. Andrei Vasilief
Framing elevations | Bill of quantities Drawing Information
---
1
29'-5.7"
Reinforced concrete
6"
6"
Exterior door header
---
661.7
3"
1
---
3'-4.4"
Foundation
6"
1
---
Reinforced concrete
Wood deck support 1
1
2
5'-8.0"
5'-8.0"
471.6
3"
1'-6.0"
---
---
Roof
6"
6"
2"
7
3
Sole plate
1
Cripple stud
5'-0.0"
5'-0.0"
Insulation
3"
---
---
---
296.2
6"
0'-9.3"
2
Ground floor
3"
---
2'-10.0"
2'-10.0"
Insulation
6"
3"
0'-11.5"
---
---
152.4
3"
6"
6"
6
2
Ground floor
3"
8
4
---
2'-10.0"
Gravel or crushed stone, 4'' minimum thickness
3"
7
7'-11.5"
2"
Blocking stud
6"
2"
57
2"
2
2x6 stud
---
6"
2
6"
---
Volume
6"
8'-2.3"
Storey
6"
2"
3"
6"
Window header
Rough sill
52
Length(where applicable) ---
6"
2x3 stud
Length(where applicable) 29'-9.0"
Wooden framing elements schedule Height (where ID Number of Pieces Plan view applicable) 6" 10 7'-11.5" 2"
Wooden framing elements schedule Height (where ID Number of Pieces Plan view applicable) 1 ---
Framing elevation | Interior wall 2/2 3/8" = 1'-0"
2"
Length(where applicable)
Framing elevation | Interior wall 1/2 F06 3/8" = 1'-0" -
2"
Wooden framing elements schedule Height (where ID Number of Pieces Plan view applicable)
F05 -
2"
Framing elevation | Exterior wall 4/4 3/8" = 1'-0"
2"
F04 -
Material name
A103 3/8" = 1'-0", 1' = 1'-0"
Design Architect
SA CO M P N L ST E PE R . N U O RM C T T F I IT O O IN N R G. O R Caulking+ Insulation
Roof ridge
Flashing
Interior finish
Double header
Roofing
Ridge board
Window sill detail 1 1/2"= 1'-0"
Siding (see elevations) 1''x3'' Furring @ 16'' OC minimum (alternative 1''x3'' Furring @ 12'' OC for oblique siding Air barrier 1/2'' Aspenite 2''x6'' Studs @ 16'' OC minimum Insulation Vapour barrier 1''x3'' Furring @ 16'' OC 1/2'' Gypsum board
D03 -
PT Sill plate
1/2'' Plywood Sealed joint
Flashing
Concrete slab, 4'' minimum thickness Polyethylene moisture barrier
Roughcast
Finish grade
2'' minimimum rigid insulation
Waterproof membrane
Gravel or crushed stone, 4'' minimum thickness
PLEASE NOTE: Amount and type of rebar in the concrete slab will be determined by a licenced professional, i.e. structural engineer.
D01 -
Jack studs
D08 -
Exterior wall section 1 1/2"= 1'-0"
Roof ridge detail 1 1/2"= 1'-0"
Asphalt shingles Self adhesive 1/2'' plywood subflooring Minimum 1'' air space Trusses (to be dimensioned by an engineer or appropriate professional) Minimum 8'' insulation Vapour barrier 1/2'' gypsum board
Full studs
PLEASE NOTE: Roof support design and individual components dimnesions will be done by a licenced professional, i.e. structural engineer.
F1 -
Top plate of studd wall frame Ledger Fascia Header
Soffit of pywood or t&g boards Continous screened or slotted vent strip
Triple 2x10 section joists used for truss support
Frieze board
D11 -
D07 -
Eave detail 1 1/2"= 1'-0"
Exterior finish Flashing over drip cap turn up 2''
Slab on grade detail 1 1/2"= 1'-0"
Rabbeted door frame
Concrete foundation
Header sized to span door opening
Interior finish 1/2'' shim space filled with insulation
Crushed stone
Typical foundation footing section
Footind height: minimum 10''
Backfill
D02 -
Ceramic tile Dry-set or latex-portland cement mortar 1/4'' minimum Cement topping for smooth, level surface Concrete slab
Interior casing
Construction Details
Flexible sealant
D06 -
Exterior door head detail 1 1/2"= 1'-0"
Header sized tospan window opening
Exterior finish Flashing over drip cap turn up 2''
5 feet minimum depth
Interior finish
D10 -
Tile flooring and wall finish detail 1 1/2"= 1'-0"
Wood strip flooring Polyethylene film 2x4 wood subflooring Concrete slab
Baseboard trim
Interior partition wall
Provide space for ventilation and expansion of wood flooring along the perimeter
Foundation footing detail 1 1/2"= 1'-0"
D05 -
Window head detail D09 1 1/2"= 1'-0" -
Project no:CD v1
Author: Arch. Andrei Vasilief
Construction details
1/2'' shim space filled with insulation
Footind width: minimum 24''
The original of this drawing is 17''x22''. If thish copy is any other size it has either been reduced or enlarged. Take appropriate precautions accodringly.
GSPublisherVersion 0.0.100.99
Interior wall detail Ceramic tile 1 1/2"= 1'-0" Dry-set or latex-portland cement mortar 1/4'' minimum Gypsum board Mounting clips 2''x3'' Studs @ 16'' OC Mounting clips Gypsum board Two coat gypsum plaster 1/2'' thick
Insulation
Filter cloth
PLEASE NOTE: Roof support design and individual components dimnesions will be done by a licenced professional, i.e. structural engineer.
Exterior door framing 3/4" = 1'-0"
Two coat gypsum plaster 1/2'' thick Gypsum board Mounting clips 2''x3'' Studs @ 16'' OC Mounting clips Gypsum board Two coat gypsum plaster 1/2'' thick
Head casing
4'' diameter drain
Blocking
ProjectInformation
D04 -
Header
Wood flooring detail 1 1/2"= 1'-0"
Drawing Information
Exterior finish
A201 1 1/2"= 1'-0", 3/4" = 1'-0"