Extension of R.C. Bungalow

Page 1

BUILDING STRUCTURES [ARC 2522] [ARC 2523] PROJECT 2: Extension of a R.C. Structure

Chosen Existing R.C. Building: No. 2, Jalan USJ 2/6G, UEP Subang Jaya, Mukim Damansara, Daerah Petaling, Selangor Darul Ehsan

Name: Andrew Chee Kiong Chee Man Shing Student ID: 0316202 Tutor: Ms Ann See Peng


Building Structures [ARC 2522] [ARC 2523]

Extension Proposal Ground Floor Extension

2 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

First Floor Extension

3 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Roof Level Extension

4 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Ground Level Structural Floor Plan

5 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Ground Floor Level Structural Floor Plan

6 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] First Floor Level Structural Floor Plan

7 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Quantity Dead Loads Acting on Structure

Quantity Live Loads Acting on Structure

Roof: 1.0 kN/m2

Roof: 0.5 kN/m2

Beam Self Weight (Assume that the size of the initial beam is 150 mm x 150 mm) = Beam size x Concrete Density = 0.15 m x 0.30 m x 24 kN/m3 = 1.08 kN/m

(According to 4th schedule of UBBL for live load according to the function of the space.)

Ground Floor: Brick Wall = Wall height x thickness x density = 3.0 m x 0.15 m x 19kN/m3 = 8.55 kN/m

Identify One Way or Two Way Slab Indicating the Distribution or Load from Slab to Beam

Ly = Longer side of slab Lx = Shorter side of slab When Ly / Lx > 2, it is a one way slab. When Ly / Lx < or = 2, it is a two way slab.

Roof Slab A-A1 / 2-4 = (2.15+3.80) / 2.10 = 2.83 > 2 [One way slab]

Slab A1-B / 2-4 = 5.95 / 2.00 = 2.975 > 2 [One way slab]

8 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Slab B-D / 2-4 = 5.95 / 4.60 = 1.29 < [Two way slab]

Slab D-E / 1-2 = 3.775 / 3.125 = 1.208 < 2 [Two way slab]

Slab D-E / 2-3A = 3.775 / 2.975 = 1.268 < 2 [Two way slab]

Slab D-E / 3A-4 = 3.775 / 2.975 = 1.268 < 2 [Two way slab]

Slab C-D / 1-2 = 3.125 / 2.450 = 1.276 < 2 [Two way slab]

9 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Load Distribution Diagram (First Level Structural Plan supporting roof) To identify how much load would be transferred from the slab to each adjacent beam.

10 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Beam Analysis Calculation 1) First Floor Beam, D-E / 2 1. Carries self-weight – Dead load 2. Slab Dead Load & Live Load  D-E / 1-2  D-E / 2-3A

1. Beam self-weight = Beam size x concrete density = 0.15 m x 0.30 m x 24 kN/m3 = 1.08 kN/m 2. Dead load on slab D-E / 1-2 [Two way slab] Load is transferred to beam D-E / 2 in a trapezoidal form. Convert the trapezoidal load into UDL. Dead Load from slab D-E / 1-2 = Dead load on slab x (Lx/2) = 1.0 kN/m2 x (3.125/2) = 1.56 kN/m Dead load on slab D-E / 2-3A [Two way slab] Load is transferred to beam D-E / 2 in a trapezoidal form. Convert the trapezoidal load into UDL. Dead Load from slab D-E / 2-3A = Dead load on slab x (Lx/2) = 1.0 kN/m2 x (2.975/2) = 1.49 kN/m Total Dead Load Total for D-E = Beam self-weight + Dead load (D-E / 2-3A) + Dead load (D-E / 1-2) = 1.08 kN/m + 1.56 kN/m + 1.49 kN/m = 4.13 kN/m

11 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Total Dead Load Diagram

Live load on slab D-E / 1-2 [Two way slab] Load is transferred to beam D-E / 2 in a trapezoidal form. Convert the trapezoidal load into UDL. Live Load from slab D-E / 1-2 = Live load on slab x (Lx/2) = 0.5 kN/m2 x (3.125/2) = 0.78 kN/m Live load on slab D-E / 2-3A [Two way slab] Load is transferred to beam D-E / 2 in a trapezoidal form. Convert the trapezoidal load into UDL. Live Load from slab D-E / 2-3A = Live load on slab x (Lx/2) = 0.5 kN/m2 x (2.975/2) = 0.74 kN/m

12 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Total live load Total for D-E = 0.78 kN/m + 0.74 kN/m = 1.52 kN/m

Total Live Load Diagram

Ultimate Load Apply factor 1.4 and 1.6 to dead load and live load respectively. Dead Load D-E = 4.13 kN/m x 1.4 = 5.78 kN/m Live Load D-E = 1.52 kN/m x 1.6 = 2.43 kN/m Ultimate load D-E = 5.78 kN/m + 2.43 kN/m = 8.21 kN/m

13 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Ultimate Load Diagram

Reactions ΣMD = 0 Assuming that anti clockwise moment is positive, hence 0 = -(8.21 x 3.775 x 3.775/2) + RE (3.775) RE = 15.48 kN ΣFy = 0 RD + RE – (8.21 x 3.775) = 0 RD = 15.48 kN

Load Diagram

14 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Shear Force Diagram

Bending Moment Diagram

Beam Analysis Calculation 2) First Floor Beam, D-E / 3A 1. Carries self-weight – Dead load 2. Slab Dead Load & Live Load  D-E / 2-3A  D-E / 3A-4

1. Beam self-weight = Beam size x concrete density = 0.15 m x 0.30 m x 24 kN/m3 = 1.08 kN/m

15 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] 2. Dead load on slab D-E / 2-3A [Two way slab] Load is transferred to beam D-E / 3A in a trapezoidal form. Convert the trapezoidal load into UDL. Dead Load from slab D-E / 2-3A = Dead load on slab x (Lx/2) = 1.0 kN/m2 x (2.975/2) = 1.49 kN/m Dead load on slab D-E / 3A-4 [Two way slab] Load is transferred to beam D-E / 3A in a trapezoidal form. Convert the trapezoidal load into UDL. Dead Load from slab D-E / 3A-4 = Dead load on slab x (Lx/2) = 1.0 kN/m2 x (2.975/2) = 1.49 kN/m Total Dead Load Total for D-E = Beam self-weight + Dead load (D-E / 2-3A) + Dead load (D-E / 3A-4) = 1.08 kN/m + 1.49 kN/m + 1.49 kN/m = 4.06 kN/m

16 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Total Dead Load Diagram

17 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Live load on slab D-E / 2-3A [Two way slab] Load is transferred to beam D-E / 2 in a trapezoidal form. Convert the trapezoidal load into UDL. Live Load from slab D-E / 2-3A = Live load on slab x (Lx/2) = 0.5 kN/m2 x (2.975/2) = 0.74 kN/m Live load on slab D-E / 3A-4 [Two way slab] Load is transferred to beam D-E / 2 in a trapezoidal form. Convert the trapezoidal load into UDL. Live Load from slab D-E / 3A-4 = Live load on slab x (Lx/2) = 0.5 kN/m2 x (2.975/2) = 0.74 kN/m Total live load Total for D-E = 0.74 kN/m + 0.74 kN/m = 1.48 kN/m

Total Live Load Diagram

18 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Ultimate Load Apply factor 1.4 and 1.6 to dead load and live load respectively. Dead Load D-E = 4.06 kN/m x 1.4 = 5.68 kN/m Live Load D-E = 1.48 kN/m x 1.6 = 2.37 kN/m Ultimate load D-E = 5.68 kN/m + 2.37 kN/m = 8.05 kN/m Ultimate Load Diagram

Reactions ΣMD = 0 Assuming that anti clockwise moment is positive, hence 0 = -(8.05 x 3.775 x 3.775/2) + RE (3.775) RE = 15.19 kN ΣFy = 0 RD + 15.19 – (8.05 x 3.775) = 0 RD = 15.19 kN

Load Diagram

19 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Shear Force Diagram

Bending Moment Diagram

Beam Analysis Calculation 3) First Floor Beam, E / 1-4 1. Carries self-weight – Dead load 2. Slab Dead Load & Live Load  D-E / 1-2  D-E / 2-3A  D-E / 3A-4 3. Point load from beam  D-E / 2  D-E / 3A

1. Beam self-weight = Beam size x concrete density = 0.15 m x 0.30 m x 24 kN/m3 = 1.08 kN/m

20 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] 2. Dead load on slab D-E / 1-2 [Two way slab] Load is transferred to beam E / 1-4 in a triangular form. Dead Load from slab D-E / 1-2 = Dead load on slab x (Lx/2) = 1.0 kN/m2 x (3.125/2) = 1.56 kN/m Convert the triangular load into UDL

= 2/3 x 1.56 kN/m = 1.04 kN/m

Dead load on slab D-E / 2-3A [Two way slab] Load is transferred to beam E / 1-4 in a triangular form. Dead Load from slab D-E / 2-3A = Dead load on slab x (Lx/2) = 1.0 kN/m2 x (2.975/2) = 1.49 kN/m Convert the triangular load into UDL

= 2/3 x 1.49 kN/m = 0.99 kN/m

Dead load on slab D-E / 3A-4 [Two way slab] Load is transferred to beam E / 1-4 in a triangular form. Dead Load from slab D-E / 3A-4 = Dead load on slab x (Lx/2) = 1.0 kN/m2 x (2.975/2) = 1.49 kN/m Convert the triangular load into UDL

= 2/3 x 1.49 kN/m = 0.99 kN/m

Total Dead Load Total for 1-2 = 1.08 kN/m + 1.04 kN/m = 2.12 kN/m Total for 2-3A = 1.08 kN/m + 0.99 kN/m = 2.07 kN/m Total for 3A-4 = 1.08 kN/m + 0.99 kN/m = 2.07 kN/m

21 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Total Dead Load Diagram

Live load on slab D-E / 1-2 [Two way slab] Load is transferred to beam E / 1-4 in a triangular form. Live Load from slab D-E / 1-2 = Live load on slab x (Lx/2) = 0.5 kN/m2 x (3.125/2) = 0.78 kN/m

22 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Convert the triangular load into UDL = 2/3 x 0.78 kN/m = 0.52 kN/m Live load on slab D-E / 1-2 [Two way slab] Load is transferred to beam E / 1-4 in a triangular form. Live Load from slab D-E / 1-2 = Live load on slab x (Lx/2) = 0.5 kN/m2 x (2.975/2) = 0.74 kN/m Convert the triangular load into UDL = 2/3 x 0.74 kN/m = 0.50 kN/m Live load on slab D-E / 3A-4 [Two way slab] Load is transferred to beam E / 1-4 in a triangular form. Live Load from slab D-E / 3A-4 = Live load on slab x (Lx/2) = 0.5 kN/m2 x (2.975/2) = 0.74 kN/m Convert the triangular load into UDL = 2/3 x 0.78 kN/m = 0.50 kN/m

Total live load Total for 1-2 = 0.78 kN/m Total for 2-3A = 0.74 kN/m Total for 3A-4 = 0.74 kN/m

23 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Total Live Load Diagram

Ultimate Load Apply factor 1.4 and 1.6 to dead load and live load respectively. Dead Load 1-2 = 1.04 kN/m x 1.4 = 1.46 kN/m Dead Load 2-3A = 0.99 kN/m x 1.4 = 1.39 kN/m Dead Load 3A-4 = 0.99 kN/m x 1.4 = 1.39 kN/m Live Load 1-2

= 0.78 kN/m x 1.6 = 1.248 kN/m

24 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Live Load 2-3A = 0.74 kN/m x 1.6 = 1.184 kN/m Live Load 3A-4 = 0.74 kN/m x 1.6 = 1.184 kN/m Ultimate load 1-2 = 1.46 kN/m + 1.248 kN/m = 2.71 kN/m Ultimate load 2-3A= 1.39 kN/m + 1.18 kN/m = 2.57 kN/m Ultimate load 3A-4= 1.39 kN/m + 1.18 kN/m = 2.57 kN/m Ultimate Load Diagram

Reactions ΣM1 = 0 Assuming that anti clockwise moment is positive, hence 0 = -(2.71 x 3.125 x 3.125/2) -(2.57 x 2.975 x [3.125 + 2.975/2]) - (2.57 x 2.975 x [3.125 +2.975 + 2.975/2]) - (15.5 x 3.125) - (15.2 x [3.125 + 2.975]) + R4 (9.075) RE = 27.29 kN ΣFy = 0 R1 + 27.29 – (3.125 x 2.71) - (2.975 x 2.57) – (2.975 x 2.57) - 15.5 - 15.2 = 0 R1 = 27.17 kN

25 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Load Diagram

Shear Force Diagram

Bending Moment Diagram

26 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Beam Analysis Calculation 4) First Floor Beam, D / 2-4 1. Carries self-weight – Dead load 2. Slab Dead Load & Live Load  B-D / 2-4  D-E / 2-3A  D-E / 3A-4 3. Point load from beam  D-E / 3A

1. Beam self-weight = Beam size x concrete density = 0.15 m x 0.30 m x 24 kN/m3 = 1.08 kN/m 2. Dead load on slab B-D / 2-4 [Two way slab] Load is transferred to beam D / 2-4 in a trapezoidal form. Convert the trapezoidal load into UDL. Dead Load from slab B-D / 2-4 = Dead load on slab x (Lx/2) = 1.0 kN/m2 x (4.6/2) = 2.30 kN/m

Dead load on slab D-E / 2-3A [Two way slab] Load is transferred to beam D / 2-4 in a triangular form. Dead Load from slab D-E / 2-3A = Dead load on slab x (Lx/2) = 1.0 kN/m2 x (2.975/2) = 1.49 kN/m Convert the triangular load into UDL

= 2/3 x 1.49 kN/m = 0.99 kN/m

Dead load on slab D-E / 3A-4 [Two way slab] Load is transferred to beam D / 2-4 in a triangular form. Dead Load from slab D-E / 3A-4 = Dead load on slab x (Lx/2) = 1.0 kN/m2 x (2.975/2) = 1.49 kN/m Convert the triangular load into UDL

= 2/3 x 1.49 kN/m = 0.99 kN/m

Total Dead Load Total for 2-3A = 1.08 kN/m + 2.30 kN/m + 0.99 kN/m = 4.37 kN/m 27 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Total for 3A-4 = 1.08 kN/m + 2.30 kN/m + 0.99 kN/m = 4.37 kN/m Total Dead Load Diagram

28 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Live load on slab B-D / 2-4 [Two way slab] Load is transferred to beam D / 2-4 in a trapezoidal form. Convert the trapezoidal load into UDL. Live Load from slab B-D / 2-4 = Live load on slab x (Lx/2) = 0.5 kN/m2 x (4.6/2) = 1.15 kN/m

Live load on slab D-E / 2-3A [Two way slab] Load is transferred to beam D / 2-4 in a triangular form. Live Load from slab D-E / 2-3A = Live load on slab x (Lx/2) = 0.5 kN/m2 x (2.975/2) = 0.74 kN/m Convert the triangular load into UDL = 2/3 x 0.74 kN/m = 0.50 kN/m Live load on slab D-E / 3A-4 [Two way slab] Load is transferred to beam D / 2-4 in a triangular form. Live Load from slab D-E / 3A-4 = Live load on slab x (Lx/2) = 0.5 kN/m2 x (2.975/2) = 0.74 kN/m Convert the triangular load into UDL = 2/3 x 0.78 kN/m = 0.50 kN/m

Total live load Total for 2-3A = 1.15 kN/m + 0.49 kN/m = 1.64 kN/m Total for 3A-4 = 1.15 kN/m + 0.49 kN/m = 1.64 kN/m

29 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Total Live Load Diagram

Ultimate Load Apply factor 1.4 and 1.6 to dead load and live load respectively. Dead Load 2-3A = 4.37 kN/m x 1.4 = 6.12 kN/m Dead Load 3A-4 = 4.37 kN/m x 1.4 = 6.12 kN/m Live Load 2-3A = 1.64 kN/m x 1.6 = 2.62 kN/m Live Load 3A-4 = 1.64 kN/m x 1.6 = 2.62 kN/m

30 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Ultimate load 2-3A= 6.12 kN/m + 2.62 kN/m = 8.74 kN/m Ultimate load 3A-4= 6.12 kN/m + 2.62 kN/m = 8.74 kN/m

Ultimate Load Diagram

Reactions ΣM2 = 0 Assuming that anti clockwise moment is positive, hence 0 = -(8.74 x 29.75 x 2.975/2) -(15.19 x 2.975) - (8.74 x 2.975 x [2.975 + 2.975/2]) + R4 (5.95) RE = 33.60 kN ΣFy = 0 R4 + 33.60 – (8.74 x 2.975) – 15.19 – (8.74 x 2.975) = 0 R4 = 33.60 kN

Load Diagram

31 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Shear Force Diagram

Bending Moment Diagram

Beam Analysis Calculation 5) First Floor Beam, A1 / 2-4 1. Carries self-weight – Dead load 2. Slab Dead Load & Live Load  A-A1 / 2-4 (One way slab)  A1-B / 2-4 (One way slab)

1. Beam self-weight = Beam size x concrete density = 0.15 m x 0.30 m x 24 kN/m3 = 1.08 kN/m 2. Dead load on slab A-A1 / 2-4 [One way slab] Load is transferred to beam A1 / 2-4 in a UDL form. 32 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Dead Load from slab A-A1 / 2-4 = Dead load on slab x (Lx/2) = 1.0 kN/m2 x (2.1/2) = 1.05 kN/m Dead load on slab A1-B / 2-4 [One way slab] Load is transferred to beam A1 / 2-4 in a trapezoidal form. Dead Load from slab A1-B / 2-4 = Dead load on slab x (Lx/2) = 1.0 kN/m2 x (2/2) = 1.00 kN/m Total Dead Load Total for 2-4 = 1.08 kN/m + 1.05 kN/m + 1.00 kN/m = 3.13 kN/m Total Dead Load Diagram

33 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Live load on slab A-A1 / 2-4 [One way slab] Load is transferred to beam A1 / 2-4 in a UDL. Live Load from slab A1 / 2-4 = Live load on slab x (Lx/2) = 0.5 kN/m2 x (2.1/2) = 0.525 kN/m Live load on slab A1-B / 2-4 [One way slab] Load is transferred to beam A1 / 2-4 in a UDL. Live Load from slab A1-B / 2-4 = Live load on slab x (Lx/2) = 0.5 kN/m2 x (2.0/2) = 0.50 kN/m Total live load Total for 2-4 = 0.525 kN/m + 0.500 kN/m = 1.025 kN/m

Total Live Load Diagram

Ultimate Load Apply factor 1.4 and 1.6 to dead load and live load respectively. Dead Load 2-4 = 3.13 kN/m x 1.4 = 4.38 kN/m Live Load 2-4

= 1.03 kN/m x 1.6 34

Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] = 1.65 kN/m Ultimate load 2-4 = 4.38 kN/m + 1.65 kN/m = 6.03 kN/m Ultimate Load Diagram

Reactions ΣMA = 0 Assuming that anti clockwise moment is positive, hence 0 = -(6.03 x 5.95 x 5.95/2) + RE (3.775) R2 = 17.94 kN ΣFy = 0 R4 + R2 – (5.95 x 6.03) = 0 R4 = 17.94 kN

Load Diagram

35 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Shear Force Diagram

Bending Moment Diagram

Beam Analysis Calculation 6) First Floor Beam, A-B / 4 1. Carries self-weight – Dead load 2. Point load from beam A1 / 2-4 1. Beam self-weight = Beam size x concrete density = 0.15 m x 0.30 m x 24 kN/m3 = 1.08 kN/m 2. Point load A1 / 2-4= 17.94 kN

36 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Total Dead Load Diagram

Ultimate Load Apply factor 1.4 and 1.6 to dead load and live load respectively. Dead Load A-B = 1.08 kN/m x 1.4 = 1.51 kN/m Ultimate load A-B = 1.51 kN/m Ultimate Load Diagram

Reactions ΣMA = 0 Assuming that anti clockwise moment is positive, hence 0 = -(1.51 x 4.10 x 4.10/2) –(17.94 x 2.1) + RB (4.10) RB = 12.28 kN ΣFy = 0 RA + 12.28 – (1.51 x 4.1) – 17.94 = 0 RA = 11.85 kN

37 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Load Diagram

Shear Force Diagram

Bending Moment Diagram

38 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Column Analysis Calculation [Tributary Area Method]

39 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

40 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

41 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

1) Column A/4: Foundation, Ground, First Level

(i) First level - Roof slab - A/4  Dead load & Live load of slab A-A1/2-4  Dead load of beam A/2-4, A-B/4 Slab Area = [2.15 + 3.80]/2 x [2.00 + 2.10]/2 = 2.975 x 2.050 = 6.10 m2

Dead load on column Dead load from slab = 6.10 m2 x 1.0 kN/m2 = 6.10 kN

Dead load from beam A-B/4 = length of beam x beam selfweight = 2.05 m x 1.08 kN/m = 2.214 kN

Dead load from beam A/2-4 = length of beam x beam selfweight = 2.975 m x 1.08 kN/m = 3.213 kN Total dead load = 6.10 kN + 2.214 kN + 3.213 kN = 11.53 kN Live Load on Column Live load from slab = 6.10 m2 x 0.5 kN/m2 = 3.05 kN Ultimate load Apply the factor 1.4 and 1.6 to dead and live load respectively. Dead load = 11.53 kN x 1.4 = 16.14 kN Live load = 6.10 kN x 1.6 = 9.76 kN Total Ultimate Load = 16.14 kN + 9.76 kN = 25.90 kN 42 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

(ii) Ground level – First Floor slab - A/4  Dead load & Live load of slab A-A1/2-4  Dead load of beam A/2-4, A-B/4 Slab Area = [2.15 + 3.80]/2 x [2.00 + 2.10]/2 = 2.975 x 2.050 = 6.10 m2

Dead load on column Dead load from slab = 6.10 m2 x 3.6 kN/m2 = 21.96 kN

Dead load from beam A-B/4 = length of beam x beam selfweight = 2.05 m x 1.08 kN/m = 2.214 kN

Dead load from beam A/2-4 = length of beam x beam selfweight = 2.975 m x 1.08 kN/m = 3.213 kN Total dead load = 21.96 kN + 2.214 kN + 3.213 kN = 27.39 kN Live Load on Column Live load from slab = 6.10 m2 x 1.5 kN/m2 = 9.15 kN Ultimate load Apply the factor 1.4 and 1.6 to dead and live load respectively. Dead load = 27.39 kN x 1.4 = 38.34 kN Live load = 9.15 kN x 1.6 = 14.64 kN Total Ultimate Load = 38.34 kN + 14.64 kN = 52.98 kN 43 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

(iii) Foundation Level – First Floor slab - A/4  Dead load & Live load of slab A-A1/2-4  Dead load of beam A/2-4, A-B/4  Dead load of brickwall A/2-4 , A-B/4 Slab Area = [2.15 + 3.80]/2 x [2.00 + 2.10]/2 = 2.975 x 2.050 = 6.10 m2

Dead load on column Dead load from slab = 6.10 m2 x 3.6 kN/m2 = 21.96 kN

Dead load from beam A-B/4 = length of beam x beam selfweight = 2.05 m x 3.6 kN/m = 2.214 kN

Dead load from beam A/2-4 = length of beam x beam selfweight = 2.975 m x 1.08 kN/m = 3.213 kN Dead load from brickwall A/2-4 = 2.05 m x 8.55 kN/m = 17.53 kN Dead load from brickwall A-B/2 = 2.975 m x 8.55 kN/m = 25.44 kN Total dead load = 21.96 kN + 2.214 kN + 3.213 kN + 17.53 kN + 25.44 kN = 70.36 kN Live Load on Column Live load from slab = 6.10 m2 x 1.5 kN/m2 = 9.15 kN Ultimate load Apply the factor 1.4 and 1.6 to dead and live load respectively. Dead load = 70.36 kN x 1.4 44 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] = 98.50 kN Live load = 9.15 kN x 1.6 = 14.64 kN Total Ultimate Load = 98.50 kN + 14.64 kN = 113.14 kN

Total load carried by column A/4 = 113.14 kN + 52.98 kN + 25.90 kN = 192.02 kN

2) Column B/4: Foundation, Ground, First Level

(i) First level - Roof slab - B/4  Dead load & Live load of slab A-A1/2-4, A1-B/2-4, B-D/2-4, C-D/1-2  Dead load of beam B/2-4, A-B/4, B-D/4 Slab Area = [0.050 x 2.975] + [2.050 x 2.975] + [2.150 x 2.975] + [0.225 x 1.56] + [0.225 x 2.975] = 0.15 + 6.10 + 6.40 + 0.35 + 0.67 = 13.66 m2

Dead load on column Dead load from slab = 13.66 m2 x 1.0 kN/m2 = 13.66 kN

Dead load from beam A-B/4 = length of beam x beam selfweight = 2.05 m x 1.08 kN/m = 2.214 kN

Dead load from beam B/2-4 = length of beam x beam selfweight = 2.975 m x 1.08 kN/m = 3.213 kN

Dead load from beam B-D/4 = length of beam x beam selfweight = 4.60 m x 1.08 kN/m

45 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] = 4.97 kN

Total dead load = 13.66 kN + 2.21 kN + 3.21 kN + 4.97 kN = 24.05 kN Live Load on Column Live load from slab = 13.66 m2 x 0.5 kN/m2 = 6.83 kN Ultimate load Apply the factor 1.4 and 1.6 to dead and live load respectively. Dead load = 24.05 kN x 1.4 = 33.67 kN Live load = 6.83 kN x 1.6 = 10.93 kN Total Ultimate Load = 33.67 kN + 10.93 kN = 44.60 kN

(ii) Ground level – First Floor slab - B/4  Dead load & Live load of slab A-A1/2-4, A1-B/2-4, B-D/2-4, C-D/1-2  Dead load of beam B/2-4, A-B/4, B-D/4 Slab Area = [0.050 x 2.975] + [2.050 x 2.975] + [2.150 x 2.975] + [0.225 x 1.56] + [0.225 x 2.975] = 0.15 + 6.10 + 6.40 + 0.35 + 0.67 = 13.66 m2

Dead load on column Dead load from slab = 13.66 m2 x 3.6 kN/m2 = 49.18 kN

Dead load from beam A-B/4 = length of beam x beam selfweight = 2.05 m x 1.08 kN/m = 2.214 kN

46 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Dead load from beam B/2-4 = length of beam x beam selfweight = 2.975 m x 1.08 kN/m = 3.213 kN Dead load from beam B-D/4 = length of beam x beam selfweight = 4.60 m x 1.08 kN/m = 4.97 kN

Total dead load = 49.18 kN + 2.21 kN + 3.21 kN + 4.97 kN = 59.57 kN Live Load on Column Live load from slab = 13.66 m2 x 1.5 kN/m2 = 20.49 kN Ultimate load Apply the factor 1.4 and 1.6 to dead and live load respectively. Dead load = 59.57 kN x 1.4 = 83.40 kN Live load = 20.49 kN x 1.6 = 32.78 kN Total Ultimate Load = 83.40 kN + 32.78 kN = 116.18 kN

(iii) Foundation Level – Ground Floor slab - B/4  Dead load & Live load of slab A-A1/2-4, A1-B/2-4, B-D/2-4, C-D/1-2  Dead load of beam B/2-4, A-B/4, B-D/4  Dead load of brickwall A-B/4, B-C/4 Slab Area = [0.050 x 2.975] + [2.050 x 2.975] + [2.150 x 2.975] + [0.225 x 1.56] + [0.225 x 2.975] = 0.15 + 6.10 + 6.40 + 0.35 + 0.67 = 13.66 m2

47 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Dead load on column Dead load from slab = 13.66 m2 x 3.6 kN/m2 = 49.18 kN

Dead load from beam A-B/4 = length of beam x beam selfweight = 2.05 m x 1.08 kN/m = 2.21 kN

Dead load from beam B/2-4 = length of beam x beam selfweight = 2.975 m x 1.08 kN/m = 3.21 kN Dead load from beam B-D/4 = length of beam x beam selfweight = 4.60 m x 1.08 kN/m = 4.97 kN Dead load from brickwall A-B/4 = [2.05 m + 0.05 m] x 8.55 kN/m = 17.96 kN Dead load from brickwall B-C/4 = 2.150 m x 8.55 kN/m = 18.38 kN

Total dead load = 49.18 kN + 2.21 kN + 3.21 kN + 4.97 kN + 17.96 kN + 18.38 kN = 95.91 kN Live Load on Column Live load from slab = 13.66 m2 x 1.5 kN/m2 = 20.49 kN Ultimate load Apply the factor 1.4 and 1.6 to dead and live load respectively. Dead load = 95.91 kN x 1.4 = 134.27 kN Live load = 20.49 kN x 1.6 = 32.78 kN Total Ultimate Load = 134.27 kN + 32.78 kN = 167.05 kN 48 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523]

Total load carried by column B/4 = 44.60 kN + 116.18 kN + 167.05 kN = 327.83 kN

3) Column D/4: Foundation, Ground, First Level  

(i) First level - Roof slab - D/4 Dead load & Live load of slab B-D/2-4, D-E/3-4 Dead load of beam B-D/4, D-E/4, D/2-4

Slab Area = 4.08 m x 3.05 m = 12.44 m2 Dead load on column Dead load from slab = 12.44 m2 x 1.0 kN/m2 = 12.44 kN

Dead load from beam B-D/4 = length of beam x beam selfweight = 2.18 m x 1.08 kN/m = 2.35 kN

Dead load from beam D-E/4 = length of beam x beam selfweight = 1.89 m x 1.08 kN/m = 2.04 kN

Dead load from beam D/2-4 = length of beam x beam selfweight = 2.98 m x 1.08 kN/m = 3.22 kN

Total dead load = 12.44 kN + 2.35 kN + 2.04 kN + 3.22 kN = 20.05 kN Live Load on Column Live load from slab = 12.44 m2 x 0.5 kN/m2 = 6.22 kN

49 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Ultimate load Apply the factor 1.4 and 1.6 to dead and live load respectively. Dead load = 20.05 kN x 1.4 = 28.07 kN Live load = 6.22 kN x 1.6 = 9.95 kN Total Ultimate Load = 28.07 kN + 9.95 kN = 38.02 kN

  

(ii) Ground Level – First floor slab - D/4 Dead load & Live load of slab B-D/2-4, D-E/3-4 Dead load of beam B-D/4, D-E/4, D/2-4 Deaf load of brickwall B-D/4, D-E/4, D/2-4

Slab Area = 4.08 m x 3.05 m = 12.44 m2 Dead load on column Dead load from slab = 12.44 m2 x 3.6 kN/m2 = 44.78 kN

Dead load from beam B-D/4 = length of beam x beam selfweight = 2.18 m x 1.08 kN/m = 2.35 kN

Dead load from beam D-E/4 = length of beam x beam selfweight = 1.89 m x 1.08 kN/m = 2.04 kN

Dead load from beam D/2-4 = length of beam x beam selfweight = 2.98 m x 1.08 kN/m = 3.22 kN Dead load from brickwall B-D/4 = 2.18 m x 8.55 kN/m = 18.64 kN

50 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Dead load from brickwall D-E/4 = 1.89 m x 8.55 kN/m = 16.16 kN Dead load from brickwall D/2-4 = 2.98 m x 8.55 kN/m = 25.48 kN

Total dead load = 44.78 kN + 2.35 kN + 2.04 kN + 3.22 kN + 18.64 kN + 16.16 kN + 25.48 kN = 112.67 kN Live Load on Column Live load from slab = 12.44 m2 x 1.5 kN/m2 = 18.66 kN Ultimate load Apply the factor 1.4 and 1.6 to dead and live load respectively. Dead load = 112.67 kN x 1.4 = 157.74 kN Live load = 18.66 kN x 1.6 = 29.86 kN Total Ultimate Load = 157.74 kN + 29.86 kN = 187.60 kN

  

(iii) Foundation Level – Ground floor slab - D/4 Dead load & Live load of slab B-D/2-4, D-E/3-4 Dead load of beam B-D/4, D-E/4, D/2-4 Deaf load of brickwall B-D/4, D-E/4, D/2-4

Slab Area = 4.08 m x 3.05 m = 12.44 m2 Dead load on column Dead load from slab = 12.44 m2 x 3.6 kN/m2 = 44.78 kN

Dead load from beam B-D/4 = length of beam x beam selfweight = 2.18 m x 1.08 kN/m = 2.35 kN

51 Andrew Chee Kiong Chee Man Shing 0316202


Building Structures [ARC 2522] [ARC 2523] Dead load from beam D-E/4 = length of beam x beam selfweight = 1.89 m x 1.08 kN/m = 2.04 kN

Dead load from beam D/2-4 = length of beam x beam selfweight = 2.98 m x 1.08 kN/m = 3.22 kN Dead load from brickwall B-D/4 = 2.18 m x 8.55 kN/m = 18.64 kN Dead load from brickwall D-E/4 = 1.89 m x 8.55 kN/m = 16.16 kN Dead load from brickwall D/2-4 = 2.98 m x 8.55 kN/m = 25.48 kN

Total dead load = 44.78 kN + 2.35 kN + 2.04 kN + 3.22 kN + 18.64 kN + 16.16 kN + 25.48 kN = 112.67 kN Live Load on Column Live load from slab = 12.44 m2 x 1.5 kN/m2 = 18.66 kN Ultimate load Apply the factor 1.4 and 1.6 to dead and live load respectively. Dead load = 112.67 kN x 1.4 = 157.74 kN Live load = 18.66 kN x 1.6 = 29.86 kN Total Ultimate Load = 157.74 kN + 29.86 kN = 187.60 kN

Total load carried by column D/4 = 38.02 kN + 187.60 kN + 187.60 kN = 413.22 kN