Fso for fpso saves 48 % cost

Page 1

FSO + Drill for FPSO. Saves 48 % Cost. INV: 60 mn$ 3 mm SHELL FSO-OIL, GAS. under FPSO. $1/Brl; 6.3 $/CBM. upto 3000 M x 3000 M x 3000 M= 27 Bn CBM = 170 Bn Brl,$ FSO-Oil, FSO-Gas + Drll for FPSO may be taken for 3 mm thick shell MS tank, closed at top with a vent vale and open at bottom. May be cylindrical or cubical in shape. L.W.D:3000m each=27 bn CBM;170 bn Brl Oil.170 bn$ Make Cost: $1/Brl; $6.3/ CBM at Yard. Tax, Transport extra. 50 % extra at site. DESCRIPTION: FPSO is meant for floating, drilling, storing and off-loading of NG in deep sea off-shore. Drilling and Storing can be split on size, safety, cost. Now FPSO: 225,900 DWT stores 1,507,953 Barrel gas from 1320 m deep water at a production of 100,000 Barrel/day. Weight allocation for drilling is 116,000DWT and for NG is 110,000 DWT. [ 72.5 kg/Brl] Cost of drill equipment’s are same for both and separate. FPSO Cost: 116+110 = 226 mn$ at 1000$/T But Drill + FSO Cost: 116+ 1.5 = 117.5 mn$ Saved 226-117.5= 108.5 mn$/unit 48 % Same FPSO-Oil = Drill+ FSO-Oil concept is for Oil also. Demo:2m.2m.5m=20 cbm= 126 Brl= 126$, in 3mm thk shell. Yard, weld, cut, paint, transport etc=3874$. 4,000$ FLNG: Free Energy Compression at 6000 m depth water When FSO-NG and LNG tank are taken down to 6000 m water depth, NG is ‘hydro statically compressed to 600 atm ‘. Free Energy Compression. Muthukal Andy Appan, M.E, 50 yrs. Expert, India. FLNG: Free Energy Compression at 6000 m depth water When FSO-NG and LNG tank are taken down to 6000 m water depth, NG is ‘hydro statically compressed to 600 atm ‘. Free Energy Compression. Muthukal Andy Appan, M.E, 50 yrs. Expert, India.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.