1 minute read

Conclusion

Next Article
Masterplan

Masterplan

Project Management & Sustainablility

Considering the scale of the project it is important to note that construction of such a project at one go is not feasible. Therefore, the most viable solution is to manage the project in phases. In the earlier chapter we discussed the goal of each phase but here we mention the specific details of how our project can be conceived in four main phases.

Advertisement

Phase -1 This is the stage where the soil modulations, plating and the foundation for the structural system is laid out. Phase -2 During this phase, the primary structure, and the vertical connections at least up to the +6m level is constructed so that the bridge between the Northern and Southern parts of the site is anchored. Phase -3 In this phase we decided that we should start the construction from Piazzale Lodi inserting the prefabricated living units into the structure and constructing the platforms around it. While we move from East to West the finished units can be utilized as temporary stay by students till the advent of the Olympic Games to generate some extra funds for the construction phase. Phase -4 The project has always been envisioned to be a metamorphic structure that can grow with growing needs. Therefore, additional units can be added following the guidelines mentioned before.

This system of management of the project can help the project be not only environmentally sustainable but also economically sustainable as well. Phase -1 Park 2020

Phase -2 Structure & Connections 2022

Phase -3 Transition 2024

Phase -4 Metamorphisis Future expansion

Construction starting from Piazzale Lodi and moving toward the New Toscana Station 2026

This article is from: