Train 18, India's first engine-less train, set to hit tracks on Oct 29

Page 1

Train 18, India's first engine-less train, set to hit tracks on Oct 29

The swanky 16-coach prototype without a locomotive (engine) will cut travel time by 15 per cent compared to the Shatabdi

Train 18, the country's first engine-less train which is being regarded as a successor to the 30-year-old Shatabdi Express, is set to hit the tracks for trials on October 29.Driven by a self-propulsion module sans a separate locomotive, the train, capable of running at a speed of up to 160 kmph, comes with technical features for enhanced quick acceleration.The swanky 16-coach prototype without a locomotive (engine) will cut travel time by 15 per cent compared to the Shatabdi. Developed by the city-based Integral Coach Factory in 18 months, the full AC train is designed in such a way that passengers can have a look at the driver's cabin.ICF General Manager Sudhanshu Mani told PTI that it cost nearly Rs 1 billion to build the prototype and subsequent production would bring down the cost.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.