AFTER 1500 sqft laboratory space gutted, abated, and renovated with VCT flooring, casework, countertops, specialized outlets and gas lines for equipment
BEFORE Decades-old space assigned to new program
AFTER A custom living wall, foliage framing the entrance, and new, reoriented desks give the team visual privacy, eliminate unused surfaces and introduce a useful wall of glassboards
BEFORE Set in the corridor of a fifty person office, three oversized and poorly lit cubicles oriented tenants’ backs to constant traffic, causing distraction and uncomfortable exposure
AFTER Preparation and dining spaces are separate, improving flow. All storage millwork was custom designed, along with brand new state of the art appliances.
BEFORE Layout created a tight squeeze between staff preparing food and those eating. Two mismatched refrigerators did not accommodate storage needs.
AFTER Renovated office includes a bright nature-evoking accent wall, easily cleanable VCT flooring, new ergonomic chairs and adjustable height desks
BEFORE Shared windowless office with unneeded wall shelves imposing on clinical staff’s work space
AFTER Renovated office with space for twice as many staff, new carpet, freshly painted walls, and all new furniture with privacy partitions
BEFORE Group clinical office overrun by cabinets containing files that could be digitally archived
AFTER New finishes, custom wall shelves, improved lighting
BEFORE In-clinic Nurse work area set in corner alcove lacked supply storage, IT and sufficient light
AFTER A team office with all new furniture, carpet, and fresh paint walls replaced the outdated storage room
BEFORE Built-in rotary cabinets took up valuable space with files that were then digitally archived and properly destroyed