1 minute read

Delayering of Masterplan

Identifying integrated systems

Multiple layers of the masterplan gives a structure to the entire masterplan and sums up to become a holistic integrated framework where the workability of each layer, in relation to the other layers becomes important.

Advertisement

Private Open space : 26 %

Public Open space : 36%

Hardscape/ Plaza

Hardscape/ Footpaths

The green trail forms a major part of the shared greenspace in the entire development, which is softscape in nature. The hardscaped plaza areas are seen along the central plaza and major public facilities catering to achieve active and porous edges.

Primary : 30m

Secondary : 24, 18m

Tertiary : 15, 12, 9m

The main 30m spine retained from the Olympics acts as the main thoroughfare, integrated with the AMTS network. The secondary road forms the main mobility route as it conencts through important vehicular routes and pedestrian network. Feeder transit is integrated with the secondary road network.

Built : 38 %

Open : 62%

The map highlights the pattern of varying grain sizes in the planned developement and marks the landmark iconic built structures and the meaningful unbuilt spaces.

With diversity in built-uses, the proximity to multiple services is minimal and it aids in achieving a live work play environment within the site

Residential : 56%

Commercial : 18%

Mixed- Residential : 12%

Amenities : 03%

Institutional : 05%

Recreational : 06%

This article is from: