Masters in Architecture (M.Arch) GPA – 3.73/4.00
Young Design Professionals group at ZGF Architects LLP
REVIT 2012 (expert)
University of Oklahoma, Norman, Oklahoma - December 1999
Coordinator, “Connection 101” at ZGF Architects, a lecture series focused on technical aspects of architecture with the dual purpose of connecting intern and senior staff
Zimmer Gunsul Frasca Architects LLP Portland, OR Associate, LEED AP (BD+C), Medical Planner & Intern Architect May 2005 – September 2011
Final Thesis specialized in healthcare architecture and ADAAG Bachelors in Architecture (B.Arch) GPA – 3.50/4.00 School of Planning and Architecture, Hyderabad, India - June 1996 Final Thesis - Case study on adaptable housing for Physically Handicapped individuals.
AutoCAD 2011, Mcolor (expert) 3D Studio VIZ / MAX (Intermediate level) Sketchup (Intermediate level) Adobe CS5 Suite (expert)
President of Toast by Design at ZGF
Microsoft Office Suite (expert)
Toast by Design - an internal Toastmasters International club
Rhino (Beginner level)
Professional Indian Classical Dancer
Grasshopper (Beginner level)
HKS Inc Dallas, TX LEEP AP, Intern Architect/ Junior Medical Planner February 2000 - April 2005 Team Design Architects Johor Bahru, Malaysia Intern Architect ArtiPlan Hyderabad, India Intern Architect & Junior Medical Planner.
zgfarchitects
St. Joseph Health System
MISSION VIEJO AND LAGUNA / CALIFORNIA
Mission Hospital Mission Viejo and Laguna Beach Campus, Sonoma County, CA (20102011)
• Part of the Master Planning team and responsible in compilation of all existing and new site assessments and creating the Master Plan documents.
A Multi-Phase Master plan to add 450,000 SF to the existing campus facilities, addition of 264 new patient beds, expansion of all the Diagnostics and Treatment including ED, Imaging, 16 new OR’s, clinics and support services.
• Responsibilities included presenting various growth volumes for the community’s growing health care needs within the Mission Viejo Campus and a new Greenfield site in Rancho Mission Viejo.
• Developed conceptual floor plans and layouts for an expanded Emergency Department, two patient towers with new 455 private patient rooms, new Diagnostic and Treatment to support the Hospital, remodel and addition to the surgery suite, and proposal for a new parking structure to support the growing Hospital. • Responsible for developing presentation floor plans for seismic upgrades to the Mission Hospital Laguna Beach campus.
3 SECOND FLOOR COSMETIC UPGRADES SECOND FLOOR COSMETIC UPGRADES
The second floor of the existing hospital will be The secondtofloor of the hospital will be renovated include theexisting following upgrades (see renovated toinclude the following upgrades (see diagram below): diagram below): • Interior finishes for walls, floors, and ceilings. • Interior fi nishes for walls, floors, and ceilings. • New light fixtures in corridors. • fixtures in corridors. • New New light reception desk and feature wall. • desk andwall feature wall. • New New reception donor recognition • donor recognition wall public spaces • New Updated signage for primary • forelevator primary lobbies public spaces • Updated Updated signage finishes for and elevator • Updated finishes for elevator lobbies and elevator cabs cabs Parking Structure • Administrative suite Expansion 208 spaces • Administrative suite A complete set of drawings and finish material A complete setisofbeing drawings and fiby nish materialDesign specifi cations prepared Montanio specifi beingCalifornia. prepared by Montanio an Design Groupcations in Simi isValley, Additionally, Group in Simi California. animation wasValley, prepared by ZGF Additionally, Architects thatan animation was prepared by Architects that provides further illustrationAdmin of ZGF the design concept. Building provides further illustration 57,080 of the SF design concept.
Parking Structure Expansion 1,100 Spaces
Healing Garden & Expansion Sites
Service Yard
Tower 4 D&T, ORs, Suppport & Beds
Secondary Entry
TOWER 3
Service/Emergency Entry
Existing Visitor’s Entry Existing Short-Term Parking
Proposed Building
Patient/Staff Entry
Existing Building Site Access Parking Structure Access Elevator Core Maintain Fire Access Along Buildings Figure 28: Tower 3 Expansion
Figure 6: Proposed SiteFigure Plan -7:Phase Proposed 1 Site Plan - Phase 2 Option 1
½
New Lobby
Short-Term Parking for ED ED Walk-In Entry from Plaza
TOWER 4
Plaza/Bridge Connection
Parking Garage Entry
Outpatient Pavilion 160,000 SF
Children’s Hospital At Legacy Emanuel Children’s Hospital at Legacy Emanuel, Portland, OR (2008-2009) A 335,000 gross square feet, 165 beds, ten floor/nine story Children’s Hospital for pediatric inpatient services, Children’s ED, Day Surgery, Day Treatment Center/ Children’s Cancer Program and pediatric rehab facilities
PORTLAND / OREGON
• Co-Medical Planner responsible for the design of the 22-bays Emergency Department, creating thoughtful design options and documentation.
• Coordination of Medical Equipment and additional responsibility as REVIT manager for the planning team.
• Responsible for creating floor plans and related documentation for all phases starting from Schematic Design sessions through Construction Documentation for ED, NICU, PICU and coordination of Medical-Surgical units,
• Part of the team development for REVIT standards and helped in creating various detail components as a resource for the entire firm.
AMBULANCE VESTIBULE EXAM
EXAM
EXAM
RESUSCITATION
LOUNGE/CONF. STAFF
EXAM
RESUSCITATION
GIFT SHOP OFFICE
EMT WORK
ELEC
NURSE WORK
EXAM
IDF
TRIAGE/ EXAM 2
UTIL SOIL
ELEC
RECEP/WORK EXAM
STOR CT
EXAM
ADMITTING
EMERGENCY
LOBBY
CT TLT STAFF
NURSE WORK
EXAM
MEDS/ CLEAN
STOR. EQUIP
NOURISH
CT CONTROL
STOR. CAFE
EXAM
EXAM
RESUSCITATION
RESUSCITATION
EXAM
EXAM
EXAM
CONSULT
RAD ROOM
CORR
VENDING
CAFE GALLERY
INFORMATION
CT EQUIP WHCR ALCOVE
RT WORK/ LAB
HOLD SOIL
ISO EXAM
ENTRANCE
ELEVATOR LOBBY
TRIAGE/ EXAM 1 SECURITY
RECEPTION/ WAITING
FIRE COMMAND CENTER
BH EXAM
MEDS/ CLEAN
ELEV. LOBBY SERVICE
ENTRANCE
STOR. GIFT SHOP
BH EXAM
HOLD CLEAN
WHCR ALCOVE
TLT STAFF
TLT PAT
Providence Newberg Medical Center Providence Newberg Medical Center, Newberg, OR (2010) A 114,000 gross square feet addition of Hospital/MOB to an existing LEED GOLD Community Hospital for expansion of the Surgery Suite, Labor and Delivery Suite, Diagnostic and Imaging, ED, ICU & Med-Surg patient beds and Clinics.
• Responsibilities including assessment of existing departmental needs and growth volumes and proposal for inpatient and MOB expansion to the existing LEED Gold 175,000sf building which includes expansion of the existing surgery suite, imaging center, ED along with addition of 10 beds to the LDRP unit and creating an healing environment for all private Medical-surgical beds.
NEWBERG / OREGON
NEW CONSTRUCTION: PHASE 2 62'-0" STAIR ELV. 205' PUBLIC CORRIDOR P/H P/H P/H P/H P/H P/H 1 2 5 6 4 3 130 SF 130 SF
SCHEDULERS 4WS
HOLD SPACE FOR PHARMACY CON 1
250 SF
155 SF
P/H 12 179 SF P/H 13
P/H P/H 11 10 155 SF T T
T
T
50 SF 50 SF 100 SF
400 SF
EQUIP
STAFF BREAK
455 SF
200 SF
EMERGENCY
P/H 15 135 SF P/H 16 135 SF
CTRL
388 SF
163 SF
STAIR
STAIRS STORAGE
OR 4
CLEAN
SOIL 183 SF
183 SF
MALE LOCKERS
PACU OR 2
OR 5
OR 3
OR 6
P/H P/H P/H 18 135 SF 19 20 P/H EQUIP 17 200 SF 255 SF
DIAGNOSTIC IMAGING CT
OR 1
REMODEL STERILE CORE 350 SF
NURSE STN 290 SF
135 SF
STAFF OFFICES
P/H P/H 9 8 130 SF 130 SF
PRECLEAN PUBLIC ANES STORAGE ELEV ELEV 272 SF 123 SF
40 SF 40 SF
P/H 14
135 SF
P/H 7
136'-0"
100 SF 112 SF
ONCALL ONCALL FEMALE LOCKERS
SURGERY INFU INFU GI 1 6843SF DICT INFU STAIR INFU 2 4
MPU
MPU
ANES. ASST. MGR. ANES. WORK OFF OFF OFF
LEGEND FIT OUT
(FINISHED NEW CONSTUCTION)
REMODEL
(DEMO+NEW WALLS)
REPURPOSE VACATE SHELL
(FINISHES ONLY)
(NO WORK)
(NEW CONSTUCTION NOT FIT OUT)
STAIR ELEVATOR
SOILED
STORAGE
BREAK LOUNGE
LEVEL 1 PLAN 0'
8'
16'
32'
HOSPITAL PROVIDENCE NEWBERG MEDICAL CENTER January 21, 2011
Kaiser Westside Medical Center Kaiser Westside Medical Center, Hillsboro, OR (2005-2006) A 450,000 gross square feet of new Hospital/ MOB to an existing Kaiser Permanente Campus as an expansion to the West side of Portland.
• Responsibilities included medical planning for the first phase of 450,000 square feet of space and would grow from an initial 138 beds. The main hospital building, two parking garages, a medical office building, and a hospital support building were to be part of the first phase of construction, with additional buildings and hospital beds to be added later to bring the total size of the campus to 2,000,000 square feet.
HILLSBORO / OREGON • Developed the program for the Hospital Support building, client meetings for design development and complete program and planning documentation after design development phase. • The project went on hold for a few years and is currently under construction (Non-ZGF firm as the architect)
Healthcare Benchmarking
DEFINITIONS DEFINITIONS
Healthcare Benchmarking (2007 - 2011) • Responsible for analysis and identifying both a range and mean of departmental net to gross area ratios and floor gross areas in various ZGF hospitals for the major departments like ED, ICU, Imaging, Pharmacy, Lab and Surgery in order to compare them to national averages, and to analyze whether these ratios have undergone significant change occurring in healthcare practices and technologies.
NET SQUARE FEET (NSF) BUILDING GROSS SQUARE FEET(BGSF): This is measured as the space within the walls of a room or the usable floor area This is calculated as the total area occupied by the building measured from outside face of assigned to a function in an open area, for example, Nurse stations, cubicles, staff work exterior wall to outside face all around the building. Area includes stairs, elevators, shafts, areas or workstations. This space includes the floor area needed for casework, furniture, mechanical/electrical rooms, exterior wall assemblies and all departments. fixtures and door swings, but does not include wall thicknesses. It is measured from the inside face of all walls and enclosing elements. It does not include structural elements such as columns and column enclosures that may protrude into a room.
FIG. 1 – NSF: ENCLOSED ROOM
Analysis of Departmental Areas Analysis of Departmental Areas
BGSF: 26, 965 SF
FIG. 2 – NSF: OPEN AREA AROUND NURSE STATIONS
9
11
2)
hksinc.
Intermountain Healthcare IHC American Fork Hospital, American Fork, UT; IHC South building, Provo, UT; IHC Orem Community Hospital, UT Greenfield and Renovation projects ranging from 150,000 gross square feet to 350,000 gross square feet
AMERICAN FORK, PROVO, OREM / UTAH
• Extensive work with construction document phase and job captain for all the IHC projects starting with the American Fork Hospital project.
Seattle Children’s Hospital Campus Janet Sinegal Inpatient Bed building, Children’s Hospital & Regional Medical Center, Seattle, WA – 103,000 GSF Train Renovation, Children’s Hospital & Regional Medical Center, Seattle, WA – 80,000 GSF Melinda Gates Ambulatory Care Building, Children’s Hospital & Regional Medical Center, Seattle, WA – 200,000 GSF ED/OR Expansion project, Children’s Hospital & Regional Medical Center, Seattle, WA – 30,000 GSF Over 400,000 gross square feet of addition and renovation of the Seattle Children’s Hospital Campus which included an addition of 300 private patient beds and multispecialty clinics collaborating with the main hospital
• Eight major projects enable the award-winning Seattle Children’s Hospital to achieve the highest level of family-focused care with private patient rooms, family area, healing gardens and userfriendly wayfinding. The 103,800-square-foot Janet Sinegal Patient Care Building provides 100 private patient rooms, while the 172,000-squarefoot Melinda French Gates Ambulatory Care Building centralizes all of the center’s ambulatory care clinics into one “clinic of the future.” The program also includes 40,000 square feet of renovations to surgery and a 50,00-squarefoot emergency department addition. A new 216,000-square-foot, 625-car parking structure was built adjacent to the clinics and a 96,400-square-foot administration building consolidates the critical non-clinical functions. Additionally, 116,400 square feet of renovations as well as seismic and infrastructure upgrades were completed in many of the center’s original building.
SEATTLE / WASHINGTON
• Focused experience in areas of design such as Evidence-based Design and Lean Design. Attended workshop for Lean Design and implemented principals in Design Sessions in order to evaluate and improve workflow and operational flow for the Seattle Children’s Hospital • Significant exposure to several phases of Schematic Design through Construction Documents for all the Seattle Children’s Hospital buildings on the campus starting with the renovation project of the Train Buildings, ED/OR expansion to the new addition of the Inpatient Bed Wing and Ambulatory Care Building.
other professional experience
Team Design Architects, Johor Bahru, Malaysia Rathi Associates, Bangalore, India Artiplan, Hyderabad, India
• Other Professional Experiences include work experience in Architecture Firms in India and Johor Bahru, Malaysia from June 1995 until June 1998 as Intern Architect/ Junior Medical Planner