BIM PORTFOLIO DRAWN BY: MOHAMED RA’AFAT
PROFESSION:
ARCHITECT & BIM SPECIALIST
linkedin.com/in/mohamed-raafat
linkedin.com/in/mohamed-raafat
2
linkedin.com/in/mohamed-raafat
3
MOHAMED RA’AFAT
Architect & BIM Specialist
(LEED GA , ACP , SCE , EES)
+966 54 4010 697 @ arch.rafat92@hotmail.com Saudi Arabia, Jeddah Transferable IQAMA Egyptian
PROFILE SUMMARY • BIM Expert with 4 years of Experience. Extremely high Technical Skilled Architect in Revit for 8 years. Hyper-realistic 3D Designer and Visualizer. Shifted and Developed 2 Architecture offices from CAD to BIM within 6 months. Lectured and Coached Professional Engineers on using different BIM applications. Examined to Identify and Managed to Solve Coordination Problems in multiple Construction Projects before Execution. Creating 2D & 3D Parametric families & producing LOD 300-400-500 construction documents. Team Leader for 10 Engineers of the Production team. Modelling MEP & Structure elements in Revit. Trained MEP and Structure Engineers on using Revit.
EDUCATION
ACCREDITATION
•
•
Autodesk Revit Certified Professional
Verify No:
•
LEED Green Associate
B.Sc. in Architecture Engineering & Urban Planning June 2015-2016 Suez Canal University (SCU) - Egypt
linkedin.com/in/mohamed-raafat
Verify No:
wBLFm - 2274
11263261
4
EXPERIENCE BIM Specialist HAK Architectural and Engineering Consultants
Design Architect MOB Architectural and Engineering Consultants
www.hak-arc.com
Feburary 2019 - Present
Saudi Arabia, Jeddah
• Established BIM Department in HAK. • Daily model management administration and maintenance. • Providing REVIT Architecture, Structure and MEP desktop support. • HAK Content creation: All Family types with parameters, formula, nested. • Generating Schedules, BOQ, MTO, cost estimations for the projects. • Implementing and developing HAK office from CAD to BIM system. • Creating office standards & templates into REVIT. • Developing models & construction documents at prequalification and tender stages for use in bids and works proposals. • Using coordination/review tools such as Navisworks to federate, coordinate clash detect and produce reports. • Organizing BIM folder structure in HAK. • Setting up Worksharing projects on the network and worksets.
mobksa.com
March 2017 - Feburary 2019
Saudi Arabia, Jeddah
• Producing CAD drawings, renderings, layouts and color boards for specific architectural design. • Perform dimensional and routine calculations required for the preparation of drawings and design layouts. • Researching and developing the design and product solutions and presents them for consideration. • Using technical manuals to ensure compliance with required codes and standards. • Creating High-Quality 3D Modelling using various software; Sketchup, Revit, 3Ds Max • Presenting Photo-Realistic Architectural Renders. • Communicating and Negotiating with Clients.
COMPUTER SKILLS
TECHNICAL SKILLLS
PERSONAL SKILLLS
LANGUAGES
• Revit • Sketchup • Adobe Suite • Autocad • Navisworks • Lumion • Corona Render
• BIM • Freehand Sketching • 3D Visualizer • Green Building Strategies • Construction Documents • Presentations • Technical Analysis
• Leadership • Team Player • Self Developing • Fast Learner • Self Independant • Multi-Tasking • Flexiable Mindset
•
English (Fluent)
•
Arabic (Native)
•
Dutch (Basic)
linkedin.com/in/mohamed-raafat
5
CONTENTS
linkedin.com/in/mohamed-raafat
6
MODELLING
01
2 BR TOWNHOUSE
02
CLUBHOUSE
03
DOCUMENTATION
ELEMENTS & FAMILIES
BOQ & SCHEDULES
10
2 BR TOWNHOUSE
16
DOOR FAMILY
24
DOOR SCHEDULES
11
3 BR TOWNHOUSE
17
FURNITURE FAMILY
24
WINDOW SCHEDULE
3 BR TOWNHOUSE
12
4 BR VILLA
18
CP FAMILY
24
ROOM SCHEDULE
04
4 BR VILLA
13
CLUBHOUSE
19
PLUMBING FAMILY
24
MTO SCHEDULE
05
REVIT ID MODELLING
14
ID DRAWINGS
20
WINDOW FAMILY
25
PLUMBING SCHEDULE
06
PROTOTYPE 1
15
DRAFTING DETAILS
21
CASEWORK FAMILY
25
PROPERTY SCHEDULE
07
PROTOTYPE 2
22
GENERIC FAMILY
25
CASEWORK SCHEDULE
08
PROTOTYPE 3
23
RAILING FAMILY
25
DRAWING LIST
09
PROTOTYPE 4
25
ELECTRIC FIXTURES
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL NEIGHBORHOOD PROJECT PAGE 1 - 10
RESIDENTIAL NEIGHBORHOOD PROJECT PAGE 1 - 10
RESIDENTIAL NEIGHBORHOOD PROJECT PAGE 1 - 10
RESIDENTIAL NEIGHBORHOOD PROJECT PAGE 1 - 10
linkedin.com/in/mohamed-raafat
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
PARAMETRIC PAGE 1 - 10
PARAMETRIC PAGE 1 - 10
PARAMETRIC PAGE 1 - 10
PARAMETRIC PAGE 1 - 10
PARAMETRIC PAGE 1 - 10
PARAMETRIC PAGE 1 - 10
PARAMETRIC PAGE 1 - 10
PARAMETRIC PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
7
linkedin.com/in/mohamed-raafat
8
linkedin.com/in/mohamed-raafat
9
MODELLING DIVISION
linkedin.com/in/mohamed-raafat
10
linkedin.com/in/mohamed-raafat
01
2 BR TOWNHOUSE
02
CLUBHOUSE
03
3 BR TOWNHOUSE
04
4 BR VILLA
05
REVIT ID MODELLING
06
PROTOTYPE 1
07
PROTOTYPE 2
08
PROTOTYPE 3
09
PROTOTYPE 4
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL NEIGHBORHOOD PROJECT PAGE 1 - 10
RESIDENTIAL NEIGHBORHOOD PROJECT PAGE 1 - 10
RESIDENTIAL NEIGHBORHOOD PROJECT PAGE 1 - 10
RESIDENTIAL NEIGHBORHOOD PROJECT PAGE 1 - 10
11
01 2 BEDROOM TOWN HOUSE ORTHOGRAPHIC VIEW
linkedin.com/in/mohamed-raafat
12
01 FIRST FLOOR - SECTION BOX ORTHOGRAPHIC VIEW
GROUND FLOOR - SECTION BOX ORTHOGRAPHIC VIEW
linkedin.com/in/mohamed-raafat
13
02 CLUBHOUSE ORTHOGRAPHIC VIEW
linkedin.com/in/mohamed-raafat
14
03 3 BEDROOM TOWNHOUSE ORTHOGRAPHIC VIEW
linkedin.com/in/mohamed-raafat
15
04 GROUND FLOOR PLAN 4 BEDROOM VILLA
linkedin.com/in/mohamed-raafat
16
04 GROUND FLOOR PLAN 4 BEDROOM VILLA
FIRST FLOOR PLAN 4 BEDROOM VILLA
linkedin.com/in/mohamed-raafat
17
05 INTERIOR DESIGN REVIT DOCUMENTATION
linkedin.com/in/mohamed-raafat
18
05 INTERIOR DESIGN SECTION BOX
3D FIRST FLOOR
3D GROUND FLOOR
linkedin.com/in/mohamed-raafat
19
05 INTERIOR DESIGN GF SECTION BOX
linkedin.com/in/mohamed-raafat
20
05 INTERIOR DESIGN FF SECTION BOX
linkedin.com/in/mohamed-raafat
21
06 RESIDENTIAL BUILDING 3D ORTHOGRAPHIC
linkedin.com/in/mohamed-raafat
22
07 RESIDENTIAL BUILDING 3D ORTHOGRAPHIC
linkedin.com/in/mohamed-raafat
23
08 RESIDENTIAL BUILDING 3D ORTHOGRAPHIC
linkedin.com/in/mohamed-raafat
24
09 RESIDENTIAL BUILDING 3D ORTHOGRAPHIC
linkedin.com/in/mohamed-raafat
25
DOCUMENTATION DIVISION
linkedin.com/in/mohamed-raafat
26
linkedin.com/in/mohamed-raafat
10
2 BR TOWNHOUSE
11
3 BR TOWNHOUSE
12
4 BR VILLA
13
CLUBHOUSE
14
ID DRAWINGS
15
DRAFTING DETAILS
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
27
10 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
52000 1800
4600
900
2700
2700
900
4400
4400
900
2700
2700
900
4400
4400
900
2700
2700
900
4600
1800
2
1100
TERRACE
TERRACE
TERRACE
TERRACE
TERRACE
G06A
F01Y
F01JJ
F01UU
F01FFF
F01QQQ
KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN
G06
F01Q
F01BB
F01MM
F01XX
F01III
LIVING
C
LIVING
F01O
F01Z
LIVING
LIVING
F01KK
F01VV
LIVING F01GGG
4250
LIVING
4250
G03
1
ENTRANCE HALL
2250
MAID
F01W
T&B
T&B
G08A
F01X
DINING
DINING
F01P
F01AA
UP
AE 301
E
MAID
F01V
G01A
HALL
G04
F01T GARAGE
GARAGE
T&W
G05
G09
F01R
F01U
MAID
F01RR
MAID
F01SS
T&B
T&B
F01II
F01TT
DINING
DINING
F01LL
F01WW
UP
UP
ENTRANCE ENTRANCE HALL HALL
F01S
F01DD
HALL
HALL
F01EE
F01PP
T&W
GARAGE
GARAGE
T&W
F01FF
F01CC
F01NN
F01QQ
LAUNDRY LAUNDRY
F01DDD
F01CCC
MAID
F01NNN
F01OOO
DINING F01HHH
T&B
T&B
F01EEE
F01PPP
UP
ENTRANCE ENTRANCE HALL HALL
F01OO
UP HALL
HALL
F01AAA
F01LLL
ENTRANCE HALL
F01KKK
T&W
GARAGE
GARAGE
T&W
F01BBB
F01YY
F01JJJ
F01MMM
F01ZZ
UP
1500
H
1500
G
1900
T&W
F01GG
1900
F
UP HALL
LAUNDRY LAUNDRY
F01HH
2750
15500
G07
G02
2750
D
LAUNDRY LAUNDRY
G08
2250
MAID DINING
15500
B
TERRACE
1100
1750
A
1750
AE 301
1800
4600
900
2700
3600
4400
8000
2700
900
4400
4400
900
2700
2700
900
4600
1800
GROUND FLOOR PLAN
Room
2 BEDROOM TOWN HOUSE
DIN
ENT
ROOM LEGEND DINING ENTRANCE HALL
TERRACE
TERRACE
TERRACE
TERRACE
TERRACE
TERRACE
G06A
F01Y
F01JJ
F01UU
F01FFF
F01QQQ
KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN
KITCHEN
G06
F01Q
F01BB
F01MM
F01XX
F01III
LIVING
LIVING
G03
LAUNDRY
MAID
LIVING
GARAGE
MAID
HALL
T&B
KITCHEN
T&W
LAUNDRY LAUNDRY
G08
DINING G02
G07
LIVING
F01O
LIVING
F01Z
MAID
MAID
F01W
F01V
T&B
T&B
G08A
F01X
DINING
DINING
F01P
F01AA
F01HH
LAUNDRY LAUNDRY F01GG
F01RR
F01VV
MAID
T&B
T&B F01TT
DINING
DINING
F01LL
F01WW
KITC
LIVING
MAID
F01II
HAL
LIVING
F01KK
F01SS
GAR
F01DDD
LAUNDRY LAUNDRY F01CCC
F01NNN
F01GGG
LAU
LIVI
MAID F01OOO
T&B
T&B
F01EEE
F01PPP
MAI
DINING F01HHH
T&B
T&W
UP ENTRANCE HALL G01A
HALL
HALL
G04
F01T
T&W
GARAGE
GARAGE
T&W
G05
G09
F01R
F01U
ENTRANCE ENTRANCE HALL HALL F01S
F01DD
HALL
HALL
F01EE
F01PP
T&W
GARAGE
GARAGE
T&W
F01FF
F01CC
F01NN
F01QQ
ENTRANCE ENTRANCE HALL HALL F01OO
F01ZZ
HALL
HALL
F01AAA
F01LLL
T&W
GARAGE
GARAGE
T&W
F01BBB
F01YY
F01JJJ
F01MMM
ENTRANCE HALL F01KKK
TERRACE
linkedin.com/in/mohamed-raafat
28
UP
TER
10 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
52000 1800
4600
900
2700
2700
900
4400
4400
900
2700
2700
900
4400
4400
900
2700
2700
900
4600
1800
2 AE 301
DRESSING STAIR HALL 1
F02B
AE 301
2250
DRESSING
DRESSING
F01A
F01I
DN
DN
T&B
T&B
F02A
F01E
1900
BALCONY
BALCONY
F02C
F01K
W05
F01G
F01SSS
DRESSING
F01J
F01F
F02
D09
MASTER BEDROOM
STAIR HALL
F05
BEDROOM 2
MASTER BEDROOM
DRESSING STAIR HALL F01RRR
BEDROOM 2
F01D
F01M
DRESSING
DRESSING
F01UUU
F01DDDD
DN
DN
T&B
T&B
F01N
F01ZZZ
BALCONY
BALCONY
F01WWW
F01FFFF
4600
900
2700
3600
4400
D26
D26
W06
MASTER BEDROOM
F01BBBB
F01KKKK
STAIR HALL DRESSING
F01JJJJ
2700
BEDROOM 2
BEDROOM 2
F01YYY
F01HHHH
D05
T&B F01UUUU
DRESSING
DRESSING
F01MMMM
F01VVVV
DN
F01TTTT
DN
W05
W05
4400
4400
STAIR HALL DRESSING F01WWWW
T&B
T&B
F01IIII
F01RRRR
F01SSSS
BEDROOM 2 F01QQQQ
D05
BALCONY
BALCONY
F01OOOO
F01XXXX
D05
W05
W01 900
D26
T&B F01LLLL
F01NNNN
W01
8000
BALCONY
MASTER BEDROOM
DRESSING STAIR HALL
F01AAAA
W06
F01YYYY
MASTER BEDROOM
W05
W01 1800
F01PPPP
F01EEEE
D05
W05
T&B F01CCCC
F01VVV
BEDROOM 2
D09
T&B F01TTT
BALCONY
1750
D26
BALCONY F01GGGG
1100
D26
W06
4250
T&B F01H
W06
15500
F01XXX
2750
BALCONY
F01L
2250
4250 15500
2750
F01
1500
H
T&B F01B
MASTER BEDROOM
F G
BALCONY
1900
D26
E
W06
F01C
C
D
W06
BALCONY
1100
B
1500
1750
A
900
W01
2700
2700
900
4600
1800
FIRST FLOOR PLAN
Room
2 BEDROOM TOWN HOUSE
BALC
BEDR
DRES BALCONY
BALCONY
BALCONY
BALCONY
BALCONY
BALCONY
F01C
F01L
F01XXX
F01GGGG
F01PPPP
F01YYYY
ROOM LEGEND DINING
LAUNDRY
ENTRANCE HALL
LIVING
GARAGE
MAID
HALL
T&B
TERRACE
linkedin.com/in/mohamed-raafat
T&W
T&B
T&B
T&B
T&B
T&B
F01B
F01H
F01TTT
F01CCCC
F01LLLL
F01UUUU
DRESSING
DRESSING
DRESSING
DRESSING
DRESSING
DRESSING
F01A
F01I
F01UUU
F01DDDD
F01MMMM
F01VVVV
MASTER BEDROOM
F01
DRESSING STAIR HALL F02B
DN
MASTER BEDROOM
MASTER BEDROOM
F01G
F01SSS
STAIR HALL DRESSING
F05
F01J
F01F
DRESSING STAIR HALL F01RRR
MASTER BEDROOM
MASTER BEDROOM
F01BBBB
F01KKKK
STAIR HALL DRESSING
F01VVV
F01EEEE
F01AAAA
STAI T&B
MASTER BEDROOM
DRESSING STAIR HALL F01JJJJ
MAS
F01TTTT
STAIR HALL DRESSING
F01NNNN
F01WWWW F01SSSS UP
BEDROOM 2
KITCHEN
T&B
T&B
T&B
F02A
F01E
F02
BEDROOM 2
BEDROOM 2
F01D
F01M
T&B
T&B
F01N
F01ZZZ
BEDROOM 2
BEDROOM 2
F01YYY
F01HHHH
T&B
T&B
F01IIII
F01RRRR
BEDROOM 2 F01QQQQ
BALCONY
BALCONY
BALCONY
BALCONY
BALCONY
BALCONY
F02C
F01K
F01WWW
F01FFFF
F01OOOO
F01XXXX
29
10 2 BEDROOM TOWN HOUSE TOS. ROOF PLAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
52000 1800
4600
900
2700
2700
900
4400
4400
900
2700
2700
900
4400
4400
900
2700
2700
900
4600
1800
2 AE 301
B
1100
1100
B
1750
A
1750
A
4250
C 4250
C
1
300
4050
SHAFT (OPEN TO BELOW)
ROOF DECK
300
TOF.= +7450
AE 301
300
E
E 2250
3800
2250
DN
OTB
300
G
1500
1500
H
1900
F
1900
F G
D
15500
SHAFT (OPEN TO BELOW)
2750
15500
D
2750
SHAFT (OPEN TO BELOW)
1800
4600
900
2700
2700
900
4400
4400
900
2700
2700
900
4400
4400
900
2700
2700
900
4600
H
1800
52000
1
2
3
4
5
linkedin.com/in/mohamed-raafat
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
30
10 3
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
W01
W01
W01
W05
W01
W05
W01
W05
W01
04_TOP RF SLAB EL.= +7250 mm
W05
8450
W05
8450
W05
W01
W01
W01
W01
D01
D01
W01
D01
D01
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
350
D01
03_FIRST FFL EL.= +3950 mm
3600
3600
W01 D01
350
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
05_TOP OF PARAPET EL.= +8450 mm
3300
3300
04_TOP RF SLAB EL.= +7250 mm
03_FIRST FFL EL.= +3950 mm
4
1200
05_TOP OF PARAPET EL.= +8450 mm
2
1200
1
FRONT ELEVATION 19
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
W06
W06
05_TOP OF PARAPET EL.= +8450 mm
W06
D26
W06
D26
W06
D26
W06
04_TOP RF SLAB EL.= +7250 mm
D26
03_FIRST FFL EL.= +3950 mm
3600
3600
8450
D26
8450
D26
D07
D07
D07
D03
D07
D03
D07
D03
D07
D03 02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
350
D03
350
D03 02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
1
3300
3300
04_TOP RF SLAB EL.= +7250 mm
03_FIRST FFL EL.= +3950 mm
18
1200
05_TOP OF PARAPET EL.= +8450 mm
20
1200
21
BACK ELEVATION H
W07
SIDE ELEVATION linkedin.com/in/mohamed-raafat
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
A
1200
B
3300
D02 02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
C
05_TOP OF PARAPET EL.= +8450 mm 04_TOP RF SLAB EL.= +7250 mm
8450
03_FIRST FFL EL.= +3950 mm
D
1200
04_TOP RF SLAB EL.= +7250 mm
E
W04
03_FIRST FFL EL.= +3950 mm
3600
W02
03_FIRST FFL EL.= +3950 mm
05_TOP OF PARAPET EL.= +8450 mm
F
350
8450
04_TOP RF SLAB EL.= +7250 mm
3600
W07
350
W08
350
3600
8450
05_TOP OF PARAPET EL.= +8450 mm
G
3300
H
8450
G
3600
F
350
E
1200
D
3300
C
1200
B
3300
A
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
SIDE ELEVATION 31
2 BEDROOM TOWN HOUSE 3D RENDER
linkedin.com/in/mohamed-raafat
32
10
B
C
D
E
F
G
H
1230
A
1900
MECHANICAL DECK
04_TOP RF SLAB EL.= +7250 mm
STAIR HALL
T&B
BALCONY 1950
3300
D09
8450
1050 1250
1400
LAUNDRY
GARAGE 3600
1400
KITCHEN
D16
2550
W08 D02 PART OF SIDE WALK
150
200 800
3600 350
TERRACE
03_FIRST FFL EL.= +3950 mm
00_ST Level EL.= +0 mm
02_GROUND FFL EL.= +350 mm
350
8450
1050
D21
02_GROUND FFL EL.= +350 mm
3300
DRESSING
2250
T&B
03_FIRST FFL EL.= +3950 mm
1200
1200
1200 04_TOP RF SLAB EL.= +7250 mm
05_TOP OF PARAPET EL.= +8450 mm
400
05_TOP OF PARAPET EL.= +8450 mm
00_ST Level EL.= +0 mm
SECTION A1 5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
1200 3700
04_TOP RF SLAB EL.= +7250 mm
STAIR HALL
DRESSING
BEDROOM 2
T&B
T&B
D17
BEDROOM 2 D17
DRESSING
STAIR HALL
STAIR HALL
D17
DRESSING D17
03_FIRST FFL EL.= +3950 mm
1232
8450
1200
D17
3300
STAIR HALL D17
3000
3300 5700
DRESSING
05_TOP OF PARAPET EL.= +8450 mm
8450
4
500
04_TOP RF SLAB EL.= +7250 mm
03_FIRST FFL EL.= +3950 mm
3
1200
05_TOP OF PARAPET EL.= +8450 mm
2
1400
1
GARAGE
GARAGE
HALL
DINING
DINING
3600 3600
T&B
ENTRANCE HALL HALL
3387
2368
DINING
100 350
02_GROUND FFL EL.= +350 mm
T&B D08
350 200
3600 2800
ENTRANCE HALL DINING
00_ST Level EL.= +0 mm
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
SECTION B1 linkedin.com/in/mohamed-raafat
33
11 GROUND FLOOR PLAN 3 BEDROOM TOWN HOUSE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
51950 3450
2100
W03 W03
3450
BEDROOM 2
F02
F13
2100
W03
2450
2450
BEDROOM 3
F15
F25
3450
3450
W03
BEDROOM 2
F23
F33
2650
BEDROOM 3
BEDROOM 3
F35
F45
W03
BEDROOM 2
BEDROOM 2
F43
F53
T/B
T/B
HALL
HALL
T/B
T/B
HALL
HALL
T/B
F02A
F06A
F12
F11
F21
F22
F32
F31
F41
F42
F52
F51
STAIR HALL
F49
F07
F14
T/B
DN STAIR HALL
DN STAIR HALL
F05
F10
-
T/B
F09
F19
STO.
STO.
F24
F34
T/B
DN
DN
STAIR HALL
F29
STAIR HALL
F20
T/B
STO.
STO.
F44
F54
F30
W05
T/B DN
DN STAIR HALL
F39
B
F55
HALL STO.
A
BEDROOM 3
HALL STO.
1800
W03
W03
BEDROOM 2
2100
W03
W03
BEDROOM 3
2100
T/B
F01B
F40
W05
F50
---
1900
E
MASTER BEDROOM
MASTER BEDROOM
F01
F04
W03
W03
BALCONY D04 F01C
UP
F08
DRESSING DRESSING
F18
BALCONY BALCONY D04 D04 F06 F17
MASTER BEDROOM
MASTER BEDROOM
F16
OTA
F26
W03
W03
F28
D
DRESSING
F38
BALCONY BALCONY D04 D04 F27 F37
MASTER BEDROOM
MASTER BEDROOM
F36
F46
F48
2350
DRESSING DRESSING
F01A
E
BALCONY D04 F47
D05
F
1800
2600
2100
3450
3450
2100
2450
2450
2100
3450
3450
F
W03
2100
2450
2450
2100
3450
3450
2100
2650
1800
51950
1
2
3
4
linkedin.com/in/mohamed-raafat
5
6
7
8
9
10
11
12
13
14
15
16
17
18
C
1900
DRESSING
2350
D
3450
W03
BEDROOM 2
T/B
2750
C
14400
6200
F03
2100
W03
BEDROOM 3
B
2450
W03
1200
A
2450
1200
3450
6200
2100
14400
2600
2750
1800
19
20
21
34
11 FIRST FLOOR PLAN 3 BEDROOM TOWN HOUSE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
51950
B 6200 14400 2750
2100
D03
D03
3450
3450
2100
2650
W06
D05
D05
D05
D05
KITCHEN
LIVING
LIVING
KITCHEN
KITCHEN
LIVING
G03
G06
G11
G10
G31
G32
G22
G21
G41
G42
G52
G51
LAUNDRY
LAUNDRY
LAUNDRY
LAUNDRY
G13
G34
G24
G44
DINING
DINING
DINING
DINING
G12
G33
G23
G43
T/B
T/B
G08A
G16
MAID
MAID
G08
G14
G04
T/W
T/W
G05
G15
UP UP
ENTRANCE HALL
HALL
HALL
G17
G38
T/B G27
MAID
MAID
G35
G25
UP
UP
T/B G37
T/W
T/W
G36
G26
ENTRANCE ENTRANCE HALL HALL
2 D01
GARAGE
GARAGE
11
G18
G09 D01
HALL
G28
G48
GARAGE
GARAGE
G39
G29
G20 D01
W06
LAUNDRY MAID
G45
DINING
G55 T/W
T/W
G46
G56
G53
UP
HALL G58
UP
UP
ENTRANCE ENTRANCE HALL HALL
G30 D01
B
ENTRANCE HALL
G40 D01
GARAGE
GARAGE
G49
G59
C
D W01
G50 D01
E 1900
UP
HALL
T/B G57
MAID
UP UP
T/B G47
A
G54
UP
UP
1800
D03
KITCHEN
G02
2350
2450
LIVING
HALL
1900
2450
LIVING
UP
E
2100
D05
DINING
D
D03
3450
KITCHEN
D04
-
D03
3450
D05
LAUNDRY
---
2100
KITCHEN
G07
C
2450
LIVING
MAINT. STORAGE G19
2450
1200
2100
6200
3450
14400
3450
2750
2100
D03
1200
A
2600
2350
1800
F
F
1800
2600
2100
3450
3450
2100
2450
2450
2100
3450
3450
2100
2450
2450
2100
3450
3450
2100
2650
1800
51950
1
2
3
4
5
linkedin.com/in/mohamed-raafat
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
35
11 A
B
C
D
E
F
ROOF TILES 2CM MORTAR 2CM SAND 6CM FOAM CONCRETE 5CM THERMAL PROOF 5CM WATER PROOF MEMBRANE 2CM REINFORCED CONCRETE 30CM
05_TOP OF PARAPET EL.= +8450 mm
05_TOP OF PARAPET EL.= +8450 mm
1200
1000
1200
ROOF
04_TOP RF SLAB EL.= +7250 mm
3000
2200
SAND 6CM
1400
MORTAR 2CM
SAND 6CM
03_FIRST FFL EL.= +3950 mm
650
400
3600
GARAGE
2028
2200
2750
T/W
2800
3200
T/B
3700
KITCHEN
REINFORCED CONCRETE 30CM
700
1000
400
REINFORCED CONCRETE 30CM
8450
FINISHING TILES 1CM
MORTAR 2CM
3600
3300
MASTER BEDROOM
322
8450
FINISHING TILES 1CM
03_FIRST FFL EL.= +3950 mm
STAIR HALL
3000
STO.
3000
3300
BEDROOM 2
1650
800
350
04_TOP RF SLAB EL.= +7250 mm
FINISHING TILES 1CM MORTAR 2CM SAND 6CM REINFORCED CONCRETE 30CM
02_GROUND FFL EL.= +350 mm
350
350
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
00_ST Level EL.= +0 mm
SECTION A-1 5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
05_TOP OF PARAPET EL.= +8450 mm
STAIR HALL
T/B
DRESSING
MASTER BEDROOM
MASTER BEDROOM
DRESSING
T/B
STAIR HALL
STAIR HALL
T/B
04_TOP RF SLAB EL.= +7250 mm
DINING
T/W
HALL
DINING
ENTRANCE HALL
GARAGE
GARAGE
ENTRANCE HALL
DINING
HALL
T/W
DINING
00_ST Level EL.= +0 mm
03_FIRST FFL EL.= +3950 mm
3600
MAINT. STORAGE
350
3600
8450
STAIR HALL
8450
T/B
350
02_GROUND FFL EL.= +350 mm
4
1200
3300
04_TOP RF SLAB EL.= +7250 mm
03_FIRST FFL EL.= +3950 mm
3
1200
05_TOP OF PARAPET EL.= +8450 mm
2
3300
1
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
SECTION A-2 linkedin.com/in/mohamed-raafat
36
11 1
3
4
5
6
7
8
9
10
11
12
14
15
16
17
18
19
20
21
W03
W03
W03
1200
W03
W03
05_TOP OF PARAPET EL.= +8450 mm 04_TOP RF SLAB EL.= +7250 mm
3300
3300
04_TOP RF SLAB EL.= +7250 mm
13
W50
1200
05_TOP OF PARAPET EL.= +8450 mm
2
D05
D01
D01
D01
D01
D01
3600
03_FIRST FFL EL.= +3950 mm
3600
03_FIRST FFL EL.= +3950 mm
D01
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
FRONT ELEVATION 19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
3300
04_TOP RF SLAB EL.= +7250 mm
W03
W03
W03
W03
W03
W03
W03
W03
W03
04_TOP RF SLAB EL.= +7250 mm
W03
03_FIRST FFL EL.= +3950 mm
3600
8100
W03
8100
W03
3600
03_FIRST FFL EL.= +3950 mm
05_TOP OF PARAPET EL.= +8450 mm
3300
1200
05_TOP OF PARAPET EL.= +8450 mm
20
1200
21
D03
D05
D05
D03
D03
D05
D05
D03
D03
D05
D05
D03
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
BACK ELEVATION B
A
A
B
C
D
E
F
1200
04_TOP RF SLAB EL.= +7250 mm
W05
W05
D04 03_FIRST FFL EL.= +3950 mm
3600
03_FIRST FFL EL.= +3950 mm
W01
W06
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
linkedin.com/in/mohamed-raafat
04_TOP RF SLAB EL.= +7250 mm
03_FIRST FFL EL.= +3950 mm
W06 02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
SIDE ELEVATION
05_TOP OF PARAPET EL.= +8450 mm
3300
C
05_TOP OF PARAPET EL.= +8450 mm
3300
04_TOP RF SLAB EL.= +7250 mm
D
3600
05_TOP OF PARAPET EL.= +8450 mm
E
1200
F
D04 02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
SIDE ELEVATION 37
12 GROUND FLOOR PLAN 4 BEDROOM VILLA
1
2
3
4
5
6
7
18200 3900
2050
2600
1850
1700
6100
1 A302
SWIMMING POOL
D09 PUMP
B
D02
B
DINING
LIVING
G04
G02
G03
D02
1700
UP
ENTRANCE HALL G01A GARAGE
A301
G09
D
D01
3950
1
C
POWDER
LAUNDRY
G05A
G07
KITCHEN G06
TOI. G05
MAID RM. G08
TOI.
D05
3950
D
10200
HALL
3650
3650
D02
G01
1700
10200
C
D02
G10
SALON D02
A
900
D03
900
A
G08A
E
E W01
3900
2050
2600
W01
1850
1700
W01
6100
18200
1
linkedin.com/in/mohamed-raafat
2
3
4
5
6
7
38
12 FIRST FLOOR PLAN
1
4 BEDROOM VILLA
2
3
4
5
6
7
18200 2050
2600
BALCONY
W02 W02
DRESSING
B T/B
F04 HALL
FAMILY LIVING
F04C
F06
UP
T/B
STAIR HALL
F04A
F05
F02A
BEDROOM 2
W01
F02
1700
1700
3650
3650
BEDROOM 1
W01
A
D05
F04D
10200
W04
D
10200
900
D05
B
C
6100
F06A
A302
W02
1700
BALCONY
1
F04B
A
1850
900
3900
C D
1
3950
BEDROOM 3 F03
T/B
T/B
DRESSING
MASTER BEDROOM
F01B
F01A
F01
BALCONY
3950
A301
D05 F01C
F03A D06
E
W02
E
W01
3900
W02
2050
2600
W03
1850
W03
1700
6100
18200
1
linkedin.com/in/mohamed-raafat
2
3
4
5
6
7
39
12 ROOF FLOOR PLAN
1
4 BEDROOM VILLA
2
3
4
5
6
7
18200 3900
2050
2600
1850
1700
6100
1
A
900
900
A
176 / 1000
176 / 1000
A302
3650
B 3650
B SHAFT OPENING
SHAFT OPENING
D
10200
1700
1700
C
10200
T.O.S = +7450
C D
1
3950 176 / 1000
E
176 / 1000
3950
A301
3900
2050
2600
1850
1700
E
6100
18200
1
linkedin.com/in/mohamed-raafat
2
3
4
5
6
7
40
12 FRONT ELEVATION
1
4 BEDROOM VILLA
2
3
4
5
6
7
05_TOP OF PARAPET EL.= +8650 mm
05_TOP OF PARAPET EL.= +8650 mm
04_TOP RF SLAB EL.= +7250 mm
04_TOP RF SLAB EL.= +7250 mm
W01
W02
W02
D06
03_FIRST FFL EL.= +3950 mm
W03
W03 03_FIRST FFL EL.= +3950 mm
W01
W01
W01
D01
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
E
D
C
B
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
A
A
B
C
D
E
1400
W01
04_TOP RF SLAB EL.= +7250 mm
3300
W01 D05
03_FIRST FFL EL.= +3950 mm
3600
8650
03_FIRST FFL EL.= +3950 mm
D05
SIDE ELEVATION 4 BEDROOM VILLA
linkedin.com/in/mohamed-raafat
D02
D02
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
350
3600
05_TOP OF PARAPET EL.= +8650 mm
04_TOP RF SLAB EL.= +7250 mm
8650
3300
1400
05_TOP OF PARAPET EL.= +8650 mm
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
SIDE ELEVATION 4 BEDROOM VILLA
41
12 7
6
5
4
3
2
1
BACK ELEVATION 4 BEDROOM VILLA
05_TOP OF PARAPET EL.= +8650 mm
05_TOP OF PARAPET EL.= +8650 mm
04_TOP RF SLAB EL.= +7250 mm
04_TOP RF SLAB EL.= +7250 mm
W02
W02
W04 03_FIRST FFL EL.= +3950 mm
D02
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
W02
D05
D02
D05
D02
03_FIRST FFL EL.= +3950 mm
D03
D09
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
SWIMMING POOL
1
2
3
4
5
6
7
SECTION A-1 05_TOP OF PARAPET EL.= +8650 mm
1400
1450
D01
04_TOP RF SLAB EL.= +7250 mm
1950 F01
BALCONY F01C
linkedin.com/in/mohamed-raafat
1100
03_FIRST FFL EL.= +3950 mm
GARAGE
TOI.
MAID RM.
TOI.
KITCHEN
G09
G05
G08
G08A
G06
3600
3600 00_ST Level EL.= +0 mm
350
02_GROUND FFL EL.= +350 mm
8650
MASTER BEDROOM
F01A
3300
DRESSING
F01B
1100
T/B
F03A
350
2600
T/B
F03
1100
03_FIRST FFL EL.= +3950 mm
BEDROOM 3
8650
3300
700
04_TOP RF SLAB EL.= +7250 mm
ROOF DECK
1400
1400
05_TOP OF PARAPET EL.= +8650 mm
200
600
4 BEDROOM VILLA
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
42
12 SECTION B-2
E
4 BEDROOM VILLA
D
C
B
A
1283
1
600
A301
1400
1200
ROOF DECK D01
04_TOP RF SLAB EL.= +7250 mm
3300
F05
G04
3600
HALL
G01A
350
350
G10
350
00_ST Level EL.= +0 mm
8650
985 1100 3600
2400
ENTRANCE HALL
PUMP 02_GROUND FFL EL.= +350 mm
03_FIRST FFL EL.= +3950 mm
2850
1400
STAIR HALL
1000
T/B F01B
1200
8650
03_FIRST FFL EL.= +3950 mm
3300
1100
04_TOP RF SLAB EL.= +7250 mm
05_TOP OF PARAPET EL.= +8650 mm
1400
05_TOP OF PARAPET EL.= +8650 mm
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
PUMP ROOM
linkedin.com/in/mohamed-raafat
43
CLUBHOUSE 3D RENDER
linkedin.com/in/mohamed-raafat
44
13 CLUBHOUSE
1
2
3
4
5
6
7
GROUND FLOOR PLAN
8
9
10
11
12
13
14
45400 6200
3000
6000
3000
3000
3000
2800
3200
2800
CD01
A
3200
3000
3200
3000
W48 W48
A 3200
3200
D35
LOCKER
M-T/W
CG13A
B
CG16
CG16A
3000
D10
3000
FITNESS ROOM
B
W48
C
SWIMMING POOL
F-T/W
D17 CG14
6000
6000
W64
C
CG15A
HALL
TERRACE CG13B W64
GYM
F-LOCKER
CG13
CG15 W48
D CG12
CG12A
W54
1
2
UP
W65
D15
CG04B
W53
W62
---
17
CG03A
4
21
5
20
6
19
7
18
8
CG12B
F
9
16
10
15
11
14
12
W63
W48
13
W52
G
D22
CG05
FFL = +350
HALL
JAN.
D25
CG03
CG08A
6000
3
22
17
ELEV.
D10
DINING D25
CG10A
HALL
W53
W62
-
GALLARY
CG01
TERRACE
D25
G
23
LOBBY
E
D25
JAN. CG07A
LOUNGE HALL
GAME ROOM
D29
6000
3000
D28
STORAGE
24
W53
F
W52
30400
30400
SERVICE
3000
W64 W54
3000
E
RECEPTION
3000
3000
UP
3000
D
CG10
CG04
D25
KITCHEN
SERVICE
CG06
CG06A
STORAGE
SITTING
W52
CG07
W55 W55 W55
3000
W48
6000
3000
H
D10 UP
TERRACE
D18
30
D17
W52
6200
CG08
CG09
CG04A
D17
I
F-T/W
3200
3200
H
M-T/W
I
W48
3000
3000
2800
3200
2800
3200
3000
3200
3000
45400
1
linkedin.com/in/mohamed-raafat
2
3
4
5
6
7
8
9
10
11
12
13
14
45
13 CLUBHOUSE
1
2
3
4
5
6
FIRST FLOOR PLAN
7
8
9
10
11
12
13
14
45400 6200
3000
6000
3000
3000
3000
2800
3200
2800
3200
3000
3200
3000
3200
A 3200
A
TERRACE FFL = +4250
3000
B
3000
B
C
C
D32 W58
FFL = +4250
MULTI PURPOSE ROOM
CF01
W58
6000
6000
W58
W58
D
D FFL = +4250
W58
W48
M-T/W
F-T/W
PANTRY
CF04B
CF04A
CF04
30400
W48
30400
ELEV. LOBBY
UP
CF02A HALLWAY
D32
CF02B
CG13M
G
TERRACE FFL = +4250
W58
-
W60
HALL
W57
---
6000
SEATING AREA FFL = +4850
CF03B
PARTY ROOM CF03
OTB
BALCONY CF03A
TERRACE FFL = +4250
MECH. ROOM
H
ELEV.
W58
D25
CD01B
H
D25 UP
UP 3200
FFL = +4250
3200
6000
G
F
CF02
CORRIDOR
3000
3000
176 / 1000
F
E
3000
3000
E
W58
3000
3000
UP
I
I
6200
3000
6000
3000
3000
3000
2800
3200
2800
3200
3000
3200
3000
45400
1
linkedin.com/in/mohamed-raafat
2
3
4
5
6
7
8
9
10
11
12
13
14
46
13 1
2
3
4
5
6
7
8
9
10
11
12
13
14
05_TOP OF PARAPET EL.= +12150 mm
05_TOP OF PARAPET EL.= +12150 mm
4000
CLUBHOUSE ELEVATIONS
3900
04_TOP RF SLAB EL.= +8150 mm
12150
04_TOP RF SLAB EL.= +8150 mm
W60
W58
D25 03_FIRST FFL EL.= +4250 mm
3900
03_FIRST FFL EL.= +4250 mm
W52
W52
W48
W55 W55 W55
D17
W48
W48
D17
D10 02_GROUND FFL EL.= +350 mm
350
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
00_ST Level EL.= +0 mm
FRONT ELEVATION 14
13
12
11
10
9
8
7
6
5
4
3
2
1
05_TOP OF PARAPET EL.= +12150 mm
4000
05_TOP OF PARAPET EL.= +12150 mm
D35
3900
04_TOP RF SLAB EL.= +8150 mm
12150
04_TOP RF SLAB EL.= +8150 mm
W48
W48
D32 03_FIRST FFL EL.= +4250 mm
3900
03_FIRST FFL EL.= +4250 mm
W48
W48 W48 D35
W54 CD01
W53
W62
W52
W62
D10
D28 02_GROUND FFL EL.= +350 mm
350
02_GROUND FFL EL.= +350 mm 00_ST Level EL.= +0 mm
00_ST Level EL.= +0 mm
BACK ELEVATION I
H
G
F
E
D
C
B
A
A
B
C
D
E
F
G
H
I
-
---
---
04_TOP RF SLAB EL.= +8150 mm
W58
12150
W58
W58
W58 03_FIRST FFL EL.= +4250 mm
W63 D25
W52
W48
350
02_GROUND FFL EL.= +350 mm
00_ST Level EL.= +0 mm
00_ST Level EL.= +0 mm
SIDE ELEVATION linkedin.com/in/mohamed-raafat
W58
W58
W58
D32
W57
D25
03_FIRST FFL EL.= +4250 mm
03_FIRST FFL EL.= +4250 mm
3900
3900
03_FIRST FFL EL.= +4250 mm
D25
04_TOP RF SLAB EL.= +8150 mm
D10 02_GROUND FFL EL.= +350 mm
W64
W64
D25
D25 02_GROUND FFL EL.= +350 mm
350
3900
W32
3900
04_TOP RF SLAB EL.= +8150 mm
12150
05_TOP OF PARAPET EL.= +12150 mm
W61
04_TOP RF SLAB EL.= +8150 mm
02_GROUND FFL EL.= +350 mm
05_TOP OF PARAPET EL.= +12150 mm
4000
05_TOP OF PARAPET EL.= +12150 mm
4000
05_TOP OF PARAPET EL.= +12150 mm
00_ST Level EL.= +0 mm
00_ST Level EL.= +0 mm
SIDE ELEVATION 47
14 INTERIOR DESIGN REVIT DOCUMENTATION
F F
E
D
4150
C
2650
4000
B 1450
E
D
C
B
A
A 1750
5
5
DRESSING BALCONY
T&B
T&B
6
6
850
6 850
6 7
7
7
7 STAIR HALL BEDROOM 2 BALCONY
MASTER BEDROOM
DRESSING
4150
2650
F
E
4000
1450
D
C
8
1750
B
8
A
F
E
GROUND FLOOR PLAN
D
C
B
A
FIRST FLOOR PLAN T8
210
T4
T7
T2
T8
240 290
255
530
T7
T6
210
930
T5
330
7 5
T2
230
6 4
T1
3
T1
232
T4 2 1
T1
960
T1
T9
T9
401
163
892
460
888
1500
GF - FLOOR PATTERN
linkedin.com/in/mohamed-raafat
FF - FLOOR PATTERN
48
14
300
828
900
W3
2200 W1
1000
2299 229
1840
4000
2500 1570
900
2500
W2
930
980
720
W2
1879 3800
W2
230
1087
4500
3900
1160
937
400
2350
761
173
263
920
3180
240 245 440 245
880 150 W3
499
W1 W3
1800
1800
W1
660
990
2700
2000
W2
1263
1000
W1
2550
1600 300
2500
1000 3650
W3
W1
380
1580
W3
W2
940
2100
100
1560 W1
W2
1150 1380
3800
W1
100
950
1035
700 155
850
785
1500 50
2550 W3
2299
W1
600
200
1901
3120
1780
750
W2
1000
1300
600
W1 W4
1900
W1
1200
850
1000
1380
1000
500
95
3800
2800
1980 1300
1000
1000
5000
2300
REVIT DOCUMENTATION
2040
INTERIOR DESIGN
3901
2000
GF - MASONRY LAYOUT 345
KITCHEN
EQ
BALCONY
DN
940 2900
950
D
EQ
EQ STAIR HALL
WIFI
DINING
TV
SH
Toilet Hand Wash
D
500
EQ EQ
EQ
T&B
207
1000
EQ EQ
MAID BEDROOM
T&B
DRESSING
TERRACE
550
H= +1300mm FFL
500
EQ EQ
620
SH
T&B
535
EQ
SH
GARAGE
950
RH
LAUNDRY
EQ
1290
310
1030
FF - MASONRY LAYOUT
EQ
500
4299
EQ
MASTER BEDROOM
EQ
BALCONY
WIFI
LIVING AREA
DRESSING
WIFI
200
EQ
D
ENTRANCE HALL
EQ
EQ
BEDROOM 2
D
5560
4120
GF - POWER LAYOUT
linkedin.com/in/mohamed-raafat
TV
1620
800
2100
1000
500
FF - POWER LAYOUT
49
15 DRAFTING DETAILS DRAFT VIEW
CONCRETE SCREED SLOPE TO DRAIN
STRAINER
02
SAND/CEMENT CANT STRIP
03
POLYFLAME, 4mm THICK BLACK MEMBRANE
04
EXTRUDED POLYSTERENE INSULATION BOARD ONE (1) LAYER OF BITUMAT
05
GEOTEXTILE SHEET SEPARATION LAYER
06
MORTAR BED
07
FLOOR FINISH (VARIES)
08
METAL LATH
WATER CUT-OFF MASTIC
09
CMU/CONCRETE WALL
SEALANT
10
20mm THICK SAND/CEMENT PLASTER, PAINTED FINISH.
10
08
06
07
02
05
ROOFING SYSTEM.
50MM THK. EXTRUDED POLYSTERENE INSULATION BOARD
W = 30mm
T = 20mm
09
SAFETY NOSING HIGH QUALITY EXTRUDED STEEL AND EPOXY ABRASSIVE FILLER LENGTH = FULL LENGTH OF TREAD
WATER PROOFING MEMBRANE
CLAMPING RING
T = 5mm
01
04
03
VARIES
01
ROOF SLAB 6 AE 403
P-STAIR NOSING DETAIL SCALE
1 : 25
DOWNSPOUT
1 AE 403
P-COURTYARD & OUTDOOR TERRACE SCALE
PROPRIETARY GALVANISED STEEL PLASTER CORNER BEAD (HEIGHT TO MATCH THE PLASTER THICKNESS)
4
1 : 25
AE 403
P-ROOF DRAIN FLUSHING DETAIL SCALE
1 : 25
RC OR MASONRY WALL
CEMENT / SAND PLASTER TO SPECIFICATIONS CONTINUOUS SEALANT PROTECTION 01
CMU/CONCRETE WALL
02
SAND/CEMENT CANT STRIP
03
POLYFLAME, 4mm THICK BLACK MEMBRANE
CONTINUOUS ALUMINUM COUNTER FLASHING BASE FLASHING SYSTEM COMPOSED OF: ONE LAYER OF BITUMAT POLYFLAME,4MM THICK MINERAL FINISHING MEMBRANE GIRTH 35CMS.
01
CONCRETE SCREED SEPARATION LAYER
05
GEOTEXTILE SHEET SEPARATION LAYER FLOOR FINISH (VARIES)
P-PLASTERED WALLS EDGE DETAIL
04
SCALE
1 : 25
METAL LATH
05
CERAMIC TILES WALL FINISH ON MORTAR BED SETTING
06
FLOOR TILES FINISH ON MORTAR BED
07
CONCRETE SCREED SLOPE TO DRAIN
02
06
50mm THK. EXTRUDED POLYSTERENE INSULATION BOARD
07
50mm THK. ON 19mm LOCALLY AVAILABLE CRUSHED GRAVEL
03
VARIES
H = 300mm
3 AE 403
04
20MM X 20MM X 6MM STAINLESS STEEL CHANNEL INSERTS ON EXTERNAL WALL (SEE BUILDING FACADE ELEVATIONS)
T= 20mm
PART OF CEMENT PLASTER WITH ACRYLIC TEXTURE PAINT PLASTER (SEE BUILDING FACADE ELEVATIONS)
(REFER TO BUILDING ELEVATIONS FOR DIMENSIONS)
ONE LAYER OF BITUMAT POLYFLAME,4MM THICK BLACK MEMBRANE OUTLINE OF STAINLESS STEEL EXPANSION BOLTS (SEE TECH. SPECS FOR VERIFICATION)
CONCRETE SCREED SLOPE TO DRAIN (MIN. 50MM THICK) SAND/CEMENT CANT STRIP
5 AE 403
P-SERVICE ROOF DECK SCALE
1 : 25
linkedin.com/in/mohamed-raafat
7 AE 403
P-WET AREA DETAIL SCALE
1 : 25
2 AE 403
T= 50mm
PARAPET WALL
PART OF FACADE'S MASONRY WALL
P-DEOCRATIVE GROOVE DETAIL SCALE
1 : 25
50
15 DRAFTING DETAILS
2 LAYERS OF RIGID INSULATION WITH A MIN. R-VALUE OF 21 OVER VAPOR BARRIER
DRAFT VIEW
2 LAYERS OF RIGID INSULATION WITH A MIN. R-VALUE OF 21 OVER VAPOR BARRIER
VAPOR BARRIER
VAPOR BARRIER
1/2" X10" ANCHOR AT 4'-0" O.C. AND 1'-0" FROM EACH SIDE OF EACH CORNER
1/2" X10" ANCHOR AT 4'-0" O.C. AND 1'-0" FROM EACH SIDE OF EACH CORNER
2X6 TREATED SILL PLATE OVER SILL SEALER TYP. DAMPPROOFING
8" WIDE CONCRETE STEMWALL (SEE SCHEDULE FOR VERT. & HORIZ. STEEL)
MAIN T.O. SUB. 100' - 0"
T.O. FOUNDATION 98' - 9 7/8"
1' - 2 1/8"
1' - 2 1/8"
2X6 TREATED SILL PLATE OVER SILL SEALER TYP. 18" WIDE CONCRETE STEMWALL (SEE STRUCTRUCAL SCHEDULE FOR VERT. & HORIZ. STEEL)
2' - 8"
(2) - #5 GR. 40 BARS TOP & BOTTOM MIN. 3" AND MAX. 6" BETWEEN BARS AND TOP OR BOTTOM OF WALL
B.O. FOUNDATION 96' - 1 7/8" B.O. FOOTING 95' - 5 7/8"
32" WIDE X 8" DEEP CONC. FOOTING PROVIDE [5] - #4 GR. 40 BARS CONTINUOUS PROVIDE #4 GR. 40 BARS @ 24" O.C. TRANSVERSE
DOWELS 32" O.C. MAX OR MATCH VERT. WALL BARD, BEND AS SHOWN AND EXTEND MIN. 24" INTO WALL
linkedin.com/in/mohamed-raafat
8"
8"
2' - 8"
VERT. & HORIZ. STEEL (SEE SCHEDULE)
MAIN T.O. SUB. 100' - 0" VERT. & HORIZ. STEEL (SEE SCHEDULE)
T.O. FOUNDATION 98' - 9 7/8" DOWELS 32" O.C. MAX OR MATCH VERT. WALL BARD, BEND AS SHOWN AND EXTEND MIN. 24" INTO WALL (2) - #5 GR. 40 BARS TOP & BOTTOM MIN. 3" AND MAX. 6" BETWEEN BARS AND TOP OR BOTTOM OF WALL
B.O. FOUNDATION 96' - 1 7/8" B.O. FOOTING 95' - 5 7/8"
18" WIDE X 8" DEEP CONC. FOOTING PROVIDE [3] - #4 GR. 40 BARS CONTINUOUS PROVIDE #4 GR. 40 BARS @ 24" O.C. TRANSVERSE
51
ELEMENTS & FAMILIES DIVISION
linkedin.com/in/mohamed-raafat
52
linkedin.com/in/mohamed-raafat
16
DOOR FAMILY
17
FURNITURE FAMILY
18
CP FAMILY
19
PLUMBING FAMILY
20
WINDOW FAMILY
21
CASEWORK FAMILY
22
GENERIC FAMILY
23
RAILING FAMILY
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
RESIDENTIAL COMPOUND PROJECT PAGE 1 - 10
53
16 DOOR PARAMETRIC FAMILIES LOD 300 - 400 - 500
linkedin.com/in/mohamed-raafat
54
17 CLOSET PARAMETRIC LOD 300 - 400 - 500
linkedin.com/in/mohamed-raafat
55
18 PARAMETRIC CW PANEL - DOOR LOD 300 - 400 - 500
linkedin.com/in/mohamed-raafat
56
19 PARAMETRIC WASH BASIN LOD 300 - 400 - 500
linkedin.com/in/mohamed-raafat
57
20 PARAMETRIC WINDOW DESIGN LOD 300 - 400 - 500
linkedin.com/in/mohamed-raafat
58
21 PARAMETRIC KITCHEN FURNITURE LOD 300 - 400 - 500
linkedin.com/in/mohamed-raafat
59
22 PARAMETRIC GATE DESIGN LOD 300 - 400 - 500
linkedin.com/in/mohamed-raafat
60
23 RAILING DESIGN LOD 300 - 400 - 500
3D RAILING ORTHOGRAPHIC
linkedin.com/in/mohamed-raafat
RAILING ELEVATION
61
BOQ & SCHEDULES DIVISION
linkedin.com/in/mohamed-raafat
62
linkedin.com/in/mohamed-raafat
24
DOOR SCHEDULES
24
WINDOW SCHEDULE
24
ROOM SCHEDULE
24
MTO SCHEDULE
25
PLUMBING SCHEDULE
25
PROPERTY SCHEDULE
25
CASEWORK SCHEDULE
25
DRAWING LIST
25
ELECTRIC FIXTURES
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
SHARED PARAMETERS PAGE 1 - 10
63
24 SCHEDULES & MTO COST ESTIMATION
BASEMENT DOOR SCHEDULE Construction Type
Type
T.O. Garage Fndn. 17' x 8' 16' x 8' OVERHEAD GARAGE DOOR 3068 36" x 80" 17' x 8' 16' x 8' OVERHEAD GARAGE DOOR 3068 36" x 80" MAIN T.O. SUB. 3080 GLASS 36" x 96" 2668 30" x 80" 2068 24" x 80" 5068 60" x 80" 5068 60" x 80" 6068 72" x 80" 2668 30" x 80" 2068 24" x 80" 3080 GLASS 36" x 96" 2668 30" x 80" 2068 24" x 80" 5068 60" x 80" 5068 60" x 80" 6068 72" x 80" 2668 30" x 80" 2068 24" x 80" 3080 36" x 96" Front Door 3080 36" x 96" Front Door UPPER T.O. SUB. 2668 30" x 80" 2668 30" x 80" 2668 30" x 80" 2668 30" x 80" 2668 30" x 80" 2668 30" x 80" 2668 30" x 80" 2468 2468 Pocket 2668 30" x 80" 2668 30" x 80" 2668 30" x 80" 2668 30" x 80" 2668 30" x 80" 2668 30" x 80" 2668 30" x 80" 2668 30" x 80" 2468 2468 Pocket 2668 30" x 80" 2668 30" x 80" 3068 GLASS 36" x 80" 3068 GLASS 36" x 80" 2668 30" x 80" Grand total: 44
Width
Height
5182
2438
914 5182
2032 2438
914
2032
914 762 610 1524 1524 1829 762 610 914 762 610 1524 1524 1829 762 610 914
2438 2032 2032 2032 2032 2032 2032 2032 2438 2032 2032 2032 2032 2032 2032 2032 2438
914
2438
762 762 762 762 762 762 762 711
2032 2032 2032 2032 2032 2032 2032 2032
762 762 762 762 762 762 762 762 711
2032 2032 2032 2032 2032 2032 2032 2032 2032
762 762 914 914 762
2032 2032 2032 2032 2032
BASEMENT WINDOW SCHEDULE Comments
TYPE
MAIN T.O. SUB. 2068 24" x 80" 2668 30" x 80" 3080 36" x 96" - Front Door 3080 GLASS 36" x 96" 5068 60" x 80" 6068 72" x 80" Grand total: 18
Existing Sill Height
ROOM SCHEDULE
Exsiting Head Height
914 914 914 1829 1829 1829 1829 1829 914 914 914 1829 1829 1829 1829 1829 1626 559 508 1626 508 559 1422 508 508 508 508 508 1626 508 1626 508 1422 508 508 508 508 559 559 508 508 508
Comments
2438 2438 2438 2438 2438 2438 2438 2438 2438 2438 2438 2438 2438 2438 2438 2438 2007 1626 2032 2007 2032 1626 2032 2032 2032 2032 2032 2032 2007 2032 2007 2032 2032 2032 2032 2032 2032 1626 1626 2032 2032 2032
Wall - 1/2" CDX Plywood Wall - 1/2" Gypsum Wall Board Wall - 5/8" Gypsum Wall Board Wall - Metal Lathe Wall - Stucco - Accent Wall - Stucco - Light Gray Wall - Tyvek Housewrap
2032 2032 2438 2438 2032 2032
linkedin.com/in/mohamed-raafat
NAME
16' x 8' OVERHEAD GARAGE DOOR 2068 2468 2668 3068 3068 GLASS 3080 3080 GLASS 5068 6068 Grand total: 44
4 4 2 2 4 2
AREA
PROPERTY SCHEDULE
TYPE 19" x 19" 26"x25" - Private
6 2
30" x 60" 36" x 66" 42" x 21" Pedestal Toilet-Domestic-3D Water Heater
2 2 2 2 6 2
COUNT
NAME LIVING ROOM DINING KITCHEN HALLWAY STAIST W/ STORAGE UNDER PORCH COVERED BALCONY MASTER BEDROOM MASTER CLOSET HALLWAY STAIRS LAUNDRY MASTER BEDROOM LINEN TOILET BATH STORAGE CLOSET CLOSET BEDROOM 2 BEDROOM 1 STAIRS ENTRY ENTRY BALCONY BALCONY GARAGE GARAGE CHASE CHASE
Family and Type Kitchen Cabinet - Base - 1 Door: 24" Kitchen Cabinet - Base - 1 Door: 27" Kitchen Cabinet - Base - 2 Door - 1 Drawer: 30 Kitchen Cabinet - Base - 2 Door - 1 Drawer: 39 Kitchen Cabinet - Base - 2 Door - 1 Fixed Draw Kitchen Cabinet - Upper - 2 Door: 30" Kitchen Cabinet - Upper - 2 Door: 30" X 12" Kitchen Cabinet - Upper - 2 Door: 36" X 24" Kitchen Cabinet - Upper - 2 Door: 39" Vanity Cabinet - Double Door Sink Unit: 42" Vanity Cabinet - Double Door Sink Unit: 45"
Family and Type Kitchen Cabinet - Base - 1 Door: 24" Kitchen Cabinet - Base - 1 Door: 27" Kitchen Cabinet - Base - 2 Door - 1 Drawer: 30 Kitchen Cabinet - Base - 2 Door - 1 Drawer: 39 Kitchen Cabinet - Base - 2 Door - 1 Fixed Draw Kitchen Cabinet - Upper - 2 Door: 30" Kitchen Cabinet - Upper - 2 Door: 30" X 12" Kitchen Cabinet - Upper - 2 Door: 36" X 24" Kitchen Cabinet - Upper - 2 Door: 39" Vanity Cabinet - Double Door Sink Unit: 42" Vanity Cabinet - Double Door Sink Unit: 45"
OVERALL DOOR SCHEDULE CONSTRUCTIO N TYPE
4514 SF 9290 SF 5334 SF 4510 SF 733 SF 3777 SF 4511 SF
PLUMBING FIXTURE SCHEDULE FAMILY AND TYPE Sink Vanity-Round: 19" x 19" Stacked Washer and Dryer: 26"x25" Private Tub-Rectangular: 30" x 60" Tub-Rectangular: 36" x 66" Sink Kitchen-Double: 42" x 21" Sink-Pedestal: Pedestal Toilet-Domestic-3D: Toilet-Domestic-3D Water Heater: Water Heater Grand total: 24
ROOM SCHEDULE
NAME STORAGE PANTRY MECH COAT POWDER LIVING ROOM DINING KITCHEN HALLWAY STAIRS W/ STORAGE UNDER PORCH COVERED BALCONY MASTER BEDROOM MASTER CLOSET HALLWAY STAIRS LAUNDRY MASTER BEDROOM LINEN TOILET BATH STORAGE CLOSET CLOSET BEDROOM 2 BEDROOM 1 STORAGE PANTRY MECH COAT POWDER
WALL MATERIAL TAKEOFF
WIDTH HEIGHT COUNT
610 762 914 914 1524 1829
Type
A Fixed 48" x 60" A Fixed 48" x 60" K Casement 36" x 60" L Awning 30" x 24" C Fixed 66" x 24" B Fixed 30" x 24" B Fixed 30" x 24" H Awning 42" x 24" A Fixed 48" x 60" A Fixed 48" x 60" K Casement 36" x 60" L Awning 30" x 24" C Fixed 66" x 24" B Fixed 30" x 24" B Fixed 30" x 24" H Awning 42" x 24" F Half-Round 30" D Fixed 30" x 42" K Casement 36" x 60" F Half-Round 30" E Fixed 30" x 60" J Casement 30" x 42" H Awning 42" x 24" G Casement 30" x 60" E Fixed 30" x 60" G Casement 30" x 60" E Fixed 30" x 60" A Fixed 48" x 60" F Half-Round 30" K Casement 36" x 60" F Half-Round 30" E Fixed 30" x 60" H Awning 42" x 24" G Casement 30" x 60" E Fixed 30" x 60" G Casement 30" x 60" E Fixed 30" x 60" D Fixed 30" x 42" J Casement 30" x 42" A Fixed 48" x 60" A Fixed 48" x 60" A Fixed 48" x 60" Grand total: 42
MAIN FLOOR DOOR SCHEUDLE CONSTRUCT ION TYPE
Type Mark
NAME
AREA 6253 SF
WIDTH
HEIGHT
COMMENTS
Description
COUNT
5182
2438
2
610 711 762 914 914 914 914 1524 1829
2032 2032 2032 2032 2032 2438 2438 2032 2032
4 2 22 2 2 2 2 4 2
4" CAST-IN-PLACE CONCRETE 8" CAST-IN-PLACE CONCRETE foundation 8" WIDE CONCRETE STEMWALL (SEE SCH STEEL) 12" CAST-IN-PLACE CONCRETE 18" WIDE CONCRETE STEMWALL (SEE STR VERT. & HORIZ. STEEL) 18" WIDE X 8" DEEP CONC. FOOTING 32" WIDE X 8" DEEP CONC. FOOTING CONCRETE STEPS
MAIN FLOOR WINDOW SCHEDULE TYPE MAKR
TYPE
A Fixed 48" x 60" B Fixed 30" x 24" C Fixed 66" x 24" H Awning 42" x 24" K Casement 36" x 60" L Awning 30" x 24" Grand total: 16
SILL HEIGHT 914 1829 1829 1829 914 1829
UPPER FLOOR DOOR S
HEAD HEIGHT 2438 2438 2438 2438 2438 2438
COUNT 4 4 2 2 2 2
CONSTRUCTIO N TYPE 2468 2668 3068 GLASS Grand total: 22
64
TYPE 2468 Pocket 30" x 80" 36" x 80"
WI 711 762 914
25 SCHEDULES & MTO COST ESTIMATION
CASEWORK SCHEDULE Family and Type Kitchen Cabinet - Base - 1 Door: 24" Kitchen Cabinet - Base - 1 Door: 27" Kitchen Cabinet - Base - 2 Door - 1 Drawer: 30" Kitchen Cabinet - Base - 2 Door - 1 Drawer: 39" Kitchen Cabinet - Base - 2 Door - 1 Fixed Drawer: 42" Kitchen Cabinet - Upper - 2 Door: 30" Kitchen Cabinet - Upper - 2 Door: 30" X 12" Kitchen Cabinet - Upper - 2 Door: 36" X 24" Kitchen Cabinet - Upper - 2 Door: 39" Vanity Cabinet - Double Door Sink Unit: 42" Vanity Cabinet - Double Door Sink Unit: 45"
24" 27" 30" 39" 42" 30" 30" X 12" 36" X 24" 39" 42" 45"
COUNTERTOP MATERIAL TAKEOFF
Type
Width 610 686 762 991 1067 762 762 914 991 1067 1143
Height 876 876 876 876 876 1067 305 610 1067 724 724
2 2 2 2 2 2 2 2 2 2 4
Count
COUNTERTOP VANITY - MATERIAL AS SPECIFIED COUNTERTOP VANITY - MATERIAL AS SPECIFIED KITCHEN COUNTERTOP - MATERIAL AS SPECIFIED KITCHEN COUNTERTOP - MATERIAL AS SPECIFIED KITCHEN COUNTERTOP - MATERIAL AS SPECIFIED KITCHEN COUNTERTOP - MATERIAL AS SPECIFIED KITCHEN COUNTERTOP - MATERIAL AS SPECIFIED KITCHEN COUNTERTOP - MATERIAL AS SPECIFIED MASTER COUNTERTOP VANITY - MATERIAL AS SPECIFIED MASTER COUNTERTOP VANITY - MATERIAL AS SPECIFIED
CASEWORK SCHEDULE Family and Type Kitchen Cabinet - Base - 1 Door: 24" Kitchen Cabinet - Base - 1 Door: 27" Kitchen Cabinet - Base - 2 Door - 1 Drawer: 30" Kitchen Cabinet - Base - 2 Door - 1 Drawer: 39" Kitchen Cabinet - Base - 2 Door - 1 Fixed Drawer: 42" Kitchen Cabinet - Upper - 2 Door: 30" Kitchen Cabinet - Upper - 2 Door: 30" X 12" Kitchen Cabinet - Upper - 2 Door: 36" X 24" Kitchen Cabinet - Upper - 2 Door: 39" Vanity Cabinet - Double Door Sink Unit: 42" Vanity Cabinet - Double Door Sink Unit: 45"
24" 27" 30" 39" 42" 30" 30" X 12" 36" X 24" 39" 42" 45"
Width 610 686 762 991 1067 762 762 914 991 1067 1143
Height 876 876 876 876 876 1067 305 610 1067 724 724
2 2 2 2 2 2 2 2 2 2 4
Count
TYPE MAKR
TYPE
1605.79 CF 72.29 CF
Cast-in-place Concrete
601.88 CF
Cast-in-place Concrete Cast-in-place Concrete
75.56 CF 202.66 CF
Cast-in-place Concrete Cast-in-place Concrete Cast-in-place Concrete
194.58 CF 88.16 CF 47.28 CF 2888.19 CF
2468 2668 3068 GLASS Grand total: 22
2468 Pocket 30" x 80" 36" x 80"
WIDTH 711 762 914
HEIGHT 2032 2032 2032
TYPE MARK
TYPE
A Fixed 48" x 60" D Fixed 30" x 42" E Fixed 30" x 60" F Half-Round 30" G Casement 30" x 60" H Awning 42" x 24" J Casement 30" x 42" K Casement 36" x 60" Grand total: 26
COUNT 2 18 2
1219 762 1676 762 762 762 762 1067 762 914 762
1524 610 610 1067 1524 381 1524 610 1067 1524 610
COUNT
DUPLEX AREA A DUPLEX AREA A DUPLEX AREA B DUPLEX AREA B GARAGE AREA A GARAGE AREA B
508 559 508 1626 508 1422 559 508
Area 938 SF 922 SF 938 SF 912 SF 456 SF 456 SF
DESCRIPTION Soffit as Specified
AREA 341 SF
A12 A0 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 S1 S2 S3 S4 E1
Unnamed COVER MAIN FLOOR PLAN UPPER FLOOR PLAN ROOF PLAN REFLECTED CEILING PLANS NORTH AND SOUTH ELEVATIONS EAST AND WEST ELEVATIONS GARAGE ELEVATIONS BUILDING SECTIONS BUILDING SECTIONS BUILDING SECTIONS WALL SECTIONS FOUNDATION PLAN MAIN FLOOR FRAMING PLAN UPPER FLOOR FRAMING PLANS ROOF FRAMING PLAN CONCEPTUAL ELECTRICAL PLANS
FAMILY
MODEL
TYPE
Downlight - Fluorescent Strip Downlight - Recessed Can 2010 Exterior Downlight Pendant Simple 2008 Sconce
DESCRIPTION 1/2" CDX PLYWOOD SHEATHING
AREA 3189 SF
15LB ROOFING ASPHALT
3107 SF
ARCHITECTURAL STYLE ASPHALT SHINGLES OVER 15LB ASPHALT 3108 SF ROOFING PAPER, GRACE ICE & WATER SHIELD® @ ROOF EVES AND VALLEYS, AND 7/16" OSB SHEATHING WHERE PERMITTED COLOR BY CONTRACTOR EPDM AS SPECIFIED
100 Watt Icandescent 48"
82 SF
ELECTRICAL FIXTURE SCHEDULE COUNT
6" 100 watt Incandescent As Specified 60 Watt 60 watt Incandescent Vanity-wall_mounted White Wall Pack Light - Exterior1 120V 2
28 8 26 2 6 4
Family
Type
Ceiling Fan - Modern Exhaust Fan - Ceiling Fan Light Combo Outlet-220 Single Outlet-Duplex Smoke Detector Switch-Single Thermostat
COUNT 4 2 6 4 4 2 2 2
2x6 EXTERIOR WALL
81404
Smoke Detector Single Thermostat
FLOOR MATERIAL TAKEOFF DESCRIPTION FLOOR - 3/4" T&G PLYWOOD SHEATHING FLOOR - 3/4" T&G PLYWOOD SHEATHING FLOOR - 3/4" T&G PLYWOOD SHEATHING FLOOR - 3/4" T&G PLYWOOD SHEATHING
CEILING MATERIAL TAKEOOF
5/8" GYPSUM WALL BOARD
Material: Area 5880 SF
GUTTER SCHEDULE DESCRIPTION
4 4 2 2 136 12 87 2
8 10
TOTAL LENGTH
Material: Description
Count
White 42" Exhaust Fan - Ceiling White Single
EXTERIOR WALL SCHEDULE MODEL
ALUMINUM GUTTER AS SPECIFIED
INTERIOR WALL SCHEDULE
2X4 INTERIOR WALL
linkedin.com/in/mohamed-raafat
2032 1626 2032 2007 2032 2032 1626 2032
NAME
Ceiling - Flat Round
8 4 2 2 6 4 4 4 2 4 2
HEAD HEIGHT
SILL HEIGHT
NO.
LIGHTING FIXTURE SCHEDULE
HEIGHT
SOFFIT MATERIAL TAKEOFF
AREA SCHEDULE Name
TYPE
Material: Volume
Cast-in-place Concrete Cast-in-place Concrete
UPPER FLOOR DOOR SCHEDULE CONSTRUCTIO N TYPE
27 SF
UPPER FLOOR WINDOW SCHEDULE Material: Description
4" CAST-IN-PLACE CONCRETE 8" CAST-IN-PLACE CONCRETE foundation 8" WIDE CONCRETE STEMWALL (SEE SCHEDULE FOR VERT. & HORIZ. STEEL) 12" CAST-IN-PLACE CONCRETE 18" WIDE CONCRETE STEMWALL (SEE STRUCTRUCAL SCHEDULE FOR VERT. & HORIZ. STEEL) 18" WIDE X 8" DEEP CONC. FOOTING 32" WIDE X 8" DEEP CONC. FOOTING CONCRETE STEPS
WIDTH
A Fixed 48" x 60" B Fixed 30" x 24" C Fixed 66" x 24" D Fixed 30" x 42" E Fixed 30" x 60" F Half-Round 30" G Casement 30" x 60" H Awning 42" x 24" J Casement 30" x 42" K Casement 36" x 60" L Awning 30" x 24" Grand total: 42
CONCRETE TAKEOFF Description
15 SF 15 SF 73 SF 23 SF 13 SF 73 SF 23 SF 13 SF 27 SF
OVERALL WINDOW SCHEDULE
Type
ROOF MATERIAL SCHEDULE
DRAWING LIST
Material: Area
Material: Description
AREA 887 SF 887 SF 878 SF 868 SF
FASCIA SCHEDULE DESCRIPTION
LENGTH
1x6 FASCIA AS SPECIFIED
106922
GARAGE DOOR SCHEDULE LENGTH 90236
CONSTRUCTION TYPE T.O. Garage Fndn. 16' x 8' OVERHEAD GARAGE DOOR 3068 Grand total: 4
TYPE
WIDTH
HEIGHT
COUNT
17' x 8'
5182
2438
2
36" x 80"
914
2032
2
TOTAL LENGTH 141890
65
linkedin.com/in/mohamed-raafat
66