Site 3 Proposition

Page 1

CONTEXT

Tangerang

B Bekasi

Depok

Bodor B

Ancol Additional areas of studio investigation Aetra distribution territory 1 PAM distribution territory 1 Existing freeway Ciliwung River Jakarta city boundaries

ANCOL John Ewanowsi Nancy Wong Meidesta Pitria

Allen Gillers Kayle Yang Yudha Kartana Putra

0

5 km

1. Karen Bakker, Michelle Kooy, Nur Endah Shofiani, Ernst-Jan Martijn, "Disconnected: Poverty, water supply and development in Jakarta, Indonesia," Human Development Report 2006, UN Human Development Report Office, 2006.

10 km

DESIGNING FOR HYPERCOMPLEXITY: JAKARTA JOINT DESIGN RESEARCH WORKSHOP


CONTEXT

ANCOL John Ewanowsi Nancy Wong Meidesta Pitria

Allen Gillers Kayle Yang Yudha Kartana Putra

Photo Credit: John Ewanowski

DESIGNING FOR HYPERCOMPLEXITY: JAKARTA JOINT DESIGN RESEARCH WORKSHOP


CONTEXT

ANCOL John Ewanowsi Nancy Wong Meidesta Pitria

Allen Gillers Kayle Yang Yudha Kartana Putra

Photo Credit: John Ewanowski

DESIGNING FOR HYPERCOMPLEXITY: JAKARTA JOINT DESIGN RESEARCH WORKSHOP


CONTEXT

ANCOL John Ewanowsi Nancy Wong Meidesta Pitria

Allen Gillers Kayle Yang Yudha Kartana Putra

Photo Credit: Allen Gillers

DESIGNING FOR HYPERCOMPLEXITY: JAKARTA JOINT DESIGN RESEARCH WORKSHOP


CONTEXT

ANCOL John Ewanowsi Nancy Wong Meidesta Pitria

Allen Gillers Kayle Yang Yudha Kartana Putra

Photo Credit: John Ewanowski

DESIGNING FOR HYPERCOMPLEXITY: JAKARTA JOINT DESIGN RESEARCH WORKSHOP


CONTEXT

atm

water management

undeveloped land

commercial area

residential

vendors and carts

developer

employee

x

public visitor

paying visitor

water gate

water pumps

harbor

seawall

canal

P

roads

8

P

ANCOL John Ewanowsi Nancy Wong Meidesta Pitria

Allen Gillers Kayle Yang Yudha Kartana Putra

DESIGNING FOR HYPERCOMPLEXITY: JAKARTA JOINT DESIGN RESEARCH WORKSHOP


DESIGN PROPOSAL

N

ANCOL John Ewanowsi Nancy Wong Meidesta Pitria

Allen Gillers Kayle Yang Yudha Kartana Putra

DESIGNING FOR HYPERCOMPLEXITY: JAKARTA JOINT DESIGN RESEARCH WORKSHOP


DESIGN PROPOSAL

N

ANCOL John Ewanowsi Nancy Wong Meidesta Pitria

Allen Gillers Kayle Yang Yudha Kartana Putra

DESIGNING FOR HYPERCOMPLEXITY: JAKARTA JOINT DESIGN RESEARCH WORKSHOP


DESIGN PROPOSAL

JUNE 2012 TIDAL SCHEDULE 1.00 m

0.75 m

0.50 m

0.25 m

0.00 m

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

ANCOL John Ewanowsi Nancy Wong Meidesta Pitria

Allen Gillers Kayle Yang Yudha Kartana Putra

2. "2012 Tide Table for Jakarta, West Indonesia for Fishing", accessed 13 June 2012, http://www. tides4fishing.com/as/west-indonesia/tanjungpriok.

DESIGNING FOR HYPERCOMPLEXITY: JAKARTA JOINT DESIGN RESEARCH WORKSHOP


DESIGN PROPOSAL

JUNE 2012 TIDAL SCHEDULE 1.00 m

0.75 m

0.50 m

0.25 m

0.00 m

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

ANCOL John Ewanowsi Nancy Wong Meidesta Pitria

Allen Gillers Kayle Yang Yudha Kartana Putra

DESIGNING FOR HYPERCOMPLEXITY: JAKARTA JOINT DESIGN RESEARCH WORKSHOP


DESIGN PROPOSAL

fro

m

Ja

va

Se

a

02

01

pump 3

06 03

pump 2

pump 6

pump 6

05

pump 4

pump 1

to can al

07

pump 7

04

FILLING PUMP SCHEDULE START pump 1 running time

pump 2

pump 3

pump 4

01 WATERSLIDE / LAZY RIVER FILTER / RETENTION

02 RAINBOW BALL POOL RETENTION

03 OLYMPIC POOL RETENTION

04 WAVE POOL FILTER / RETENTION

05 WATERFALL RIVER RETENTION

06 OCTAPUS ADVENTURE RETENTION

07 KIDDY POOL RETENTION

pump 5

pump 6

pump 7

FLUSHING PUMP SCHEDULE START

STOP (24:35)

pump 2 running time

pump 3 512 m 3

150 m 3

pump 4

512 m 3

pump 5 1,954 m3

2,000 m3

pump 6

pump 7

pump 8 4,370 m3 4,900 m3

STOP (24:35)

* pumping times assume a Berkeley Pumps BS Self-Priming Trash Pump Series pump, which runs at 2500 GPM, 9.46 m3/min.3

ANCOL John Ewanowsi Nancy Wong Meidesta Pitria

Allen Gillers Kayle Yang Yudha Kartana Putra

Photo Credit: Google Earth

3. "BS Series Self-Priming Trash Pumps," accessed 13 June 2012, http://www.berkeleypumps.com/ ResidentialProduct_Series_Self_ Priming_Trash_Pumps.aspx

DESIGNING FOR HYPERCOMPLEXITY: JAKARTA JOINT DESIGN RESEARCH WORKSHOP


FILTER

PUMP

DESIGN PROPOSAL

PUMP

HIGH TIDE SEA WATER

FILTER

PUMP

WATER RESOURCE

OUR PROPOSAL HIGH TIDE SECTION A - A

OUR PROPOSAL HIGH TIDE SECTION B - B

A

A

B

PUMP

B

PUMP

FILTER

PUMP

LOW TIDE SEA WATER FROM SUDE

WATER RESOURCE

REGULAR / EXISTING LOW TIDE SECTION A - A

REGULAR / EXISTING LOW TIDE SECTION B - B

canal

SECTION C - C SCALE 1 : 500

Park

ANCOL John Ewanowsi Nancy Wong Meidesta Pitria

Allen Gillers Kayle Yang Yudha Kartana Putra

Aquarium

Parking lot

SECTION D - D SCALE 1 : 500

DESIGNING FOR HYPERCOMPLEXITY: JAKARTA JOINT DESIGN RESEARCH WORKSHOP


CONCLUSIONS Ancol

2012 JCDS Proposed Sea Wall

Existing Land

Currently Stalled Reclemation

2012 JCDS Proposed Reclemation 2011 Marunda Special Economic Zone 2011 World Bank JUFMP Proposed CDF

ANCOL John Ewanowsi Nancy Wong Meidesta Pitria

Allen Gillers Kayle Yang Yudha Kartana Putra

DESIGNING FOR HYPERCOMPLEXITY: JAKARTA JOINT DESIGN RESEARCH WORKSHOP


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.