New York April 21, 2016
Facade Retrofitting Method with an inverted drainage system
BT Tan YKK AP FACADE PTE. LTD.1
High Street Centre Singapore Built: 1974 Usage: Commercial Office Floors: 31 (7 story podium and 24 story tower) Height: 400 ft. (122m) Owner: Management Corporation Strata Title Surrounded by notable government buildings including the Parliament House and the High Court.
2
Project Scope 1. Remove existing tower facade entirely. 2. Install new Unitized Curtain Wall System. 3. Extend roof crown 70 ft height.
Before
Work Challenges: • Business as usual for existing tenants • Safety of workers, tenants and the public • Minimum disruption and noise • Full weather-tightness during construction
During 3
A Retrofitting Method Solution
4
Comparison: Unitized Curtain Wall Drainage Systems Conventional Unitized Bottom-up System
Conventional Splice Plate
Innovative Unitized
Top-Down System
INVERTED Splice Plate
Although a totally opposite installation method, the inverted splice plate performs and functions as a conventional system.
5
Advantages of the Top-Down vs. Bottom Up Retrofit Method
Bottom-up
Top-Down
6
vs.
Top-Down Method
Activity cycle turnaround time 3 days
12 days
2
9 days
3 days
3
Shorter 3
3 days
3 days
2
4
3 days
3 days
1
6 floors at each period of time 5
6
3 days
Duration affecting tenant: 33 days
4 floors at each period of time Duration affecting tenant: 21 days
Night work
Day work
4
1
Day work
Night work
Bottom-Up Method
12 days 7
Top-Down Method
Less exposure to weather
4
2
3
3
2
4
1
5
6
Additional temporary rain screen barrier
Night work
Day work
1
vs.
Day work
Night work
Bottom-Up Method
8
1
vs.
Top-Down Method
Reduced risk of falling debris
3
2
RISK!
2
4
1
5
6
Demolition ABOVE new cladding
Demolition BELOW new cladding
Night work
Day work
3
4 Day work
Night work
Bottom-Up Method
9
Bottom-Up Method
vs.
Top-Down Method
Shorter installation turn around time Less exposure to weather
1
4
Reduced risk of falling debris
2
3
3 COST Less temporary protection and cleaning
4
Additional safety platform
5
Additional temporary rain screen barrier
6
Additional heavy duty protection screen
2
1
Night work
Day work
SAFETY
Day work
Night work
TIME
10
TOP-DOWN METHOD: Monthly Progress Pictures
Mth 1
Mth 9
Mth 4
Mth 5
Mth 10
Mth 6
Mth 11
Mth 7
Mth 8
Mth 14
11
Before and After: Internal
12
Why Facade Retrofitting Method Matters: • Aged building - Precondition survey ü No proper as built record ü Structure strength
• Occupied building - Operational constraints ü ü ü ü ü
Working hours Noise Safety Security Interfacing finishes
• Facade specialist - General contractor role ü Liaison with authority ü Total project management
Contractor Assumes All Risk! 13