A Façade For Performance
October 18, 2013 Are you ready?
ASHRAE 90.1 -‐ 2010 • • • • •
Basis for IECC 2012 All climate zones will require CI + ASHRAE 189.1 – Air barriers Basis for IgCC 2012, CalGreen Future codes will likely increase requirements
EIFS – the original CI Maybe ECIFS is beRer? • • • • •
Incorporate an air barrier/flashing Rigid insulaVon – EPS or XPS typ. AestheVcally diverse Code approved – IBC 2009 Proven on over 1 million buildings in US since 1969
OK … EIFS looks great, but what about the cost savings?
MCA Academy Case Study -‐ 2010
OKC -‐ “Bricktown, USA”
Designed for brick/masonry – built with EIFS
Designed for brick/masonry – built with EIFS
“Not your father’s EIFS!”
MCA Savings Installed Costs Installed Costs: – 37,000 sq. d. Brick & Cast Stone -‐ original design
• $ 834,410.00 or $ 22.61/sq.d.
MCA Savings Installed Costs Installed Costs: – 37,000 sq. d. Brick & Cast Stone – design opVon • $ 834,410.00 or $ 22.61/sq.d.
– 37,000 sq. d. 4” thick EIFS -‐ value engineered • $ 501,000.00 or $ 13.54/sq.d.
MCA Savings Installed Costs Installed Costs: – 37,000 sq. d. Brick & Cast Stone – design opVon • $ 834,410.00 or $ 21.40/sq.d.
– 37,000 sq. d. 4” OutsulaVon Plus MD -‐ value engineered • $ 501,000.00 or $ 13.54/sq.d.
– Created a Direct Savings of: • $ 333,410.00 or $ 8.55/sq.@.
MCA Savings Associated Costs Aggregated Savings: Direct:
Structural:
$ 333,410.00 $ 50,534.50 $ 383,944.50
MCA Savings Associated Costs
Aggregated Savings: Direct:
$ 333,410.00
Associated: $ 50,534.50
$ 383,944.50
Cost of Claddings: Masonry:
$ 834,410.00 = $ 22.55 / sf
Less Savings:
$ 383,944.50 = $ 10.37 / sf
EIFS:
$ 450,465.50 = $ 12.18 / sf
MCA Savings Single Source Simplified ContracKng: – One Contract to Administer • One Contractor – flashing to finish
MCA Savings Single Source Simplified ContracKng: – One Contract to Administer • One Contractor – flashing to finish • One MobilizaVon
MCA Savings Single Source Simplified ContracKng: – One Contract to Administer • One Contractor – flashing to finish • One MobilizaVon • One Manufacturer’s Materials
MCA Savings Single Source Simplified ContracKng: – One Contract to Administer • One Contractor – flashing to finish • One MobilizaVon • One Manufacturer’s Materials • One (renewable) Warranty
MCA Savings Single Source Time & Labor: – 8 weeks cut from construc5on schedule • Lower equipment costs
MCA Savings Single Source Time & Labor: – 8 weeks cut from construc5on schedule • Lower equipment costs • Lower manpower costs
MCA Savings Single Source Time & Labor: – 8 weeks cut from construc5on schedule • Lower equipment costs • Lower manpower costs • Lower insurance costs
MCA Savings Single Source Time & Labor: – 8 weeks cut from construc5on schedule • Lower equipment costs • Lower manpower costs • Lower insurance costs • Open for business sooner!
MCA Savings Time On Site
Savings: Energy ConsumpVon Energy ConservaKon: – Oklahoma uses ’06 IBC & ’03 IECC
Savings: Energy ConsumpVon Energy ConservaKon: – Oklahoma City uses ’06 IBC & ’03 IECC
Code Required R – 8 U – 0.125
MCA Actual
R – 22 U – 0.045
Energy Savings: Return On Investment Energy ConservaKon: – AnKcipated Annual Costs: Per Code: $ 78,440.00
Energy Savings: Return On Investment Energy ConservaKon: – AnKcipated Annual Costs: Per Code: $ 78,440.00
As Built: $ 44,388.00
Energy Savings: Return On Investment Energy ConservaKon: – AnKcipated Annual Costs: Per Code: $ 78,440.00
As Built: $ 44,388.00
– A Savings of $ 34,052.00 per year!
Energy Savings: Return On Investment
MCA – LEED Gold CerVficaVon
EIFS -‐ Add up the savings • • • • •
Material Environment Time Co-‐ordinaVon on jobsite Energy for the lifeVme of the building
EIFS -‐ A Single Source SoluVon • One system “flashing to finish” • One manufacturer/warranty • One professional contractor • And they got the LOOK they wanted!
Metro Career Academy
Ques5ons?