TIMELINE •  •  •  •  •  •  •  •  •  •  •  •  •  •  •

March 2015 – Minnesota awarded MLS franchise November 2015 – Concept design kickoff June 2016 – Schematic design approved October 2016 – Design development / Skin design-assist package January 2017 – Fabritec awarded contract and façade steel design begins March 2017 – Structural steel bid package May 2017 – Mockup round 1 Oct/Nov 2017 – Mockup round 2 Sept 2017– Illuminate 28 Physical Properties confirmed. March 2018 – PTFE fabrication begins March 2018 – Driver pipe installation begins May 2018 – First PTFE panel lift November 2018 – Last PTFE panel lift December 2018 – Completed detailing April 2019 – First home game


DEVELOPING AN ADAPTABLE WORKFLOW


DEVELOPING AN ADAPTABLE WORKFLOW


DEVELOPING AN ADAPTABLE WORKFLOW


DEVELOPING AN ADAPTABLE WORKFLOW


DEVELOPING AN ADAPTABLE WORKFLOW


FORM-FOUND SIMULATED SHAPE


STRUCTURAL COLLABORATION AND RAPID ITERATION


STRUCTURAL COLLABORATION AND RAPID ITERATION


STRUCTURAL COLLABORATION AND RAPID ITERATION


STRUCTURAL COLLABORATION AND RAPID ITERATION


STRUCTURAL COLLABORATION AND RAPID ITERATION


STRUCTURAL COLLABORATION AND RAPID ITERATION


STRUCTURAL COLLABORATION AND RAPID ITERATION


STRUCTURAL COLLABORATION AND RAPID ITERATION


STRUCTURAL COLLABORATION AND RAPID ITERATION


STRUCTURAL COLLABORATION AND RAPID ITERATION


STRUCTURAL COLLABORATION AND RAPID ITERATION


STRUCTURAL COLLABORATION AND RAPID ITERATION


LAMINATED MEMBRANE

St. Gobain PTFE coated mesh without film St. Gobain PTFE coated mesh with PTFE film

Versaidag PTFE coated mesh with PTFE film Visible Light 350 to 800 nm


LAMINATED MEMBRANE

Nominal Strength Capacity Modulous of Elasticity Typical Compensation Material Typical PTFE (Sheerfill II) Illuminate 28

Warp (lb/in)

Fill (lb/in)

825 700

600 600

Warp (lb/in) Fill (lb/in) 5,708 28,465

3,806 11,910

warp

fill

Tear Resistance (lbs)

0.50% 0.25%

3-3.5% 0.25%

65 150


LAMINATED MEMBRANE


Mock-up: Lessons Learned

Mock-up #1

Mock-up #2


LESSONS LEARNED- LED LIGHT & SHIELD AIMING PROCESS


Proof of Concept


SECONDARY STEEL – CONNECTION DETAILING


SECONDARY STEEL – CONNECTION DETAILING


SECONDARY STEEL – CONNECTION DETAILING


Membrane Clamping Design

Upper Clamping

Lower Clamping


Membrane Clamping Design

Sectionalized Clamping

Driver Tube Clamping


SECONDARY STEEL – CONNECTION DETAILING






Faรงade Steel Tolerance






Panel Sizes & Layout


Panel Fabrication

Solid PTFE Filler

PTFE pull tabs

PTFE double chord edge at driver beam connection


Panel Folding Packaging/ Shipping


Panel Installation: Layout-Lift-Tension Perimeter


Panel Installation: Final Tension and Detailing


PARK I-94




Steve Bergerson


Steve Bergerson


Steve Bergerson


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.