Portfolio ariadna plescan

Page 1

Portfolio Ariadna Pleșcan


Name

Ariadna Pleșcan

geboren am

1.März 1986

Geburtsort

Sibiu, Romania

Adresse

Lorenz Müller Gasse 1a/5511

Handy

+43 67761645463

E-mail

ariadna_plescan@yahoo.com


AUSBILDUNG

2013 - bis dato

Master Architektur - Technische Universität Wien

2014 - 2015

Dual Degree Programm - Tongji Universität , Shanghai & Technische Universität Wien

2009 – 2013

Bachelor Architektur - Technische Universität Wien

2004 – 2008

Philologie Germanistik-Anglistik - Lucian Blaga Universität, Sibiu, Romania

2000-2004

Samuel von Brukenthal Gymnasium (deutschsprachiger Unterricht), Sibiu, Romania

März - September 2015

Jörg Lonkwitz Mag. Arch. - Shanghai - Praktikum

Juli - Oktober 2011

Retter Group Projektentwicklung und Management, Bukarest - Praktikum

September - Dezember 2008

KundenzentrumTechteam Global S.R.L Sibiu, Technischer Support Level 1 für Canon Office-Geräte (Kundenbetreuung für Deutschland, Österreich, Schweiz)

Oktober - Dezember 2007

Pädagogisches Praktikum für Englischunterricht an dem Pädagogischen Gymnasium Andrei Şaguna , Sibiu

Juli - Oktober 2005, 2006

Teilnahme an dem Work & Travel Programm, North Carolina, Virginia USA

STIPENDIEN

2014

Leistungsstipendium & Mobilitätsstipendium Technische Universität Wien

KENNTNISSE

Software

Rhinoceros 5 Archicad Autocad Cinema 4D Grasshopper Vray Adobe Ps Ai Indd Revit Architecture Nemetschek Allplan Ms Office

Sprachkenntnisse

Rumänisch - Muttersprache Deutsch – verhandlungssicher (Deutsches Sprachdiplom 2. Stufe) Englisch –verhandlungssicher Chinesisch - Grundkenntnisse

BERUFSERFAHRUNG

Andere

▪▪▪ ▪▪▪ ▪▪▪ ▪▪▪ ▪▪▪ ▪▪▪ ▪▪▪ ▪▪▪ ▪▪▪ ▪▪▪

Handzeichnen, Modellbau, Lasern, CNC Fräsen


revitalisation

pixel school

Metro Town Shanghai

rethinking ground floor area

host body

dip in schรถnbrunn

urban schrebergarden

the local network

outdoor swimming pool

Retail space

urban design

Competition for MJ Architects

[motion]scape

das boot

seminar hotel & bike rental shop

Boat building workshop

phil*happy

Guide to soft urban renewal

bombyx

Study on elasticity

orm

formz

courtyard house



existing facade east

existing facade south Part of the internship completed in Shanghai in the office of Mag. Arch . Jรถrg Lonkwitz was a revitalisation project for the shopping mall Metro Town in Shanghai. The concept was to create displays which open to the by-passing people and attract their attention on the shopping mall advertising either the goods which are being sold or the activities which take place in the interior.

interior situation The building should also get a new facade with rustic features for which custom made GRC-panels were designed. First floor was delineated from the upper floor by a brushed aluminum cladded canopy, which emphasized the displays by its geometry. Also concepts for interventions into the atria of the shopping mall were panned in form of an organic landscape aimed at bringing life into the light flooded areas.

construction site interior

01_revitalising metro town Retail space Shanghai


rounded edge profiles

elevation east + 13.90

+ 12.40

+ 8.50

ARCHITECT

LONKWITZ DESIGN with MUDI GROUP Shanghai Co. Ltd R407, 71 Xi Suzhou Road, 200042 Shanghai

CLIENT BAUHERR

Thomas and William Yeung Shanghai Leaderank Real Estate Development Co. Ltd. 200042 Shanghai, China

PROJECT BAUVORHABEN

METROTOWN SCHEMATIC DESIGN CANOPY Shanghai, China

000.1. MT Facade Call Out Drawing SIGNATURE ARCHITECT / UNTERSCHRIFT ARCHITEKT:

A3

SCALE / MASSTAB

1:12 AUTHOR

DATE

PLAN/CAD-DATEI

INDEX

16.07.2015

+ 0.00

- 0.30

canopy plan level 2 10

1/3-

9

1/33-8

1/

4C

°

19

7

1/3-

6

1/3-

93

6

PHASE 1

5 53

1/3-

SHAFT 2 2

ALU-BRUSHRD SILVER 3mm

4.880

3D 35°

OPERABLE LOUVERS

2100

18

44

.5

.0

.9

300

3C

275

4.550 4000

4.550

SE-AA'

Ceiling Above

4B

PHASE 1

3B

Raised Floor, +380mm Stair, 2x raisers 300x165 mm

5800

300.

.4

0

0 300.

1801

3A

GLASS DOOR

ALU-BRUSHRD SILVER 3mm

34°

AUFTRAG NR.

14

FORMAT

88

N

+ 4.50

SCHEMATIC Design

4E

PLANTITEL

4D

PHASE PLANART

4.880

Stair, 2x raisers 300x165mm Stair, all raisers 160mm each ASE 1

PH

GREENHOUSE VOID

°

37

6625

-BB'

SE

10

1/3E

AS 1

PH

6300 9

1/3-

SITE BOUNDARY

-CC'

SE

section AA’

9000

9000

7

1/3-

1/

3-8


elevation south facade proposal

tile pattern 1/3-5

1/3-6

1/3-8

1/3-7

1/3-9

1/3-10

Phase 1

+ 13.90

+ 13.90 +13.90

+13.90

+ 12.40

1200

GRC- CLADDING EXISTING FACADE

+12.70

+12.70

+12.40

+12.40

METAL DARK GRAY

200 300

+ 12.40

+12.20

EXISTING WINDOW 3390

LOGO METRO TOWN

+ 9.00 +8.85

+8.78

+8.73

+8.68

GLASS 3430

GRC-tiles custome made + 4.50

+3.85

BRUSHED ALUMINIUM CLADDING

+3.90

+4.75 350

+4.40

GRC- CLADDING

+4.15

+3.90

ALU-DARK GRAY

+4.97

+4.40

+4.36

+4.23

577

+4.75

+4.71

+4.58

+4.15

1246

+4.61

+4.25

200 200

+5.38 +5.18

+4.96 +4.50 +4.25

3135

PIZZA HUT FACADE

+ 0.00

- 0.30

GRC- CLADDED DOOR

- 0.30

+0.00

1/3-5

1/3-6

1/3-8

1/3-7

1/3-9

1/3-10

Phase 1

unroll south facade with tile pattern Axis 1/3-7

Phase 2

Phase 1

A1

GRC-PANEL_192

GRC-PANEL_193

1200

+ 4.770

GRC-PANEL_175

A1

1110

GRC-PANEL_171

1200

A1

GRC-PANEL_170

A1 GRC-PANEL_178

341

A1

A1

+ 0 ,0 0

-0,30

GRC-PANEL_183

GRC-PANEL_127

shaft 2, dimensions need to be checked on site, depending on survey

A1

GRC-PANEL_138

A1

C

C

A1

1500

GRC-PANEL_154

A1

A1

1000

GRC-PANEL_153

A1

A1

GRC-PANEL_140

GRC-PANEL_152

690

1/3-8

shaft 1&2 dimensions and position need to be checked on site prior to construction, depending on survey

.

.

1200

GRC-PANEL_155

GRC-PANEL_141

A1

A1 GRC-PANEL_156

A1 GRC-PANEL_142

GRC-PANEL_133

GRC-PANEL_139

1030

GRC-PANEL_157

+ 5,20

A1

1200 1200

101

6

993

756 117

3066

shaft 2

2030

1012

988

08 12

515

509

912

10 12

A1

shaft 1

6

A

909

3058

5

1172

3029

1163

1200

1160

4 233

GRC-PANEL_198

A1 GRC-PANEL_201

GRC-PANEL_202

3000

3000

933

3071

3132

1200

GRC-PANEL_197

A1 GRC-PANEL_200

A1 GRC-PANEL_194

A

GRC-PANEL_196

C

3000

GRC-PANEL_132

A1 2239

63

545

A1 GRC-PANEL_193

A

A

GRC-PANEL_137

690

A1 GRC-PANEL_144

GRC-PANEL_143

A1 A1

GRC-PANEL_131

A1 1955

A1

379 936

3162

A1

GRC-PANEL_136

A1 GRC-PANEL_158

A1

elevation shaft 2

4E

1/3-8

A1 GRC-PANEL_192

GRC-PANEL_199

GRC-PANEL_130

A1 1955

REFLECTED CEILING AT TOP NORTH EDGE

1/3-7

GRC-PANEL_195

GRC-PANEL_129

GRC-PANEL_135

GRC-PANEL_159

A1

+ 5 ,2 0 GRC-PANEL_145

GRC-PANEL_115

GRC-PANEL_121

1393

REFLECTED CEILING AT TOP GREENHOUSE

A1

A1

GRCPANEL _134

GRC-PANEL_126

A1

A1

A1

GRC-PANEL_146

690

A1 A1

GRC-PANEL_125

A1

GRC-PANEL_160

rounded corner panels

unrolled elevation greenhouse, refer to 104_ELEVATION GREENHOUSE.DWG

GRC-PANEL_191

A1

A1 GRC -PANEL _128

A1

GRC-PANEL_124

GRC-PANEL_122 GRC-PANEL_123

GRC-PANEL_184

448

Phase 1

A1

1200

C

C

C

494

A1

A1

A1

A1

GRC-PANEL_147

shaft 2

A1

A1 A1 GRC-PANEL_120

A1 GRC-PANEL_161

1200

C

B

C

A1 GRC-PANEL_166

exit door cladded with GRC

GRC-PANEL_185

A1

GRC-PANEL_114

A1 GRC-PANEL_119

GRC-PANEL_162

A1

A1

existing window

A1

A1 A1

A1 GRC-PANEL_113

A1 GRC-PANEL_118

GRC-PANEL_102

+ 5,20

GRC-PANEL_109

A1 GRC-PANEL_112

A1

A1

GRC-PANEL_116 GRC-PANEL_117

A1

GRC-PANEL_150

GRC-PANEL_105

3033

GRC-PANEL_108

A1

A1

GRC-PANEL_110 GRC-PANEL_111

GRC-PANEL_186

GRC-PANEL_180

GRC-PANEL_179

1200

1200

3A

A1

A1

690

C

B

B

C

364 1200

836

1200

A1

GRC-PANEL_167

+ 4.175

A1

A1 GRC-PANEL_181

GRC-PANEL_172

283

A1

GRC-PANEL_182

1200

576 1200

A1

1200

+ 4 .1 7 5 A1

GRC-PANEL_173

GRC-PANEL_168

A1

GRC-PANEL_107 GRC-PANEL_106

+ 4.40

GRC-PANEL_174

elevation line canopy

1200

+ 4.175

GRC-PANEL_164 GRC-PANEL_163

A1

GRC-PANEL_148

A1

GRC-PANEL_194

+ 7,40

900

A1

+ 5 ,2 0

+ 13.90

A1

A1

GRC-PANEL_151

GRC-PANEL_149

GRC-PANEL_96

A1 A1 GRC-PANEL_101

A1

A1 GRC-PANEL_104

1821 elevation line canopy

+ 4,63

A1

A1

A1

+ 7,40

3246

existing window

A1 GRC-PANEL_90

A1 A1 GRC-PANEL_95

GRC-PANEL_100

GRC-PANEL_99

A1

A1

A1 GRC-PANEL_86

3033

A1

A1

GRC-PANEL_98

GRC-PANEL_191

+ 1 0 ,0

GRC-PANEL_94

GRC-PANEL_103

A1 GRC-PANEL_165

A1

A1

+ 11,80

A1

GRC-PANEL_93

A1

A1 GRCPANEL _97

1200

A1

GRC-PANEL_23

C1

GRCPANEL _24

A1

tile type distribution

A1 GRC-PANEL_87

A1 GRC-PANEL_74 GRC-PANEL_80

GRC-PANEL_85

GRC-PANEL_89

A1

GRC-PANEL_92

A1

GRC-PANEL_79

1200

side end glasshouse

1200

A1

GRC-PANEL_176

C1

GRC-PANEL_73

A1

GRC-PANEL_84

+ 10,0

3246

A1

A1

existing window

C1 GRC-PANEL_22

A4.1. A5.1.

GRC-PANEL_48

A1

GRC-PANEL_78

A1

+ 13.90

1957

A4 A5

1200

GRC-PANEL_187

A1

+ 11,80

A1

GRCPANEL _91

+ 8,80

GRC-PANEL_83

GRCPANEL _81

existing window

+ 8,70

GRC-PANEL_72 GRC-PANEL_77

A1

GRCPANEL _88

A1

GRC-PANEL_177

1798

GRC-PANEL_82

GRC-PANEL_47

A1

1200

A1

GRC-PANEL_188

1434

A4 A5

1200

A1 A1

1200

rounded panels, unrolled elevation

3000

3000

GRC-PANEL_46

GRC-PANEL_71 GRCPANEL GRC-PANEL_76 _75

1200

A4 A5

1200

GRC-PANEL_70

400

3000

GRC-PANEL_45

1200

A4 A5

300

GRC-PANEL_69

1200

3000

GRC-PANEL_44

1200

A3 A2

1200

GRC-PANEL_68

1200

2668

GRC-PANEL_43

1200

A3 A2

1200

2668

GRC-PANEL_42

GRC-PANEL_67

elevation shaft 2

2668

A3 A2

300

GRC-PANEL_66

1200

300 1200

GRC-PANEL_42

1200

A1

GRC-PANEL_21

832

+ 13,90

A3 A2

1200

1652

A1

GRC-PANEL_65

+ 12,70

side end glasshouse

GRC-PANEL_189

GRC-PANEL_41

UNROLLED SHAFT ELEVATION

UNROLLED NORTH ELEVATION 2668

A3 A2

1200

A1

GRC-PANEL_64

1800

A1

GRCPANEL_20

GRC-PANEL_40

1200

GRCPANEL_6

GRCPANEL_13

2668

A3 A2

1200

GRC-PANEL_19

A1

341

GRC-PANEL_39

GRC-PANEL_63

400

GRC-PANEL_12

B

A3 A2

elevation shaft 1

GRC-PANEL_18

GRC-PANEL_5

B

GRC-PANEL_62

1821

GRC-PANEL_17

A1

GRC-PANEL_38

1200

GRC-PANEL_11

B1

A3 A2

1200

GRC-PANEL_4

B1 GRC-PANEL_10

GRC-PANEL_61

1200

GRC-PANEL_3

C

A1

GRC-PANEL_37

+ 12,40

2668

2668

2668

A3 A2

1200

GRC-PANEL_16

A1

+ 8,80

GRC-PANEL_169

Phase 2

GRC-PANEL_9

A1

400

C

C1

GRC-PANEL_2

C

GRC-PANEL_60

4176

C

GRC-PANEL_15

A1

A1

2668

GRC-PANEL_36

GRC-PANEL_190

576

C

GRC-PANEL_8

832

1200

C

GRC-PANEL_1

C C

A3 A2

1200

C C C

GRC-PANEL_14

A1

GRC-PANEL_35

GRC-PANEL_59

3000

1200

1200 1200 1200

B B

GRC-PANEL_0

GRC-PANEL_7

2668

A3 A2

1200

B

B

A1

B

GRC-PANEL_58

1200

B

A1

A B

GRC-PANEL_34

G RC-PANEL_57

1200

A

B

1200

A

B

C

A

B

C

A A

A

B

A

B

B

B

A

B

B

B

C

B

C

C C

C

C

C

B

C

A1

G RC-PANEL_33

A5.1.

431

A

A

B1

UNROLLED ROUNDED PANELS BISTRO 2668

360

A4.1.

3000

592

A1

A

A

949

576

A1

A

GRC-PANEL_56

3000

3000

A4 A5

GRC-PANEL_32

576

A1

A

GRC-PANEL_55

3000

A4 A5

1200

A1

A

GRC-PANEL_31

1200

A1

A

GRC-PANEL_54

3000

1200

A1

A

GRC-PANEL_53

3000

A4 A5

1200

A1

B B

1200

A1

1200

A1

GRC-PANEL_52

3000

C

A1

B

GRC-PANEL_51

3000

GRC-PANEL_30

1200

GRC-PANEL_50

3000

3000

A4 A5

GRC-PANEL_29

1200

GRC-PANEL_49

3000

C

000 3000 3

C

3 3000 000

A

C

3000

A

C

3000

A

C

3000

A

A1

3000

A

A1

3000

A

C

3000

B

A1

3000

A

C

A1

3000

A4 A5

B

C

3000

GRC-PANEL_28

B

A1

3000

A4 A5

C

C

A1

3000

GRC-PANEL_27

C

C

3000

A4 A5

C

A1

3000

GRC-PANEL_26

3000

3000

A

3000

GRC-PANEL_25

3000

A

A4.1. A5.1.

3000

1800

Phase 1

UNROLLED GREENHOUSE ELEVATION 1299

1333

3000

2098

3000

1334

1332

1/3-8

3B

4E

1/3-9

Phase 2

3000

3000

3000

3000

3000

UNROLLED ROUNDED PANELS BISTRO

3000

3000

360

2668

2668

2668

2668

2668

2668

2668

UNROLLED NORTH ELEVATION 2668

+ 13,90

2668

2668

3000

2668

3000

3000

UNROLLED SHAFT ELEVATION

3000

GRC-PANEL_28

GRC-PANEL_29

GRC-PANEL_30

GRC-PANEL_31

GRC-PANEL_32

GRC-PANEL_49

GRC-PANEL_50

GRC-PANEL_51

GRC-PANEL_52

GRC-PANEL_53

GRC-PANEL_54

GRC-PANEL_55

GRC-PANEL_56

GRC-PANEL_34

GRC-PANEL_35

GRC-PANEL_36

GRC-PANEL_37

GRC-PANEL_38

GRC-PANEL_39

GRC-PANEL_40

GRC-PANEL_41

GRC-PANEL_42

GRC-PANEL_42

GRC-PANEL_43

GRC-PANEL_44

GRC-PANEL_45

GRC-PANEL_46

GRC-PANEL_47

GRC-PANEL_48

GRC-PANEL_58

GRC-PANEL_59

GRC-PANEL_60

GRC-PANEL_61

GRC-PANEL_62

GRC-PANEL_63

GRC-PANEL_64

GRC-PANEL_65

GRC-PANEL_66

GRC-PANEL_67

GRC-PANEL_68

GRC-PANEL_69

GRC-PANEL_70

GRC-PANEL_71 GRCPANEL _75 GRC-PANEL_76

GRC-PANEL_72

GRC-PANEL_73

1200

GRC-PANEL_27

+ 13.90

+ 13.90

1957

G RC-PANEL_33

GRC-PANEL_26

1500

UNROLLED GREENHOUSE ELEVATION 1299

GRC-PANEL_25

GRC-PANEL_1

GRC-PANEL_2

GRC-PANEL_3

GRC-PANEL_4

GRC-PANEL_5

GRCPANEL_6

GRC-PANEL_189

GRC-PANEL_7

GRC-PANEL_8

GRC-PANEL_9

GRC-PANEL_10

GRC-PANEL_11

GRC-PANEL_12

GRCPANEL_13

GRC-PANEL_188

GRC-PANEL_14

GRC-PANEL_15

GRC-PANEL_16

GRC-PANEL_17

GRC-PANEL_18

GRC-PANEL_19

GRCPANEL_20

GRC-PANEL_187

GRCPANEL _91

GRCPANEL _97

GRC-PANEL_177

1200

1200

1798

+ 8,70

GRC-PANEL_22

GRC-PANEL_93

GRC-PANEL_92

GRC-PANEL_98

GRC-PANEL_99

GRC-PANEL_100

GRC-PANEL_192

GRC-PANEL_193

+ 4.770

GRC-PANEL_101

GRC-PANEL_102

GRC-PANEL_104

3246

900

GRC-PANEL_105

+ 5,20

3033

+ 5,20

GRC-PANEL_108

690

GRC-PANEL_185

GRC-PANEL_110 GRC-PANEL_111

GRC-PANEL_112

GRC-PANEL_116 GRC-PANEL_117

GRC-PANEL_118

GRC-PANEL_113

GRC-PANEL_114

GRC-PANEL_115

GRC-PANEL_120

GRC-PANEL_121

GRC-PANEL_130

GRCPANEL _134

GRC-PANEL_135

GRC-PANEL_133

GRC-PANEL_136

1955

GRC-PANEL_137

1955

2239

GRC-PANEL_138

GRC-PANEL_139

1030

1000

.

.

1200

101

6

756

5

1163 4 233

515

3000

2098

3B

1/3-8

1333 3000

1332

1334

1/3-9

shaft 2

2030

1012

993

4E

690

shaft 1

509

912

1172 1160

1200

1200

3029

08 12

GRC-PANEL_202

3000

GRC-PANEL_159

GRC-PANEL_146

GRC-PANEL_158

GRC-PANEL_145

GRC-PANEL_157

+ 5,20 GRC-PANEL_156

GRC-PANEL_155

GRC-PANEL_142

GRC-PANEL_154

GRC-PANEL_141

GRC-PANEL_153

GRC-PANEL_140

GRC-PANEL_152

690 elevation shaft 2

933 909

988

117 3066

GRC-PANEL_198

GRC-PANEL_201

3000

3071

3058

10 12

GRC-PANEL_194

GRC-PANEL_197

GRC-PANEL_200

3000

6 63

GRC-PANEL_196

GRC-PANEL_199

3132

1200

GRC-PANEL_195

GRC-PANEL_127

379 936

545

GRC-PANEL_193

GRC-PANEL_126

GRC-PANEL_132

400

+ 0,00

-0,30

GRC-PANEL_183

3162

GRC-PANEL_192

GRC-PANEL_125

GRC-PANEL_131

1393

1/3-8

GRC-PANEL_191

GRC-PANEL_160

GRC-PANEL_147

1200 GRC-PANEL_124

GRC-PANEL_129

REFLECTED CEILING AT TOP NORTH EDGE

REFLECTED CEILING AT TOP GREENHOUSE

GRC-PANEL_161

GRC-PANEL_148

GRC-PANEL_143

elevation shaft 1

1200 GRC-PANEL_178

GRC-PANEL_162

GRC-PANEL_149

690

GRC-PANEL_144

1200 GRC-PANEL_122 GRC-PANEL_123

GRC -PANEL _128

448

1/3-7

GRC-PANEL_119

1200 341

GRC-PANEL_150

GRC-PANEL_184

400

GRC-PANEL_170

494

GRC-PANEL_163

1200

1200

1200 GRC-PANEL_179

1200

1200

1200

3A

GRC-PANEL_166

tiles distribution rendered texture

836

1200

GRC-PANEL_171

GRC-PANEL_167

GRC-PANEL_180

GRC-PANEL_164

GRC-PANEL_151

1200

GRC-PANEL_186

GRC-PANEL_181

1200

GRC-PANEL_182

1200

1200 GRC-PANEL_172

364

GRC-PANEL_168

1200

1200

Phase 2

GRC-PANEL_165

+ 5,20

GRC-PANEL_109

1200

+ 4.40

+ 4.175

GRC-PANEL_194

576

576

576

283

GRC-PANEL_96

1200

431

1110

592

1200

+ 4.175

GRC-PANEL_173

GRC-PANEL_90

GRC-PANEL_95

+ 7,40

GRC-PANEL_106 GRC-PANEL_107

GRC-PANEL_174

576

+ 4.175

GRC-PANEL_169

GRC-PANEL_86

3033

GRC-PANEL_94

+ 7,40

1200

1200

1200

+ 4,63

GRCPANEL _24

+ 10,0 GRC-PANEL_89

GRC-PANEL_103

GRC-PANEL_175

GRC-PANEL_80

GRC-PANEL_85

+ 11,80

GRC-PANEL_87

+ 10,0

1821

GRC-PANEL_176

GRC-PANEL_23

GRC-PANEL_79

GRC-PANEL_84

+ 11,80

3246

GRC-PANEL_191

1200

GRC-PANEL_21

GRC-PANEL_83

GRC-PANEL_82 GRCPANEL _81

GRCPANEL _88

+ 8,80

1200

1200

+ 8,80

GRC-PANEL_78

1200

341

GRC-PANEL_77

1200

+ 12,70

1200

GRC-PANEL_0

+ 12,40

1200

GRC-PANEL_190

1200

832

1200

3000

1200

3000

1200

949

1200

3000

1200

3000

1200

3000

3000

400

3000

elevation shaft 2

3000

300

3000

1200

3000

1200

3000

1200

3000

1200

3000

1200

3000

1200

3000

1800

3000

1821

3000

1800

3000

1200

3000

1200

3000

GRC-PANEL_74

1200

3000 000 3

300

3000 3 000

1200

3000 3000

1200

3000

1200

3000

300

G RC-PANEL_57


interior design proposal

trellis pattern

i=8%

SE-2

EL

-N

OR

TH

EL-WEST

i=8%

EL-SOUTH

EL-

EA

ST

SE-1

i=8%

SE-1

TRELLIS FIXING WITH ADJUSTABLE SCREW PIECE DETAIL A 1:5 PLANTER BOX TRELLIS FIXED ON ALUMINIUM CLADDING

interior elevation proposal

DETAIL B 1:5 TRELLIS FIXED ON CEILLING BISTRO

trellis fixing TRELLIS FIXING WITH ADJUSTABLE SCREW PIECE DETAIL A 1:5 PLANTER BOX TRELLIS FIXED ON ALUMINIUM CLADDING

+12.300 m

Rooftop

DETAIL B 1:5 TRELLIS FIXED ON CEILLING BIST

ZOOM IN L3-PLAN

15

1

15

1

15

1

15

1

EXISTING CLADDING

15

1

15

COLUMNS

1

15

1

15

SHOP WINDOW EXISTING RAILING

+4.500 m

Level L2

EXISTING STRUCTRE EXTISTING CLADDING TRELLIS

LIGHTING

1

15

1

15

1

15

1

15 1 IN ZOOM 1 L3-PLAN 51

ALU-PANEL CUT OUT

15

1

15

1

PLANTER BOX -/+0.00 m

Level L1

1 1 51

151

15

1

15

1

151

151

151

ARCHITECT

LONKWITZ DESIGN with MUDI GROUP Shanghai Co. Ltd R407, 71 Xi Suzhou Road, 200042 Shanghai

CLIENT BAUHERR

Thomas and William Yeung Shanghai Leaderank Real Estate Development Co. Ltd. 200042 Shanghai, China

PROJECT BAUVORHABEN

METROTOWN MALL SCHEMATIC DESIGN CANOPY Shanghai, China

15

1

15

1

15

1

Schematic Design

PHASE PLANART PLANTITEL

DETAILS TRELLIS FIXTURE

FORMAT

SIGNATURE ARCHITECT / UNTERSCHRIFT ARCHITEKT:

A3

-3.090 m

15

STEEL CABLE

LIGHTING

AUFTRAG NR.

DATE

AUTHOR

15

1

1:5 PLAN/CAD-DATEI

15

1

SCALE / MASSTAB

15

1

15

1

15

INDEX

1 1 5

22.06.2015

1 1 5

1

STEEL CABLE

Level B1 Atrium West

-5.200 m

ALU-PANEL CUT OUT

LANDSCAPE INTEGRATED PLANTER BOX

Level B2 Garage

-8.200 m

PLANTER BOX

ARCHITECT

LONKWITZ D R407, 71 Xi S

CLIENT BAUHERR

Thomas and Shanghai Lea 200042 Shan

PROJECT BAUVORHABEN

METROTOW Shanghai, Ch

PHASE PLANART PLANTITEL

FORMAT

Schematic De

DETAILS

SIGNATURE AR

A3 AUFTRAG NR.

DATE

22.06.2015

SECTION-ELEVATION WEST


02_ host body


back side metro town

atrium metro town

linking element

zhongshan park

LINE

4

line 4 connection

LINE

2

public space

shopping mall cloud 9

shopping mall

line 2 exit to metro town

shopping passage


shops

entrances possible connections

filtered connections

design implementation

form finding process


functions

temporary use

Metro Town Shopping Mall is located at Zhongshan Park and metro station on line 2 and 4. Next to it Cloud 9 and other retail facilities can be found, making it difficult to enter the competition as it is surrounded from 2 sides by residential buildings and this prevents an extension in the vertical dimension. Keeping parts of the existing building was also desired in the context of the design studio. The design intent focused on keeping the existing retail space in the shopping mall and uses the current atria as possible developing area. The on-site-analysis revealed the importance of the area as a transportation knot. Therefore the design focused on rethinking the non-space of the atria as linking element not just inside the

mall but extending outside to the other points of interest in the area (cloud 9, metro line, Zhongshan Park) connecting them into a complex pathway network. The existing building is kept as a shell to which the new design is implanted and connects to the other buildings similar to a parasite which grows from the body of its host. The pathways host stops like bar, hair dresser, fitting rooms, tailor and also walkable roof terraces. These added functions try to improve and enhance the shopping experience which is transformed into a journey. As shopping malls are regarded as some kind of interior public spaces it tries to give more freedom of use for the visitors on their way through the retail space.


fitting room party A

order snacks & drinks

A ssistant

rent fitting box

reserve items

fittings & lighting fixtures LCD-interactive screens

fitting room

K-TV


bird view day situation

section

sky walk to cloud 9


The site is located in the 22nd Viennese district where the urban texture mingles with the rural surroundings. Seen from an urban scale a mosaic pattern consisting of building typologies and cultivated fields can be spotted. The project seeks to connect both elements into an urban city dwelling and to bring the rural neighbourhood nearer to the urban dwellers. Eco corner

Pixel school

City of Gardeners

existing residential

Urban Avant-garde

Buena Vista Quarter

tramway HST26

quarter promenade

railway tracks

play ground

Competition Raffenstättergasse, Vienna 22 for MJ Architects


green quarter promenade Grüne Quartierspromenade

Wohnen Gemeinschaftsräume

urban junctions Städtische Querungen

Grüne Quartierspromenade

interior corridors Innere Korridore

Grundstücksgrenze

private gardens Intime Gemeinschaftsgärten existing private gardens Bestehende Privatgärten

1

Eco Grätzel

2

Schulviertel

3

City of Gardeners

4

Bestand

5

Urbane Avangarde

6

Buena Vista Viertel

7

Straßenbahn

8

Promenade

6

7

5

4

3

2 1

Public space design The backbone of the new area is the continuous green quarter promenade which stretches from one end to the other connecting newly designed area with the lowrise residential housing. It also functions as a buffering zone for the residential area providing phonic and visual protection against the railway tracks. The promenade is interrupted by corridors which provide connection to the quarter. Green space is also provided as roof terraces and small allotments for the ground floor apartments.

ground floor area use

traffic plan

Wohnen

Garage

Gemeinschaftsräume

PKW

“Pixelschule”

Fahrrad & Fußweg

Gewerbe

Straßenbahn

Grüne Quartiersrpomenade Fahrrad & Fußgänger

site plan

rooftop sight

Begegnungszone

Zuggleis

8

26


Fabrication process

experimental boat building workshop

physical model scale 1:5 CNC-milling process of XPS-foam for molding

TU-Vienna aims at taking part in the Beton-Regatta 2015 Competition in Brandenburg on the Havel, Germany. In this context a boat -building workshop was organised where knowledge of different disciplines were shared in the form finding and fabrication process for the optimal concrete canoe.

5,40m 0,85m

gunwale flotation depth water line

design for speed canoe 0,86m

max. width

0,15m


weight: + 2 pers: area: volume: canoe height: hull thickness:

69 kg 269 kg 6,02 m2 0,87 m3 0,406 m 5 mm speed steerage stability

raw materials for concrete mix

mold casting

separating molding from concrete hull with water pressure

flow analysis in artificial streaming channel

perform stream analysis on the physical model

mix concrete

hardening concrete hull under water


Inflatable boat originally built in the 1950‘s by Atelier SchultesWien © www.schulteswien.com

PVC- inflatable boat built after 1950‘s model scale 1:2

scale 1:1

cutting PCV in shape

welding PVC-sheet

inflated boat

use as mold for concrete hull


weight: + 2 pers: area: volume: canoe height: hull thickness:

92 kg 292 kg 3,42 m2 0,47 m3 0,36 m 10 mm

3,00m

speed steerage stability 0,66m

gunwale flotation depth

0,21m

water line

0,96 m

max. width


Elevated living area

Quezon City

By elevating the living area one floor up damage in case of flood is decreased. The ground floor area should be used for other temporary activities. Also the cladding walls should consist of mobile elements (bamboo panels) which can be removed for water to pass through.

Metro Manila

Livingroom 19,50m2

Bedroom 12,70m2

Barangay Damayang Lagi Bathroom 3,85m2

Ground floor

1.Floor

Terrace 10,00m2

2.Floor

... guide to soft urban upgrade


Bridge Eulogio Rodriguez Sr.

heavy traffic

Urban pattern

River San Juan

today extremely polluted Formation: 1960’s-1970’s Density: 4500 per/ha Type: spontaneous growth Hierarchy: main streets, secondary streets


Shading canopies

Private space

Private space

Ground floor area suitable for commercial

The Main Pathway should remain as wide as possible. It is not only a separator, which gives a better address to the housing units in the squatter, but it is also a connection joint, where most of the secondary streets end. As a pedestrian area, it is a place where a lot of social and community-based activities, such as meeting, shopping etc, take place. It provides also better lighting and ventilation.

River promenade Substracted volumes Ventilation

Sunlight

The redesign of the riverside could be of a great importance for the residents. If trees are planted, they cannot only transform the place to a lively and pleasant walkway, but they could also be used as required set-back line, as shading elements and even strengthening the river bank.

Ground floor area suitable for commercial

To E. Rodriguez Sr. Ave

N

Main Pathway

Secondary pathways

Main Pathway

San Juan River

Secondary pathways

Secondary pathways

Secondary pathways

Secondary pathways Sitting area

Secondary pathways

Trees as border and as shading elements

To San Juan River


Step-by-step construction

reinforced concrete foundation reinforced concrete walls &

access stair to 1st floor

bearing structure for 1st floor

reinforced concrete slab protecting living area

later extension of living area is possible

walls cladded with locally manufactured hollow blocks


controlling the deformation radius

Topic of the design studio is elasticity. The aim was to create a self-supporting structure which could be elastically deformed by using a deformation principle. The structure should function as exhibition pavilion or installation. The created object tries to formally mimic the soft body of the caterpillar (Latin bombyxsilkworm) and its elastic deformation while moving. The elastic deformation principle was inspired by the length change, respectively contraction and expansion, which affect an elastic material, when compression and tension forces are applied to it.

Construction of a module

Simple grid

strips -> tension

screw -> compression

Double grid


test model

lenght change of 1 module

materials_polystyrene strips, screws, screw nuts Material study

aluminium 2 mm

steel sheet 0,2 mm max. height 15cm

max. height 4,5cm birch plywood 2 mm max. height 7cm

For the final mock-up different materials were tested to find the fittest one which would resist tension and even torsion forces but would still provide enough rigidity to support the added weight of 600 screw nuts and 150 screw.

before breaking

initial lenght 25cm

polystyrene sheet 2 mm

max. height 17cm

torsion

materials_paper strips, wood sticks, hose Ă˜ 0.2 mm


side elevation

plan

section

front elevation


Grasshopper definition

Construction streps

deformation by changing module heigth




dwelling

Vorhandene Bildungseinrichtungen Wenn man die Situation der Bildungseinrichtungen kannPixel festgestellt The designuntersucht studio werden, dass schon eine school dealt with renewal andTendenz change in use der Dezentralisierung of empty ground floor locations into small von Bildungseinrichtungen learning units. The aim was tobesonders find a solution bei Kindergärten vorhandenfloor ist. Es sind for the countless unused schon ground aber Bereiche wo areas in Vienna and to pointBildungseinrichtungen out the needs fehlen. Daher wurde diese these areas might fulfill in new residential Lücke im Quartier als Standort für dieanneue buildings. The project also tried to offer Pixelschule ausgewählt.

alternative to the trend of building enormous school campuses in remote locations of the city. As a possible location the 10th Vienna -district Favoriten was chosen to implement Im Vergleich zur 1. Variante, beschäftigt sich die 2. verstärkt the mit project. The plot stretched along learning Landgutgasse with old residential buildings dem Bestand, die Gebäude werden to the newly build residential area ending mit wenigen Eingriffen für with diethe Helmut Zilk Park. An integration of the old and new elements was tested out, neuen Nutzung adaptiert. Meist werden kleine Glaspavillions the vorlinking element between the two being the Landgutgasse which was transformed Kindergarten den Räumen der Erdgeschosszone into a learning landscape. Volksschule

Verkehrssituation Landgutgasse

Vorhandene Bildungs Vorhandene Bildungseinrichtungen Wenn man die Situation der Vorhandene Bildungseinrichtungen Bildungseinrichtungen Wenn man die Situation der untersucht kann festgestellt Vorhandene BildungseinrichtungenBildungseinrichtungen werden, dass schon eine Wenn man die Situation der Bildungseinrichtungen Wenn man die Situation der untersucht kann festgestellt Bildungseinrichtungen werden, dass schon eine untersucht kann festgestellt Tendenz der werden, dass schon eine Dezentralisierung von Tendenz der Bildungseinrichtungen Dezentralisierung von besonders bei Kindergärten Bildungseinrichtungen schon vorhanden ist. Es sind besonders bei Kindergärten aber Bereiche wo schon vorhanden ist. Es sind Bildungseinrichtungen aber Bereiche wo fehlen. Daher wurde diese Bildungseinrichtungen Lücke im Quartier als fehlen. Daher wurde diese Standort für die neue Lücke im Quartier als Pixelschule ausgewählt. Standort für die neue Pixelschule ausgewählt.

untersucht kann festgestellt werden, dass schon eine Tendenz der Dezentralisierung von Bildungseinrichtungen besonders bei Kindergärten schon vorhanden ist. Es sind aber Bereiche wo Bildungseinrichtungen fehlen. Daher wurde diese Lücke im Quartier als Standort für die neue Pixelschule ausgewählt.

Befahrene Straße

Verkehrsberuhigter Abschnitt

rethinking ground floor area

hinzugefügt. Die Glaskörper dienen in einigen Fällen als Rückzugsbereiche. "Kurz mal frische Luft schnappen" ohne nach draßen gehen zu müssen. - Die Abschottung zur Straßenseite erfolgt durch Grünbereiche. In anderen Fällen, wie bei der Bibliothek helfen die Glaskörper zur Vergrößerung der Raumtiefe. In beiden Varianten wertet leichte Zubau den Bestand auf und spielt mit der Beziehung zwischen Straße und Innenraum.

Die Landgutstraße wird durch die verkehrsberuhigte Situation zu einer Art Spielstraße umfunktioniert. Im Straßenraum befinden sich Einrichtungen, wie beispielsweise

Tendenz der Dezentralisierung von Bildungseinrichtungen besonders bei Kindergärten schon vorhanden ist. Es sind aber Bereiche wo Bildungseinrichtungen fehlen. Daher wurde diese Lücke im Quartier als Standort für die neue Pixelschule ausgewählt.

Kindergarten

Musikschule Schwimmbad

Kindergarten

Volksschule

Kindergarten

Volksschule

Musikschule

Volksschule primary school

Musikschuleschool vocational

Schwimmbad swimming pool

Volksschule

Musikschule

Schwimmbad

Musikschule

Schwimmbad

Kindergarten kindergarden

F F

Schwimmbad

aus Str Landgutgasse

chosen section for pedestrian area and learning landscape Befahrene Straße

Verkehrsberuhigter Abschnitt


Area around the newly-built Sonnwend-quarter

Das Gebiet

service& residential Dienstleistungen &W Dienstleistungen &Wohnen

residential only Wohnen

Wohnen

Bildungscampus

Dienstleistungen &Wo Bildungscampus school campus

Helmut-Zilk Park

Wohnen

Bildungscampus Helmut-Zilk Helmut Zilk Park Park Helmut-Zilk Park

Vienna Main Railway Station Hauptbahnhof

Sonnenwend-quarter Sonnwendviertel

Favoriten Street FavoritenstraĂ&#x;e


Learning landscape

Lernlandschaft

Landgutgasse

1

Rotes Kreuz

11 Biblothek

21 Veranstaltungssaal

2

Ăœbungsplatz

12 Verwaltung

22 Sandkiste

3

Ausfahrt

13 Jausenstation

23 Kletterparcur

4

Kinderarzt

14 Homebase VS 1

24 Homebase KIGA

5

Kindertheater

15 Ballausgabe

25 Homebase KIGA Vlay

6

Musikraum

16 Werkstatt

26 Biotop

7

Garderobe

17 Mensa

27 Laufbahn

8

Zeichenraum

18 Homebase VS 2

28 Hartplatz

9

Jungschar

19 GemĂźsegarten

29 Sporthalle

20 Membrandach

30 Weg zum Helmut-Zilk Park

10 Chill Area


Street atmosphere


Functions

exercise zone Red Cross

children theatre/ art base

play street canteen chilling zone scouts

home base primary school play ground

canteen terrace

outdoor sports area

membrane canopy biotope

mediatheque

administration city furniture home base primary school

event hall

home base kindergarden

indoor sports hall


n

de

3,2 aut.

residential building adapted to primary school

Adaptierung Bestand - Volksschule Aufgrund der niedrigen Geschosshöhe des Wohngebäudes, verlangt der Umbau zu einer Homebase , das Einräumen von drei Geschossen. In dem draus entstandenen Volumen wurden zwei Ebenen mit einer mind. Raumhöhe 3 m von eingezogen.

Teeküche

Lesenische

Luftraum

+8.550

Gallerie

+6.400 +6.200

Luftraum

Lernplattform 2

Freibereich

Lernplattform 1

+3.250

Eingang ±0.000

Konzept

Fakten - das ausgewählte Gebäude im Bestand ist ein Wohnbau aus den 60er-Jahren - Erdgeschossnutzung: Müllräume bzw. Abstellräume - Erschließungsart: Gang - Geschosshöhe 3,0 m - Tragtiefe 12,0 m Scooter

Eingang

Gallerie .

Freibereich

Integrationsbereich

Sanitär

A

Teeküche

Computer Arbeitsplätze

Lobby+Garderobe

Luftraum Gruppenbereich

A

Luftraum

Lesenische

Ansicht VS Bestand Adaptierung Bestand - Volksschule Lernplattform

Lehrerraum

Lernplattform

Freibereich

Innenhof

floor plan base Gallerie . home im EG Biber für Homebase drei zwei m Computer Arbeitsplätze

EG Bestand

Luftraum

50 Schüler

2 x Lernplattform 1 x Integrationsgereich 1 x Gruppenbereich 1 x Computerarbeitsplätze 1 x Garderobe & Lobby 1 x Sanitär Gruppenbereich

Lehrerraum

Lernplattform

Fläche gesamt Raumhöhe

2 x Freibereich 1st floor home base 1.OG Homebase 1 x Gallerie

1.OG Homebase +18.000

70 m² 24 m² 30 m² 30m² 35 m² 30 m²

+15.000

+12.000

+9.000

+6.400

+3.700

280 m² +3.20 m 200 m² 50 m²

±0.000

Schnitt A:A Ansicht VS Bestand Adaptierung Bestand - Volksschule

Ansicht VS Bestand

Homebase Volksschule - Bestand

Biber für 50 Schüler +18.000

2 x Lernplattform 1 x Integrationsgereich 1 x Gruppenbereich 1 x Computerarbeitsplätze 1 x Garderobe & Lobby 1 x Sanitär

chosen residential building

elevation

Fakten - das ausgewählte Gebäude im Bestand ist ein Wohnbau aus den 60er-Jahren Fläche gesamt - Erdgeschossnutzung: Müllräume bzw. Abstellräume Raumhöhe - Erschließungsart: Gang - Geschosshöhe 3,0 m 2 x Freibereich - Tragtiefe 12,0 m

1 x Gallerie

70 m² 24 m² 30 m² 30m² 35 m² 30 m²

+15.000

+12.000

+9.000

+6.400

+3.700

280 m² +3.20 m 200 m² 50 m²

±0.000

section

Ansicht Straße Ansicht VS Bestand

Schnitt A


abstract land art model

swimming pools integratio

outdoor swimming pool As part of the bachelor thesis the design studio focused on creating a natural swimming pool at the prominent location of the baroque garden of Schรถnbrunn Castle. Formally the first steps towards design started from an abstract model of land art. The amorphous shapes in the design strongly contrast to the symmetric geometric shapes of the baroque garden design. The natural swimming pool opposes the artificiality of the baroque garden. Inspired by the water lily the elements where reversed forming floating elements on the surrounding water. The water basins are designed to contain water with different properties.

N site plan

building integration


Physical model - functions


DIP DIP ININ _ Naturbad _ Naturbad Schรถnbrunn_Bachelor Schรถnbrunn_Bachelor Entwerfen Entwerfen

level 11 1 Ebene Ebene

section A:AA:A Schnitt Schnitt A:A

level 22 2 Ebene Ebene

Ebene Eben3


3

level 3 Ebene

3

Schnitt B:B

Ebene 3

section B:BB:B Schnitt

Schnitt B:B


THE LOCAL NETWORK _ Studio Städtebau & Vu Grundlagen der Landschaftsarchitektur

Grillplatz

Zufahrt Garage

Grillplatz

Werkstatt

Grillplatz

Zufahrt Garage

Grillplatz

Abstellraum Fahrrad/Kinderwagen

Kinderspielplatz

Lager

Café

Supermarkt

Supermarkt

Verein

Abstellraum Fahrrad/Kinderwagen

Lager

Abstellraum Fahrrad/Kinderwagen

Verein

Café

Kinderspielplatz

Fitness

Werkstatt

Zufahrt Garage

Fitness

Türkisches Bad

Zufahrt Garage

Abstellraum Fahrrad/Kinderwagen

Türkisches Bad

Starting point was a study conducted by the Austrian Academy of Science in Vienna estimating a scenario of an increase of immigrant population of 60% by 2035. A fast increase in the immigrant population can lead to the formation of ghettos. Areas in which a high percentage of immigrant population is concentrated are the Gürtel ring road, Aspern, Central Railway Station, North Railway Station. This tendency is typical of large cities though the main problem is integration of the newcomers.

Geschäft

Abstellraum Fahrrad/Kinderwagen

Grillplatz

Zufahrt Garage

Supermarkt

Grillplatz

Geschäft

Zufahrt Garage

Grillplatz

Lager

Zufahrt Garage

Lager

Abstellraum Fahrrad/Kinderwagen

Grillplatz

Supermarkt

Zufahrt Garage

Verwaltung

Rezeption

Café/ Lounge

N

Wintergarten

Wintergarten

0

site plan N

20 30 4

Erdgeschoß

10


.

Pathways main street secondary pathways green walkways

Public space green areas green walkways

Public-private public space semi-public space private space

connecting roads

tessellation

offset

new way systyem

inner offset

buildings & public space


zoom in learning campus

Volksschule& Hauptschule

Zoom in - Bildungscampus

The location of the design project is the South Skating Ring in Vienna’s district Favoriten where the highest number of immigrants is living. The urban design integrates working space, school campus, and residential area with a ground floor area used as commercial spots for daily needs. The school campus aims at offering immigrant children a solid education to avoid integration problems. The public spaces in the new quarter display a great variety of different uses encouraging the formation of a

Kindergarten/hort

strong neighborhood network.

N 0

Sportplatz

Spielplaz

10

20

30

40

50


Zoom in - Bildungscampus

Volksschule& The Local Network_Studio Städtebau & VU Grundlagen der Landschaftsarchitektur Hauptschule

Zoom in - Bildungscampus

lagen der Landschaftsarchitektur _Städtebauliches Szenario Tendenz der Einwanderer ist steigend. Bis 2035 wird prognostiziert, dass der Ausländeranteil in den Stadterweiterungsgebieten bis zu 60% erreichen wird. Laut einer veröffentlichten Untersuchung der Österreichischen Akademie der Wissenschaften (ÖAW) kann der schnelle Anstieg der Ausländeranzahl zur Bildung von Ghettos führen. Davon betroffen werden nicht nur heute bekannte Problemzonen um den Gürtel, sondern auch die neuen Stadterweiterungsgebiete wie Flugfeld Aspern, der Zentalbahnhof und Nordbahnhof.

Kinderspiel platz

Grillplätze

Zoom in - Wohnstaße Gastronomie

Im Weiteren wird angeführt, dass die Einwanderungstendenz typisch für Großstädte ist. Das eigentliche Problem, das sich aus dem Anstieg der Ausländeranzahl ergibt, ist die Integrationsproblematik.

Verein

Grillplatz

Grillplatz

Grillplatz

Zufahrt Garage

Grillplatz

Liegewiese

Liegewiese

Kindergarten/hort

Café

Supermarkt

Verein

Kinderspielplatz

Fitness

N

Abstellraum Fahrrad/Kinderwagen

Geschäft

Fitness

Geschäft

0

10

20

30

40

50 Verein

Geschäft

Türkisches Bad

Privatgärten in EG

Türkisches Bad

Abstellraum Fahrrad/Kin derwagen

Geschäft

Spielplaz

N 0

10

20

30

40

50

N 0

Sportplatz

Wohnstraße

section

Kindergarten/hort

Auch im Bezug auf Wohnqualität für Mirganten werden neue Standards gesetzt, die den Integrationsprozess unterstützen und möglichst große Vielfalt and Freiraumtypologien bietet. Der Freiraum soll möglichst allen zugänglich sein als Ort wo man die Bekanntschaft seiner Mitbewohner aufsucht und Teil des lokalen sozialen Nezwerks wird.

Geschäft Zufahrt Garage

Sportplatz

Die Stadt Wien reagiert auf die Migrationsproblematik indem neue Projekte zur Förderung der Integration im Gang gesetzt werden. Die Absicht ist es potenzielle Konflikte erst gar nicht entstehen lassen. Den Migranten-Innen werden unterschiedliche Informationsmodule angeboten. Besonderen Augenmerk richtet die Stadt Wien auf die Ausbildung der Kinder migrantischen Hintergrunds. Besondere Schwerpunkte sind sprachliche Förderung der Kinder im Vorschulalter, Hauptschulkinder bei denen ein vergleichsweise hoher Anteil das Bildungssystem ohne Pflichtabschluss verlassen (14% - im Vergleich Inländische 4%), aber auch Integrationsprogamme für Eltern und Personen im fortgeschrittenen Alter anzubieten. Nach dem Motto – Die Stadt Wien als Zusammenlebenprojekt - soll im bev ölkerungsreichsten Bezirk Wiens mit der höchsten Anzahl an Migranten (in absoluten Werten) ein Pilotprojekt entstehen, das auf die Förderung der Integration ausgerichtet ist. Am Areal des Eisrings Süd soll ein Schulcampus entstehen, das aus Kindergarten, Volksschule, Hauptschule und Gymnasium besteht, speziell auf die Bedürfnissse der Kinder mit Migrantenhintergund ausgerichten.

Geschäfte

Spielplaz

10

20

30

40

50


[motion]scape _Studio Gebäudelehre _SS The concept of motion is central to this project. Mobility is reflected in the shape of the building (ramps, form, hull, surrounding) Programmatically the building should combine a seminar hotel and a bike rental shop at the edge of Vienna in the nearby woods which are beloved as weekend recreation area for outside activities. The designed building tries to integrate into the surrounding landscape and invites the visitors to interact with both. The soft transition to the surroundings is realized by ramps with gentle soaps. The building constitutes of two parts hosting the seminar hotel and the bicycle rental shop which are connected by the restaurant bridging the elements. Lageplan Lageplan

_ Die Idee der Bewegung steht im Mittelpunkt dieses undMultimobilität bestimmt zugleich Funktion 2011 _ Projektes Thema: _

_ Die Idee der Bewegung steht im Mittelpunkt

(Rampen, Form,Hülle, Umgebung).Das Ziel des

dieses Projektes und bestimmt zugleich Funktion _ Die Idee der Bewegung steht im Mittelpunkt Projektes war,Thema eine Multimoblilität Promenadearchitektur im dieses Projektes und bestimmt zugleich Funktion und Form. Das ist in den un-

und Form. Das Thema Multimoblilität ist in den unEntwurfes vorhanden des (Rampen, Form,Hülle, Umgebung).Das Ziel des

Wiener Wald zuEbenen schaffen. terschiedlichen des Entwurfes vorhanden terschiedlichen Ebenen des (Rampen, Form,Hülle, Umgebung).Das Ziel Der entstandene Baukörper versucht sich mit der Projektes war, eine Promenadearchitektur im Projektes

Landschaft zu schaffen. verschmelzen Wiener Wald zu

Lageplan

Konzeptmodell

war, eine Promenadearchitektur im Wiener Wald zu schaffen.

und lädt die Benutzer/innen zur Interaktion mit beidem ein. Der Der entstandene Baukörper versucht sich mit der Der entstandene versuchterfolgt sich mit der Landschaft zu verschmelzen und lädt die sanfte ÜbergangBaukörper zur Umgebung durch Landschaft zu verschmelzen und aus lädt zwei die Benutzer/innen zur Interaktion mit beidem ein. Der Rampen. Das Gebäude besteht sanfte Übergang zur Umgebung erfolgt durch Benutzer/innen Interaktion mit ein. Der Baukörper,demzur Fahrradverleih undbeidem dem SeminarRampen. Das Gebäude besteht aus zwei sanfte Übergang zur Umgebung erfolgt durch hotel. Um diese beiden Bereiche gruppieren sich Baukörper,dem Fahrradverleih und dem SeminarRampen. Das Gebäude besteht aus zwei hotel. Um diese beiden Bereiche gruppieren sich zusätzliche vorgegebene Funktionen. Das Baukörper,dem Fahrradverleih und dem Seminar- zusätzliche vorgegebene Funktionen. Das Verbindungsglied dazwischen stellt das Restau- Verbindungsglied dazwischen stellt das Restauhotel. Um diese beiden Bereiche gruppieren sich dar, der die beiden Teile überbrückt. rant im 1.OG dar, der die beiden Teile überbrückt. rant im 1.OG Erdgeschoss vorgegebene Funktionen. Das zusätzliche Verbindungsglied dazwischen stellt das Restaurant im 1.OG dar, der die beiden Teile überbrückt.

Konzeptmodell

Konzeptmodell

Funktion: Seminarhotel & Fahrradverleih am

und Form. Das Thema Multimoblilität ist in den un[motion]scape _Studio Gebäudelehre _SS 2011 _ Thema: Multimobilität _ Funktion: Seminarhotel & Fah terschiedlichen Ebenen des Entwurfes vorhanden

Erdgeschoss

Erdgeschoss


1. Obergeschoss

Scnitt A : A

2. Obergeschoss

Scnitt B : B


orm Courtyard house in the 22nd district of Vienna Donaustadt - detail drawing and static system consisting of a steel primary structure and a timber secondary structure. stair detail - section

section a:a

section b:b


facade detail section

D1

Anschluss Stütze-Träger-Abspannung Maßstab 1:10

eingeschlitztes Blech Ankerkörper

Stütze Hohlprofil 70/70

Kopfplatte (verschraubt)

Zugseil (Abspannung)

Winkelverbindung

0,240 Hauptträger IPE 240

floor plan

3d structural model

3d joint model

D1

Anschluss Stütze-Träger-Abspannung Maßstab 1:10


Vielen Dank


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.