Week 6 Studio Journal Our group decided to build the structural model of the roof structure in ERC building. The primary structure include beams(horizontal) and columns(vertical). The secondary structure include wall(horizontal).
Materials we used include battens, glue, tape, cutting mat, knives, white paper board, scissors.
Following case study, set the wall(cardboard) horizontally and stick beams connect with wall, finally glue the columns on the end of beams.
The roof system is frame structure that base on columns and beams as it's primary structure and there are four floors and a ground floor within ERC building.