AZ portfolio 2019

Page 1

ARMANDO ZAPPALĂ Masterplanning and Public Realm


I have a first-class degree in technology and policies for urban planning from Catania University, Italy. I also have a first-class masters degree in urban planning and policies for cities and environment from IUAV Istituto di Architettura di Venezia (Higher Institute of Architecture of Venice), as well as a surveying qualification from the Collegio dei Geometri of Catania. I am able to use specialist design software, such as Adobe suite as well as Autodesk softwares. I hold an ESRI GIS (Geographic Informative System) certification.

ARMANDO ZAPPALĂ AoU

I have been involved in many exciting projects since my university career started in 2008. I have worked on Italian projects as well as international projects such as MSP Maritime Spatial Planning, Azores or NEOM. I have been working on a wide range of projects, as strategic masterplans for residential developments (all over 50 units) within rural sites in West Sussex, Bedfordshire, and Norfolk, and international urban extensions such as in Oman. I also have experience of assessing heritage sites that have the potential for new development. Since 2018 I am a member of the Academy of Urbanism in London.


CONTENT

4

REGENERATION MASTERPLAN, VALBRENTA, ITALY

32 NEW SETTLEMENT, UNITED KINGDOM

6

AR’AR LOGISTIC AND INDUSTRIAL CITY, SAUDI ARABIA

34 ABANO AND MONTEGROTTO TERME, ITALY

8

NEOM MANSION, NEOM

36 TREVISO 2020 - ITALY

10 KHAWR AL BATAH, OMAN

38 SAN DONA’ DI PIAVE, ITALY

12

WA’AD AL SHAMAAL INDUSTRIAL CITY, SAUDI ARABIA

40 ISOLA DI MILANO, ITALY

14

LEKKI, ILORIN, SOKOTO, NIGERIA

42 MSP MARITIME SPATIAL PLANNING, AZORES

16 RURAL ENTERPRISE CENTRE, WEST SUSSEX, UNITED KINGDOM

44 BAGHDAD WEST, IRAQ

18 URBAN EXTENSION, HAMPSHIRE, UNITED KINGDOM

46 SANT’AGOSTINO, ITALY

20 URBAN EXTENSION, BANSTEAD, UNITED KINGDOM

48 FIVE SQUARES PROJECT, CATANIA, ITALY

22 NEW SETTLEMENT, UNITED KINGDOM

50 SOANE STABLE BLOCK, LONDON, UNITED KINGDOM

24 VILLAGE EXTENSION,SUSSEX, UNITED KINGDOM

52 BATT’S FORD BRIDGE, BEDFORD, UNITED KINGDOM

26 MOGGERHANGER, UNITED KINGDOM

54 PRINTWORK APARTMENTS, SURREY, UNITED KINGDOM

28 REGENT QUARTER, LONDON, UNITED KINGDOM

56 AFRICA BIG CHANGE BIG CHANCE, MILAN, ITALY

30 NORWICH, UNITED KINGDOM


REGENERATION MASTERPLAN, VALBRENTA, ITALY MASTERPLANNING Project aims: To provide a strategic framework for the municipality of Valbrenta that identifies a sustainable development prospect for it, able to safeguard and enhance its natural and economic resources and highlight its multiple identities. The aim is to promote a unitary vision for the future.

50

km

N

us radi

Trento

The new born municipality of Valbrenta requested: • A strategic urban design framework including: • An urban regeneration masterplan for the settlement of Valstagna/Carpane, located within the municipality. • The architectural vision to reuse the historic hydro-electric power plant located in Valstagna/Carpane as a multi-purpose space for the community.

2

m 5k

u radi

s

Castelnuovo

Valdastico No rd

Rovereto

0k

m

1

A3

Cismon del Grappa

SS47 ROAD Valstagna Campolongo sul Brenta

2

I have collaborated for the proposed land use plan and the proposal for new strategies to revitalise the urban and economic context of Valbrenta as a whole. The project is currently closed and I am managing the relationships with the client.

A2

Piovene Rocchette

Pordenone

s radiu

Bassano del Grappa

VALBRENTA VALBRENTA

San Nazario

A27

Besenello

1

Grigno

Solagna Pove del Grappa Romano d’Ezzelino

t a (SP V) ene V r e s e P p a d t u a d r S em o t an a n

Spresiano

Treviso Treviso

Vicenza 1,800 1,600

Montecchio Maggiore

1,400

Verona

1,200 1,000

A4

800 600 400

Padua

Venice

Venice

200

a

-

Va lb

re

SS

nt

4

Stores

Sale analysis 2019 4

Shops

Workshop

0

5km

34

15km

Context plan MIXED USE DEVELOPMENT


Cismon del Grappa

Natural activities network within Valbrenta

Segheria Frison Franco Snc (Saw mill)

Altopiano dei Sette Comuni

Trasporti Frison Livio Giuseppe & C. Snc (Trucking company)

r

B r nta

B r e e R iv R n ta e r

ive

Grotta di ponte Subiolo Grotta dell’Elefante Monte Grappa IBA

Cismon del Grappa

Valstagna Massiccio del Grappa

Grotte di Oliviero

Idroelettriche Riunite S.P.A. (Electric Utility Company) San Nazario

Calà del Sasso

Campolongo sul Brenta

Tessilveneta S.R.L. (Fabric Shop)

Solagna Granezza

Chiomento Daniele (Car Body Shop) Ranked the best university of their category in Italy 2017-18 (CENSIS and ANVUR)

Pove del Grappa

Trento

Autofficina Costenaro (Vehicle Repair) Radio 7 Asiago (Radio broadcaster)

High quality Food Industry

Theoretical Nuclear Studies

60 Km

m

Tourism

Physics Environmental engineering

60 K

Cellular integrated biology

Centre for Computational and System Biology

Mathematics

Fly-Project

Pordenone

Bassano del Grappa

Aquafil

Rovereto

Riva del Garda

Green-Tech Valley

Fabricaltra

Pia ve

River Cleaning

nta Bre

Appliance Industry Textile Industry

Vicenza

H-Farm

Clothing Industry

Shoes Industry Clothing industry Motorbike Industry Adig

e

Pharmaceutical Medicine Geology and biology

Padua Shoes Industry Engineering Industry

Economics and statistics

Clothing industry Furniture Industry

Chemical science

Economic and Statistics

Rondellificio Valbrenta S.r.l.(Metalwork) Gheller S.R.L(Road Construction Company)

Ci.be srl(Clothes and fabric wholesaler)

Venice

Maffeis Engineering (Manufacturer) Scramoncin Auto (Vehicle repair shop) Campolongo sul Brenta

Metal industry Petrolchemical Industry

Food Industry INN-Veneto

Incubators, Green-Tech Startups, universities ranked the best intheir category in Italy 2017-18 (CENSIS and ANVUR) NOVEMBER 2019

Nord Legno S.R.L.(Pallet supplier)

L’alveare(Packaging company)

Agriculture and veterinary Biological science

Geo&Tex 2000 Spa - Nonwoven(Manufacturer) Imballaggi Ceccon(Packaging company)

Geo&Tex 2000 Spa (Clothes and fabric wholesaler)

Shoes Industry

Verona

San Nazario

Autosport 23 di Olivo Matteo (Vehicle repair shop)

D. L. Legnami Srl (Wood Contractor)

Fabrica

Treviso

Manifattura Fontana Spa (Plastic fabrication company) Granulati Dolomitici Peroglio Spa

Cosmet 3000 S.R.L.(Metalwork) Imballaggi Scremin Sas(Packaging company) DE NARDI Timber drying kilns (Industrial equipment supplier)

Valbrenta

Ley

Bassano del Grappa

Valstagna

Idroelettriche Riunite S.P.A. (Electric Utility Company)

Existing businesses and universities network 5


Roads Highway 80 Primary 60 m ROW Primary 46 m ROW Secondary 30 m ROW

AR’AR LOGISTIC AND INDUSTRIAL CITY, SAUDI ARABIA Industrial Logistics

Supporting facilities for logistic and industry

MASTERPLANNING

Key

Project aims: To provide a detailed masterplan for an industrial and logistic city including residential and commercial small components.

Office

TP

Truck parking area

Roads

Community Facilities MQ

Mosque

Commercial

Primary 46 m ROW

GS

General sales

Secondary 30 m ROW

OF

Office

Utilities

Industrial

I have been fully involved in this project since the kick start meeting. I have been involved in the design of the masterplan and the detailed guidelines for the industrial and logistic plots.

OF

Site boundary

Primary 60 m ROW

A Market Study (2018) by A.T. Kearney highlighted the opportunity of substantially increasing trade links with Iraq as the nearby Ar’ar border crossing has reopened.

Emergency Unit

Residential

Highway 80

The proposal is for a new concept master plan for Ar’ar Logistics and Industrial City (ALIC) - a 200ha site established 10km outside Ar’ar city in the Northern Borders province, KSA.

EU

Logistics

RP

Retention Pond

Supporting facilities for logistic and industry

ST

STP facility

EU

Emergency Unit

WL

Well

OF

Office

SS

Sub-station

TP

Truck parking area

EN

Entrance Gate

Residential

EX

Exit Gate

Community Facilities

RG

Residential gate

MQ

Mosque

Commercial

ST

RP

GS

General sales

OF

Office

Industrial plots

Utilities RP

Retention Pond

ST

STP facility

WL

Well

SS

Sub-station

EN

Entrance Gate

EX

Exit Gate

RG

Residential gate

RP

MQ

WL

RG SS

EU

OF GS

OF

OF TP

EN

Aerial view proposed plan 6

0

Land use plan

500m

EX

Logistics plots INDUSTRIAL DEVELOPMENT


A

Industrial small plot

Industrial medium plot

Industrial large plot

Logistics containerised goods plot

Logistics small plot

Logistics medium plot

Logistics large plot

Logistics break bulk plot

OCTOBER 2019

7


NEOM MANSION, NEOM MASTERPLANNING SITE BOUNDARY

Project aims: To provide a conceptdesign for the public realm including high level plot design guidelines.

RESIDENTIAL LARGE PLOTS RESIDENTIAL MEDIUM PLOTS

April 2019 Dar was asked to develop the concept design for the public realm and landscape with the NEOM Luxury Mansions Area. Dar was also asked to review the concept design work for the Luxury Mansion Masterplan previously undertaken by Luca Dini Associates (LDA) to ensure a fully integrated plan covering both the plots themselves and the landscape and public realm areas.

RESIDENTIAL SMALL PLOTS HOSPITALITY COMMUNITY BUILDINGS CIVIC OPEN SPACE - GENERAL OPEN SPACE - FACILITIES OPEN SPACE - BEACH

I have worked on a final report including the outcome of the Dar work undertaken between April and July 2019, providings: • a rationalised and adjusted concept masterplan that accommodates 70+ Luxury Mansions varying in size from 10,000 sq m to 2,500 sq m; • a concept design for the landscape and public realm areas covering all the land outside the plots themselves; • a suggested phasing plan indicating a logical sequence for delivering the development; • high level plot design guidelines to ensure that the mansion plots and landscape work in unison to deliver a high quality scheme and deliver the required levels of privacy and security.

UTILITIES PARKING ROADS CYCLO-PEDESTRIAN CIRCULATION

Land use plan 8

RESIDENTIAL DEVELOPMENT


Key 250M

Site boundary Promenade

de

na

Sea

me Pro

Large Plot Gate

ade n e Prom

Gatehouse Landscaped boundary zone Parking bays for trucks

38

Vehicular Access

m

Pedestrian Access Main Road Secondary Road Utilities pit

Mansion Zone

Meter on the perimeter wall

de

m

m 18

Park

ena

m Pro

35

Villa

70 m

Villa

48 m

Villa

Villa

Villa

20 m

Villa

Medium plot guidelines

Mansion Zone

Villa

Villa

40 m

16 m

Mansion Zone

40

m

Park

Park

Phase 1 plan JUNE 2019

Large plot guidelines

Small plot guidelines 9


KHAWR AL BATAH, OMAN MASTERPLANNING Project aims: To provide a Masterplan for the residential expansion of Sur, including land reclamation, a new water channel and strategies and projects for the enhancement of the existing landscape assets.

Gulf of Oman

Oman’s Ministry of Housing (MoH) is preparing a Master Plan for Khawr Al Batah at Sur. Dar was appointed to lead the project on behalf of the MoH. Between 2007 and 2009, DAR prepared a Land Use Strategy for Sur in 2009 on behalf of the Supreme Committee for Town Planning and the developer Sama Dubai. The framework of this report prepared in 2019 was based on three distinct development areas, namely: – The Old Town – The New Town, and – The Khawr The proposal, also, included land reclamation in the western Khawr, combined with the creation of a new eastern water channel linking the khawr to the coast.

Key Project Area Khawr Existing Governmental

I have worked on the final report which summarise the work completed to 2019 including the master plan design for Khawr Al Batah. This report included the detailed design components as the detailed land use plan, development plot parcellation, low-density residential villa parcellation and preparation of plot ID sheets.

Mix Use Commercial Community Facility 0

100

500

1 Km

The Khawr

Proposed Governmental Mix Use Commercial Community Facility Open Space Office Residential Low Density Residential Medium Density Residential High Density Utilities Parking

Land use plan 10

Cultural

MIXED USE DEVELOPMENT


Gulf of Oman

Gulf of Oman

Key Project Area Khawr Fast route Slow route Bus stop (type 1) Bus stop (type 2) Bus stop interchange node Jetty pier Land use Existing Governmental

Key

Mix Use Commercial

Project Area

Community Facility

Khawr

Proposed

Existing building

Governmental

0 storey

Mix Use

2 storey

Commercial

4 storey

Community Facility

6 storey

Open Space

Proposed building

OďŹƒce Residential Low Density

Parking

Residential Medium Density 0

100

500

1 Km

1 storey

Residential High Density

The Khawr

0

Utilities

Public transport strategy plan

500

1 Km

The Khawr

2 storey 3 storey

Cultural Parking

100

Heights plan

4 storey

Illustrative master plan APRIL 2019

11


WA’AD AL SHAMAAL INDUSTRIAL CITY, SAUDI ARABIA MODELLER 3D Project aims: To provide a high-level Masterplan for an industrial city including industrial sectors and residential sectors. I was involved to the end of the project; therefore my tasks included graphic, 3d modelling and 3d animation.

Open space in the residential core

Entrance to the site 12

INDUSTRIAL CITY


Aerial view of the community facility area

Public facility JANUARY 2019

Core of the residential area 13


LEKKI, ILORIN, SOKOTO, NIGERIA MASTERPLANNING Project aims: To provide 3 masterplans for these 3 sites to maximise the use of industrial uses and residential uses. The Federal Government launched the Economic Recovery and Growth Plan (ERGP) to put Nigeria on a path of sustainable socio-economic development in 2006. One of the mechanisms to achieve this was the introduction of Special Economic Zones (SEZs). The Lekki, Ilorin and Sokoto Special Economic Zone (SEZ) have been identified as a strategic site to attract manufacturing firms. Covering, respectively XX, XX and 440 hectares, they are set to become the flagship industrial hub for Northern Nigeria. Aerial View Sokoto Master Plan

Aerial View Ilorin Master Plan 14

Aerial View Lekki Master Plan INDUSTRIAL CITIES


KEY

KEY Site Boundary

Site Boundary

Plot Boundary

Plot Boundary

Central Swale Road

Existing Road Collector Road

Collector Road

Local Road

Local Road

Service Road

Service Road

Industrial

Industrial

Footpath

Infrastructure

Retained Settlement Area

Green Wedges

Town Centre

Established Settlements

Buildings

Mixed use (Residential/ Retail) Petrol Station

Sokoto Land Use Plan

KEY Site Boundary Primary Road - ROW 60m Collector Road - ROW 30m Vista Prominent Frontages Open Space Network Landmark building Plot entrances

Sokoto Land Use Plan NOVEMBER 2018

Lekki Analysis Diagram 15


RURAL ENTERPRISE CENTRE, WEST SUSSEX, UNITED K MASTERPLANNING Project aims: To provide a high-level Masterplan to maximise the use of the agricultural land including agriculture and farming, rural worker accommodation, a variety of tourism and leisure facilities and educational and economic uses. The site (192.4 ha) included an anaerobic digester plant and the associated equipment in the centre of the site which is no longer in use. The site is designated as countryside including Ancient Woodlands and two Sites of Nature Conservation Importance (SNCI). The Initial High-Level Masterplan set-out the vision for up to 10 years including lawful commercial activity on the site that could start at the earliest opportunity, in the context of a long-term vision and masterplan.

Aerial View of the Anaerobic Digester Plant

To facilitate the understanding of the topographical, ecological and transport constraints the site has been divided into 14 plots. Each plot has been assessed in order to have a robust understanding of the constraints and the opportunities of the site. The Masterplan illustrates the end functions and uses that I considered appropriate in accordance with planning policy, landscape, ecology and topographical constraints that emerged during the site visit and a deskbased review of all available documents. These plans and the masterplan briefing have been gathered in an A3 report that was submitted to the client.

Connectivity Map (external) 16

Connectivity Map (internal)

Initial ideas RURAL ENTERPRISE CENTRE


KINGDOM Key Ifold

Plaistow

Indicative Site Boundary Alder Platt

Plots

Long Copse

CR01 Seven Acre Furze

Main Access to the Site

Corner Copse CR01

Rumbold Wood Rumbold Farm

Tourist Route Live Stock Route

CR14

Red Copse CR02

CR03 Hardnip’s Barn

Limekiln Wood

The Mount

CR04 Hardnip’s Copse CR05

CR03

Lagoon L4

Agricultural Route

Crouchland Farm CR13

Foxbridge Farm

Kiln Platt

Pond Field Plantation

Equestrian Route

CR06

Roundwick Copse Lagoon L2

Lagoon L1

Furze Field

CR12

Old Furze Field

Crouchland

Lagoon L3

Ravensnest Copse

Blackwell Wood

Middlegroup Copse

CR02

Broad Field

CR08

CR14

Woodlands

CR11

CR03

CR03

Laneland

CR07

Visitor Center

CR09

Farm Shop

Wephurst Park Farmhouse CR10 Ainsworth Copse

Education Facility

Laneland Farm Cottages

CR04

Whithurst Copse Whithurst Park

Little Slifehurst Wood

Sustainable Farming Route

Ancillary Office

CR13

CR05

Arnold’s Farm

Hotel

Constraints Map

Residential Accomodation

CR06

Fountain’s Farm Cottages

Steer’s Common Copse

Belchamber’s Copse

Parking Agricultural Building / Live Stock

CR12

Tractor Route Heron’s Copse

Agricultural Land

CR08

Plaistow

Fishing Pond

CR06

Iford Plaistow

CR01

Restaurant Cafe

Kirdford CR11

Temporary Event Space

Rumbold Farm CR02

CR14

Glamping

CR03

CR03

CR07

CR04 CR13

CR05

CR06

Stores / Stables Horse Training

CR09

CR12

Roundwick Copse

Furze Field

CR08

Horse Riding

CR10

CR06 CR11

Wildlife Observation Point Sustainable Farming

CR07 CR09

Live Stock

CR10

Live Stock Sussex Game Farm

Steer’s Common

Sports Pitches

Mackerel’s Common

Kirdford

Combined Connectivity Map and Plot Divisions SEPTEMBER 2018

Community Facility

Strategic Masterplan 17


URBAN EXTENSION, HAMPSHIRE, UNITED KINGDOM 15 5

m

MASTERPLANNING

5m

m

14

The proposal at the land east of Old Odiham Road seeks to develop a mixed-use scheme comprising 108 residential units and 470 sq m commercial floorspace in a sustainable location.

0 18

1 50

m

Project aims: To provide an Indicative Masterplan to maximise the use of the land considering the previously refused planning application for 120 houses.

The majority of the dwellings will be two storey houses, with limited potential for three storey buildings where this does not protrude above the average two storey ridge line.

17 5m

A number of bungalows would be located to the northern part of the site which will maintain a more uniform approach to the land without impacting upon the existing undulating landscape.

Site boundary OS Contour 1 Storey

16 5m

A further access point will be provided parallel to the existing Public Right of Way off Grebe Close. The Right of Way which runs from south to north through the site will be maintained and enhanced as part of this proposal.

Key

17 0

The proposed access into the site will utilise the existing infrastructure provided by the development at Cadnam Farm (to the north east).

m

Most of the development will take place in the lower part of the site with boundary vegetation that will be retained and reinforced. New planting is proposed for the northern site boundary.

2 Storeys 3 Storeys

Height Plan 18

LAND EAST OF OLD ODIHAM ROAD


B D

A

New tree belt and hedges to create landscape buffer

B

Chasewood New tree belt and hedges to create a less House dense landscape

C

Existing boundary vegetation retained and alk nw enhanced mi

B

F

Public park with paths and planting

Playing Fields

Site boundary Open Space

I

Equipped play area

E

Key

P

5

D

H

K

Private garden Main Road

10

m in

F

alk w

Landscaping along Gilbert White Way to be incorporating existing trees Wootey

G

Main access

H

Secondary access

Junior and Infant School

J

High residential density

K

Medium residential density

M

Commercial building

N

MAY 2018

C P J

Football Ground

D

G P

Anstey Junior School

TOWN CENTRE

Pedestrian links to publi right of way

A

Hedgerow Dense Trees

K

Cemetery

Amery Hill School

L

Alton College

Panoramic point of view towards Alton

Context Plan

Eggar’s School

M

Allotments

P

Secondary Road

Alton Convent School

N

E

Landscape buffer

Low residential density

D

Anstey Park

I

L

N

Trees A

New tree belt and hedges to create landscape buffer

B

New tree belt and hedges to create a less dense landscape

C

Existing boundary vegetation retained and enhanced

D

Public park with paths and planting

E

Equipped play area

F

Landscaping along Gilbert White Way to be incorporating existing trees

G

Main access

H

Secondary access

I

Landscape buffer

J

High residential density

K

Medium residential density

L

Low residential density

M

Commercial building

N

Panoramic point of view towards Alton

P

Pedestrian links to public right of way

Illustrative Concept Plan 19


URBAN EXTENSION, BANSTEAD, UNITED KINGDOM MASTERPLANNING Project aims: To provide an Indicative Masterplan to maximise the use of the land considering the Flood Zone 3 constrains.

POLICY NWH1: Land at Meath Green Lane, Horley

The Indicative Masterplan demonstrates an indicative layout for a housing development on the site, taking into account the advice from the FRA. The plan contains 175 dwellings at a density of 15.4 dwellings per hectare (dph) on land outside of the flood-prone areas to the west of Burstow Stream and south of the farmhouse. The density of the surrounding linear development is 18.6 dph.

POLICY NWH2: Land at Bonehurst Road, Horley

The site offered a challenging opportunity to stitch different urban development styles and natural complete the residential developments surrounding Horley town centre.

Horley Recreation Ground

Yattendon School

Key Oakwood School

Horley Town Center

Developed land

Development Management Plan Regulation 19 Consultation (January 2018) Residential allocation Development Management Plan Regulation 19 Consultation (January 2018) Strategic Business Park Town Centre

School Horley Strategic Business Park

Train Station

Proposed Site

Proposed Footpath

Existing Foothpath

Pedestrian Connections to the Town Centre and the Train Station

Road A23, M23 and A217

Flood Zone 3 in blue within the site 20

Context Plan LAND AT WILGERS FARM, HORLEY


Key

Indicative Masterplan FEBRUARY 2018

21


NEW SETTLEMENT, UNITED KINGDOM MASTERPLANNING DIAGNOSTICS Project aims: To provide an analysis of the vision plan, assessing the requirements for a new settlement of up to 4000 units. The proposed quantum of development maximises the developable space of the Site and explores the highest densities achievable. The project is still running and this report provided initial considerations that are subject to change throughout the masterplanning process.

Site Area 142.09 ha 37.51% Green corridors and Beeding’s Copse 53.30 ha 1.17% Retail and other uses 1.64 ha 1.11% Ligh Industrial/ Industrial 1.56 ha 0.57% Office 0.80 ha 9.00% School 12.77 ha 5.97% Opens Space 8.40 ha

Developable area 88.79 ha 62.49%

44.77% Residential 63.62 ha

Area F 3.78 ha Area G 12.17 ha Area H 3.50 ha

Area E 3.88 ha

Area D 19.04 ha Area A 14.36 ha

Area B 13.12 ha

Area C 18.95 ha

22

NEW SETTLEMENT


Key up to 74 dph

Primary School

49-51 dph 39-47 dph

All-Through School

29-37 dph 12-24 dph Schools

Neighbourhood centre A 172,907 sq m floorspace

DECEMBER 2017

Neighbourhood centre B 143,499 sq m floorspace

23


VILLAGE EXTENSION,SUSSEX, UNITED KINGDOM 0

MASTERPLANNING AND SUPPORT

50

100m

N

Illustrative Development Concept Plan

Project aims: The proposed development consists Relevant of circa 50Information new homes with an appropriate mix.

Plan Key Site boundary

Promoter Welbeck Strategic Land II LLP Land off Downsview Avenue, Storrington, West Sussex, RH20 optionsAddress have been carefully set 4LU within

Approximate Size 1.86 ha Dwellings 35 units Density 18 dph

All the the landscape, responding to the proposed Closest Bus Stop Melton Drive (550 m, 6 min walk) much largerFirst residential area planned for the Storrinton School 1.3 Km, 15 min, walk Paula Rosa site as well as responding to the Approximate Site Area 2.00 ha existing residential 35 to the south of the site. Buildingsarea The proposed residential areas will face the Dwellings 35 17.5symmetric dph main road. TheDensity overall rationale will help to achieve a safe residential development and to create a uniform streetscape. The internal connections will be mainly achieved by pedestrian passages that will improve the permeability of the whole site. Those options have been prepared to support a pre-application meeting with the Council.

Main Road Footpath Residential Area Open Space Trees Dwelling

A

A’

Approximate Size 0.7 ha Dwellings 9 units Density 12 dph

Elevation AA’ Key

ate W

rL

e Melton Driv

Dwelling

Dow nsvi ew

Dow nsview A venue

Ave

e an

Approximate Size 2.4 ha Dwellings 40 units Density 16 dph

Approximate Size 3.1 ha Dwellings 50 units Density 16

rG

24

Open Space e ov Gr

f ield een Gr

n

e ist

e ch Be

a rd

ens

Fence

Ban

A

Tree

Way

A’

STORRINGTON


Illustrative Development Concept Plan B

0

50

100m

N

1 Gracechurch Street, London EC3V 0DD, UK T: +44 (0)20 3713 8500 E: dl@dominiclawson.co.uk www.dominiclawson.co.uk

Plan Key

Relevant Information

Site boundary

Promoter Welbeck Strategic Land II LLP Address Land off Downsview Avenue, Storrington, West Sussex, RH20 4LU

Main Road Secondary Road

Closest Bus Stop Melton Drive (550 m, 6 min walk) Storrinton First School 1.3 Km, 15 min walk

Footpath Public Right of Way

Approximate Site Area 2.05 ha

Residential Area

Size of the development 57 unit

Approximate Size 4.47 ha Dwellings 75 units Density 16 dph

Open Space

Density 27.8 dph

Viewing corridor

Approximate Size 0.7 ha Dwellings 9 units Density 12 dph

ll be Ro

y Wa

ate W

rL

e Melton Driv

e an

Ave

Approximate Size 3.1 ha Dwellings 50 units Density 16 dph

Approximate Size 3.5 ha Dwellings 98 units Density 28 dph

rG

e ch Be

a rd

ens

Dow nsvi ew

Dow nsview A venue

Approximate Size 2.4 ha Dwellings 40 units Density 16 dph

nis

te

e ov Gr

Ban

Way f ield een Gr

Denshire D

Sull ingt on C opse

rive

Illustrative Development Concept Plan C

0

50

100m

N

1 Gracechurch Street, London EC3V 0DD, UK T: +44 (0)20 3713 8500 E: dl@dominiclawson.co.uk www.dominiclawson.co.uk

Plan Key

Relevant Information

Site boundary

Promoter Welbeck Strategic Land II LLP Address Land off Downsview Avenue, Storrington, West Sussex, RH20 4LU

Main Road Secondary Road

Closest Bus Stop Melton Drive (550 m, 6 min walk) Storrinton First School 1.3 Km, 15 min walk

Footpath Public Right of Way

Approximate Site Area 2.05 ha

Residential Area

Size of the development 57 unit

Approximate Size 4.47 ha Dwellings 75 units Density 16 dph

Open Space

Density 27.8 dph

Viewing corridor

Approximate Size 0.7 ha Dwellings 9 units Density 12 dph

ll be Ro

y Wa

ate W

rL

e Melton Driv

Approximate Size 3.1 ha Dwellings 50 units Density 16 dph

Approximate Size 3.5 ha Dwellings 98 units Density 28 dph

rG

e ch Be

a rd

ens

Dow nsvi ew Ave

Dow nsview A venue

e an

Approximate Size 2.4 ha Dwellings 40 units Density 16 dph

nis

te

e ov Gr

Ban

Way f ield een Gr

Denshire D

MAY 2017

rive

Sull ingt on C opse

25


MOGGERHANGER, UNITED KINGDOM Illustrative Development Concept Plan

N

1 Gracechurch Street, London EC3V 0DD, UK T: +44 (0)20 3713 8500 E: dl@dominiclawson.co.uk www.dominiclawson.co.uk Granted planning application CR/14/01818 Proposed development Proposal for 90 new dwellings, a retail unit, associated open space, new vehicular and pedestrian accesses, new landscape and additional tree planting. Unit: 90 Site area: 4.63 ha Density: 19.44 dph

Erection of 18 dwellings with highway, services, hardstanding and external works. Unit: 18 Site area: 0.59 ha Density: 30.5 dph

MASTERPLANNING AND SUPPORT Commissioning body: ICP Ltd Local Authority: Central Bedfordshire District Council Project aims: A new infill development in the existing Moggerhanger village for up to 90 high-quality residential dwellings, provision of community facilities, associated open space, surface water management and attenuation. The site was in agricultural use and the southwest corner of the site is opposite the Historic Park and Garden of Moggerhanger Park. Â Moggerhanger Park

The vision for this development was to create a sympathetic extension to the village of Moggerhanger taking in account the existing contraints. I have produced the initial concept plans and I have ammended the final masterplan that was submitted in June 2017. 26

Plan Key Site boundary Proposed Main Road Proposed Secondary Road Proposed New Footpath Proposed Residential Area Proposed Open Space Proposed Tree Planting Blocks Proposed Store Key tree groups Moggerhanger Boundary Existing Open Space Existing Historic Park and Gardens

MOGGERHANGER


A revised new green masterplan has been prepared by collating feedback received from Central Bedfordshire Council (on planning policy matters), many different experts (on matters such as flood risk, drainage, landscape and transport) and especially from local people who attended the consultation event and expressed their concerns to the team.

New Village Gateway

Bus Shelter Improvements

New Shop and/or Clinic

New safe pedestrian crossing and new footpath on Bedford Road

New Classroom Moggerhanger Lower School

Water attenuation basin for sustainable drainage

This revised masterplan includes solutions to address the concerns raised by the local people during the consultation and also includes off-site contributions resolving existing pressing problems such as drainage, water pressure and road safety.

Safe Access on Park Road

FEBRUARY 2017

Scattered landscaped green spaces including a new play ground

Improved number of bungalows in line with local people’s requirements

Safe pedestrian link towards the village centre

1 of 2 Proposed Average Speed Camera

New Village Gateway

27


REGENT QUARTER, LONDON, UNITED KINGDOM Trematon Mews

43

45

42 to 50

1 to 3

44

47

52

PH

Trematon Building 37

MASTERPLANNING DIAGNOSTICS

32

RAILWAY STREET

35

17

The Copperworks

The Ironworks

Listed building

1 to 7 El Sub Sta

9

17

1 2

2 to 8

13

Albion Buildings

1

1

Viewing Corridor

35

48

32

The Brassworks

PH 5

Parliament Hill summit to St Paul's Cathedral

46

33

Left Lateral Assessment

44 42 40

YORK WAY

Focus Point Hotel

24

CAL

EDO

Kenwood viewing gazebo to St Paul's Cathedral

28

NIA

21

30

Right Lateral Assessment

NR

OA D

Kenwood viewing gazebo to St Paul's Cathedral

23

Viewing Corridor

38

1 19

YORK WAY

2

8 24

PH

PH

2a

26

26a

CALEDONIA STREET

3

Block C

43

ALBION YARD

Jahn Court

Parliament Hill summit to St Paul's Cathedral

10

Site Boundary

to 4

Covered passage

19

34b

10

18.3m

Roofless area

20

36 to 40

Block D

This initial appraisal showed that increasing the height of Times House by up to three storeys, including a roof terrace bar, with an accompanying redevelopment of the adjacent Courtyard, would be achievable in the short term, as Eurostar’s requirements may be changing following the rent review. This research supported the following preapplication submission.

19

Cottam House

BALFE STREET

Key

Local Authority: London Borough of Islington Project aims: Development Opportunities and analysis of the site.

Laundry Buildings

6

1 to 15

13 to 17

Joiners

Th

18

ard r ty

ou eC

Yard

Shelter

CALEDONIA STREET Times House

3 to 5 8

5

3

4

s Bravington

3

6

10 to 25

42

3

10 2

1 to 9 1

Shelter

294 to 300

LLE ROAD

PENTONVI

277

283

285

291

370

297

368

Context

1

374

372

5

281

376

289

378

287

380

295

King's Cross

Site location

264

15.4m

278 to 284

286 to 292

2

Block A

LLE ROAD

266 to 270

275

6

House

304 302

272 to 276

King's Gate

Bravington

Bank

The Yard

The Courtyard Theatre

16.1m

PH

1

8

Walk

The Varnish Works

273

ROAD

12 to 18

OMEGA PLACE Varnishers Yard

London King's Cross Railway Station

PENTONVI

1

10

5

Block B

CALEDONIAN

2

Shelter

Shelters

REGENT QUARTER 331

333

335 337

339

343

28

345

1


Trematon Mews

43

45

42 to 50

1 to 3

44

47

52

PH

32

RAILWAY STREET

35

19

17

The Copperworks

The Ironworks

Direct visual link with the bus stop to attract pedestrians and commuters.

Roofless area

21

10

1 to 7

Building Building 43

23

38

5 3

6

1

OA D NR NIA

21

EDO CAL

3

2a

2

1 19

8 42

8

The Courtyard Theatre

2 2 10

House

3 to 5

5 3

5

372 331

337

345

285

291

5 1

333

283

374

Wide and welcoming space to host and entertain consumers.

339

Improved entrance. Direct visual link to the internal shops and improved footpath lighting.

1

277

372

275

281

Pedestrian link made by translucent materials to enhance the historical disused subterranean rail line.

343

297

368

Proposed

370 368

Shelters

370

The main branch of the gallery. Main pedestrian and shop hub.

273

376

289

378

287

380

295

King's Cross

376

335

1

LLE ROAD PENTONVI

378

374

1 to 9

2

297

380

291

Shelter

294 to 300

287

2

King's Cross

289

15.4m

278 to 284

295

266 to 270

264

285

1

42

3

10

6

272 to 276

283

8

Bank

The Yard

286 to 292 304 302

LE ROAD

PENTONVIL

PH

King's Gate

House

16.1m

294 to 300

6

10 to 25

The Varnish Works

The Courtyard Theatre

Bravington

8

3

s Walk Bravington

London King's Cross Railway Station

304 302

This building will be 8 meter higher than before including on the roof a bar that will benefit of the St. Paul view corridor.

1

Shelters

321

7 331

333

335 337

339

343

345

1

NOVEMBER 2016

266

278 to 284

286 to 292

2

12 to 18

OMEGA PLACE Varnishers Yard

281

4

5

1

272 to 276

King's Gate

Bravington

1

Times House Shelter

PH

The Yard

3

13 to 17

10

10 to 25

The Varnish Works

Walk

10

Shelter

6

Yard

3

s Bravington

8

Joiners

u Co

5

26a

26

e Th

Yard

18

ard r ty

Varnishers

London King's Cross Railway Station

1 to 15

1

OME

12 to 18

28

24

Laundry Buildings

6

Shelter

Shelter

Proposed opened/covered passage

30

24

PH

Yard Times House

Proposed building

CALEDONIA STREET

PH

19

1 to 4 33

Traffic Flow Proposed Pedestrian Traffic Flow

Joiners

Co

13 to 17

17

13 5

44

e Th

1 to 15

d yar urt

18

46

Flow Proposed Pedestrian

40

YORK WAY

6

Existing Pedestrian Traffic Flow Pedestrian Traffic Existing

42

Focus Point Hotel

Laundry Buildings

Site Boundary

PH

4

2

The Brassworks

1 to 9

1

35

Site Boundary

48

32

Long term

PH

PH

26a

Covered passage

Internal passage

24

Albion Buildings

26

2 to 8

Roofless area

1

Medium term

CALEDONIA STREET

Roofless area 8

9

ALBION YARD

Jahn Court

CAL

19

10

Short term

Key Key

28

El Sub Sta

30

34b

Site Boundary

EDO NIA NR

18.3m

20

36 to 40

Internal passage

Secondary exit to connect the proposed gallery to the local shopping area outside Regent Quarter Block B.

Consolidated pedestrian flows towards Varnishers Yard.

29

277

Cottam House

BALFE STREET

Key

The second branch of the gallery, including commercial activities at ground floor. It is the second axis that connects the gallery to Tesco and the local shopping area on the western side.

OA D

37

Trematon Building


NORWICH, UNITED KINGDOM Th or p e Wo odla nds to

MASTERPLANNING DIAGNOSTICS

GT4

la n

Public Open Space and School Playing Fields (GT5)

overt /Fir C ion tat

GT4

GT20

Mixed-Use Allocation (460 homes, formal recreation. Commencement 2020/21.)

Potential Extension to Woodland Park (GT21)

GT5

Completion of existing committed development (Outline Permission for 1,233 homes. Reserved Matters consent for 1st Phase of 448 homes. Development commenced on 1st phase May 2014.)

Boar Plantation Sport’s Ground

Paines Park

20

Public Park Land North of Thorpe End (GT2 and GT7)

Enhanced Tree Belts and Landscaping (GT2 and GT7)

Factory

Recreation Ground

Industrial Estate

Racecourse Plantations

ar

kh

th ea

P

GT8

a (vi

c Ra

eck dla

or Th

p

oo eW

nd

oD st

Key

Residential Allocation (45 homes, vehicular connection to Salhouse Roa, formal recreation.)

B bs

e

Cottage Plantation

antation) ons Pl arris ia H k (v ec sB bb

Pr

ry im a

M GI:

h to t d l eho ou s

ads Bro

Harrison’s Plantation Woodland Park (GT5)

(EIA Scoping received for 1,400 homes south of Salhouse Road)

Thorp e Wo odl an ds to Do

Green Infrastructure Key Diagram

k)

GT7

Recreation Ground

Heath Wood

Rackheath Park

GT

Our vision was to create a beautiful residential development in a woodland setting, supporting the enhancement of the green infrastructure and the ecological value of this key location in the urban expansion zone of this important English city.

Gazebo Covert

B ro a d w a l k P

Commissioning body: Socially Conscious Capital Local Authority: Broadland District Council Project size: Racecourse Plantations could deliver up to 300 new homes

Completion of existing committed development (120 homes are completed. 290 homes total.)

Green infrastructure key diagram

Sprowston Manor Golf Course

Primary GI Corridor

ob

Secondary GI Corridor Pedalway Road used as a public path

GT8

DLBP Proposed footpath Brook Farm

(GT6) Tho rpe W oodl ands to Wit ton Run

Mousehold Heath Open Accedemy

GT3 (AAP) Route for Orbital Link Road

Triangle Wood

Railways Northern Distributor Road Racecourse Plantation Existing Woodland

GT6

Completion of existing committed development (Outline Permission for 600 homes)

Heartsease Primary School

Existing Public Open Space

GT21

Proposed Public Open Space/Landscape

Mixed-Use Allocation (300 homes, formal recreation. Commencement 2020 at earliest, if Reserve Sites Policy (GT20) is triggered.)

nds odla e Wo Thorp

Proposed development

Allotments

GT9

Employment Allocation

Pl

e,

Playing Field

an

Thorpe St Andrew School

Potential Open Space for GT21

eL me to S

Sprots Field Pavillion

Proposed allocation

um

s te

ad

Broadland Business Park

Recreation Ground

The Rectory

Reservoirs (covered)

30

GT11

Mixed-Use Allocation (850 homes, primary school, nursery, community building, police development base. Commencement 2018/19.)

Weston Wood Lion Wood

Primary GI: Thorpe Ridge

Townpit Plantation

GT10

Employment Allocation

NORWICH


County wildlife analysis of the site surrounding area

The site is a commercial forestry plantation which is locally ecologically significant and has the designation as a County Wildlife Site. The masterplanning process started from a deep understanding of the ecology of the site, and how residential development to meet critical housing needs could be managed in harmony with ecological enhancement.

Ladies Ladies Wood, Wood, Church Carr Carr Church and and Springs Springs

Tollshill Tollshill Wood Wood

The solution was to limit the development area to the zone of least ecological value, and use the rest of the site to create new green infrastructure corridors required by the Council as well as to provide ecological enhancement zones and areas for public recreation through the creation of a new 60 hectare Community Woodland Park, funded by the residential

Paine’s Yard Yard Wood, Wood, Paine’s The Owlery Owlery The and and March March Covert Covert

development.

Racecourse Racecourse Plantation Plantation

Mousehold Mousehold Heath Heath and Valley Valley Drive Drive and

Belmore Belmore and and Brown's Brown's Plantations Plantations Land west west Land of Wensum Wensum Park Park of

Norwich

JUNE 2016

Lion Lion Wood Wood and and Telegraph Telegraph Plantation Plantation

Pinebanks Pinebanks

31


NEW SETTLEMENT, UNITED KINGDOM Pulborough CP

MASTERPLANNING Commissioning body: Welbeck Strategic Land Project aims: To provide an illustrative strategic masterplan for a new settlement taking benefit from the existing development and green resources. The proposed new settlement responds to the existing local area and improves the infrastructure to meet the new demands that it brings. The existing bridge over the railway will be widened to provide safe vehicle access across the railway. The plan on the right shows three different boundaries: • wider site boundary originally proposed by the Client; • the Farm ownership boundary; and • proposed development site boundary.

Key Wider Site Boundary Farm Proposed development site boundary Railway Main Road Secondary Road Civil Parish 01 Civil Parish 02 Civil Parish 03 Consolidated Urban Boundary Consolidated Vegetation Water College Bridge Railway Station

Proposed Development Secondary Road Railway Station

Site location plan 32

NEW SETTLEMENT


Proposed outline masterplan

The proposed development site boundary assumes this shape because it follows the flattest zone around 20-30 m above sea level. Residential development at the west of the site provides possible accommodation for use by the existing College and the new employment uses already being developed on this site, enhancing the sustainability of the proposed development. The new secondary routes link into the existing highways network, with a proposed new railway station providing access to the London to Chichester train service. The masterplan identifies three different home types: • Type A, low density, placed in more sensitive landscape; • Type B, medium density at the edges of the site; • Type C, high density close to the railway, road and the college.

The core of the settlement is developed around the existing pond. This area provides for all the main social functions. It provides the links to the northern consolidated vegetation area, the existing pond and the envisaged open space beyond the settlement. The core hosts the primary school that provides easy pedestrian and cycle access to the new settlements and with the open space. It lies on the boundary of the green corridors.

Key Site boundary

Proposed Development

Farm

Residential Area

Open Space

Proposed development site boundary Railway

Home type A

Village Green

Home type B

Playground area

Main Road

Home type C

Green space and Public seating

Secondary Road

Secondary Road

Water

Consolidated Urban Boundary

Upgraded Bridge

Enhance the existing vegetation

Consolidated Vegetation

Railway Station

College

Primary School

DECEMBER 2015

These corridors, that could be emphasised through appropriate landscaping, link the centre with the open space towards green space to the south.

0

100

250

500 m

The open space has a range of proposed uses, from the “village green” around the pond, “playground areas” in close proximity to the primary school and green space and public seating towards the existing vegetation. 33


ABANO AND MONTEGROTTO TERME, ITALY MASTERPLANNING Commissioning body: IUAV (Italy) Local Authority: Abano Terme and Montegrotto Terme, Padua, Italy Project aims: To demonstrate how amending regional policies can improve the effectiveness of masterplanning. Cinema Marconi

The Italian planning system sets a legal framework for the masterplanning process to be used in Italian cities.

Duomo S. Lorenzo

Piazza Mercato

In Padua, an alternative to the conventional masterplanning process was adopted to support the development of the neighbouring cities of Abano Terme and Montegrotto Terme. Sketch aerial view of illustrative masterplan A without policy changes

Piazza Unità Hotel ex Salvagnini

on et erm

ale

Municipio

Sketch aerial view of illustrative masterplan A with policy changes

si

es n n o C Hotel l’Orologio

Fonte del Montirone

Sketch aerial view of illustrative masterplan B without policy changes 34

Sketch aerial view of illustrative masterplan B with policy changes

Centro Congressi P. d’Abano

Parco Termale

Sketch aerial view of illustrative connections masterplan for the whole city ABANO AND MONTEGROTTO TERME


Comune di Montegrotto Terme

Originally a Roman spa, the city split into two over the years and this project aimed to recreate the connection through careful masterplanning.

The modest scale of the individual projects means that the plan can be delivered flexibly over time as resources allow, with the cumulative impact being much greater than would be created by larger, more costly projects.

The alternative approach consisted of working with local people at the very local level, developing a network of small scale interventions that will create connections over time, rather than the conventional approach of starting with the whole city and proposing larger scale interventions that, whilst beneficial in themselves, often fail to create the connections that are required. This approach resulted in proposals to take poorly utilised public spaces and intensify their use, thus creating a network of public spaces which unifies the two cities.

Comune di Abano Terme

Many of the projects focus on the thermal baths which still inform the identity of the two cities, representing the historic unity of the place.

Sketch aerial view of ‘Orologio hotel’ without policy changes

Sketch aerial view of ‘Orologio hotel’ with policy changes DECEMBER 2014

35


TREVISO 2020 - ITALY

23

The path of the industrial architecture and historic mansions of treviso complement each other giving the opportunity to the user to choose at any time whether to follow one oo the other path. Is shown in the lines below a list of goods deemed to be relevant and made the system between them. All the design choices presented in this table are intended to better enjoyment of the land.

9_Villa Tiepolo

Industrial architecture path a) Porto di Silea b) Centrale elettrica c) Mulino Mandelli d) Mulino ex Purina e) Porto di fiera

21

Historical villas path 1. Villa Ninni Carrisi 2. Villa Cornaro 3. Villa Torzo, Ciani Bassetti 4. Villa Bassan 5. Villa Piovesan Zamuner 6. Casa D’Ambrosio 7. Villa Benes Cominato 8. Villa Silvano Fenoglio, Giacomelli, Zalla 9. Villa Tiepolo 10. Villa Rapizzi 11. Villa Cellini 12. Villa Saccardo Venturi 13. Villa Fan detta “delle Rose” 14. Villa Olivi Conean 15. Villa Calzavara 16. Villa Cavedon 17. Villa Crispi 18. Villa Zeno detta “la Casetta” 19. Villa Manfrin detta “Margherita” 20. Villa Braida 21. Villa Zeno 22. Villa Pavan 23. Villa Reali, Sugano, Zeno Antonini, Zen, Grizzi, Dal Fiume. 24. Villa Gritti, Rubinato

19 20

Section of Villa Tiepolo daytime use

18

16

17 10 11

12

9_Villa Tiepolo

9

13

14

15

In the image next propose a new model of stand inserted in the new design of the driveway of the villa Tiepolo. Stand that depending on usage can assume different functions as a support for display panels until you get to sessions covered or not. The model lends itself to use temporary or permanent by placing so a different way of using both space and time. The settings may vary depending on the season or their intended uses.

MASTERPLANNING Commissioning body: IUAV (Italy), Delft University of Technology (Holland), Università Politecnica de Catalunya (Spain), TU Beijing (China), Tsinghua University (China), Chonnam University (South Korea) and Chinese University of Hong Kong (China) Local Authority: Treviso, Italy Project aims: To create a masterplan for Treviso that responds to the historical urban expansion which has resulted in the merger of the former industrial area with the rest of the city. The city wishes to be more welcoming and engaging for future generations, LEGENDA encouraging visitors as well as promoting a archaeology building healthy Industrial social and economic future.

Section of Villa Tiepolo night use 24

AREA EX DE LONGHI

d

1

Photomontage of project bridge “p1“

4 2 p1

3

7 8 5

e

6 c p2

Industrial architecture path Historical villa Historical villas path

Proposed summary plan

Existing bridge Project bridge

36

Ex De Longhi

b

Section of the project bridg “p1“

TREVISO 2020


Proposed site location plan

In October 2014 the city of Treviso ran an international workshop with a number of universities from around the world, called Treviso 2020. The aim was to produce a masterplan for the future of the city based on SmartCity principles. The masterplan focussed on building on the heritage of the city, enhancing the value of the former industrial area, to create a new central zone for the city that would be attractive to both citizens and visitors. The masterplan proposed the creation of a new network of pedestrian connections, including the creation of new pedestrian bridges and the remodelling of the historic gardens in the city centre. The pedestrian routes have been incorporated into a locationbased smartphone app, which allows the user to understand the history of the location, see the current urban policies for the location as well as seeing some sketches of potential future plans.

Treviso Aqua Connection

archVISION 500 piedi

100 m

Trevigian road Turist road New Bridge Industrial Architecture Historical Villa’s Path Area SMART

WS 04 / 09 Culture & Tourism Cultural Heritage OCTOBER 2014

archVISION Treviso Aqua Connection

Alessandra degli Azzoni Avogadro, Armando Zappalà, Giovanni Matteo Cudin, Giulia Battiston, Alessandra Benazzato, Gian Andrea Giacobone, Federico Lo Porto, Michela WS04 CULTURA E TURISMO archVISION Alessandra degli Azzoni Avogadro, Giulia Battiston, Giovanni Matteo Cudin, Mansutti Armando Zappalà CULTURE & TOURISM

PATH MAP

37


SAN DONA’ DI PIAVE, ITALY MASTERPLANNING

Activities fall out of the proposed new funcions on the surrounding city

Commissioning body: IUAV (Italy) and San Dona’ di Piave Local Authority: San Dona’ di Piave, Venice, Italy Caption on images: Activities fall out of the proposed new functions in the surrounding city. Commercial building in close proximity to historic buildings, new challenges for the centre of the city. Bigger box buildings create opportunities for new urban functions. San Dona’ Di Piave established a summer masterplan workshop to respond to the consequences of the post 2008 economic crisis in Europe. This had led to a significant reduction in commercial activities in the central part of the city, threatening to destabilise the urban balance between commercial, leisure

Commercial building towards historical building, a new way to live the centre of the city

Bigger building such as box for others urban functions 38

SAN DONA’ DI PIAVE


Comune di San DonĂ di Piave

Proposed historical/commercial network for the entire San Dona’ di Piave

and residential uses that had evolved over many years. The masterplan process therefore looked at how to encourage new uses in the empty retail galleries, generating cultural events to promote the historic importance of the city, and creating a linked network of commercial buildings to provide the basis for the revival of the city centre. Â This also required the reshaping of some of the existing commercial areas, to give them new meaning within the proposed network.

JULY 2014

39


ISOLA DI MILANO, ITALY

The district of Isola was isolated from the centre of Milan in terms of pedestrian and vehicular connections, a situation that was made worse by the Porta Nuova project.

AREE RICREATIVE

Existing green areas network 40

Si consiglia un percorso di progettazione partecipata che si può svolgere in due fasi principali: 1. una fase strategica che prevede la formulazione delle prime proposte-idee condivise; 2. una fase operativa in cui i gruppi di lavoro, già costituiti precedentemente, potranno seguire più direttamente le fasi della progettazione esecutiva dell’area.

AREE GIOCO RAGAZZI

ATTIVITA’ ALL’ APERTO

AREA GIOCO BIMBI AREA PER FESTE DI QUARTIERE

AREE COLTIVABILI E DI SENSIBILITA’ ECOLOGICA

Studenti: Studenti: Giovanni Matteo Cudin Cudin Giovanni Matteo Elisa Lazzarin Elisa Lazzarin Barbara Michelon Barbara Michelon Armando Zappalà Armando Zappalà

Docenti: Docenti: Moreno Baccichet Moreno Baccichet Ruben BaioccoBaiocco Ruben Giulio Ernesti Ernesti Giulio

By enhancing the connections between Porta Nuova and the neighbouring areas of Milan, the masterplan aimed to stitch the district of Isola back into Milan’s urban fabric.

L’intervento mira a riqualificare e riattivare provvisoriamente alcuni piani del “Rasoio” e si può attuare attraverso la stesura di un contratto di quartiere. Questo strumento è generalmente utilizzato per promuovere progetti di recupero urbano (edilizio e sociale) di quartieri segnati da diffuso degrado delle costruzioni e dell’ambiente urbano e prevedono il coinvolgimento diretto degli abitanti del quartiere nell’elaborazione dei progetti. Hanno come obiettivo primario la “promozione del territorio” in coerenza con i programmi per lo sviluppo umano a livello locale delle Nazioni Unite e in riferimento ad Agenda 21.

SPORT ESTREMI

MASTERPLAN IL PARCO

Commissioning body: IUAV (Italy) Local Authority: Milano, Italy Project aims: To establish a new urban masterplan solution which improves the functionality of the Porta Nuova project and its surrounding areas.

CDL MAGISTRALE IN PIANIFICAZIONE E CDL MAGISTRALE IN PIANIFICAZIONE E POLITICHE POLITICHE LA CITTA’, IL TERRITOPER LA CITTA’, IL PER TERRITORIO E L’AMBIENTE. RIO E L’AMBIENTE. A.A 2013/2014 A.A 2013/2014

MASTERPLANNING

In contratto di quartiere mira ad: • avviare percorsi di partecipazione e co-progettazione tra i diversi soggetti residenti e/o frequentanti l’area considerata; • elaborare proposte inerenti le funzioni e la struttura degli spazi considerati, i possibili utilizzi di questo edificio e il ruolo di centralità che potrà svolgere all’interno del quartiere e dello stesso comune, una volta attivato; • definire eventuali modalità di gestione dei nuovi spazi, stimolando, se necessario, i vari soggetti coinvolti ad impegni concreti e co-responsabili; • migliorano la qualità delle abitazioni e dell’insediamento accrescendo la dotazione e la qualità dei servizi; • realizzare accordi tra enti pubblici per incrementare l’occupazione e favorire l’integrazione sociale e di realizzare accordi con associazioni e volontariato (settore molto sviluppato e articolato all’interno del quartiere Isola) per migliorare l’offerta dei servizi pubblici.

NORDIC WALKING/ MOUNTAIN BIKE

Il contratto di quartiere è pensato per integrarsi con i piani e programmi dell’amministrazione (piani del traffico, di zona, urbanistico, ecc.), con i progetti strategici di mandato del Sindaco e con gli orientamenti per l’allocazione delle risorse, soprattutto nell’ambito della manutenzione straordinaria.

‘The Park‘ illustrative masterplan ISOLA DI MILANO


Comune di Milano IMBOCCO M5 LINEA LILLA: FERMATA ISOLA

5

Via Confalonieri illustrative masterplan

The proposed masterplan had three objectives: 1

CDL MAGISTRALE IN PIANIFICAZIONE E CDL MAGISTRALE IN PIANIFICAZIONE E POLITICHE POLITICHE LA CITTA’, IL TERRITOPER LA CITTA’, IL PER TERRITORIO E L’AMBIENTE. RIO2013/2014 E L’AMBIENTE. A.A A.A 2013/2014

• to reshape the main retail street, generating a wider range of independent shops, to encourage people to walk through the area; • to redevelop a previously unused corner plot into a new hub of activity, including a local market, to revitalise the streets and encourage people to come to the centre of the area; and • the redistribution of existing urban and public realm functions, notably including the central park, Il Parco, to enhance the public realm in the new Porta Nuova area of Isola and to overcome the isolation created by earlier developments.

PERCORSO TIPO N° 7: ARTISTA

4

4 1-5 6

2

5

CENA AL BAR

3

1

8

4

6

3

4

MASTERPLAN PERCORSI TIPO

1

SPETTACOLO AL TEATRO VERDI

RIENTRO A CASA IMBOCCO M5 LINEA LILLA: FERMATA ISOLA 6

4 60 5

2

4

5

4

3

2

2 3

1 7

7

CENA AL BAR SASSETTI

5

PALESTRA E ARRAMPICATA NOTTURNA AL “RASOIO”

3

5

ANIMATORE AL LABORATORIO DI TEATRO NEL PARCO “BIBLIOTECA DEGLI ALBERI”

PERCORSO VITA NEL PARCO “BIBLIOTECA DEGLI ALBERI”

3

PERCORSO TIPO N° 6: ARRAMPICATORE URBANO

3

5

4 3 6

USCITA DALLA M2 LINEA VERDE: FERMATA GIOIA

1

1

2

1

6 5

2

4 3

2

2

RISCALDAMENTO ED ESERCIZI DI STRETCHING

2

CASA: USCITA E RIENTRO IN BICICLETTA 1-5

RIENTRO A CASA IMBOCCO M5 LINEA LILLA: FERMATA ISOLA

PISTA CICLABILE 4 LUNGO VIA VOLTURNO

6

1-6

PERCORSO TIPO N° 5: ADOLESCENTE

SEDI ISTITUZIONALI

1

SITO DI PROGETTO

2

SITO DI PROGETTO

Studenti: Studenti: Giovanni Matteo Cudin Cudin Giovanni Matteo Elisa Lazzarin Elisa Lazzarin Barbara Michelon Barbara Michelon Armando Zappalà Armando Zappalà

Docenti: Docenti: Moreno Baccichet Moreno Baccichet Ruben BaioccoBaiocco Ruben Giulio Ernesti Ernesti Giulio

CASA

4

LUDOTECA: 3 GIOCHI PER IL BIMBO E SCAMBIO D’OPINIONI TRA MAMME

ACQUISTO DEL GIORNALE IN EDICOLA

5

STECCA 3.0

INCUBATORE D’ ARTE

PRELIEVO FIGLI SCUOLA ELEMENTARE

RIPORTARE LA NIPOTINA A CASA IMBOCCO M5 LINEA LILLA: FERMATA ISOLA

RITROVO AL PARCHETTO CON GLI AMICI

PRANZO AL RISTORANTE

4

GIOCO: CAMPI DA BASKET SUL TETTO DEL “RASOIO”

2

3

3

8 2

PERCORSO TIPO N° 1: NONNO

AREA DIREZIONALE

SITO DI PRELIEVO NIPOTINA PROGETTO

PERCORSO TIPO N° 2: NEOMAMMA

ASILO SOTTOSOPRA

RESTITUZIONE BICICLETTA AL “RASOIO”

5 4

NOLEGGIO BICICLETTA AL CICLOBBY

PASSEGGIATA

7

2

PERCORSO TIPO N° 3: PAPÀ

LAVORO: SEDE REGIONE LOMBARDIA

1 7

AUTOMOBILE AL PARCHEGGIO “RASOIO”

GIOCHI E AREA RELAX IN VIA PIETRO BORSIERI 5

PERCORSO TIPO N° 4: UOMO IN CARRIERA

3

USCITA DALLA M2 LINEA VERDE: FERMATA PORTA GARIBALDI

LETTURA DEL GIORNALE NELL’ AREA RELAX VIA PIETRO BORSIERI FESTA DI COMPLEANNO AL PARCO “BIBLIOTECA DEGLI ALBERI” RESIDENZIALE E TERZIARIO

1 6

LAVORO: TORRE UNICREDIT 2

PASSEGGIATA AL PARCO “BIBLIOTECA DEGLI ALBERI”

RIENTRO AL LAVORO 4

5

PRANZO AL BAR 3

6

Major existing pedestrian connections FEBRUARY 2014

GIRO IN BICICLETTA NEL PARCO “BIBLIOTECA DEGLI ALBERI”

1-6 CASA

Trip generation for the whole area 41


MSP MARITIME SPATIAL PLANNING, AZORES MASTERPLANNING Commissioning body: University of the Azores Project aims: Marine spatial planning (MSP) is a public process of analyzing and allocating the spatial and temporal distribution of human activities in marine areas to achieve ecological, economic, and social objectives that are usually specified through a political process. In 2013 IUAV with the European program and Azores University have proposed an international summer school in Sao Miguel, the largest island in Azores archipelago. The project involved the identification of the stakeholders involved and the resolution of conflicts present considering both the economic sphere-urban and the natural (flora, fauna and landscape). CARETTA CARETTA

BALAENOPTERA MUSCULUS

42

TURSIUPS TRUNCATUS

MSP AZORES


TODAY

DELPHINUS DELPHIS

Proposed

Proposed

JULY 2013

Planning protected areas as vulnerables resources of a marine sensible bioma.

43


BAGHDAD WEST, IRAQ MASTERPLANNING DIAGNOSTICS Project size: Graphical analysis of the masterplan made by the architect and planner Constantinos Doxiadis (1955-58). How Doxiadis’s social and formal experiments drew on larger mid-twentieth-century debates on modernism, urbanism, regionalism, and development. Analysis of the different layers that composed Doxiadis Masterplan for Baghdad. Graphical exercise to understand how European thinking shaped the future of Baghdad by imposing buildings and major roads on the existing rural communities.

44

BAGHDAD WEST


APRIL 2013

45


Sant´Agostino

SANT’AGOSTINO, 1. ITALY MASTERPLANNING Commissioning body: IUAV (Italy) and Sant’Agostino Local Authority: Sant’Agostino, Ferrara, Italy Project aims: Working in a town that was badly damaged by the earthquake of May 2012, to use the remaining historic buildings to reactivate the town centre socially and architecturally.

Vuoti

The earthquake of May 2012 resulted in the loss of many of the historic buildings in the town centre, including the Town Hall. New planning policies were developed, building on the history of the town and on its diverse population, with significant migrant communities from Morocco and Pakistan.

Mercato interculturale

Lo studio condotto sul territorio del comune di Sant´Agostino, ha permesso di conoscere gli elementi storici e culturali presenti. Ci siamo resi conto delle difficoltà economiche, sociali e ambientali che l’amministrazione ha incontrato nel gestire questo patrimonio, patrimonio considerando anche l’assenza di politiche di valorizzazione atte a tali beni. Questi luoghi di cui parliamo sono percepiti, come un’identità perduta. Per questo i nostri obiettivi mirano a far riaffiorare i valori ormai persi creando un legame più forte tra i cittadini e i luoghi considerati. Unione che si esplica tra i cittadini Esposizione di Sant’Agostino immigrati e non, e tra i cittadini delle frazioni corollarie. L’immersione pregnante in questo scenario e l’empatia del gruppo di lavoro sul campo, campo ha generato la definizione di interventi progettuali di politiche possibili per il comune di Sant’Agostino.

Cineforum

2 .

L’ide di cr evide ciclo valor Sarà riduc dei tragi Cons semp com ricon valor diven Avrà poss a mi uno indir che in re Alla scen di co

Sant´Agostino Lo studio condotto sul territorio del comune di Sant´Agostino, ha permesso di conoscere gli elementi storici e culturali presenti. Ci siamo resi conto delle difficoltà economiche, sociali e ambientali che l’amministrazione ha incontrato nel gestire questo patrimonio, patrimonio considerando anche l’assenza di politiche di valorizzazione atte a tali beni. Questi luoghi di cui parliamo sono percepiti, come un’identità perduta. Per questo i nostri obiettivi mirano a far riaffiorare i valori ormai persi creando un legame più forte tra i cittadini e i luoghi considerati. Unione che si esplica tra i cittadini Esposizione di Sant’Agostino immigrati e non, e tra i cittadini delle frazioni corollarie. L’immersione pregnante in questo scenario e l’empatia del gruppo di lavoro sul campo, campo ha generato la definizione di interventi progettuali di politiche possibili per il comune di Sant’Agostino.

1.

Vuoti

Mercato interculturale

Cineforum

2 .

L’idea ispiratrice della nostra proposta è quella di creare unione tra i frammenti sociali che si evidenziano. Favorendo attraverso un percorso ciclo pedonale processi di informazione e valorizzazione delle patrimonio esistente. Sarà un percorso che favorirà ll’accesso accesso ai luoghi riducendo gli spazi e arricchendo la conoscenza dei fruitori con possibili esposizioni lungo il tragitto. Considerando che la piazza di Sant’Agostino è sempre stata un riferimento importante per le comunità locali; vogliamo non solo riconfermarla, ma anche avviare un processo di valorizzazione e arricchimento. Facendola diventare un nodo fondamentale del percorso. Avrà un indirizzo multifunzionale, con la possibilità di avviare una serie di iniziative volte a migliorare la coesione sociale. Pensiamo ad uno spazio flessibile, evitando l’imposizione di indirizzi ben definiti, perché sappiamo bene che le utilità saranno date nel corso del tempo in relazione alle richieste e al momento storico. Alla vostra sinistra si espongono alcuni possibili scenari atti alla ri‐attivazione di processi sociali di coesione.

San Carlo

San Carlo

Chiesa Sant´ Agostino – dopo

Chiesa Sant´ Agostino – dopo sisma Chiesa Sant´ Agostino – Progetto percorso La chiesa di Sant´Agostino, è situata Anche la chiesa ha subito dei danni. Allo ll zona nord d della d ll piazza centrale. l Li stato odierno d esistono delle d ll opere di d nella di fronte era situato il municipio oggi recupero. demolito a causa delle numerose instabilità strutturali dovute al sisma.

Sant´Agostino

3 .

Bosco Panfilia – Vista aerea

La chiesa di Sant´Agostino, è s ll zona nord d della d ll piazza centr nella di fronte era situato il municipio demolito a causa delle num instabilità strutturali dovute al sism

Il bosco della Panfilia insieme al fiume Reno, esso rappresenta uno dei tanti beni ambientali che vogliamo valorizzare. Il bosco è sempre stato un polo ricreativo non solo per le caratteristiche ambientali ma anche perchè da sempre è stato fonte per il tartufo bianco. Prodotto che ha avviato specialmente nel dopo guerra un circuito di sagre e momenti sociali d’unione.

Mappa con il con il percorso proposto in rosso in rosso

4 .

5 .

Oratorio Ghisilieri– post sisma L’Oratorio Ghisilieri ‐ Chiesa Vecchia di San Carlo (Fe), è una piccola chiesa barocca del Seicento di notevole interesse architettonico, storico e artistico. É il più antico esempio di architettura religiosa e artistica del Comune ed è stata al centro di un progetto di restauro avviato nel 2005.

Oratorio Ghisilieri– Progetto Percorso Pur dopo le opere di restauro la struttura non resiste al terremoto presentadosi diroccata. Sappiamo che il degrado del territorio determina una perdita d’identità. Per questo pensiamo che sia molto importante recuperare luoghi di interesse culturale.

Palazzo quattro torri– post sisma Un altro nodo importante del nostro percorso è quello del Palazzo Quattro Torri, un suggestivo ed insolito esempio di architettura bolognese del XVI° sec., caratterizzato da 4 torrette cilindriche agli angoli.

6 .

Palazzo quattro torri– Progetto percorso Durante il sisma la struttura ha riportato evidenti danni. Il nostro progetto prevede il recupero di questo bene, prima che l’instabilità determini il crollo totale, per poterlo inserire in un percorso storico‐culturale.

Siamo già arrivati al centro di San Carlo. Dove possiamo ammirare la scuola storica che fa da contorno alla piazza centrale. Da cui potremo riprendere il percorso per tornare al centro di Sant’Agostino.

46 Scuola– dopo sisma

Scuola– con progetto

Manifesto showing how enhance the historical value of the local buildings by re-shaping the urban matrix demolished by the Emilia earthquake Sant´Agostino

3 .

SANT’AGOSTINO


Comune di Sant’Agostino

Sant´Agostino From this starting point, policies were developed which promoted the reshaping of the urban matrix, improving access to public spaces, knitting together the various communities through linking pubilc spaces across the town, and using the remaining historic buildings as important landmarks for the emerging masterplan.

La scelta del comune di Sant’Agostino è legata alle peculiarità del Comune in termini di legami: con la storia, con l’arte, con le diverse etnie che lo arricchiscono, con le eccellenze del tessuto produttivo, Le ripetute visite al territorio comunale ci hanno fornito ottiche di visione e chiavi di lettura sempre diverse per meglio coglierne l’essenza ed il substrato culturale, oltre ad un temperamento caratteria le locale indimenticabile, che non conosce sosta o arresti di marcia nella piena e consapevole volontà di ripartire con le proprie forze a tutti i costi, che ci è stato lezione di vita,

storia

Regione: Emilia-Romagna

Provincia: Ferrara

Comune: Sant´Agostino

territorio Comune Superficie 35 km² Densità

203,03 ab./km²

Frazioni

Corsi d’acqua fiume Reno Cavo Napoleonico Canale EmilianoRomagnolo

Sant´Agostino La scelta del comune di Sant’Agostino è legata alle peculiarità del Comune in termini di legami: con la storia, con l’arte, con le diverse etnie che lo arricchiscono, con le eccellenze del tessuto produttivo, Le ripetute visite al territorio comunale ci hanno fornito ottiche di visione e chiavi di lettura sempre diverse per meglio coglierne l’essenza ed il substrato culturale, oltre ad un temperamento caratteria le locale indimenticabile, che non conosce sosta o arresti di marcia nella piena e consapevole volontà di ripartire con le proprie forze a tutti i costi, che ci è stato lezione di vita,

Dosso San Carlo

Regione: Emilia-Romagna

Provincia: Ferrara

storia

Comune: Sant´Agostino

Autostrada Regionale Cispadana

territorio Comune Superficie 35 km² Densità

203,03

Frazioni

Dosso San Carlo

ab./km²

Corsi d’acqua fiume Reno Cavo Napoleonico Canale EmilianoRomagnolo

abitanti

Autostrada Regionale Cispadana

Terremoto del 20-29 Maggio Emilia-Romagna

abitanti

Terremoto del 20-29 Maggio Emilia-Romagna

Stranieri

9,8%

Marocco 40,5% Pakistan 16,6% Romania 11,6% Albania 4,9% Tunisia 4,9% Ucrania 3,6% Uc Cinese, Repubblica Popolare 2,7% Altri 15,2%

Attori

Stranieri Gruppo di lavoro

parroco don gabriele

Proposte

JANUARY 2013

beni culturali e urbanistica Lorenzo Grazioli elena melloni

Associazione culturale emilio bardani

Proloco antonio taddia

Poste locali

Summary panel showing the major points on which the proposal was based

Marocco Pakistan Romania Albania Tunisia Ucrania Uc

9,8% 40,5% 16,6% 11,6% 4,9% 4,9% 3,6%

47


FIVE SQUARES PROJECT, CATANIA, ITALY MASTERPLANNING Commissioning body: Biennal of Landscape Architecture (Spain) Local Authority: Catania, Italy Project aims: To reshape the existing five squares in Catania to establish links between the social housing and central part of the city. The masterplan strategy in this project was to use links between the five squares to embrace the social housing districts surrounding them. Â By using the main entrance artery from the north, the Viale R. Sanzio, and creating new arms of connection to east and west, the five squares becoming a unifying feature that link together the different zones in the central part of the city. Â

sez. BB

Proposed illustrative masterplan and elevations 48

FIVE SQUARES PROJECT


Site location plan

In this case, given the volcanic history of Catania, the concept of the flow of lava helped to shape the idea of the new and flexible connections that can be created by careful urban masterplanning.

Green roofs and walls, provision of flexible seating areas and the careful location of solar panels all combine to make the squares both welcoming and environmentally sustainable.

SEPTEMBER 2012 .............................................................................................................................................................................................................................................................. .........................................................................................................................................................................................................................................................

7

.......................................................................................................................................................................................................................................................................................

Comune di Catania

49


SOANE STABLE BLOCK, LONDON, UNITED KINGDOM MASSING STUDY Commissioning body: Royal Hospital Chelsea Local Authority: Royal Borough of Kensington and Chelsea Project aims: Massing study. The result of this report illustrated that a newer building should consider this legacy and use yellow or brown brick making reference to the architectural features present on the site such as cobblestone paving for courtyards or external areas, Diocletian windows, sash windows and steep hipped roofs, etc. The rear of the Bakehouse and Guardhouse offers the opportunity for the contemporary architecture to reinterpret these two design styles in a modern way. Those options have been prepared to support a pre-application meeting with the Council. Existing

Royal Hospital and Chelsea 50

Site location

Existing

Existing

Existing SOANE STABLE BLOCK


Proposed massing Option B

Proposed massing Option B

Proposed massing Option A

Proposed massing Option C

Proposed massing Option A AUGUST 2016

Proposed massing Option C 51


BATT’S FORD BRIDGE, BEDFORD, UNITED KINGDOM TOWNSCAPE ANALYSIS Commissioning body: JMP Consultants Ltd Local Authority: Bedford Borough Council Project aims: This report set out the potential impacts of a new road bridge crossing the River Great Ouse, at Batt’s Ford Bridge, Bedford. Riverside Square t re e r St

Roa

Ho

rn

e

High Street (A6)

Rive

ne La

d

Town Bridge

cial mer Com

Preb t St en reet

This study has identified the potential impacts The Salvation Army that the proposed river crossing might have on the local environment and its users. This report analysed the information available in each topic area listed below: Townscape and heritage; Landscape, access and recreation; Air quality and noise; Transport network; Star Rowing Club Hydrology, Biodiversity, Sustainability and Archaeological area.

l Cau

treet ell S dw

Kin gs wa y

Key

Embankment Gardens

Main traffic routes Secondary traffic routes Proposed bridge Main Road Secondary Road National Cycle Route 51 Pedestrian core

Proposed Bridge

Bedford College

Bedford Borough Council

Existing 52

Proposed BATT’S FORD BRIDGE


High Street (A6)

et tre er S R iv

al R erci

A

ne La e rn Ho

G

oad

m

Com

F Sant Mary’s Street

b Pre

(A6)

B d en

E

e Str et

Key

Br i dg e

Proposed bridge (Option 3)

C e ll Str we d l Cau

et

D

View reference

A

Proposed

Proposed

Kin gs wa y

Ca ul dw el

lS tre

et

Proposed

Point of view

Proposed APRIL 2016

53


PRINTWORK APARTMENTS, SURREY, UNITED KINGDOM TOWNSCAPE ANALYSIS Commissioning body: Shuttleworth (UK) Ltd Local Authority: London Borough of Sutton Project aims: This townscape study assessed the proposed roof extension at Unicol House in the context of the surrounding area.

Aragon Primary School Key Proposal Map Sutton's Local Development Framework

King George's Recreation Field

The study appraised the surrounding area of the site within a 1km radius. The study considered a number of factors:

Printwork Apartments Health Facilities (Fig. D)

Designations; Site Topography; Local context; Views; and Townscape Observations.

Military Facilities

Dorchester Primary School

A

rA ve

Green and Recreational Areas

co tH ill

Tra fal ga

St o ne

B

Schools

210 (Sutton) Transport Squadron Royal

Commercial Areas

C

Industrial Areas Character Areas:

D St Raphael's Hospice

Ha mi

Brookfield Primary Sutton Cemetery

l to

nA v

Type 2 (Fig. B) Type 3 (Fig. C)

Lo ndo

nR oad

e

St Cecilia's Catholic Primary School

Type 1 (Fig A)

Fairlands Park Explore Learning North Cheam

Site location 54

Cheam Park Farm Junior

Existing PRINTWORK APARTMENTS


M 150 m radius

02

03 06

Existing topography

07

a

05 04

Existing topography OCTOBER 2015

01

b

Point of view map 55


AFRICA BIG CHANGE BIG CHANCE, MILAN, ITALY ARCHITECTURAL DESIGNER 3D Commissioning body: La Triennale di Milano Project aims: The exhibition is devoted to Africa,. La Triennale di Milano provides exhibitions on architecture and modern art. In 2014 IUAV selected me and a few other students to create 3D models of some African architectures. The models have been drawn with AutoCAD, the animations were made with 3ds Max and models on display at the exhibition, were made by printers 3d Sharebot PLA. The models on display illustrate 3d sections of the most interesting features of the building.

56

AFRICA BIG CHANGE BIG CHANCE


ARCH. HENRI CHOMETTE MARKET BUILDING

ARCH. MIQUEL SIMOUNET THEATER OF ALBERT CAMUS YOUTH AND SPORTS CENTER

ARCH. H.L. SHAH SAINT PETERS CHURCH

ARCH. PANCHO GUEDES SMILING LION

ARCH. ZALMAN ENAV THERMAL BATH

ARCH. JEAN BOSSU CENTRE COMMERCIAL

OCTOBER 2014

57



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.