Master of Architecture Portfolio
PORTFOLIO
Arnab Majumder | The University of Melbourne
Illustration for CTBUH Masters Student Competition Entry
ARNAB MAJUMDER
Master of Architecture - The University of Melbourne E: arnab.majumder1994@gmail.com | M: 0452 470 550 LinkedIn : https://www.linkedin.com/in/arnabmajumder/ Address : 445 Elizabeth Street, Melbourne, VIC 3000
My name is Arnab Majumder, and I am a Master of Architecture Graduate from the University of Melbourne. I have a deep passion for residential and mixed-use developments. Apart from design, I am interested in photography, sports & fitness. I love reading books and have excellent culinary skills.
List of Projects
01 02 03
Nightingale Queensberry Street Master of Architecture Thesis with Nightingale Night School. The proposal was aimed to create affordable housing solutions using small foot print design.
Design Development with Spowers Design Development in Revit with Spowers Architects. Specific focus on NCC 2019 Amendment 1 and AS 1428.1.
Melbourne Grammar School Radical Reform in pedagogy for twenty-first century learning. Exploration of constructivist educational model & project based learning.
Note : All the hand sketches shown in this portfolio are my original work
04 05
Applied Architectural Technology Documentation for the podium of a building using Australian Codes & Standards. Blown up part-details.
Architecture Visualisations Visual illustrations for We Are Humble and Motion Studio. Realistic Renders using Lumion Pro.
PORTFOLIO
I am highly skilled in delivering design documentation, realistic 3D visualisations and animated walkthroughs. I have a demonstrated background of collaborating in team environments, where I have focused on the ideation, development and execution of human-centric designs.
Nightingale Queensberry Street 01. Project Overview Master of Architecture Thesis : Bringing affordability through small footprint living Softwares : Revit, AutoCAD, SketchUP, Lumion, Photoshop
1. Affordability The thesis aims to address the issue of housing affordability through small footprint design.
2. Small Footprint Living As per sqm cost thousands of dollars, the innovative small footprint living will not only reduce the cost per dwelling, but will also minimize net carbon footprint.
3. Rental + Ownership Model The Rental model will enable wider demographics to take part in the process. It is based on the Assemble’s build to rent model with minor modifications.
Illustration of Design Principles
4. Communal Spaces To create an aspirational apartment design, and to foster community living, it is essential to focus on the communal spaces. Therefore, the building has dedicated communal spaces on every floor with larger footprints on the ground floor and terrace.
The Hero Shot
Design Pointers & Constraints
Financial Feasibility
Urban Design
Occupancy
To address the issue of housing affordability, 60% of the overall units are dedicated small footprint living. The smaller units will be sold at a maximum of 33% below market rate. The remaining 40% are conventional 2 bedroom & 3-bedroom units.
1. The building sets back at level 8 and also at level 3
While the forefront of the thesis was to address housing affordability, it was also essential to create successful communal spaces, to create an aspirational proposal and set a standard of benchmark. Hence, this thesis is tested on the interaction of the smaller apartments with the communal areas, spread evenly throughout the building.
3. And finally, it was necessary to tie this building with its immediate context and create an exciting connection to the ground. Therfore, the mass has been further broken down at level 3, and the windows from its adjacent neighbor has been carried over.
2. This proposal started with feasibility planning, hence the intention was to reflect the interior functions onto the faรงade.
The ground and first floor have commercial occupancy with dedicated public spaces. As the site is in close proximity to Queen victoria market, it was essential to introduce public space at the ground. The residential tower starts from level 3 all the way till level 8. At the top, there is a communal kitchen, an infinity garden and communal laundry area.
S
Commercial
XL
Residential
1
2
3
Communal Space on every Residential Floor
Communal spaces create a sense of belongingness
Units Typology
Communal Area Area : 40 Sqm
2 Bedroom Apaprtment Area : 60 Sqm Cost : $660,000
3 Bedroom Apartment Area : 75 Sqm Cost : $825,000
4 Pack Area : 16 Sqm Rent : $160 Per Week Cost : $160,000
Tree House 2.0 Area : 40 Sqm Rent : $385 Per Week Cost : $400,000
Tree House Area : 22 - 25 Sqm Rent : $250 Per Week Cost : $250,000
Ground Floor Activation - Embedded Street Furnitures
Cafeteria + ground floor activation Intergenerational living
Typical Floor Plan
Typical Floor Plan (1:100) at A3
Living Area of a typical 3 Bedroom Unit
Datlight access re-used materials all electric carbon neutral fixtures
Elevation from Queensberry Street
Design Development With Spowers 02. Project Overview Professional Training : Documentation of M.Arch Thesis Softwares : Revit + BIM 360
01. The following exercise was compiled to demonstrate my understanding of producing a set of Design Documentation Drawings in Revit with attention to NCC 2019 Amendment 1 and AS 1428.1 02. The exercise was carried out with weekly feedbacks and guidance from Ros Magee and Steven Laughlin Of Spowers Architects. 03. The set of drawings produced in this chapter are my original work.
Disclaimer: This drawing and design is subject to copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Figured dimensions take precedence over scaled dimensions.
Drawing Status
Design Development Revisions
Notes
GENERAL NOTES 01. THE FOLLOWING EXERCISE WAS COMPILED TO DEMONSTRATE MY UNDERSTANDING OF PRODUCING A SET OF DESIGN DOCUMENTATION DRAWINGS IN REVIT WITH ATTENTION TO NCC 2019 AMMENDMENT 1 AND AS 1428.1
TERRACE LEVEL
02. THE EXERCISE WAS CARRIED OUT WITH WEEKLY FEEDBACKS AND GUIDANCE FROM ROS MAGEE AND STEVEN LAUGHLIN OF SPOWERS ARCHITECTS.
COMMUNAL KITCHEN COMMUNAL LAUNDRY TERRACE GARDEN
03. THE SET OF DRAWINGS PRODUCED IN THIS PORTFOLIO ARE MY ORIGINAL AND INDIVIDUAL WORK.
Sheet List Sheet Number Sheet Name A101 A102 A103 A104 A105 A106 A107 A108 A109 A110 A111 A112
Communal Kitchen + Seating Total Area : 40 Sqm
Project Overview Site Plan Architectural - Ground Floor Architectural - First Floor Reflected Ceiling Plan - Ground Floor Reflected Ceiling Plan - First Floor Building Elevation (West) Building Elevation (South) Buiilding Section 1 - Lower Levels Only Buiilding Section 2 - Lower Levels Only Detailed Wall Section - Lower Levels Only Schedules
4 Pack (4m X 4m) Total Area : 16 Sqm
2 Bedroom Unit Total Area : 60 Sqm
Tree House 2 Total Area : 40 Sqm
RESIDENTIAL BLOCKS INNOVATIVE SMALLFOOT - PRINT LIVING UNITS + TRADITIONAL 2 & 3 BEDROOM APARTMENTS
Tree House Total Area : 22 - 25 Sqm
3 Bedroom Unit Total Area : 75 Sqm
COMMERCIAL BLOCK ARNAB MAJUMDER
FOOD COURT + COFFEE SHOP OFFICE SPACES COMMUNAL SEATING
M.ARCH THESIS DESIGN DEVELOPMENT Retail Tenancy 2
Project
Nightingale Queensberry Street North Melbourne, VIC 3053, Australia Drawing
Project Overview
Retail Tenancy 1
Drawn
Checked
AM
SL
RM
Job Number
Date
Scale
01
22.09.2020
Drawing Number
Only the Lower levels are considered for Design Development
Exploded Axonometric View of Detailed Revit Model (Level 1 & 2)
A101
Approved
Revision
Revit Training with Spowers Architects
Outdoor Seating
Nightingale Queensberry
Office floor plate
12/10/2020 12:11:30 PM
Disclaimer: This drawing and design is subject to copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Figured dimensions take precedence over scaled dimensions.
Drawing Status
Existing Building ( 4 Storey )
Design Development Revisions
R6
20/09/2020 Corrected Set out points
Existing Building ( 2 Storey )
AY EW N LA
5
Notes
SITEWORKS AND DEMOLITION NOTES 01. DEMOLISH EXISTING KERBS, PATHWAYS, FENCES, UTILITIES, LANDSCAPE AS REQUIRED FOR NEW WORKS. ALLOW FOR THE RECONSTRUCTION AND REGRADING OF FOOTPATHS, KERBS, AND CHANNEL AND THE CONSTRUCTION OF NEW FOOTPATHS AND KERBS TO MATCH EXISTING TO THE SATISFACTION OF THE RESPONSIBLE AUTHORITY. OBTAIN ALL PERMITS AS NECESSARY AND PAY ALL FEES.
Existing Building ( 2 Storey )
24 18 50 45 0 0 To To ta ta lP lF lo oo tW tp id rin t W th Id th
e
ry da un Bo
Ti tl
20 27 55 15 0 0 To To ta ta lF lP oo lot L tp rin en t L gth en gt h
e
3
02. DEMOLISH ALL INGROUND, STRUCTURES AND SERVICES AS NOTED ON THE SURVEY PLANS. SITE PLANER ENGINEERS DOCUMENTATION AS REQUIRED TO UNDERTAKE THE WORKS. THE CONTRACTOR SHALL ALLOW FOR ALL SERVICE TERMINATIONS, EXTENSION AND/OR RELOCATION REQUIRED TO UNDERTAKE THE WORKS.
tl Ti
Bo un da ry
4
03. HAZARDOUS MATERIALS SHALL BE REMOVED BY THE CONTRACTOR PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES BY AN APPROVED SUB-CONTRACTOR UNDER SUPERVISION AND IN ACCORDANCE WITH RELEVANT STATUTORY AUTHORITY REQUIREMENTS AND THE EPA. 04. MAKE GOOD TO ALL SURFACES, COMPONENTS AND ELEMENTS AFFECTED BY THE DEMOLITION AND ANCILLARY WORKS. 05. THE CONTRACTOR SHALL ALLOW FOR ALL EARTH WORKS NOMINATED IN CIVIL AND/OR STRUCTURAL DOCUMENTATION. 06. ALLOW FOR THE EXACAVATION AND GRADING OF SITE IN ACCORDANCE WITH CIVIL AND/OR STRUCTURAL DOCUMENTATION.
36 00
07. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RELOCATION OF EXISTING COUNCIL ASSET, PROTECTION OR REINSTATEMENT OF BOUNDARY FENCES. EXISTING PRIVATE ASSETS, INCLUDING: PARKING TICKET MACHINES, SIGNAGE, LIGHT POLES AND FITMENTS SHALL BE REMOVED AND DELIVERED TO THE PRINCIPAL AT A LOCATION NOMINATED ON CAMPUS.
20 00
2 1
08. THE CONTRACTOR SHALL COMPLETE FULL SERVICE DETECTION OF INGROUND SERVICES PRIOR TO THE COMMENCMENT OF WORKS. A COMPLETE SET OF SURVEY DETECTION RECORDS SHALL BE SUBMITTED TO THE SUPERINTENDENT.
N 12950 E 10617
New Building Foot Print Lot Size 24.5M X 27.15M
09. THE CONTRACTOR SHALL COMPLETE A DILAPIDATION SURVEY OF ADJACENT BUILDING ON SITE PRIOR TO THE COMMENCEMENT OF WORKS. A COPY OF THIS SURVEY SHALL BE SUBMITTED TO THE SUPERINTENDENT. THE CONTRACTOR SHALL MONITOR ADJACENT PROPERTIES AND NOTIFY THE SUPERINDENT OF ANY DEVELOPMENT.
41 50
Set out Point A1
10. SITE ENVIRONMENTAL MANAGEMENT PLANS, OH&S SITE MANAGEMENT PLAN AND TRAFFIC MANAGMENT PLAN SHALL BE SUBMITTED BY THE CONTRACTOR PRIOR TO THE COMMENCMENT OF WORKS.
62 00
11. THE CONTRACTOR SHALL MAINTAIN THE PUBLIC ACCESS AND OPERATION OF BUILDINGS ADJACENT TO THE SITE DURING THE CONSTRUCTION PERIOD AND PROVIDE NECESSARY SAFETY AND PROTECTION REQUIREMENT INCLUDING TRAFFIC MANAGEMENT SERVICES AS REQUIRED BY RELEVANT STATUTORY AUTHORITIES.
59 00
A 31 75
59 00
Ti tle
60 50
Bo un da ry
41 50
ry da un Bo
Fr on ts
e
et ba ck
tl Ti
B
51 00
52 00
C 13 00
27 50
M.ARCH THESIS DESIGN DEVELOPMENT Project
Nightingale Queensberry Street North Melbourne, VIC 3053, Australia Drawing
Site Plan
Drawn
Checked
AM
SL
RM
Job Number
Date
Scale
01
22.09.2020
Drawing Number
A102
Approved
1 : 100 Revision
R6
Revit Training with Spowers Architects
ARNAB MAJUMDER
Nightingale Queensberry
2 ST R EE T
NORTH
LI N E
1
M AI N
T EE R ST
E
TR AM
N AI M
D
12/10/2020 12:11:31 PM
Disclaimer: This drawing and design is subject to copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Figured dimensions take precedence over scaled dimensions.
2
1
1
3
4
A109
Drawing Status
5
Design Development
18540 (Total Building Width) 1300
5900
1050
5550
200
70
1835
70
1000
70
1545
200
Revisions
5900 2150
R1 R7
5550
4400
200
2200
200
3800
600
R 112
Landscaped Garden
PC1
1000
Notes
NOTES - PLANS
R 101
Exterior
AW1
R 115 D.G01.1
SW1
G = 250 T = 190
4465 1000
SW1
9
PC3
7
Unisex DDA Toilet
6 5
05. PROVIDE REINFORCING TO ALL STUD WALLS SUPPORTING JOINERY, FITTINGS, FIXTURES, A/V SCREENS & PINBOARD LOCATIONS (COORDINATED WITH FITOUT DRAWINGS).
FFL 350 PC1
8
R 103 W3
03. ALL SERVICE CONDUITS/PIPES (ELECTRICAL & HYDRAULIC) TO BE CONCEALED WITHIN WALL FRAMING OR SLAB. CONTRACTOR TO SUBMIT SHOP DRAWINGS WITH COORDINATED LOCATIONS OF SERVICE PENETRATIONS & CONDUITS.
6115
10
BOH (Kitchen)
02. DRAWING TO BE READ IN CONJUNCTION WITH STRUCTURAL ENGINEER'S AND SERVICES ENGINEER'S DRAWINGS.
04. ALL SERVICE PENETRATIONS THROUGH FIRE/SMOKE RATED ELEMENTS ARE REQUIRED TO BE PROTECTED IN ACCORDANCE WITH BCA C3.15 (A TESTED PENETRATION PROTECTION SYSTEM).
R 114 PC1
01. DRAWINGS TO BE READ IN CONJUNCTION WITH SCHEDULES & SPECIFICATIONS.
Resident's Storage + Bike Parking
5600
W2
1000
6200
PC2
Storage
2800
R 102
BA1
WC
06. FLOOR FINISHES UNDER JOINERY (TO RECESSES) NOT SHOWN FOR CLARITY. EXTENT OF FLOOR FINISH TO JOINERY KICKER AND/OR ALL EXPOSED FLOOR UNDER JOINERY (I.E. UNDERSIDE OF OVERHEAD SHELVES, UNDER DESK).
2800
Air lock
D.G14.2
D.G12.1
D.G02.1
1000
W1
70
1000
1955
PC2
R 110
07. ALLOW SS. FLOOR ANGLE FOR ALL FLOOR FINISHES JUNCTION INTERNALLY & FLOOR TO WALL JUNCTIONS WITH NO SKIRTING.
4
PC2
2
1150
500 200 650
BR1
3075
900 Clear
BR1
Concierge + Postal Collection R 108
W15
BR2
200
D.G09.1
W16
1000
D.G04.1
250 400
Room Area
Storage Air lock BOH (Kitchen) Tenancy 1 Landscape Outdoor Seating Tenancy 2 Concierge + Postal Collection Lift Lobby Unisex DDA Toilet Garbage Collection WC Landscape Garden Resident's Storage + Bike Parking Exterior
3 m² 3 m² 19 m² 48 m² 10 m² 95 m² 43 m² 4 m² 33 m² 5 m² 8 m² 2 m² 7 m² 28 m² 19 m² 328 m²
600
D.G08.1
2500
PC1
2300
G6
G5
W6
1050
R 111 2550
140
900 Clear
1040
2400
1040
R 101 R 102 R 103 R 104 R 105 R 106 R 107 R 108 R 109 R 110 R 111 R 112 R 113 R 114 R 115
3050
G8 650
65
C
FFL 350
R 109
Room Number Room Name
400 500
1800
FFL 350
Garbage Collection
D.G09.3
Lift Lobby
200
1000
W5
1000
Check at site
R 104
1000
PC1
1000
20550 Total Building Length
5200
1
Tenancy 1
3350
D.G09.2
1000
1300
FFL 350
1705
D.G03.1
D.G10.1
D.G11.2
1000 Clear
W4
Room Schedule Ground Floor
BR1
D.G14.1
DN
1
140
400
UP
70
1000
SW1
D.G11.1
1000
3
B
A110
07/09/2020 Internal Wall lines changed 18/09/2020 DDA Toilet and Surrounding Areas Fixed
200
450
A
2430
5100 2650
1000
Resident's Entry
Lift 1 8 Pax (630kgs) 1100 X 1400
G4
G 3
5550 1000
Landscape Outdoor Seating Tenancy 2
FFL 350
600
400
D
PC3
2350
NORTH
te Si at
2400
ck he C
2750
0° 45.0
G2
ARNAB MAJUMDER
G1
PC3
2400
Nightingale Queensberry Street North Melbourne, VIC 3053, Australia
D.G07.1
te si at
200
Project
200
ck he C
E
200
00 15
M.ARCH THESIS DESIGN DEVELOPMENT
PC3
45.0 0°
562
1000
1000
1000
1000
1000
1000
1000
999
1239
1032
3984
Drawing
1000
Architectural - Ground Floor
Isometric View of Staiircase hand rails in compliance with BCA and NCC
Drawn
Checked
AM
SL
RM
Job Number
Date
Scale
01
22.09.2020
Drawing Number
A103
Approved
1 : 50 Revision
R7
Revit Training with Spowers Architects
R 107
FFL 350
Nightingale Queensberry
8685
R 106
1000
1000
R 105
8600
6050
1000
PC3
Lift 2 16 Pax (1200kgs) 1400 X 1940
12/10/2020 12:11:32 PM
Disclaimer: This drawing and design is subject to copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Figured dimensions take precedence over scaled dimensions.
2
1
1
3
4
A109
Drawing Status
5
Design Development Revisions
18540 (Total Building Width) 5900
1050
5550
R2
5100 2735
06/09/2020 Mullion Fixed
5900 200
1900
200
5550
600
450
A
1300
1000
PC2
PC2
Notes
W9
NOTES - PLANS
G17
Void to Below
02. DRAWING TO BE READ IN CONJUNCTION WITH STRUCTURAL ENGINEER'S AND SERVICES ENGINEER'S DRAWINGS.
G16
G8
R 206
6200
PC1
W10
03. ALL SERVICE CONDUITS/PIPES (ELECTRICAL & HYDRAULIC) TO BE CONCEALED WITHIN WALL FRAMING OR SLAB. CONTRACTOR TO SUBMIT SHOP DRAWINGS WITH COORDINATED LOCATIONS OF SERVICE PENETRATIONS & CONDUITS.
Directors Cabin 5600
1000
G = 250 T = 190
04. ALL SERVICE PENETRATIONS THROUGH FIRE/SMOKE RATED ELEMENTS ARE REQUIRED TO BE PROTECTED IN ACCORDANCE WITH BCA C3.15 (A TESTED PENETRATION PROTECTION SYSTEM).
GP1
1000
05. PROVIDE REINFORCING TO ALL STUD WALLS SUPPORTING JOINERY, FITTINGS, FIXTURES, A/V SCREENS & PINBOARD LOCATIONS (COORDINATED WITH FITOUT DRAWINGS).
29
PC1
28 27
D.106.1
GP1
1000
26
FFL 3850
W11
25
06. FLOOR FINISHES UNDER JOINERY (TO RECESSES) NOT SHOWN FOR CLARITY. EXTENT OF FLOOR FINISH TO JOINERY KICKER AND/OR ALL EXPOSED FLOOR UNDER JOINERY (I.E. UNDERSIDE OF OVERHEAD SHELVES, UNDER DESK).
2600
6200
1000
01. DRAWINGS TO BE READ IN CONJUNCTION WITH SCHEDULES & SPECIFICATIONS.
PC2
Unisex DDA Toilet
24
1000
22
1275
26 m² 11 m² 5 m² 43 m²
5200
22 m² 57 m² 230 m²
D.105.1 1000
Check at Site
400 1000
1000
4800
1200
G19
2300
R 205
PC1
2350
R 202
Lift 1 8 Pax (630kgs) 1100 X 1400
Lift 2 16 Pax (1200kgs) 1400 X 1940
BA1
1000
4550
1000
6050
G 10
1000
1000
66 m²
Executive Cabin with 8 workstations
PC1
Conference Room
R 206 R 207
Room Area
2500
200
900 Clear
BR3
W14
R 202 R 203 R 204 R 205
Room Name Common office cabin with 20 Workstations Conference Room Lift Lobby Unisex DDA Toilet Executive Cabin with 8 workstations Directors Cabin Office Terrace
400
D.103.1
1000 1000
900 Clear
D.102.1
C
6050
FFL 3850
R 203
GP1 1000
5200
R 201
600
D.103.2
W13
R 201
PC1
Lift Lobby
Common office cabin with 20 Workstations
1
20550 Total Building Length
1000
3100
1000
1705
Room Schedule First Floor Number
D.104.1
D.103.3
FFL 3850
1200 Total
1000
W12
FFL 3850
DN
400
20
UP
400
21
B
A110
07. ALLOW SS. FLOOR ANGLE FOR ALL FLOOR FINISHES JUNCTION INTERNALLY & FLOOR TO WALL JUNCTIONS WITH NO SKIRTING.
G17
R 204
23
PC3
0° 45.0
2750
1990
te Si at
2750
ck he C
NORTH
ARNAB MAJUMDER
360
Project
Nightingale Queensberry Street North Melbourne, VIC 3053, Australia
200
ck he C te si at
200
2400
45.0 0°
562
1000
1000
1000
1000
1000
1000
1000
999
6250 Clear
1000
Drawing
2295
E
200
00 15
M.ARCH THESIS DESIGN DEVELOPMENT
PC3
Architectural - First Floor
Isometric View of DDA Toilets and Office Space in compliance with AS 1428.1
Drawn
Checked
AM
SL
RM
Job Number
Date
Scale
01
22.09.2020
Drawing Number
A104
Approved
1 : 50 Revision
R2
Revit Training with Spowers Architects
600
FFL 3850
Nightingale Queensberry
Void to Below
400
D
R 207
5770
1000
Office Terrace
12/10/2020 12:11:34 PM
Disclaimer: This drawing and design is subject to copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Figured dimensions take precedence over scaled dimensions.
Drawing Status
Design Development Revisions
R4
06/09/2020 Wall Tagged + Full Elevations
Notes
External Wall Finish Schedule BT1
Brick Veneer Cladding
CB1
Vertical Striped Concrete Finish
CB2
Smooth Concrete Finish
Upper Levels are not considered for Design Development
A
1
B
C
A110
5200
6050
E 2750
2000
6200
D
BT1
BT1
BT1
BT1
BT1
BT1
BT1
2450
BT1
Level 2 Structural Slab Level
W11
W12
W13
W14
Level 1 Structural Slab Level 1000
3750 CB1
CB1
CB1
CB1
CB1
CB1
CB1
ARNAB MAJUMDER
M.ARCH THESIS DESIGN DEVELOPMENT
CB1
Project
Void
Nightingale Queensberry Street North Melbourne, VIC 3053, Australia
Void
2450
3500
Void
W1
W2
W3
W4
W5
W6
Drawing
Building Elevation (West)
Void
CB2
CB2
CB2
Ground Structural Slab Level 250
Drawn
Checked
AM
SL
RM
Job Number
Date
Scale
01
22.09.2020
Drawing Number
West Elevation Lower Levels are considered for Design Development
A107
Approved
1 : 50 Revision
R4
Revit Training with Spowers Architects
W10
Nightingale Queensberry
W9
8400
2500
3500
7250
12/10/2020 12:11:38 PM
1
Disclaimer: This drawing and design is subject to copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Figured dimensions take precedence over scaled dimensions.
2
1400 Clear
GEBERIT PLUVIA SIPHONIC DRAINAGE FLAT ROOF SYSTEM WITH 600 WIDE PAPARPET SOAKER
1400 FROM FINISHED FLOOR
PARAPET CAPPING TO MATCH ADJOINING WALL CLADDING. ALLOW PACKER UNDER TO MATCH FALL (TYPICAL)
Drawing Status
Design Development Revisions
SELECT METAL CLADDING AS SPECIFIED. PROVIDE TIMBER SUPPORT TO MANUFACTURERS RECOMMENDATIONS. ALL ADJOINING FLASHINGS TO MATCH. TERRACE FINISH WITH SUPPORT TO MANUFACTURERS RECOMMENDATION. 3mm APP MEMBRANE SYSTEM (TORCHED ON) WITH SLAB Notes
Level 2 Finished Floor Level 7350 Level 2 Structural Slab Level
1200
750 Depth
OVERFLOW POP
SELECT BRICK VINEER CLADDING AS SPECIFIED. PROVIDE METAL SUPPORT TO MANUFACTURERS RECOMMENDATIONS. ALL ADJOINING FLASHINGS TO MATCH
7250
STRUCTURAL CONCRETE MEMBERS TO ENGINEERS DETAILS
90mm THICK R2.7 GLASSWOOL CEILING BATT INSULATION (32Kg/m3) TESTED TO AS1530.1-1994. COMBINED DEATH R VALUE TO ACHIEVE 3.2.
ALUMINIUM DOUBLE GLAZED WINDOWS AS SPECIFIED
2200
2150 Clear
W13
2750 Clear height
750
PB LINNING OFF TOP HATS.GLASSWOOL INSULATION (32Kg/m3) TO ACHIEVE VALUE 1.8 TESTED TO AS1530.1-1994.
FLOOR FINISH ON ACOUSTIC BACKING. REFER FINISHES SCHEDULE
Level 1 Finished Floor Level 3850
1350 Clear
750 Depth
Level 1 Structural Slab Level
PC2 110mm Brick Wall 30mm Cavity 200 Precast 90 Stud/tophat 90 Glasswool 13mm PBD
3750 STRUCTURAL CONCRETE MEMBERS TO ENGINEERS DETAILS
PROPRIETARY SUSPENDED CEILING SYSTEM. CONTRACTOR TO ENSURE SMOKE SEPARATION BETWEEN GROUND FLOOR PLANT AREAS
FLOOR FINISH TO INTERIOR DESIGN SCHEDULE
150 From ground
ALLOW FOR REBATED EXPANSION JOINT COVER BETWEEN TWO SLABS TO ENSURE FLUSH "NO BUMP" INSTALLATION
Ground Finished Floor Level 350 Ground Structural Slab Level 250 STRUCTURAL CONCRETE SLAB TO ENGINEERS DETAILS
WATERPROOF MEMBRANE AND UNDERSLAB INSULATION BITUMINOUS CANITE (EXPANSION JOINT)
STRUCTURAL CONCRETE PAD FOOTING TO ENGINEERS DETAILS
1
Wall Section 1 : 20
ARNAB MAJUMDER
M.ARCH THESIS DESIGN DEVELOPMENT Project
Nightingale Queensberry Street North Melbourne, VIC 3053, Australia Drawing
Detailed Wall Section - Lower Levels Only
Drawn
Checked
AM
SL
RM
Job Number
Date
Scale
01
22.09.2020
Drawing Number
A111
Approved
1 : 20 Revision
Revit Training with Spowers Architects
2300
2150 Clear
W5
Nightingale Queensberry
ALUMINIUM DOUBLE GLAZED WINDOWS AS SPECIFIED
2750 Clear height
750
12/10/2020 12:11:42 PM
FUTURE OF EDUCATION
Melbourne Grammar School 03. Project Overview Master of Architecture Year 2 : Future of education in the year 2050 Softwares : Revit, AutoCAD, SketchUP, Lumion, Photoshop
Illustration of the future of education in 2050
Design Research - Identified issues
Identifying issues for student dis-engagement 1. Adolescent Identity Crisis
2. Anxiety & Distress
3. Isolation & Dis-engagement
4. School Dropouts
Identity formation is a foundational & central developmental concern for adolescence. It is an ongoing life long process, which begins at the early childhood. However, during adolescence, it has a substantial physical and psychological affect on an individual who is battling with emergence of new social expectations from other individuals. (Abbassi, 2016)
In a globalised Australian market, and increased competition from foreign countries, it has become a minimum requirement to complete secondary school education, in order to secure any white-collar job or get access to vocational training and university education. Early school dropout is resulting in increased psychological stress on a student with limited career prospects.
For students, who become a victim of abstract-ism, they cannot see a connection between what they learn and what they observe outside the school environments. It becomes more relevant in the middle years, when the teacher focuses on one subject rather than the whole course, leading to disintegration of disciplines. (Moore and Glancy,2013)
Dr. Ben Cleveland, who is a is a Research Fellow with the Learning Environments Applied Research Network (LEaRN), and professor at The University of Melbourne’s design school has suggested that disengagement has a detrimental outcome for an individual and has associated problems for the wider community. There is a greater chance for early school dropout for students concerned with disengagement. (Cleveland, 2016)
Illustration of identified issues, students commonly face in an education environment
HERO SHOT
Design Pointers & Constraints
Pedagogical Diagram
Circulation Diagram
Spatial Analysis
Exploded view of functional requirements
Functional layout of the Design Proposal
Ground Floor Plan
The future of education will be delivered through reflexive studios and project based learning
First Floor Plan looking towards biology lab
Biophillic design : A connection with mother nature is imperative to a child’s emotional and mental growth
Call out view of Biology Lab
Fourth Floor Plan
The floor plates are divided into two componets : Specialised Learing Zones and informal + maker spaces
Section through Reflexive Learning Studios
Section Through Reflexive Studios
Applied Architectural Technology 04. Project Overview Master of Architecture Year 1 : Detailed Podium Design Softwares : AutoCAD, SketchUP, Lumion and Photoshop
01. The following exercise was compiled to demonstrate my understanding of producing a set of Construction Drawings in AutoCAD with attention to Australian Standard sections 02. The exercise was carried during my first year of M.Arch studies 03. The set of drawings produced in this chapter are my original work.
HERO SHOT
Illustration of Podium as seen from Exhibition Street
Part Plan of Podium at 1:100 in A3
Blown -up Part Details
1. Detail at Glazing and Precast Joinery
2. Typical Spider Connection to Glass
05. Project Overview Professional Work : Visualisations for We Are Humble and Motion Studio Softwares : AutoCAD, SketchUP, Lumion and Photoshop
VISUALISATIONS
Architecture Visualisations & illustrations
CODE BLACK
Code - Black Interior Visual - We Are Humble
The stripped back, utilitarian deli offers your morning coffee & take-away sandwich, consciously evoking a retro diner feel
The luxurious lounge, meanwhile, is tucked away in the corner and the perfect spot for a long lunch. Things here are more tactile and set-in
CODE BLACK
Code - Black Interior Visual - We Are Humble
Dynamic Apartment Competition Entry - Motion Studio
An aspiration spiral tower, with each apartment block is set to receive their private green space
Interior Visual of Dynamic Apartments - Motion Studio
Natural materials and open floor plan create a sense of luxury
Thank you for taking the journey Arnab Majumder | Master of Architecture - The University of Melbourne
This is not a Picture : Realsitic Render of Boat House
PORTFOLIO
ARNAB MAJUMDER | MASTER OF ARCHITECTURE
E : arnab.majumder1994@gmail.com P : 0452 470 550