Master of Architecture Portfolio

Page 1

Master of Architecture Portfolio

PORTFOLIO

Arnab Majumder | The University of Melbourne

Illustration for CTBUH Masters Student Competition Entry


ARNAB MAJUMDER

Master of Architecture - The University of Melbourne E: arnab.majumder1994@gmail.com | M: 0452 470 550 LinkedIn : https://www.linkedin.com/in/arnabmajumder/ Address : 445 Elizabeth Street, Melbourne, VIC 3000

My name is Arnab Majumder, and I am a Master of Architecture Graduate from the University of Melbourne. I have a deep passion for residential and mixed-use developments. Apart from design, I am interested in photography, sports & fitness. I love reading books and have excellent culinary skills.

List of Projects

01 02 03

Nightingale Queensberry Street Master of Architecture Thesis with Nightingale Night School. The proposal was aimed to create affordable housing solutions using small foot print design.

Design Development with Spowers Design Development in Revit with Spowers Architects. Specific focus on NCC 2019 Amendment 1 and AS 1428.1.

Melbourne Grammar School Radical Reform in pedagogy for twenty-first century learning. Exploration of constructivist educational model & project based learning.

Note : All the hand sketches shown in this portfolio are my original work

04 05

Applied Architectural Technology Documentation for the podium of a building using Australian Codes & Standards. Blown up part-details.

Architecture Visualisations Visual illustrations for We Are Humble and Motion Studio. Realistic Renders using Lumion Pro.

PORTFOLIO

I am highly skilled in delivering design documentation, realistic 3D visualisations and animated walkthroughs. I have a demonstrated background of collaborating in team environments, where I have focused on the ideation, development and execution of human-centric designs.


Nightingale Queensberry Street 01. Project Overview Master of Architecture Thesis : Bringing affordability through small footprint living Softwares : Revit, AutoCAD, SketchUP, Lumion, Photoshop

1. Affordability The thesis aims to address the issue of housing affordability through small footprint design.

2. Small Footprint Living As per sqm cost thousands of dollars, the innovative small footprint living will not only reduce the cost per dwelling, but will also minimize net carbon footprint.

3. Rental + Ownership Model The Rental model will enable wider demographics to take part in the process. It is based on the Assemble’s build to rent model with minor modifications.

Illustration of Design Principles

4. Communal Spaces To create an aspirational apartment design, and to foster community living, it is essential to focus on the communal spaces. Therefore, the building has dedicated communal spaces on every floor with larger footprints on the ground floor and terrace.


The Hero Shot


Design Pointers & Constraints

Financial Feasibility

Urban Design

Occupancy

To address the issue of housing affordability, 60% of the overall units are dedicated small footprint living. The smaller units will be sold at a maximum of 33% below market rate. The remaining 40% are conventional 2 bedroom & 3-bedroom units.

1. The building sets back at level 8 and also at level 3

While the forefront of the thesis was to address housing affordability, it was also essential to create successful communal spaces, to create an aspirational proposal and set a standard of benchmark. Hence, this thesis is tested on the interaction of the smaller apartments with the communal areas, spread evenly throughout the building.

3. And finally, it was necessary to tie this building with its immediate context and create an exciting connection to the ground. Therfore, the mass has been further broken down at level 3, and the windows from its adjacent neighbor has been carried over.

2. This proposal started with feasibility planning, hence the intention was to reflect the interior functions onto the faรงade.

The ground and first floor have commercial occupancy with dedicated public spaces. As the site is in close proximity to Queen victoria market, it was essential to introduce public space at the ground. The residential tower starts from level 3 all the way till level 8. At the top, there is a communal kitchen, an infinity garden and communal laundry area.

S

Commercial

XL

Residential

1

2

3


Communal Space on every Residential Floor

Communal spaces create a sense of belongingness


Units Typology

Communal Area Area : 40 Sqm

2 Bedroom Apaprtment Area : 60 Sqm Cost : $660,000

3 Bedroom Apartment Area : 75 Sqm Cost : $825,000

4 Pack Area : 16 Sqm Rent : $160 Per Week Cost : $160,000

Tree House 2.0 Area : 40 Sqm Rent : $385 Per Week Cost : $400,000

Tree House Area : 22 - 25 Sqm Rent : $250 Per Week Cost : $250,000


Ground Floor Activation - Embedded Street Furnitures

Cafeteria + ground floor activation Intergenerational living


Typical Floor Plan

Typical Floor Plan (1:100) at A3


Living Area of a typical 3 Bedroom Unit

Datlight access re-used materials all electric carbon neutral fixtures


Elevation from Queensberry Street


Design Development With Spowers 02. Project Overview Professional Training : Documentation of M.Arch Thesis Softwares : Revit + BIM 360

01. The following exercise was compiled to demonstrate my understanding of producing a set of Design Documentation Drawings in Revit with attention to NCC 2019 Amendment 1 and AS 1428.1 02. The exercise was carried out with weekly feedbacks and guidance from Ros Magee and Steven Laughlin Of Spowers Architects. 03. The set of drawings produced in this chapter are my original work.


Disclaimer: This drawing and design is subject to copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Figured dimensions take precedence over scaled dimensions.

Drawing Status

Design Development Revisions

Notes

GENERAL NOTES 01. THE FOLLOWING EXERCISE WAS COMPILED TO DEMONSTRATE MY UNDERSTANDING OF PRODUCING A SET OF DESIGN DOCUMENTATION DRAWINGS IN REVIT WITH ATTENTION TO NCC 2019 AMMENDMENT 1 AND AS 1428.1

TERRACE LEVEL

02. THE EXERCISE WAS CARRIED OUT WITH WEEKLY FEEDBACKS AND GUIDANCE FROM ROS MAGEE AND STEVEN LAUGHLIN OF SPOWERS ARCHITECTS.

COMMUNAL KITCHEN COMMUNAL LAUNDRY TERRACE GARDEN

03. THE SET OF DRAWINGS PRODUCED IN THIS PORTFOLIO ARE MY ORIGINAL AND INDIVIDUAL WORK.

Sheet List Sheet Number Sheet Name A101 A102 A103 A104 A105 A106 A107 A108 A109 A110 A111 A112

Communal Kitchen + Seating Total Area : 40 Sqm

Project Overview Site Plan Architectural - Ground Floor Architectural - First Floor Reflected Ceiling Plan - Ground Floor Reflected Ceiling Plan - First Floor Building Elevation (West) Building Elevation (South) Buiilding Section 1 - Lower Levels Only Buiilding Section 2 - Lower Levels Only Detailed Wall Section - Lower Levels Only Schedules

4 Pack (4m X 4m) Total Area : 16 Sqm

2 Bedroom Unit Total Area : 60 Sqm

Tree House 2 Total Area : 40 Sqm

RESIDENTIAL BLOCKS INNOVATIVE SMALLFOOT - PRINT LIVING UNITS + TRADITIONAL 2 & 3 BEDROOM APARTMENTS

Tree House Total Area : 22 - 25 Sqm

3 Bedroom Unit Total Area : 75 Sqm

COMMERCIAL BLOCK ARNAB MAJUMDER

FOOD COURT + COFFEE SHOP OFFICE SPACES COMMUNAL SEATING

M.ARCH THESIS DESIGN DEVELOPMENT Retail Tenancy 2

Project

Nightingale Queensberry Street North Melbourne, VIC 3053, Australia Drawing

Project Overview

Retail Tenancy 1

Drawn

Checked

AM

SL

RM

Job Number

Date

Scale

01

22.09.2020

Drawing Number

Only the Lower levels are considered for Design Development

Exploded Axonometric View of Detailed Revit Model (Level 1 & 2)

A101

Approved

Revision

Revit Training with Spowers Architects

Outdoor Seating

Nightingale Queensberry

Office floor plate

12/10/2020 12:11:30 PM


Disclaimer: This drawing and design is subject to copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Figured dimensions take precedence over scaled dimensions.

Drawing Status

Existing Building ( 4 Storey )

Design Development Revisions

R6

20/09/2020 Corrected Set out points

Existing Building ( 2 Storey )

AY EW N LA

5

Notes

SITEWORKS AND DEMOLITION NOTES 01. DEMOLISH EXISTING KERBS, PATHWAYS, FENCES, UTILITIES, LANDSCAPE AS REQUIRED FOR NEW WORKS. ALLOW FOR THE RECONSTRUCTION AND REGRADING OF FOOTPATHS, KERBS, AND CHANNEL AND THE CONSTRUCTION OF NEW FOOTPATHS AND KERBS TO MATCH EXISTING TO THE SATISFACTION OF THE RESPONSIBLE AUTHORITY. OBTAIN ALL PERMITS AS NECESSARY AND PAY ALL FEES.

Existing Building ( 2 Storey )

24 18 50 45 0 0 To To ta ta lP lF lo oo tW tp id rin t W th Id th

e

ry da un Bo

Ti tl

20 27 55 15 0 0 To To ta ta lF lP oo lot L tp rin en t L gth en gt h

e

3

02. DEMOLISH ALL INGROUND, STRUCTURES AND SERVICES AS NOTED ON THE SURVEY PLANS. SITE PLANER ENGINEERS DOCUMENTATION AS REQUIRED TO UNDERTAKE THE WORKS. THE CONTRACTOR SHALL ALLOW FOR ALL SERVICE TERMINATIONS, EXTENSION AND/OR RELOCATION REQUIRED TO UNDERTAKE THE WORKS.

tl Ti

Bo un da ry

4

03. HAZARDOUS MATERIALS SHALL BE REMOVED BY THE CONTRACTOR PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES BY AN APPROVED SUB-CONTRACTOR UNDER SUPERVISION AND IN ACCORDANCE WITH RELEVANT STATUTORY AUTHORITY REQUIREMENTS AND THE EPA. 04. MAKE GOOD TO ALL SURFACES, COMPONENTS AND ELEMENTS AFFECTED BY THE DEMOLITION AND ANCILLARY WORKS. 05. THE CONTRACTOR SHALL ALLOW FOR ALL EARTH WORKS NOMINATED IN CIVIL AND/OR STRUCTURAL DOCUMENTATION. 06. ALLOW FOR THE EXACAVATION AND GRADING OF SITE IN ACCORDANCE WITH CIVIL AND/OR STRUCTURAL DOCUMENTATION.

36 00

07. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RELOCATION OF EXISTING COUNCIL ASSET, PROTECTION OR REINSTATEMENT OF BOUNDARY FENCES. EXISTING PRIVATE ASSETS, INCLUDING: PARKING TICKET MACHINES, SIGNAGE, LIGHT POLES AND FITMENTS SHALL BE REMOVED AND DELIVERED TO THE PRINCIPAL AT A LOCATION NOMINATED ON CAMPUS.

20 00

2 1

08. THE CONTRACTOR SHALL COMPLETE FULL SERVICE DETECTION OF INGROUND SERVICES PRIOR TO THE COMMENCMENT OF WORKS. A COMPLETE SET OF SURVEY DETECTION RECORDS SHALL BE SUBMITTED TO THE SUPERINTENDENT.

N 12950 E 10617

New Building Foot Print Lot Size 24.5M X 27.15M

09. THE CONTRACTOR SHALL COMPLETE A DILAPIDATION SURVEY OF ADJACENT BUILDING ON SITE PRIOR TO THE COMMENCEMENT OF WORKS. A COPY OF THIS SURVEY SHALL BE SUBMITTED TO THE SUPERINTENDENT. THE CONTRACTOR SHALL MONITOR ADJACENT PROPERTIES AND NOTIFY THE SUPERINDENT OF ANY DEVELOPMENT.

41 50

Set out Point A1

10. SITE ENVIRONMENTAL MANAGEMENT PLANS, OH&S SITE MANAGEMENT PLAN AND TRAFFIC MANAGMENT PLAN SHALL BE SUBMITTED BY THE CONTRACTOR PRIOR TO THE COMMENCMENT OF WORKS.

62 00

11. THE CONTRACTOR SHALL MAINTAIN THE PUBLIC ACCESS AND OPERATION OF BUILDINGS ADJACENT TO THE SITE DURING THE CONSTRUCTION PERIOD AND PROVIDE NECESSARY SAFETY AND PROTECTION REQUIREMENT INCLUDING TRAFFIC MANAGEMENT SERVICES AS REQUIRED BY RELEVANT STATUTORY AUTHORITIES.

59 00

A 31 75

59 00

Ti tle

60 50

Bo un da ry

41 50

ry da un Bo

Fr on ts

e

et ba ck

tl Ti

B

51 00

52 00

C 13 00

27 50

M.ARCH THESIS DESIGN DEVELOPMENT Project

Nightingale Queensberry Street North Melbourne, VIC 3053, Australia Drawing

Site Plan

Drawn

Checked

AM

SL

RM

Job Number

Date

Scale

01

22.09.2020

Drawing Number

A102

Approved

1 : 100 Revision

R6

Revit Training with Spowers Architects

ARNAB MAJUMDER

Nightingale Queensberry

2 ST R EE T

NORTH

LI N E

1

M AI N

T EE R ST

E

TR AM

N AI M

D

12/10/2020 12:11:31 PM


Disclaimer: This drawing and design is subject to copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Figured dimensions take precedence over scaled dimensions.

2

1

1

3

4

A109

Drawing Status

5

Design Development

18540 (Total Building Width) 1300

5900

1050

5550

200

70

1835

70

1000

70

1545

200

Revisions

5900 2150

R1 R7

5550

4400

200

2200

200

3800

600

R 112

Landscaped Garden

PC1

1000

Notes

NOTES - PLANS

R 101

Exterior

AW1

R 115 D.G01.1

SW1

G = 250 T = 190

4465 1000

SW1

9

PC3

7

Unisex DDA Toilet

6 5

05. PROVIDE REINFORCING TO ALL STUD WALLS SUPPORTING JOINERY, FITTINGS, FIXTURES, A/V SCREENS & PINBOARD LOCATIONS (COORDINATED WITH FITOUT DRAWINGS).

FFL 350 PC1

8

R 103 W3

03. ALL SERVICE CONDUITS/PIPES (ELECTRICAL & HYDRAULIC) TO BE CONCEALED WITHIN WALL FRAMING OR SLAB. CONTRACTOR TO SUBMIT SHOP DRAWINGS WITH COORDINATED LOCATIONS OF SERVICE PENETRATIONS & CONDUITS.

6115

10

BOH (Kitchen)

02. DRAWING TO BE READ IN CONJUNCTION WITH STRUCTURAL ENGINEER'S AND SERVICES ENGINEER'S DRAWINGS.

04. ALL SERVICE PENETRATIONS THROUGH FIRE/SMOKE RATED ELEMENTS ARE REQUIRED TO BE PROTECTED IN ACCORDANCE WITH BCA C3.15 (A TESTED PENETRATION PROTECTION SYSTEM).

R 114 PC1

01. DRAWINGS TO BE READ IN CONJUNCTION WITH SCHEDULES & SPECIFICATIONS.

Resident's Storage + Bike Parking

5600

W2

1000

6200

PC2

Storage

2800

R 102

BA1

WC

06. FLOOR FINISHES UNDER JOINERY (TO RECESSES) NOT SHOWN FOR CLARITY. EXTENT OF FLOOR FINISH TO JOINERY KICKER AND/OR ALL EXPOSED FLOOR UNDER JOINERY (I.E. UNDERSIDE OF OVERHEAD SHELVES, UNDER DESK).

2800

Air lock

D.G14.2

D.G12.1

D.G02.1

1000

W1

70

1000

1955

PC2

R 110

07. ALLOW SS. FLOOR ANGLE FOR ALL FLOOR FINISHES JUNCTION INTERNALLY & FLOOR TO WALL JUNCTIONS WITH NO SKIRTING.

4

PC2

2

1150

500 200 650

BR1

3075

900 Clear

BR1

Concierge + Postal Collection R 108

W15

BR2

200

D.G09.1

W16

1000

D.G04.1

250 400

Room Area

Storage Air lock BOH (Kitchen) Tenancy 1 Landscape Outdoor Seating Tenancy 2 Concierge + Postal Collection Lift Lobby Unisex DDA Toilet Garbage Collection WC Landscape Garden Resident's Storage + Bike Parking Exterior

3 m² 3 m² 19 m² 48 m² 10 m² 95 m² 43 m² 4 m² 33 m² 5 m² 8 m² 2 m² 7 m² 28 m² 19 m² 328 m²

600

D.G08.1

2500

PC1

2300

G6

G5

W6

1050

R 111 2550

140

900 Clear

1040

2400

1040

R 101 R 102 R 103 R 104 R 105 R 106 R 107 R 108 R 109 R 110 R 111 R 112 R 113 R 114 R 115

3050

G8 650

65

C

FFL 350

R 109

Room Number Room Name

400 500

1800

FFL 350

Garbage Collection

D.G09.3

Lift Lobby

200

1000

W5

1000

Check at site

R 104

1000

PC1

1000

20550 Total Building Length

5200

1

Tenancy 1

3350

D.G09.2

1000

1300

FFL 350

1705

D.G03.1

D.G10.1

D.G11.2

1000 Clear

W4

Room Schedule Ground Floor

BR1

D.G14.1

DN

1

140

400

UP

70

1000

SW1

D.G11.1

1000

3

B

A110

07/09/2020 Internal Wall lines changed 18/09/2020 DDA Toilet and Surrounding Areas Fixed

200

450

A

2430

5100 2650

1000

Resident's Entry

Lift 1 8 Pax (630kgs) 1100 X 1400

G4

G 3

5550 1000

Landscape Outdoor Seating Tenancy 2

FFL 350

600

400

D

PC3

2350

NORTH

te Si at

2400

ck he C

2750

0° 45.0

G2

ARNAB MAJUMDER

G1

PC3

2400

Nightingale Queensberry Street North Melbourne, VIC 3053, Australia

D.G07.1

te si at

200

Project

200

ck he C

E

200

00 15

M.ARCH THESIS DESIGN DEVELOPMENT

PC3

45.0 0°

562

1000

1000

1000

1000

1000

1000

1000

999

1239

1032

3984

Drawing

1000

Architectural - Ground Floor

Isometric View of Staiircase hand rails in compliance with BCA and NCC

Drawn

Checked

AM

SL

RM

Job Number

Date

Scale

01

22.09.2020

Drawing Number

A103

Approved

1 : 50 Revision

R7

Revit Training with Spowers Architects

R 107

FFL 350

Nightingale Queensberry

8685

R 106

1000

1000

R 105

8600

6050

1000

PC3

Lift 2 16 Pax (1200kgs) 1400 X 1940

12/10/2020 12:11:32 PM


Disclaimer: This drawing and design is subject to copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Figured dimensions take precedence over scaled dimensions.

2

1

1

3

4

A109

Drawing Status

5

Design Development Revisions

18540 (Total Building Width) 5900

1050

5550

R2

5100 2735

06/09/2020 Mullion Fixed

5900 200

1900

200

5550

600

450

A

1300

1000

PC2

PC2

Notes

W9

NOTES - PLANS

G17

Void to Below

02. DRAWING TO BE READ IN CONJUNCTION WITH STRUCTURAL ENGINEER'S AND SERVICES ENGINEER'S DRAWINGS.

G16

G8

R 206

6200

PC1

W10

03. ALL SERVICE CONDUITS/PIPES (ELECTRICAL & HYDRAULIC) TO BE CONCEALED WITHIN WALL FRAMING OR SLAB. CONTRACTOR TO SUBMIT SHOP DRAWINGS WITH COORDINATED LOCATIONS OF SERVICE PENETRATIONS & CONDUITS.

Directors Cabin 5600

1000

G = 250 T = 190

04. ALL SERVICE PENETRATIONS THROUGH FIRE/SMOKE RATED ELEMENTS ARE REQUIRED TO BE PROTECTED IN ACCORDANCE WITH BCA C3.15 (A TESTED PENETRATION PROTECTION SYSTEM).

GP1

1000

05. PROVIDE REINFORCING TO ALL STUD WALLS SUPPORTING JOINERY, FITTINGS, FIXTURES, A/V SCREENS & PINBOARD LOCATIONS (COORDINATED WITH FITOUT DRAWINGS).

29

PC1

28 27

D.106.1

GP1

1000

26

FFL 3850

W11

25

06. FLOOR FINISHES UNDER JOINERY (TO RECESSES) NOT SHOWN FOR CLARITY. EXTENT OF FLOOR FINISH TO JOINERY KICKER AND/OR ALL EXPOSED FLOOR UNDER JOINERY (I.E. UNDERSIDE OF OVERHEAD SHELVES, UNDER DESK).

2600

6200

1000

01. DRAWINGS TO BE READ IN CONJUNCTION WITH SCHEDULES & SPECIFICATIONS.

PC2

Unisex DDA Toilet

24

1000

22

1275

26 m² 11 m² 5 m² 43 m²

5200

22 m² 57 m² 230 m²

D.105.1 1000

Check at Site

400 1000

1000

4800

1200

G19

2300

R 205

PC1

2350

R 202

Lift 1 8 Pax (630kgs) 1100 X 1400

Lift 2 16 Pax (1200kgs) 1400 X 1940

BA1

1000

4550

1000

6050

G 10

1000

1000

66 m²

Executive Cabin with 8 workstations

PC1

Conference Room

R 206 R 207

Room Area

2500

200

900 Clear

BR3

W14

R 202 R 203 R 204 R 205

Room Name Common office cabin with 20 Workstations Conference Room Lift Lobby Unisex DDA Toilet Executive Cabin with 8 workstations Directors Cabin Office Terrace

400

D.103.1

1000 1000

900 Clear

D.102.1

C

6050

FFL 3850

R 203

GP1 1000

5200

R 201

600

D.103.2

W13

R 201

PC1

Lift Lobby

Common office cabin with 20 Workstations

1

20550 Total Building Length

1000

3100

1000

1705

Room Schedule First Floor Number

D.104.1

D.103.3

FFL 3850

1200 Total

1000

W12

FFL 3850

DN

400

20

UP

400

21

B

A110

07. ALLOW SS. FLOOR ANGLE FOR ALL FLOOR FINISHES JUNCTION INTERNALLY & FLOOR TO WALL JUNCTIONS WITH NO SKIRTING.

G17

R 204

23

PC3

0° 45.0

2750

1990

te Si at

2750

ck he C

NORTH

ARNAB MAJUMDER

360

Project

Nightingale Queensberry Street North Melbourne, VIC 3053, Australia

200

ck he C te si at

200

2400

45.0 0°

562

1000

1000

1000

1000

1000

1000

1000

999

6250 Clear

1000

Drawing

2295

E

200

00 15

M.ARCH THESIS DESIGN DEVELOPMENT

PC3

Architectural - First Floor

Isometric View of DDA Toilets and Office Space in compliance with AS 1428.1

Drawn

Checked

AM

SL

RM

Job Number

Date

Scale

01

22.09.2020

Drawing Number

A104

Approved

1 : 50 Revision

R2

Revit Training with Spowers Architects

600

FFL 3850

Nightingale Queensberry

Void to Below

400

D

R 207

5770

1000

Office Terrace

12/10/2020 12:11:34 PM


Disclaimer: This drawing and design is subject to copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Figured dimensions take precedence over scaled dimensions.

Drawing Status

Design Development Revisions

R4

06/09/2020 Wall Tagged + Full Elevations

Notes

External Wall Finish Schedule BT1

Brick Veneer Cladding

CB1

Vertical Striped Concrete Finish

CB2

Smooth Concrete Finish

Upper Levels are not considered for Design Development

A

1

B

C

A110

5200

6050

E 2750

2000

6200

D

BT1

BT1

BT1

BT1

BT1

BT1

BT1

2450

BT1

Level 2 Structural Slab Level

W11

W12

W13

W14

Level 1 Structural Slab Level 1000

3750 CB1

CB1

CB1

CB1

CB1

CB1

CB1

ARNAB MAJUMDER

M.ARCH THESIS DESIGN DEVELOPMENT

CB1

Project

Void

Nightingale Queensberry Street North Melbourne, VIC 3053, Australia

Void

2450

3500

Void

W1

W2

W3

W4

W5

W6

Drawing

Building Elevation (West)

Void

CB2

CB2

CB2

Ground Structural Slab Level 250

Drawn

Checked

AM

SL

RM

Job Number

Date

Scale

01

22.09.2020

Drawing Number

West Elevation Lower Levels are considered for Design Development

A107

Approved

1 : 50 Revision

R4

Revit Training with Spowers Architects

W10

Nightingale Queensberry

W9

8400

2500

3500

7250

12/10/2020 12:11:38 PM


1

Disclaimer: This drawing and design is subject to copyright and may not be reproduced without prior written consent. Contractor to verify all dimensions on site before commencing work. Figured dimensions take precedence over scaled dimensions.

2

1400 Clear

GEBERIT PLUVIA SIPHONIC DRAINAGE FLAT ROOF SYSTEM WITH 600 WIDE PAPARPET SOAKER

1400 FROM FINISHED FLOOR

PARAPET CAPPING TO MATCH ADJOINING WALL CLADDING. ALLOW PACKER UNDER TO MATCH FALL (TYPICAL)

Drawing Status

Design Development Revisions

SELECT METAL CLADDING AS SPECIFIED. PROVIDE TIMBER SUPPORT TO MANUFACTURERS RECOMMENDATIONS. ALL ADJOINING FLASHINGS TO MATCH. TERRACE FINISH WITH SUPPORT TO MANUFACTURERS RECOMMENDATION. 3mm APP MEMBRANE SYSTEM (TORCHED ON) WITH SLAB Notes

Level 2 Finished Floor Level 7350 Level 2 Structural Slab Level

1200

750 Depth

OVERFLOW POP

SELECT BRICK VINEER CLADDING AS SPECIFIED. PROVIDE METAL SUPPORT TO MANUFACTURERS RECOMMENDATIONS. ALL ADJOINING FLASHINGS TO MATCH

7250

STRUCTURAL CONCRETE MEMBERS TO ENGINEERS DETAILS

90mm THICK R2.7 GLASSWOOL CEILING BATT INSULATION (32Kg/m3) TESTED TO AS1530.1-1994. COMBINED DEATH R VALUE TO ACHIEVE 3.2.

ALUMINIUM DOUBLE GLAZED WINDOWS AS SPECIFIED

2200

2150 Clear

W13

2750 Clear height

750

PB LINNING OFF TOP HATS.GLASSWOOL INSULATION (32Kg/m3) TO ACHIEVE VALUE 1.8 TESTED TO AS1530.1-1994.

FLOOR FINISH ON ACOUSTIC BACKING. REFER FINISHES SCHEDULE

Level 1 Finished Floor Level 3850

1350 Clear

750 Depth

Level 1 Structural Slab Level

PC2 110mm Brick Wall 30mm Cavity 200 Precast 90 Stud/tophat 90 Glasswool 13mm PBD

3750 STRUCTURAL CONCRETE MEMBERS TO ENGINEERS DETAILS

PROPRIETARY SUSPENDED CEILING SYSTEM. CONTRACTOR TO ENSURE SMOKE SEPARATION BETWEEN GROUND FLOOR PLANT AREAS

FLOOR FINISH TO INTERIOR DESIGN SCHEDULE

150 From ground

ALLOW FOR REBATED EXPANSION JOINT COVER BETWEEN TWO SLABS TO ENSURE FLUSH "NO BUMP" INSTALLATION

Ground Finished Floor Level 350 Ground Structural Slab Level 250 STRUCTURAL CONCRETE SLAB TO ENGINEERS DETAILS

WATERPROOF MEMBRANE AND UNDERSLAB INSULATION BITUMINOUS CANITE (EXPANSION JOINT)

STRUCTURAL CONCRETE PAD FOOTING TO ENGINEERS DETAILS

1

Wall Section 1 : 20

ARNAB MAJUMDER

M.ARCH THESIS DESIGN DEVELOPMENT Project

Nightingale Queensberry Street North Melbourne, VIC 3053, Australia Drawing

Detailed Wall Section - Lower Levels Only

Drawn

Checked

AM

SL

RM

Job Number

Date

Scale

01

22.09.2020

Drawing Number

A111

Approved

1 : 20 Revision

Revit Training with Spowers Architects

2300

2150 Clear

W5

Nightingale Queensberry

ALUMINIUM DOUBLE GLAZED WINDOWS AS SPECIFIED

2750 Clear height

750

12/10/2020 12:11:42 PM


FUTURE OF EDUCATION

Melbourne Grammar School 03. Project Overview Master of Architecture Year 2 : Future of education in the year 2050 Softwares : Revit, AutoCAD, SketchUP, Lumion, Photoshop

Illustration of the future of education in 2050


Design Research - Identified issues

Identifying issues for student dis-engagement 1. Adolescent Identity Crisis

2. Anxiety & Distress

3. Isolation & Dis-engagement

4. School Dropouts

Identity formation is a foundational & central developmental concern for adolescence. It is an ongoing life long process, which begins at the early childhood. However, during adolescence, it has a substantial physical and psychological affect on an individual who is battling with emergence of new social expectations from other individuals. (Abbassi, 2016)

In a globalised Australian market, and increased competition from foreign countries, it has become a minimum requirement to complete secondary school education, in order to secure any white-collar job or get access to vocational training and university education. Early school dropout is resulting in increased psychological stress on a student with limited career prospects.

For students, who become a victim of abstract-ism, they cannot see a connection between what they learn and what they observe outside the school environments. It becomes more relevant in the middle years, when the teacher focuses on one subject rather than the whole course, leading to disintegration of disciplines. (Moore and Glancy,2013)

Dr. Ben Cleveland, who is a is a Research Fellow with the Learning Environments Applied Research Network (LEaRN), and professor at The University of Melbourne’s design school has suggested that disengagement has a detrimental outcome for an individual and has associated problems for the wider community. There is a greater chance for early school dropout for students concerned with disengagement. (Cleveland, 2016)

Illustration of identified issues, students commonly face in an education environment


HERO SHOT

Design Pointers & Constraints

Pedagogical Diagram

Circulation Diagram

Spatial Analysis


Exploded view of functional requirements

Functional layout of the Design Proposal


Ground Floor Plan

The future of education will be delivered through reflexive studios and project based learning


First Floor Plan looking towards biology lab

Biophillic design : A connection with mother nature is imperative to a child’s emotional and mental growth

Call out view of Biology Lab


Fourth Floor Plan

The floor plates are divided into two componets : Specialised Learing Zones and informal + maker spaces


Section through Reflexive Learning Studios

Section Through Reflexive Studios


Applied Architectural Technology 04. Project Overview Master of Architecture Year 1 : Detailed Podium Design Softwares : AutoCAD, SketchUP, Lumion and Photoshop

01. The following exercise was compiled to demonstrate my understanding of producing a set of Construction Drawings in AutoCAD with attention to Australian Standard sections 02. The exercise was carried during my first year of M.Arch studies 03. The set of drawings produced in this chapter are my original work.


HERO SHOT

Illustration of Podium as seen from Exhibition Street

Part Plan of Podium at 1:100 in A3


Blown -up Part Details

1. Detail at Glazing and Precast Joinery

2. Typical Spider Connection to Glass


05. Project Overview Professional Work : Visualisations for We Are Humble and Motion Studio Softwares : AutoCAD, SketchUP, Lumion and Photoshop

VISUALISATIONS

Architecture Visualisations & illustrations


CODE BLACK

Code - Black Interior Visual - We Are Humble

The stripped back, utilitarian deli offers your morning coffee & take-away sandwich, consciously evoking a retro diner feel


The luxurious lounge, meanwhile, is tucked away in the corner and the perfect spot for a long lunch. Things here are more tactile and set-in

CODE BLACK

Code - Black Interior Visual - We Are Humble


Dynamic Apartment Competition Entry - Motion Studio

An aspiration spiral tower, with each apartment block is set to receive their private green space


Interior Visual of Dynamic Apartments - Motion Studio

Natural materials and open floor plan create a sense of luxury


Thank you for taking the journey Arnab Majumder | Master of Architecture - The University of Melbourne


This is not a Picture : Realsitic Render of Boat House

PORTFOLIO

ARNAB MAJUMDER | MASTER OF ARCHITECTURE

E : arnab.majumder1994@gmail.com P : 0452 470 550


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.