CLIENT: Laser Spine Institute
CASE STUDY
Tampa, FL
Bringing together multi-functional teams to map the patient experience leads to discovery & improvement. Many times, team members solely focus on improving the work in their own department. When we bring all stakeholders together to form a multi-functional team, they see how different departments interact and realize that their focused improvements might not benefit the entire system.
SERVICE: Transformation
EXECUTIVE SUMMARY
METHOD: Kaizen Event
Array partnered with Laser Spine Institute (LSI) to help facilitate their transition from the current Orion surgery center to the new Avion Park facility. During this engagement, a multi-functional team of LSI stakeholders participated in six workshops to develop a transition plan for the new facility.
Challenge A planetree-designated, minimally-invasive spinal surgery center was interested in improving their patient experience and defining new operating procedures before moving into a new facility.
As Array led the team members through the mapping exercises, they developed a better understanding of how each piece of the clinic day fits together. The clinic workshops resulted in a detailed study around MRI utilization, and the potential value of roomers in the new, larger space. Array used a simulation model to test different scenarios and determine the best staffing option for the imaging department at the Avion Park facility. Upon completing the mapping events, a few key improvements became apparent to the team. Utilizing the transformation plan to guide these activities, LSI could see
Solution
potential increases in patient satisfaction and value-added process time. There was also potential for reducing the duration of the first clinic day, resulting in a larger
Array gathered a multi-functional team to participate in a kaizen event, where the team mapped the current state and ideal future state of the patient throughput process. A gap analysis resulted in a transformation plan that the client could execute before moving to the new facility.
PROJECT HIGHLIGHTS
9%
number of patients being scheduled for surgery, and improving the overall patient experience.
EXPECTED INCREASE IN VALUE-ADD TIME
1.6hr
EXPECTED CLINIC DURATION REDUCTION
3
MRI THROUGHPUT SCENARIOS TESTED