Kristyzhang profolio

Page 1

KRISTY ZHANG LANDSCAPE ARCHITECTURE


LANDSCAPE MASTERPLAN

3 1

1//Aged Care Masterplan, BNE 2//Ruby Field Masterplan, TV 3//GU, Aquarium center, GC 4//KM Graden Design, BNE 5//Aged Care Masterplan, BNE 6//QUT Carpark, KG 7//EM Tooth Aged Care, BNE 8//168 Turbot St, BNE

2 4

6

LANDSCAPE PRESENTATION

5

9//28 Baxter St, BNE 10//LCCH AILA Awanrds Boards

7

LANDSCAPE 3D MODELLING 11//Green Wall Infrastructure

8

13 14 12

PHYSICAL MODELLING 12//Lamington Market, BNE 13//Bench Dairy, LCCH

COMPETITION

13//AILA - With All

9

10 11

LANDSCAPE DOCUMENTATION

11//BFA, Carpark Documentation


LEGEND 01 THE CLUBHOUSE • Café • Alfresco plaza • Lookout deck • Wide steps to water’s edge • Kayak/canoe landing point 02 GREAT LAWN • Central lawn – manicured turf • Clear, accessible edge • ‘The Beach’ • Sweeping access path 03 THE COMMON • Bowling green • Viewing deck • Multi use lawn • Swimming pool and deck • Community gardens

09

04 CENTRAL SPINE • Main pedestrian spine • Planted arbour/trellis • Shaded seats • Feature planting 08 07

07

06 THE BIRD HIDE • Bird hide • ‘The Grove’ • Winding footpaths • Reeds and grasses to lake edge

01 14

10

07 ENTRY PLAZA • Feature entry signage • Feature paving and seating • Sales centre and shops • Water feature • Dry creek bed (water harvesting and filtering)

03

02

11

12

05 PLAY ZONE • Active play for all • Passive play and relaxation areas • Dry creek bed (water harvesting and filtering)

08 THE CAUSEWAY • Lake crossing • Water views • Tall, columnar tree avenue • Footpaths with balustrade 09 OUTDOOR FITNESS • Outdoor fitness equipment • Private bushland setting • Link to bush trail • Natural lake edge

06 12

03

04 05

10 BOATHOUSE • Jetty for kayak/canoe launch • Lookout/vantage point • Natural lake edge 11 DISPLAY GARDENS • Herb gardens • Sensory gardens • Scented gardens • Colourful flowers and textures 14

12 GARDEN COURTYARDS • Lush planting • Rainforest feel • Pedestrian links 13 COMMUNITY HALL & SCULPTURE GARDEN • Sculpture garden • Community space • Dedicated parking 14 ROOF TERRACES • Paved areas • Planted gardens • Custom furniture and seating

13


LEGEND

MAIN PLAYING FIELD 5 degrees East of North (With Lighting to AS2560.2.3-2002) PLAYING FIELD With lighting to AS2560.2.3-2002

CAR PARK / PASSENGER SETDOWN Approx 260 spaces BUS SETDOWN

07

ENTRY FEATURE/SIGNAGE

08

STORMWATER OPEN DRAIN

G

02

MAIN PLAYING FIELD 5 degrees East of North (With Lighting to AS2560.2.3-2002)

03

PLAYING FIELD With lighting to AS2560.2.3-2002

04

PLAYING FIELD

05

CAR PARK / PASSENGER SETDOWN Approx 260 spaces

09

06

BUS SETDOWN

07

ENTRY FEATURE/SIGNAGE

08

STORMWATER OPEN DRAIN

05

01

E

06

09

FUTURE EXPANSION

IV

FUTURE EXPANSION SH

02

N

AN

AH

AN

N

08

DR

09

L

E TR AR

RT UA ST

06

TDRU FACILITIES & WESTERN GRANDSTAND

09

UE EN AV

05

IVE

R LD

GA OL

PLAYING FIELD

BR

04

01

T

03

EN M

02

LEGEND

TDRU FACILITIES & WESTERN GRANDSTAND

SE EA

01

IVE

DR

FIELD ORIENTATION

04

09

FIELD ORIENTATION 07

03 P R EF E R R ED

P R EF E R R ED

03

04

Y WA

SUN PATH DIAGRAM

CE

RU

SUN PATH DIAGRAM

IV

DR

R

IVE

UN

Y SIT

B E/

H HIG

AY HW

U

TOWNSVILLE AND DISTRICTS RUGBY UNION GROUNDS & FACILITIES

ITY

RS

E NIV

E RIV

IG EH

UC

/ BR

D

CONCEPT MASTER PLAN - PREFERRED LAYOUT 1:2500 @ A3

0

50

100

150


Water tank

Water tank

Water tank

Water tank

Water tank

Water tank

Planting area 11

Shed Shed

Informal Stepper Path

1

Shed

Stepping stone

Pool fence

Planting area Spa Swimming pool

Access to the house

“Sleeper” bridge2

Active garden

12

8

Pool fence Beach

Access to the pool Access to the pool

9

Feature tree Dry Creek

Access to the house

Relaxing garden

7

Grassed area for relaxation

3

4

Timber Bridge Water Feature Timber decking

13

10

Relaxing garden

Water tank

Vehicle Access 5

Water tank

13 12 11

Shed

6

5

7

9

8 10

4 3

1

Landscape concept

6

Circulation diagram

Landscape concept plan

CHARACTER IMAGES Project:15106 McGrath Residence Date: 05/08/2015

LANDSCAPE CONCEPT PLAN Project:15106 McGrath Residence Date: 05/08/2015

Circulation Diagram LANDSCAPE CONCEPT PLAN Project:15106 McGrath Residence Date: 05/08/2015

Project:15106 McGrath Residence Date: 05/08/2015

2

Character images


HERS

TON

HERS

TON

ROAD

ROAD

LEGEND

2

New street-trees

3

Walls to meander in and out to give more air flow and to give more light to lower level, to ensure retention of Poinciana trees.

4

Car park to be redefined to maximise car parking and to provide a more logical boom gate operation.

3 7

LOWER LEVEL CARPARK

NE

11

3

SPOR TS LA

BOUND

5

6

ARY R

OAD

8

EXISTING CARPARK

7

9

EXISTING CARPARK

9

7 8

Main entry in at ground level Entry to level 1

7

Low groundcovers and fern gardens

8

Seating nodes at entry points for rest stops

9

New planting to soften edge of existing road and to set up entry to

2

UPPER LEVEL SPORTS FIELD ON TOP OF CAR PARK

3

New service lane to be adjusted.

6

6 11

3

EXISTING CARPARK

7

10 New street Tree planting to

embankment side of the road

7

1

10

12

13

8

NEW ROA

D

11 Old entry closed off to

2 4

to Field

10

C&K BLOCK

5

12

9

1

12

13

8

NEW ROA

D

Scale: 1:400 @A1

Issue A - 14/8/2015

4

Car park to be redefined to maximise car parking and to provide a more logical boom gate operation.

5

New service lane to be adjusted.

6

Main entry in at ground level Entry to level 1

7

Low groundcovers and fern gardens

8

Seating nodes at entry points for rest stops

9

New planting to soften edge of existing road and to set up entry to

4

facilitate boom gate operation

9

8

12 New Bridge Link form P Block

to Field

14

10

14 Emergency vehicular parking

13 New Bio detention basin

2 10

15 New turf and with trees

Ground level masterplan

Walls to meander in and out to give more air flow and to give more light to lower level, to ensure retention of Poinciana trees.

11 Old entry closed off to

2

P BLOCK

5

12

C&K BLOCK

as temporary landcape to replace existing building

N BLOCK

15146 QUT Car Park, Kelvin Grove Campus landscape master plan development

14 Emergency vehicular parking 15 New turf and with trees

N BLOCK

15146 QUT Car Park, Kelvin Grove Campus landscape master plan development

New street-trees

3

embankment side of the road

10

as temporary landcape to replace existing building

New 2m wide pathway

2

10 New street Tree planting to

13 New Bio detention basin

2

P BLOCK

EXISTING CARPARK

7

12 New Bridge Link form P Block

14

10

9

facilitate boom gate operation

9

8

1

4

NE

2

1

15 3

SPOR TS LA

4

7

OAD

15

New 2m wide pathway

ARY R

1 3

LEGEND

1

BOUND

7

masterplan Scale: 1:400 @A1

Issue A - 14/8/2015



sub-tropical.

screen the services.

Walking radius

BAXTER STREET BCCP BGGS CAC CP CTM E FS JM OM

Bowen Park Brisbane Showgrounds

STJC VM

RICC OM

Victoria Park Golf Complex

Brisbane City Council Pool Brisbane Girls Grammar School Centenary Aquatic Centre Centenary Place Chinatown Mall Emporium Fire Station James st Market Old Museum Royal International Convention Centre St. Joseph’s College RICC Valley Mall E

28 Baxter Street

Victoria Park BCCP

5 Minute walk 400mts

28 Baxter Street

CAC

28 Baxter Street STJC

10 Minute walk 800mts

JM

VM

CT

M

BGGS

Level 6 - podium terrace

Conc main land

plan 1:100@A3 Screened neighbour fencing with climbing plants to grow up over it.

Mix of planting heights to soften edges and to screen service condensers.

the site specifically

Condensers.

28 Baxter Street is close to many amenities in the local area as listed in diagrams adjacent. It has street frontage that faces north east. It is on a side street off St Pauls Terrace, very close to the hub of valley. Local transport links are very close making it a very convenient inner city address. There are cooling south easterly breezes in the summer and quite cold winter breezes from the south west. There are expansive views to the north and city views to the south.

Issue A - 31/08/2015

Clique

Level 6 - podium terrace

landscape master plan -

section A 1:50@A3

Issue A - 31/08/2015

Integrated seating under structure. Open pergola to

climbing plants up and over it. 28 baxter street, fortitude valley qld - 21haveStorey Option

CP

Clique

lley qld - 21 Storey Option

Low level planting to low for big expansive views to the north.

Green space Green spaces

Walkingradius radius Walking BCCP Brisbane City Council Pool BGGS Brisbane Girls Grammar School CAC Centenary Aquatic Centre Centenary Place CP CTM Chinatown Mall Emporium E Fire Station FS James st Market JM Old Museum OM Royal International Convention Centre STJC St. Joseph’s College RICC Valley Mall VM

FS

un

28 baxter street, fortitude valley qld - 21 Storey Option RICC OM

Victoria Park Golf Complex

E Victoria Park

28 Baxter Street

JM

28 Baxter Street

VM

CT

M

BGGS

CP

Cooling Summer Winds

the site specifically

28 Baxter Street is close to many amenities in the local area as listed in diagrams adjacent. It has street frontage that faces north east. It is on a side street off St Pauls Terrace, very close to the hub of valley. Local transport links are very close making it a very convenient inner city address. There are cooling south easterly breezes in the summer and quite cold winter breezes from the south west. There are expansive views to the north and city views to the south.

Planting to soften edges of service plant area

Low level planting to low for big expansive views to the north.

Low level planting to low for big expansive views to the north.

Areas for sun lounges.

Areas for sun lounges.

City Views South Roof top with PoolRoof top with Pool

Winter winds

section C 1:50@A3

section C 1:50@A3

CliqueClique

landscape master planlandscap - roof de

Issue A - 31/08/2015

28 baxter street, fortitude valleystreet, qld - 21fortitude Storey Option 28 baxter valley qld - 21 Storey Option

Clique

analysis and local context

Transportation Transportationlinks links

n

u rs

e

m

m

Su

28 Baxter Street

Planting to soften edges of service plant area

section B 1:50@A3

FS

Surroundingfacilities Surrounding Green ffacilities spaces

Issue A - 31/08/2015

Roof top with Pool

Pa u

STJC

into pool

Roof top with Poolsection B 1:50@A3

28 Baxter Street

ls

CAC

S

Northern Views

e

BCCP

m

um

ra c

Brisbane Showgrounds

s er

Te r

Bowen Park

Integrated seating under structure. Open pergola to

Low level planting tohave climbing plants up and Integrated seating over it. low for big expansive into pool views to the north. Integrated seating

analysis and local context Surrounding facilities

Issue A - 31/08/2015

St

alley is somewhat of a d. It is often referred to andscape character as e music hub and hive hinese supermarkets pean village feel, James home to multicultural is also providing a new

contradiction in itself; it can be both raw and sophisticated. It is often referred to as where elegance and style meet grungy and quirky. It‘s landscape character as such follows that varied style. The Valley is famous as a live music hub and hive of clubs and chic bars. Chinatown Mall is a hub of exotic Chinese supermarkets and restaurants. The Emporium complex channels a European village feel, James St showcases Australian fashion labels and Brunswick St is home to multicultural dining options. The redevelopment of RNA show grounds is also providing a new urban hub in the local area.

Northern Views

28 baxter street, fortitude valley qld - 21 Storey Cooling Option

analysis and local context

Landscape masterplan

Issue A - 31/08/2015

plan 1:200@A3

landscape master plan

Issue A - 31/08/2015


Designed For Healing The Gardens of the Lady Cilento Children’s Hospital

The Lady Cilento Children’s Hospital (LCCH) brief was a once in a life opportunity requesting a new children’s hospital built to world’s best practice. The project vision is for a holistic approach to health and wellbeing based on evidence based design. Demonstrating the power of nature and the benefits of contextual design the LCCH with its 11 delightful roof top gardens and community plaza is arguably setting a new standard for hospitals in Australia.

Designed For Healing The Gardens of the Lady Cilento Children’s Hospital

The Designed for Healing video showcases the landscape design of the Lady Cilento Children’s Hospital (LCCH), completed in November 2014. The project brings together specialist services from the Mater Children’s and Royal Children’s Hospital to a single location, designed to world best practice. The video celebrates the achievements of the project vision – challenging the traditional notion of hospital. It offers insights into the design philosophies that support this holistic approach to health and wellbeing, presented by three key team members. The video promotes the value of landscape, educates the community, brings awareness to our profession and redefines the notion of healing gardens. https://www.youtube.com/watch?v=PIkW2ENG2Yw

PROJECT NAME: COMPANY NAME: CLIENT: PROJECT LOCATION:

LADY CILENTO CHILDREN’S HOSPITAL CONRAD GARGETT QUEENSLAND HEALTH WITH DR. PETER STEER AS REPRESENTATIVE FOR THE ENTIRE PROJECT RAYMOND TERRACE - SOUTH BRISBANE

PROJECT NAME: COMPANY NAME: CLIENT: PROJECT LOCATION:

LADY CILENTO CHILDREN’S HOSPITAL - DESIGNED FOR HEALILNG VIDEO CONRAD GARGETT QUEENSLAND HEALTH WITH DR. PETER STEER AS REPRESENTATIVE FOR THE ENTIRE PROJECT RAYMOND TERRACE - SOUTH BRISBANE


SCALE CHECK

0

REFER TO DRAWING BFA-CGH-04-LA-DWG-0002 FOR LANDSCAPE SCHEDULE

A B C D E F G H I

SCALE CHECK

50

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SITE

30

40

50

DATE

26/06/2015 17/07/2015 22/07/2015

CHKD APPD LOR LOR LOR

MR MR MR

BFA-CGH-01-LA-DWG-0201

FOR CONTINUATION REFER

.728

.420

+ FS

.608 .653

L 28

.728 L 28 + FS

08 29 .1

L

FS +

.608 L 28

90째

+ FS

L 28

+ FS

21 LOM hys [140] 68 FIC nod [140] 34 CAR app [140] 95 JUN usi [140]

5

ACA fim [300]

72 MYO ell [140] 39 THE tri [140] 51 LOM lon [140]

.728

200L

20 MYO ell [140] 21 LOM hys [140]

7

12

DOR exc [300]

PROJECT MANAGER / CONTRACT ADMINISTRATOR

MANAGING CONTRACTOR

LOP con 200L

ARCHITECT

.728

TUF EXTENT OF BATTERS AND MAKE GOOD ADJOINING EXISTING GRASS

L 28

3

ARCHITECT

WAT flo 400L

32 LOM lon [140] 8 MYO ell [140]

870

870

.728

All lit

CLIENT

40

+ FS

.653

.608 L 28 + FS

L 28

L 28 + FS

430

40

L 28

LOP con 200L

870

870

ALL THRESHOLD PAVEMENT STRIPS TO MATCH DOORWAY DIMENSIONS - REFER TO ARCHITECTS DRAWINGS.

WORK ELEMENT

STAGE 01 TRAINING FACILITIES

WORK ELEMENT

STAGE 01 TRAINING FACILITIES

430

BUILDING NAME

BUILDING NAME

0DRAWING 10 20

30

40

50

TSF Landscape Levels DATE CHKD and Setout - Sheet 1 LOR A FOR LOR REVIEW 26/06/2015

A1 SCALE

A1 SCALE

1 : 200

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SITE

REV DESCRIPTION

DRAWN

NORTH

17/07/2015 22/07/2015

LOR LOR

G

MR MR MR

MR

DRAWING No:

BFA-CGH-01-LA-DWG-0202

FOR CONTINUATION REFER

. Fall Max

REV:

C

1 in

430

40

10

20

30

A B C

DATE

FOR LOR REVIEW 26/06/2015 DDR ISSUE FOR REVIEW 17/07/2015 DESIGNED: DDR ISSUE 22/07/2015

MR

NORTH

870

0

CHKD APPD

A1 SCALE

C

1 : 200

MR

20

30

40

DDR ISSUE

DESIGNED:

REFER TO DRAWING BFA-CGH-04-LA-DWG-0011 FOR PLANT SCHEDULE

LOR MR LOR MR DRAWN LOR MR

DRAWING No:

10

50

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND A1LEVELS SCALE ON SITE DRAWING

REVPlanting DESCRIPTION Plan TSF A FOR LOR REVIEW B DDR Sheet 1 ISSUE FOR REVIEW

40

REV DESCRIPTION

DRAWN

MR

BFA-CGH-01-LA-DWG-0201

REV:

0

NORTH

MR

DRAWING No:

DATE1 :CHKD 200 APPD

26/06/2015 17/07/2015 22/07/2015

LOR LOR LOR

MR MR MR

DRAWN

MR

REV:

BFA-CGH-01-LA-DWG-0301

C

REV:

BFA-CGH-01-LA-DWG-0202

.728

BFA-CGH-01-LA-DWG-0201

DDR ISSUE FOR REVIEW DDR ISSUE

DRAWING

TSF Landscape Levels and50 Setout - Sheet 2 DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SITE

SCALE CHECK

APPD

L 28

FOR CONTINUATION REFER

B C

870

C

+ FS

1 : 200

40

.728

1 in

L 28

. Fall Max

430

TRAINING SYSTEM FACILITIES

BFA-CGH-01-LA-DWG-0204

FOR CONTINUATION REFER

+ FS

TRAINING SYSTEM FACILITIES

BFA-CGH-01-LA-DWG-0203

TRAINING SYSTEM FACILITIES SCALE CHECK

in 40

1275

TUF EXTENT OF BATTERS AND MAKE GOOD ADJOINING EXISTING GRASS

BFA-CGH-01-LA-DWG-0103

34 CAR app [140] 68 FIC nod [140] 34 CAR app [140] 68 JUN usi [140] 145 LOM hys [140] 34 CAR app [140]

1 in

. Fall Max

430

3 0005

PROJECT NO. R8004 Battlefield Airlifter Air 8000 PH2 Main Operating Base Facilities RAAF Base Amberley QLD

LOP con 200L

L 28

L 28

.420 + FS

+

+ FS

L 28

.420 L 28 + FS

L 28 + FS 08

2650

29 .1 L FS +

+ FS

40

Fall

1 in

465

2300

B

B

PROJECT

T1

CLIENT

PROJECT

T 268 D 0.8

MANAGING CONTRACTOR

ANG Lei 100L

93 HAR vio [140] 5

DOR exc [300]

3 5

DOR exc [300] ACA fim [300]

3

DOR exc [300]

71 CHR app [140] 28 LOM lon [140] 36 MEL ct [140]

5

DOR exc [300]

43 LOM hys [140] 54 POA sie [140] 35 MYO ell [140] 29 LOM lon [140] 2

ACA fim [300]

175 LOM lon [140] 96 MYO ell [140] 71 MEL ct [140]

2 6 2

PROJECT NO. R8004 Battlefield Airlifter Air 8000 PH2 Main Operating Base Facilities RAAF Base Amberley QLD

COR cit 100L DOR exc [300] ACA fim [300]

58 POA sie [140]

CLIENT

51 THE tri [140]

FOR CONTINUATION REFER BFA-CGH-01-LA-DWG-0301

PROJECT MANAGER / CONTRACT ADMINISTRATOR

T 270 D 0.4

2

CLIENT

PROJECT MANAGER / CONTRACT ADMINISTRATOR

T 256 D 0.2

PROJECT

DOR exc [300]

32 MEL thy [140]

COR cit 100L 3 ACA fim [300]

36 MYO ell [140]

PROJECT NO. R8004 Battlefield Airlifter Air 8000 PH2 Main Operating Base Facilities RAAF Base Amberley QLD

TUF EXTENT OF BATTERS AND MAKE GOOD ADJOINING EXISTING GRASS

MANAGING CONTRACTOR

3

73 POA sie [140] 43 THE tri [140] 2

PROJECT NO. R8004 Battlefield Airlifter Air 8000 PH2 Main Operating Base Facilities RAAF Base Amberley QLD

FOR CONTINUATION REFER

CLIENT

FOR CONTINUATION REFER

PROJECT NO. R8004 Battlefield Airlifter Air 8000 PH2 Main Operating Base Facilities RAAF Base Amberley QLD

BFA-CGH-01-LA-DWG-0203

BFA-CGH-01-LA-DWG-0204

PROJECT

FOR CONTINUATION REFER

BFA-CGH-01-LA-DWG-0104

11

30 MEL ct [140] 34 CHR app [140] 30 CAL LJ [300]

136 MYO ell [140] 156 LOM lon [140] 163 HAR vio [140]

Max.

5000

FOR CONTINUATION REFER

ACA fim [300]

61 MYO ell [140]

45 POA sie [140]

T1

MANAGING CONTRACTOR

MANAGING CONTRACTOR

T 269 D 1.0

ARCHITECT ARCHITECT

T1

3

EUC mic 100L

T1

T1 TO EXTENT OF BATTERS - REFER TO CIVIL ENGINEERS DRAWINGS. MAKE GOOD TO EXISTING TURF AREAS.

MANAGING CONTRACTOR

106 MEL ct [140]

73 MEL ct [140] 194 HAR vio [140]

28 MEL thy [140] 98 LOM lon [140] 110 HAR vio [140]

T1

PROJECT MANAGER / CONTRACT ADMINISTRATOR

LOP con 200L

. Fall Max

SCALE CHECK

MR

68 FIC nod [140] 34 CAR app [140] 68 JUN usi [140]

44 JUN usi [140] 34 CAR app [140] 68 FIC nod [140] 34 CAR app [140] 68 JUN usi [140] 117 LOM hys [140] 34 CAR app [140]

85 MYO ell [140] MANAGING CONTRACTOR

BUILDING NAME

FOR CONTINUATION REFER

BFA-CGH-01-LA-DWG-0102

98 THE tri [140] 76 LOM hys [140] 73 CAL LJ [300]

21 LOM hys [140]

5

STAGE0005 01 TRAINING FACILITIES

0005

B

8

PROJECT MANAGER / CONTRACT ADMINISTRATOR

T 275 D 0.4

T 257 D 0.3

T 271 D 0.5

20

FOR LOR REVIEW DDR ISSUE FOR REVIEW DDR ISSUE

B

84 POA sie [140] 82 MEL thy [140]

. Fall Max

PROJECT MANAGER / CONTRACT ADMINISTRATOR

T 272 D 1.2

870

870

DRAWING No:

300

MR

2

WORK ELEMENT

DESIGNED:

DESIGNED: NORTH

PANTHER AIRFIELD FIRE TRUCK ROAD - REFER TO CIVIL ENGINEERS DRAWINGS

300

T1 TO EXTENT OF BATTERS - REFER TO CIVIL ENGINEERS DRAWINGS. MAKE T1 GOOD TO EXISTING TURF AREAS.

1

0005

+FFL 28.900

465

I

L 28 .758

40

REV:

430

40

0005

1

KNW KNW KNW MR MR MR MR

DRAWING

PROJECT NO. R8004 Battlefield Airlifter Air 8000 PH2 Main Operating Base Facilities RAAF Base Amberley QLD CLIENT

LOR LOR LOR LOR

20 MYO ell [140]

82 LOM lon [140]

1

300mm CONCRETE SUROUND TO BASE OF BUILDING SIGN. SIGN TO ARCHITECTS DRAWINGS

. Fall Max

PROJECT

04/02/2015 09/02/2015 02/03/2015 03/06/2015

TRAINING 26/06/2015 SYSTEM LOR 17/07/2015 LOR FACILITIES22/07/2015 LOR

TSF Surface Finishes Plan - Sheet 2

P1

T1

MR

DRAWING No:

SDR ISSUE

REVISED SDR ISSUE BUILDING NAME LEGEND REFERENCE FOR LOR REVIEW FOR LOR REVIEW DDR ISSUE FOR REVIEW DDR ISSUE

77 CAL LJ [300] 79 MEL ct [140] 102 HAR vio [140]

21 LOM hys [140]

PROJECT MANAGER / CONTRACT ADMINISTRATOR

1 in

L 28 .693

+ FS

870

CLIENT

BFA-CGH-01-LA-DWG-0102

0005

CHKD APPD

89 POA sie [140] 71 MEL thy [140] 92 THE tri [140] 75 LOM hys [140]

29 WES fru [300]

1 in

PROJECT NO. R8004 Battlefield Airlifter Air 8000 PH2 Main Operating Base Facilities RAAF Base Amberley QLD T 276 D 0.4

T 273 D 0.6

40

PROJECT

FOR CONTINUATION REFER

1 : 200

BFA-CGH-01-LA-DWG-0101

T 220 D 0.2

T 255 D 0.2

1 in

LOR KNW LOR KNW LOR KNW LOR MR LOR MR A1 LORSCALE MR LOR MR

DRAWN

MR

NORTH

T 217 D 0.2

T 252 D 0.3

. Fall Max

DESIGNED:

KNW KNW KNW KNW MR MR MR MR

2

PROJECT NO. R8004 Battlefield Airlifter Air 8000 PH2 Main Operating Base Facilities RAAF Base Amberley QLD CLIENT

5100

100

2300

A B C D E F G

CHKD APPD

1 in

+ FS

465

DATE

04/02/2015 09/02/2015 02/03/2015 03/06/2015 26/06/2015 17/07/2015 22/07/2015

. Fall Max

5000

870

LEGEND REFERENCE FOR LOR REVIEW FOR LOR REVIEW DDR ISSUE FOR REVIEW DDR ISSUE

DATE

.300

40

REV DESCRIPTION

50

L 28

ARCHITECT

1 in

T1

CHKD APPD

T 218 D 0.2

T 254 D 0.4

4000

L 28 .758

. Fall Max

BFA-CGH-01-LA-DWG-0101

SCALE CHECK

LOR LOR LOR LOR LOR LOR LOR LOR

10

A B C

MR MR MR

. Fall Max

2630

40

TSF Surface Finishes Plan - Sheet 1 50

L 28 .693

+ FS

4000

1615

A B C D E DRAWING F G

J

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SITE

100

+ FS

40

30

REV DESCRIPTION TRAINING SYSTEM SDR ISSUE FACILITIES REVISED SDR ISSUE

REV:

STAGE 01 30 40 50 TRAINING FACILITIES

40

20

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SITE

MR

P1

T 251 D 0.4

LOR LOR LOR

0005

Fall

DRAWN

20

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SITE

FS

PROJECT MANAGER / CONTRACT ADMINISTRATOR

2

1 in

0 NAME 10 BUILDING

10

WORK ELEMENT

Max.

0

SCALE CHECK

FOR CONTINUATION REFER

T 250 D 1.0

1 in

L 28 .707

1 in

SCALE CHECK

BFA-CGH-01-LA-DWG-0104

40

FOR CONTINUATION REFER

.296

+

Fall

1 in

STAGE 01 TRAINING FACILITIES

400

Max.

WORK ELEMENT

BFA-CGH-01-LA-DWG-0103

L 28

MANAGING CONTRACTOR

9380

+ FS

2820

40770

. Fall Max

Max. Fall

P3

T1

FOR CONTINUATION REFER

FS

2630

2000

1 in 40

G1

+

1800

39700

P1 P2

ARCHITECT

P1

BFA-CGH-01-LA-DWG-0001

T 274 D 0.3

CHKD APPD

B

CONCRETE EDGE TO EXTEND TO EXTENT OF EXISTING PLANTING AND TURF INTERFACE

1 in

. Fall Max

P1

CLIENT

300

MOUND GARDEN BED + 500 SURROUNDING FSL AS INDICATED

1000

CE

.300

1800

Max. Fall

G1

A1 SCALE

1 : 500

L 28

Max. Fall

1840 11 9째

2555

TRAINING SYSTEM FACILITIES

T 267 D 0.3

DATE

26/06/2015 17/07/2015 22/07/2015

B

RETAINING WALL - REFER TO CIVIL ENGINEERS DRAWINGS

40

10475

1 in 40

T1

VEHICULAR PAVEMENT

22275

G1

BUILDING NAME

T 240 D 0.2

0

50

PROJECT

PROJECT NO. R8004 Battlefield Airlifter Air 8000 PH2 Main Operating Base Facilities RAAF Base Amberley QLD

Fall

0003

P2

ARCHITECT

DATE

40

PROJECT

1 in

2

Max. Fall

P1

FS

.420

4230

F2

P2

23/01/2015 27/01/2015 04/02/2015 09/02/2015 03/06/2015 26/06/2015 17/07/2015 22/07/2015

30

FOR LOR REVIEW DDR ISSUE FOR REVIEW DDR ISSUE

3

Max.

BIN STORE - REFER TO ARCHITECTS DRAWINGS FOR DETAILS

MANAGING CONTRACTOR

CE

.296

+

PROJECT

1 in 40

PROJECT MANAGER / CONTRACT ADMINISTRATOR

1 in 40

F2

P2

L 28

P3

PA1

CE

FS

VEHICULAR PAVEMENT

3300 G1 P1

P1

MANAGING CONTRACTOR

PA1

+

BOLLARDS - REFER TO ARCHITECTS DRAWINGS AND SCHEDULES

G1

F1

5690

1 in 40

T1

P1

T1

T1

P1

T1

T1

40

A B C

R

F1

Max. Fall

G1

STAGE 01 TRAINING FACILITIES

30

MR MR MR

KEEP CL EA

CLIENT

P3

P1

T1

10190

2505

PANTHER AIRFIELD FIRE TRUCK ROAD - REFER TO CIVIL ENGINEERS DRAWINGS

BFA-CGH-01-LA-DWG-0202

T1 TO EXTENT OF BATTERS REFER TO CIVIL ENGINEERS DRAWINGS. MAKE GOOD TO EXISTING TURF AREAS.

CONCRETE EDGE TO EXTEND TO EXTENT OF EXISTING PLANTING AND TURF INTERFACE

FOR CONTINUATION REFER

PROJECT NO. R8004 Battlefield Airlifter Air 8000 PH2 Main Operating Base Facilities RAAF Base Amberley QLD

CE

WORK ELEMENT

20

20

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SITE

LOR LOR LOR

5 1315

ANSON ROAD

PA3

PA3

PROJECT MANAGER / CONTRACT ADMINISTRATOR

G1

SDR ISSUE SDR ISSUE SDR ISSUE REVISED SDR ISSUE FOR LOR REVIEW FOR LOR REVIEW DDR ISSUE FOR REVIEW DDR ISSUE

10

REV DESCRIPTION

CHKD APPD

465

PA1

CE

REV DESCRIPTION

0

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SITE

REV DESCRIPTION

DATE

26/06/2015 17/07/2015 22/07/2015

50 LOM lon [140] 131 WES fru [300] 85 HAR vio [140] 201 LOM lon [140]

CE

CE

DRAWING No:

50

RETAINING WALL - REFER TO CIVIL ENGINEERS DRAWINGS

P2

F1

PA1

PA1

DESIGNED:

40

1685 870

F1

VEHICULAR PAVEMENT

P1

T1

MR

30

BE

PROJECT

PROJECT NO. R8004 Battlefield Airlifter Air 8000 PH2 Main Operating Base Facilities RAAF Base Amberley QLD CLIENT

F1

ARCHITECT

DRAWING

SCALE CHECK

SCALE CHECK

20

FOR LOR REVIEW DDR ISSUE FOR REVIEW DDR ISSUE

REFER TO DRAWING BFA-CGH-04-LA-DWG-0002 FOR LANDSCAPE SCHEDULE

9305

MANAGING CONTRACTOR

PROJECT P1

P2

CE

BFA-CGH-01-LA-DWG-0101

PA2

PA3 TO EXTENT OF BATTERS AND TO MEET EXISTING PLANTED SWALE - MAKE GOOD TO ANY DAMAGE TO EXISTING SWALE

FOR CONTINUATION REFER

P1

PA2

TSF Landscape Masterplan

10

+ FS

TO ALE D SW CTED ANTE OTE G PL D PR AN TIN EXIS AINED RET

BFA-CGH-01-LA-DWG-0102

ANSON ROAD

0

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SITE

B

FOR CONTINUATION REFER

PA1

PROJECT MANAGER / CONTRACT ADMINISTRATOR

ANSON ROAD

SCALE CHECK

REV DESCRIPTION

REFER TO DRAWING BFA-CGH-04-LA-DWG-0002 FOR LANDSCAPE SCHEDULE

EXISTING RETAIN PLANTED SWA ED AND PROTEC LE TO BE TED

SHEET 2

T 277 D 0.3

KNW KNW KNW MR MR MR MR

PA3 TO EXTENT OF BATTERS AND TO MEET EXISTING PLANTED SWALE - MAKE GOOD TO ANY DAMAGE TO EXISTING SWALE

VEHICULAR PAVEMENT

CLIENT

10

LOR LOR LOR LOR LOR LOR LOR

REFER TO DRAWING BFA-CGH-04-LA-DWG-0011 FOR PLANT SCHEDULE

PROJECT NO. R8004 Battlefield Airlifter Air 8000 PH2 Main Operating Base Facilities RAAF Base Amberley QLD

A B C D E F G H

CHKD APPD

T1

PROJECT

0

DATE

04/02/2015 09/02/2015 02/03/2015 03/06/2015 26/06/2015 17/07/2015 22/07/2015

A B C

TGSI

NORTH

50

FOR CONTINUATION REFER BFA-CGH-01-LA-DWG-0302

KNW KNW KNW KNW KNW KNW MR MR MR MR

PA3

SHEET 4

40

90째

LOR LOR LOR LOR LOR LOR LOR LOR LOR LOR

PA3

SHEET 3

30

CHKD APPD

CE

SHEET 1

20

SDR ISSUE REVISED SDR ISSUE LEGEND REFERENCE FOR LOR REVIEW FOR LOR REVIEW DDR ISSUE FOR REVIEW DDR ISSUE

2500

10/09/2014 22/09/2014 23/01/2015 27/01/2015 04/02/2015 09/02/2015 03/06/2015 26/06/2015 17/07/2015 22/07/2015

10

A B C D E F G

L 28 .374

DATE

ISSUE TO QS ISSUE TO QS SDR ISSUE SDR ISSUE SDR ISSUE REVISED SDR ISSUE FOR LOR REVIEW FOR LOR REVIEW DDR ISSUE FOR REVIEW DDR ISSUE

0

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SITE

REV DESCRIPTION

KNW KNW KNW MR MR MR MR

+ FS

A B C D E F G H I J

LOR LOR LOR LOR LOR LOR LOR

FS

REV DESCRIPTION

REFER CHKD APPD TO DRAWING BFA-CGH-04-LA-DWG-0002 LOR KNW FOR SCHEDULE LOR LANDSCAPE KNW

DATE

23/01/2015 27/01/2015 04/02/2015 09/02/2015 02/03/2015 03/06/2015 26/06/2015 17/07/2015 22/07/2015

16055

40

SCALE CHECK

50

1800

30

40

2650

20

30

12870

10

20

SDR ISSUE SDR ISSUE SDR ISSUE REVISED SDR ISSUE LEGEND REFERENCE FOR LOR REVIEW FOR LOR REVIEW DDR ISSUE FOR REVIEW DDR ISSUE

1800

0

10

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SITE

REV DESCRIPTION

ARCHITECT

PROJECT MANAGER / CONTRACT ADMINISTRATOR

MANAGING CONTRACTOR

ARCHITECT

ARCHITECT

ARCHITECT

WORK ELEMENT

WORK ELEMENT

STAGE 01 TRAINING FACILITIES LEGEND Trees to be removed COUNT: 51

Trees to be retained Refer to BFA-CGH-01-LA-DWG-0011 for further survey tree information NORTH

STAGE 01 TRAINING FACILITIES

WORK ELEMENT

T1

STAGE 01 TRAINING FACILITIES

BUILDING NAME

TRAINING SYSTEM FACILITIES

TSF Trees to be removed DESIGNED:

MR

DRAWING No:

A1 SCALE

As indicated

TRAINING SYSTEM REFER TO DRAWING BFA-CGH-04-LA-DWG-0002 FACILITIES FOR LANDSCAPE SCHEDULE

REFER TO DRAWING BFA-CGH-04-LA-DWG-0002 FOR LANDSCAPE SCHEDULE

DRAWING

DRAWN

MR

BFA-CGH-01-LA-DWG-0010

TSF Surface Finishes Plan - Sheet 3

REV:

H

DRAWING

TSF Surface Finishes Plan - Sheet 4

A1 SCALE

1 : 200

DESIGNED: NORTH DESIGNED: NORTH

MR

DRAWING No:

DRAWN

MR

BFA-CGH-01-LA-DWG-0103

WORK ELEMENT

STAGE 01 TRAINING FACILITIES

TRAINING SYSTEM FACILITIES

BUILDING NAME DRAWING

WORK ELEMENT

STAGE 01 TRAINING FACILITIES

REV:

G

MR

DRAWING No:

BUILDING NAME

A1 SCALE

BUILDING NAME

TRAINING SYSTEM FACILITIES

REFER TO DRAWING BFA-CGH-04-LA-DWG-0002 FOR LANDSCAPE SCHEDULE

1 : 200

BUILDING NAME

: 200 TSF Landscape LevelsTO1 DRAWING REFER BFA-CGH-04-LA-DWG-0002 and Setout - Sheet FOR 3 LANDSCAPE SCHEDULE

DRAWING

DRAWING

TSF Landscape Levels and Setout - Sheet 4

DRAWN

MR

BFA-CGH-01-LA-DWG-0104

DESIGNED:

REV:

G

NORTH

MR

DRAWING No:

TRAINING SYSTEM FACILITIES

TRAINING SYSTEM FACILITIES

A1 SCALE

DRAWING

STAGE 01 TRAINING FACILITIES

WORK ELEMENT

BUILDING NAME

TSF Planting Plan Sheet 2

A1 SCALE

1 : 200

A1 SCALE

1 : 200

DRAWN

MR

BFA-CGH-01-LA-DWG-0203

REV:

C

DESIGNED: NORTH

MR

DRAWING No:

DESIGNED:

DRAWN

MR

BFA-CGH-01-LA-DWG-0204

NORTH REV:

C

MR

DRAWING No:

DRAWN

MR

BFA-CGH-01-LA-DWG-0302

REV:

C


10

0

SCALE 1: 1

10

20

30

40

50 mm

@ A1

© CONRAD GARGETT mail@conradgargett.com.au

ABN 49 325 121 350

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SI

REV

10

0

10

SCALE 1: 1

20

30

40

DESCRIPTION

DATE

APP

50 mm

@ A1

© CONRAD GARGETT mail@conradgargett.com.au

ABN 49 325 121 350

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SITE

REV

10

0

SCALE 1: 1

10

20

30

40

DESCRIPTION

DATE

APPD

50 mm

@ A1

© CONRAD GARGETT mail@conradgargett.com.au

ABN 49 325 121 350

DO NOT SCALE DRAWING & VERIFY ALL DIMENSIONS AND LEVELS ON SITE

DESCRIPTION

DATE

APPD

PROJECT

PROJECT

PRELIMINARY

PRELIMINARY

CLIENT

MORETON BAY REGIONAL COUNCIL

DRAWING

Design Concept 1

PROJECT No:

STATUS

DRAWING No:

REV:

15 236 SK 0001

SK

PROJECT

URBAN HEAT ISLAND MITIGATION

URBAN HEAT ISLAND MITIGATION

URBAN HEAT ISLAND MITIGATION

CLIENT

MORETON BAY REGIONAL COUNCIL

PRELIMINARY

REV

CLIENT

MORETON BAY REGIONAL COUNCIL

DRAWING

Design Concept 3

DRAWING

Design Concept 6 PROJECT No:

STATUS

DRAWING No:

REV:

15 236

A1 SCALE

PROJECT No:

STATUS

DRAWING No:

REV:

15 236 SK 0006

SK

SK 0003

SK

A1 SCALE

A1 SCALE

PROJECT

URBAN HEAT ISLAND MITIGATION

PROJECT

PRELIMINARY

URBAN HEAT ISLAND MITIGATION

CLIENT

PROJECT: Urban Heat Island Reduction: Station Road, Strathpine PROJECT NUMBER: 15 236 ISSUE: Concept Design 29th OCT 2015

MORETON BAY REGIONAL COUNCIL

DRAWING

Design Concept 2

CLIENT

MORETON BAY REGIONAL COUNCIL

DRAWING

Design Concept 5

MORETON BAY REGIONAL COUNCIL

DRAWING

Design Concept 4

PROJECT No:

STATUS

DRAWING No:

REV:

15 236

Photo Montage

CLIENT

PRELIMINARY

PROJECT

PRELIMINARY

URBAN HEAT ISLAND MITIGATION

SK 0004

SK

A1 SCALE

PROJECT No:

STATUS

DRAWING No:

REV:

15 236 SK 0002

SK

A1 SCALE

PROJECT No:

STATUS

DRAWING No:

REV:

15 236 SK 0005

SK

A1 SCALE



WITH WITH

aLL

aLL passions we are designing for aLL people WITH in aLL nations .

As a graduate landscape architect, THIS PUBLIC LIFE for me is the communal reproduction, it is the condition for this community, society, inhabitants, residents, citizens, everyone from

all countries, all nations, and all around the world.

Landscape architecture are not just changing contours, adding features, planting trees and shrubs, but distinctive features of a sphere of activity, imaging the future for different people and places according to what they need. We are designing the art of our outdoor environment to harmonize building and roads and to achieve environmental social behavioural aesthetic outcomes.

As landscape architects we are designing for future. We see the vision for spaces and with a time frame it will continual change. Through vision we will help with improving people life style and providing people with a better place and memorable experience for

all people among all nations.

Even though as freshman, we understood of the social and cultural effects our built environments regardless it is either for individual or for the society. Landscape architecture is overlapping of everything, only when we understand all layers and all connections will lead us for a better solution. All though it is not easy to do so, but with passion love and hope, we can. One day the

AILA FRESH

a will become a A.

Kristy Zhang

Emai: kzhang@conradgargett.com.au

KRISTY ZHANG, 2015

Tel: 0401600353


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.