A Renewable Energy Roadmap for Aruba
Presented at: Green Aruba Conference 2012
Brant Richards Head of Marketing & Sales
Aruba 4 October 2012
Younicos AG Berlin, Germany
Contents:
About Younicos Graciosa Project Roadmap for Aruba Simulation Optimal renewable energy layout The final 12 %
About us
About us
Graciosa Project
Roadmap for Aruba
Simulation
Optimal renewable energy layout
The final 12%
What we do • Develop reliable up-to-100-percent renewable energy systems that can outcompete fossil-based systems o
o
o
Since 2006 we have been continuously identifying commercially viable energy storage technologies Develop and deploy innovative grid control and energy management solutions in combination with energy storage Pioneer market models that reduce overall economic cost and provide attractive returns for investors
Consulting
Planning
Page 5
Development
Deployment
Younicos AG 2012 – A Renewable Energy Roadmap for Aruba
Monitoring
About us
Graciosa Project
Roadmap for Aruba
Simulation
Optimal renewable energy layout
The final 12%
The challenge Breaking the dependence on fossil generators by combining innovative grid control and energy management solutions with reliable energy storage • Integrating fluctuating energy sources like sun and wind into existing electrical grids poses technical challenges: o
o
o
Need to match electricity generation and demand at any given moment Current dependence on the spinning mass of large generators to adjust production to demand Low resulting limit (< 20%) of sun- and wind generated power that can be used safely
Page 6
Younicos AG 2012 â&#x20AC;&#x201C; A Renewable Energy Roadmap for Aruba
About us
Graciosa Project
Roadmap for Aruba
Simulation
Optimal renewable energy layout
The final 12%
Younicos Technology Center On our campus in Berlin, we have built a megawatt scale technology center containing actual hardware needed to run grids based on 100% renewable energy sources. In addition to demonstrating our innovative grid control and energy management strategies, this center also provides: • Component supplier qualification • Technical due diligence • New technology certification • Employee and partner training
Page 7
Younicos AG 2012 – A Renewable Energy Roadmap for Aruba
Graciosa Project
About us
Graciosa Project
Roadmap for Aruba
Simulation
Optimal renewable energy layout
CLIP: „Graciosa: The road so far“
Seite 10
Younicos AG 2012 – A Renewable Energy Roadmap for Aruba
The final 12%
About us
Graciosa Project
Roadmap for Aruba
Simulation
Optimal renewable energy layout
The final 12%
The Graciosa project Younicos is building a megawatt scale energy grid capable of running without a fossil fuel generator on the Azorean island of Graciosa in the middle of the Atlantic ocean. • 4500 inhabitants • 100% renewable generation during the majority of the year • >70% of total annual consumption generated by renewable sources • Competitive against current system
Storage 2,5 MW
Wind Power 5,4 MW
• In cooperation with the local utility Solar Power 500 KW
• Project start: 2012 Page 11
Younicos AG 2012 – A Renewable Energy Roadmap for Aruba
Roadmap for Aruba
Seite 14
Copyright 路 Pr盲sentationstitel 路 TT. Monat JJJJ
Simulation
About us
Graciosa Project
Roadmap for Aruba
Simulation Optimal renewable energy layout
The final 12%
Finding the optimal system setup Climate Data
Load Profile
Technology Data
PV: Avg. daily radiation: 5.48 kWh/m²/d
Max. Peak Load: 139 MW
Avg. Wind speed: 11m/s at 80m
Included: 30% Reduction (energy efficiency)
Storage: Lithium Ion Battery, 140 MW Power, 140 MWh Capacity
Consumption: 730 GWh/a
HOMER Simulation: Technically feasible renewable energy scenarios Heavy fuel oil cost average cost: 0.68$/l (annual inflation: 5%) Economically Optimal Solution (US$ 960m invest, delivers ~ US$0.21/kWh) Other factors (e.g. biomass potential & available area) Optimum Solution Sources: NASA, Vestas, Utilities Aruba NV Seite 16
Younicos AG 2012 – A Renewable Energy Roadmap for Aruba
The Optimum
About us
Graciosa Project
Roadmap for Aruba
Simulation
Optimal renewable energy layout
The final 12%
Results: The Optimal System Setup The optimal solution consists of: • 240 MW Wind power (including 30MW existing Wind farm) • 0 MW PV Power • 140MW/140MWh Lithium Ion Battery Fuel reduction of: 177,5 Mio. l/year The investment is: 960 million $ The system allows a 88% renewable energy share
Seite 18
Younicos AG 2012 – A Renewable Energy Roadmap for Aruba
About us
Graciosa Project
Roadmap for Aruba
Simulation
Optimal renewable energy layout
Results: Land use estimation • 70 additional turbines approximate required land use: 9 km2 • Battery power plant size 10,000 m2
Seite 19
Younicos AG 2012 – A Renewable Energy Roadmap for Aruba
The final 12%
About us
Graciosa Project
Roadmap for Aruba
Simulation
Optimal renewable energy layout
The final 12%
Why 88%? Rising fuel prices make a large share of renewables competitive today, up to an economic optimum Levelized cost of electricity (20 year discounted average) and selected wind farms sizes
Optimum share of renewables = 88%
60MW 600MW 120MW 180MW
==> Great, but how can we reach 100% renewables? Seite 20
Younicos AG 2012 â&#x20AC;&#x201C; A Renewable Energy Roadmap for Aruba
240MW
The final Optimum 12% Seite 21
Copyright 路 Pr盲sentationstitel 路 TT. Monat JJJJ
About us
Graciosa Project
Roadmap for Aruba
Simulation
Optimal renewable energy layout
The final 12%
Some options for reaching 100% 88% renewable energy system
The final 12%
Biomass (e.g. Palm oil)
Excess Energy (32% expected)
Biomass & Excess Energy
Pyrolysis
Electrolysis
Gasification
Hydrogen
Methane
Synthetic Diesel
Diesel Generator
Seite 22
Fuel Cell
Gas Turbine
Younicos AG 2012 â&#x20AC;&#x201C; A Renewable Energy Roadmap for Aruba
Let the fossils rest in peace.
Seite 6
Kerstin Reisch 路 Younicos Brand and Identity 路 10.06.2012
Brant Richards Am Studio 16 12489 Berlin Fon +49 30 81879-9018 Fax +49 30 81879-9000 richards@younicos.com www.younicos.com