Ygrab ecatalogue 2014

Page 1

Minimizing negative impaction to environment Reducing construction time Reducing construction investment cost Increase of bearing capacity

CATALOGUE


YG-50 YG-60 YG-70 YG-80 YG-90 YG-100 YG-120

CATALOGUE


Y-Grab (with Y – shape section) is a three jaws excavation grab that can be closed and opened simultaneously, being used to excavate a hole for the reinforced concrete pile with the same form (called Y-pile). To compare with a bore pile has the same radius, Y-pile's surround area is larger, and its volume decreases remarkably from 30% to 45%, more effective because of: Ÿ Ÿ Ÿ Ÿ

Decreasing the concrete quantity. Increasing friction between the pile outer and soil. Reducing the transportation of disposal soil and ready-mix concrete to the site. Reducing construction time of piles for projects.

With above advantages, Y-Grab provides one more effective option for piling solution of high rise buildings, transport projects.


1,530 mm

6,120 mm

3,960 mm

SPECIFICATION Product Name

1,060 mm

5,920 mm

3,960 mm

Data on the volume and weight are approximate values,weight may be varieddepending on demand

Width (W)

Radius (R)

Weight (P)

Volume (V) Suspension Transmission Cable cable m3 mm mm

mm

mm

kg

YG-50.80

500

800

7,200

0.2

24

24

YG-50.90

500

900

8,000

0.3

24

24

YG-50.100

500

1,000

9,000

0.4

24

24

YG-50


the negative imp g n i z mi to environment actio ini n M

750 mm

R= 800 mm R= 900 mm R= 1,000 mm

470mm W= 500mm

WITH THE SAME RADIUS, Y-PILE HAS MORE EFFICIENT THAN BORE PILE Pile's circumference (m) Y-pile

Bore pile

5.43

5.02

6.03 6.63

Pile's section area (m2) Y-pile

Bore pile

Increase of 8%

1.10

2.01

Decrease of 45.3%

5.65

Increase of 6%

1.24

2.54

Decrease of 51%

6.28

Increase of 5%

1.39

3.14

Decrease of 55%

Efficiency

Efficiency


1,700 mm

6,700 mm

4,100 mm

SPECIFICATION Product Name

1,100 mm

6,480 mm

4,100 mm

Data on the volume and weight are approximate values,weight may be varieddepending on demand

Width (W)

Radius (R)

Weight (P)

Volume (V) Suspension Transmission Cable cable m3 mm mm

mm

mm

kg

YG-60.80

600

800

8,500

0.31

28

28

YG-60.90

600

900

9,000

0.43

28

28

YG-60.100

600

1,000

9,500

0.54

28

28

YG-60.120

600

1,200

10,500

0.84

28

28

YG-60


the negative imp g n i z mi to environment actio ini n M

r

R= 800 R= 900 R= 1,000 R= 1,200

r=750mm r=850mm r=850mm r=1,100mm

570mm W= 600mm

WITH THE SAME RADIUS, Y-PILE HAS MORE EFFICIENT THAN BORE PILE Pile's section area (m2)

Pile's circumference (m) Y-pile

Bore pile

Y-pile

Bore pile

Efficiency

5.56

5.02

Increase of 10%

1.3

2.01

Decrease of 36%

6.16

5.65

Increase of 9%

1.46

2.54

Decrease of 42.5%

6.76

6.28

Increase of 7%

1.64

3.14

Decrease of 47.8%

7.96

7.54

Increase of 5.5%

2.00

4.52

Decrease of 55.7%

Efficiency


1,700 mm

6,800 mm

4,200 mm

SPECIFICATION Product Name

1,100 mm

6,500 mm

4,200 mm

Data on the volume and weight are approximate values,weight may be varieddepending on demand

Width (W)

Radius (R)

Weight (P)

mm

mm

YG-70.120

700

1,200

11,200

0.9

30

30

YG-70.140

700

1,400

12,000

1.1

30

30

YG-70

kg

Volume (V) Suspension Transmission Cable cable m3 mm mm


the negative imp g n i z mi to environment actio ini n M

1150 mm

R= 1,200 mm R= 1,400 mm

650mm W= 700mm

WITH THE SAME RADIUS, Y-PILE HAS MORE EFFICIENT THAN BORE PILE Pile's section area (m2)

Pile's circumference (m) Y-pile

Bore pile

Efficiency

Y-pile

Bore pile

8.09

7.54

Increase of 7.2%

2.31

4.52

Decrease of 48.9%

9.28

8.79

Increase of 5.5%

2.8

6.15

Decrease of 54.9%

Efficiency


1,690 mm 650 mm

6,900 mm

4,250 mm

SPECIFICATION Product Name

6,540 mm

4,250 mm

Data on the volume and weight are approximate values,weight may be varieddepending on demand

Width (W)

Radius (R)

Weight (P)

mm

mm

YG-80.140

800

1,400

14,200

1.2

34

34

YG-80.150

800

1,500

14,500

1.5

34

34

YG-80.160

800

1,600

15,000

1.8

34

34

YG-80

kg

Volume (V) Suspension Transmission Cable cable m3 mm mm


the negative imp g n i miz to environment actio i n i n M

1250 mm

R= 1,400 mm R= 1,500 mm R= 1,600 mm

750mm W= 800mm

WITH THE SAME RADIUS, Y-PILE HAS MORE EFFICIENT THAN BORE PILE Pile's circumference (m)

Pile's section area (m2)

Y-pile

Bore pile

Efficiency

Y-pile

Bore pile

9.41

8.8

Increase of 6.9%

3.08

6.15

Decrease of 49.9%

10.01

9.42

Increase of 6.2%

3.32

7.07

Decrease of 53%

10.61

10.05

Increase of 5.5%

3.56

8.04

Decrease of 55.6%

Efficiency


1,900 mm 850 mm

7,100 mm

4,350 mm

SPECIFICATION Product Name

6,740 mm

4,350 mm

Data on the volume and weight are approximate values,weight may be varieddepending on demand

Width (W)

Radius (R)

Weight (P)

mm

mm

YG-90.140

900

1,400

15,000

1.4

34

34

YG-90.150

900

1,500

15,500

1.7

34

34

YG-90.160

900

1,600

16,000

2.0

34

34

YG-90

kg

Volume (V) Suspension Transmission Cable cable m3 mm mm


the negative imp g n i miz to environment actio i n i n M

1250 mm

R= 1,400 mm R= 1,500 mm R= 1,600 mm

850mm W= 900mm

WITH THE SAME RADIUS, Y-PILE HAS MORE EFFICIENT THAN BORE PILE Pile's circumference (m)

Pile's section area (m2)

Y-pile

Bore pile

Efficiency

Y-pile

Bore pile

9.54

8.8

Increase of 8.4%

3.43

6.15

Decrease of 44.2%

10.14

9.42

Increase of 7.6%

3.70

7.07

Decrease of 47.7%

10.74

10.05

Increase of 6.6%

3.97

8.04

Decrease of 50.6%

Efficiency


1,900 mm 850 mm

7,150 mm

4,350 mm

SPECIFICATION Product Name

6,800 mm

4,350 mm

Data on the volume and weight are approximate values,weight may be varieddepending on demand

Width (W)

Radius (R)

Weight (P)

mm

mm

YG-100.140

1,000

1,400

16,000

1.6

34

34

YG-100.150

1,000

1,500

16,500

1.9

34

34

YG-100.160

1,000

1,600

17,000

2.2

34

34

YG-100

kg

Volume (V) Suspension Transmission Cable cable m3 mm mm


the negative imp g n i miz to environment actio i n i n M

1250 mm

R= 1,400 mm R= 1,500 mm R= 1,600 mm

950mm W= 1000mm

WITH THE SAME RADIUS, Y-PILE HAS MORE EFFICIENT THAN BORE PILE Pile's circumference (m)

Pile's section area (m2)

Y-pile

Bore pile

Efficiency

Y-pile

Bore pile

9.67

8.8

Increase of 9.8%

3.77

6.15

Decrease of 38.5%

10.27

9.42

Increase of 9%

4.07

7.07

Decrease of 42.5%

10.86

10.05

Increase of 8%

4.36

8.04

Decrease of 45.8%

Efficiency


1,900 mm 850 mm

7,200 mm

4,350 mm

SPECIFICATION Product Name

6,850 mm

4,350 mm

Data on the volume and weight are approximate values,weight may be varieddepending on demand

Width (W)

Radius (R)

Weight (P)

mm

mm

YG-120.140

1,200

1,400

18,000

1.9

34

34

YG-120.150

1,200

1,500

18,500

2.35

34

34

YG-120.160

1,200

1,600

19,000

2.7

34

34

YG-120

kg

Volume (V) Suspension Transmission Cable cable m3 mm mm


the negative imp g n i miz to environment actio i n i n M

1250 mm

R= 1,400 mm R= 1,500 mm R= 1,600 mm

1150mm W= 1200mm

WITH THE SAME RADIUS, Y-PILE HAS MORE EFFICIENT THAN BORE PILE Pile's circumference (m) Y-pile

Bore pile

9.92

8.8

10.52 11.12

Pile's section area (m2) Y-pile

Bore pile

Increase of 12%

4.41

6.15

Decrease of 28.3%

9.42

Increase of 11.6%

4.77

7.07

Decrease of 32.5%

10.05

Increase of 10.6%

5.13

8.04

Decrease of 36.2%

Efficiency

Efficiency


MORE OPTION FOR FOUNDATION

In this plan, 84 piles {36 piles YG-60.90*depth 80m + 48 piles YG-60.100*depth 90m} with total volume 11,290 m3 is an effective solution to replace for 128 bored piles {33 piles D1000mm*depth 80m + 35 piles D1200mm* depth 85m + 60 piles D1300mm * depth 90m} with total volume 12,606 m3. Reducing 44 bored piles and reducing over 1000m3 of concrete.




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.