Kombi Gun The new Kombi Gun is compatible with both the Kombi Klip Short and Kombi Klip Long pipe staples allowing one tool to be used to install all Uponor underfloor heating pipe to various types of insulation. These guns are recommend for regular underfloor heating installers and can dramatically reduce installation time.

Polythene Envelope Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.

Kombi Klip Short

The Kombi Klip Short are used for fixing pipework to EPS insulation (expanded polystrene) with laminated covering (e.g. Rolltec). The barbs length is 22mm and the clips require a minimum of 25mm insulation depth.

Kombi Klip Long

The Kombi Klip Long are used for fixing pipework to most types of insulation including plain EPS and foil faced PUR (polyurethane) such as Kingspan or Celotex. The barbs length is 33mm and the clips require a minimum of 35mm insulation depth.

Heating Pipework laid at 200mm centres unless specified in quotation and laid approximatly 100mm away from walls.

Kombi Klip for Heating Pipe. Clips should be spaced approximately 500mm apart when using 16mm Unipipe MLC and approximatley 300mm apart when using 15mm Wirsbo PEX. Additional clips maybe required on bends.

Floor Make-up 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be deterimental to the pipe. Protective Layer. It is essential to prevent screed from slipping between the insulation board joints. This can be achieved by taping the joints of Uponor insulation or alternatively by using foil or polythene film. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum should additionally be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below an to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation.

Section of typical floor make up Drawing Title:

Not to Scale

Details of a Screed Floor with Pipe Installed using Kombi Klips

Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.

UPONOR LIMITED Drawing Number:

Date:

I 11

04/01/10

Rev:

C

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


200mm U-Clips

Polythene Envelope

Max 500mm from wall

Clip Rail

Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.

Heating Pipework

1m

The U-clips are used to fasten Cliprail or pipework to insulation. The clips require a minimum of 25mm insulation depth to be fitted into. U-Clip

Plan View of Heating Pipework Floor Make-up 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be deterimental to the pipe.

Heating Pipework laid at 200mm centres unless specified in quotation and laid approximatly 100mm away from walls.

U-clip for securing clamp track and pipe on the bends

1m Length of Clip Rail positioned 1m apart with double sided tape for locating Clip Rail. Once Clip Rail is laid in position it is to be secured with pipe fixing clips. Protective Layer. It is essential to prevent screed from slipping between the insulation board joints. This can be achieved by taping the joints of Uponor insulation or alternatively by using a foil or polythene film. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum

Concrete Slab

should additionally be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below an to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation.

Section of Floor Make Up Drawing Title:

Not to Scale

Details of a Screed Floor with Pipe Installed using Clip Rail

Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.

UPONOR LIMITED Drawing Number:

Date:

I 12

04/01/10

Rev:

C

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


The distance from the pipe to the wall should be half of what the pipe centres are. Polythene Envelope Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.

Plate Nail The Plate Nails are used to attach the Pipe Positioning Plates to the insulation.

Plan View of Heating Pipework Heating Pipework laid at 120, 180 & 240mm centres. See quotation for details of pipe centres. 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be deterimental to the pipe. Pipe Positioning Panel These panels provide for positioning and fixation of Heating Pipes as well as a barrier against penetration of screed. The panels are joined by using the press-stud function and overlapping one row of studs onto of another row. Panels can be cut to size using a convential blade knife. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum Concrete Slab should additionally be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below an to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation. Concrete Slab

Section of typical floor make up

Drawing Title:

Details of a Screed Floor with Pipe Installed using Positioning Panels Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.

UPONOR LIMITED Drawing Number:

Date:

I 13

04/01/10

Rev:

C

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


200mm

100mm

Heating Pipework

Polythene Envelope Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.

Wire Ties

Floor Make-up 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be deterimental to the pipe.

Wire Tie

Plan View of Heating Pipework Heating Pipework laid at 200mm centres unless specified in quotation.

A 142 Mesh. Pipes are to be secured to mesh by using wire ties. Both the wire ties and mesh are to be supplied by others. Protective Layer. It is essential to prevent screed from slipping between the insulation board joints. This can be achieved by taping the joints of Uponor insulation or alternatively by using a foil or polythene film. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum should additionally be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below an to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation.

Section of typical floor make up

Not to Scale

Drawing Title:

Details of a Screed Floor with Pipe Installed using Clip Rail

Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.

UPONOR LIMITED Drawing Number:

Date:

I 14

04/01/10

Rev:

C

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


Edge Insulation Edge Insulation must be positioned around all wall edges to reduce heat loss to the walls.

Kombi Gun The new Kombi Gun is compatible with both the Kombi Klip Short and Kombi Klip Long pipe staples allowing one tool to be used to install all Uponor underfloor heating pipe to various types of insulation. These guns are recommend for regular underfloor heating installers and can dramatically reduce installation time.

Kombi Klip Short

Kombi Klip Long

The Kombi Klip Short are used for fixing pipework to EPS insulation (expanded polystrene) with laminated covering (e.g. Rolltec). The barbs length is 22mm and the clips require a minimum of 25mm insulation depth. The Kombi Klip Long are used for fixing pipework to most types of insulation including plain EPS and foil faced PUR (polyurethane) such as Kingspan or Celotex. The barbs length is 33mm and the clips require a minimum of 35mm insulation depth.

400mm Kombi Klip for Heating Pipe. Clips should be spaced approximately 500mm apart when using 16mm Unipipe MLC and approximatley 300mm apart when using 15mm Wirsbo PEX. Additional clips maybe required on bends.

Floor Covering Floor Decking Heating Pipework @ 200mm centres

Minimum 25mm 4:1 Sand/Cement Screed (non-load bearing). Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum insulation thermal be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below required to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation. Drawing Title:

Timber Floor with a Screed Infill and Kombi Klips Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.

UPONOR LIMITED Drawing Number:

Date:

I 15

04/08/11

Rev:

D

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


Heating Pipework fitted at 200mm centres Chipboard Heat Emission Plate Joists @ 400mm Centres Minimum depth of joist is 160mm to allow for notching.

Insulation (by others)

Insulation It is essential that insulation is fitted between the joists, as close to the underside of the plates as possible, even on intermediate floors. The insulation should satisfy the requirements of Part L and Part E of the Building Regulations.

Heat Emission Plate

Insulation Underfloor Heating Pipework

Heat Emission Plates These plates are only for heat distribution and are not structural. They are easily damaged and it is very important that no other trades are allowed where the UFH is being installed. The plates should be laid accross the floor before fixing. They should only be laid on the straight runs and should be installed with a 10mm minimum gap between plates. Decking The area should be decked out immediately after completeing installation to protect the system. Temporary sheets of ply are acceptable. If necessary, the floor can be marked to show the pathway of the pipe runs to assist the floor layer fixing down the floor.

Joists @ 400mm Centres

Drawing Title:

Details of a Timber Suspended Floor with Heat Emission Plates

Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.

UPONOR LIMITED Drawing Number:

Date:

I 22

04/01/10

Rev:

C

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


Kombi Gun The new Kombi Gun is compatible with both the Kombi Klip Short and Kombi Klip Long pipe staples allowing one tool to be used to install all Uponor underfloor heating pipe to various types of insulation. These guns are recommend for regular underfloor heating installers and can dramatically reduce installation time. Edge Insulation Edge Insulation must be positioned around all wall edges to reduce heat loss to the walls.

Kombi Klip Short

Kombi Klip Long

Kombi Klip for Heating Pipe. Clips should be spaced approximately 500mm apart when using 16mm Unipipe MLC and approximatley 300mm apart when using 15mm Wirsbo PEX. Additional clips maybe required on bends.

The Kombi Klip Short are used for fixing pipework to EPS insulation (expanded polystrene) with laminated covering (e.g. Rolltec). The barbs length is 22mm and the clips require a minimum of 25mm insulation depth. The Kombi Klip Long are used for fixing pipework to most types of insulation including plain EPS and foil faced PUR (polyurethane) such as Kingspan or Celotex. The barbs length is 33mm and the clips require a minimum of 35mm insulation depth.

Floor Covering Floor Decking Heating Pipework @ 200mm centres

25mm Sand/Cement Screed Infill (Non-load bearing) The insulation should satisfy the requirements of Part L and Part E of the Building Regulations.

Batten screwed to the side of the joist to support the decking and insulation.

Minimum depth of joist is 160mm to allow for notching. Support decking maybe required. Seek advice from the architect or structual engineer.

Drawing Title:

Timber Suspended Floor with Screed Infill and Kombi Klips Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.

UPONOR LIMITED Drawing Number:

Date:

I 23

04/01/10

Rev:

C

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


Floor Covering Decking such as chipboard or Thermacell Heat Emission Plate Floating Floor Panel

Heating Pipework fitted at 200mm centres

50mm

Additional insulation (can be above or below slab) See notes Concrete Slab

Section of typical ground floor make up

Additional Insulation Additional insulation maybe required below the Floating Floor Panels on ground floors to ensure compliance with Part L of the Building Regulations. Additional acoustic insulation maybe required on intermediate floors to comply with Part E of the Building Regulations. Heat Emission Plate

Underfloor Heating Pipework

Additional Insulation

Floating Floor Panels The pre-grooved insulation panels are to be laid out accross the whole floor. It will be necessary to cut the panels in places such as doorways and near to the manifold. Heat Emission Plates These plates are only for heat distribution and should cover approximately 80% of the floor. The Heat Emission Plates should be pressed into the insulation panels.

Floating Floor Panel

Drawing Title:

Details of Floating Floor System with Heat Emission Plates Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.

UPONOR LIMITED Drawing Number:

Date:

I 31

04/01/10

Rev:

C

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


Floor Covering Decking such as chipboard or Thermacell Heat Emission Plate Floating Floor Panel

Heating Pipework fitted at 125mm

15mm

Additional insulation (can be above or below base layer) See notes Existing Base Layer

Section of typical ground floor make up

Additional Insulation Additional insulation maybe required below the Floating Floor Panels on ground floors to ensure compliance with Part L of the Building Regulations. Additional acoustic insulation maybe required on intermediate floors to comply with Part E of the Building Regulations.

Pipe Feed Panel

Floating Floor Panels The pre-grooved insulation panels are to be laid out accross the whole floor. It will be necessary to cut the panels in places such as doorways and near to the manifold.

Heat Emission Plate

Heat Emission Plates These plates are only for heat distribution. The Heat Emission Plates should be pressed into the insulation panels.

Underfloor Heating Pipework Additional Insulation

Floating Floor Panel

Drawing Title

System 12 (12mm Pex) Floating Floor UPONOR LIMITED

Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems

Drawing Number:

I33

Date:

04/01/10

Rev:

C

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


Tracked Plywood Panel (13mm) Bonded Heat Emission Plate

Existing Flooring (may be timber, as shown or solid)

Insulation (by others)

Insulation It is essential that insulation is fitted below the system, even on intermediate floors. The insulation should satisfy the requirements of Part L and Part E of the Building Regulations. Finish Flooring The area should be finish floored as soon as possible after completing installation to protect the system. Temporary sheets of ply are acceptable. If necessary, the floor can be marked to show the pathway of the pipe runs to assist the floor layer fixing down the floor. Refer to installation manual for more detail.

Drawing Title

Tracked Plywood Floor UPONOR LIMITED

Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems

Drawing Number:

I 34

Date:

04/01/10

Rev:

C

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


Kombi Gun The new Kombi Gun is compatible with both the Kombi Klip Short and Kombi Klip Long pipe staples allowing one tool to be used to install all Uponor underfloor heating pipe to various types of insulation. These guns are recommend for regular underfloor heating installers and can dramatically reduce installation time.

Polythene Envelope Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.

Kombi Klip Short

The Kombi Klip Short are used for fixing pipework to EPS insulation (expanded polystrene) with laminated covering (e.g. Rolltec). The barbs length is 22mm and the clips require a minimum of 25mm insulation depth.

Kombi Klip Long

The Kombi Klip Long are used for fixing pipework to most types of insulation including plain EPS and foil faced PUR (polyurethane) such as Kingspan or Celotex. The barbs length is 33mm and the clips require a minimum of 35mm insulation depth.

Heating Pipework laid at 300mm centres unless specified in quotation and laid approximatly 150mm away from walls.

Kombi Klip for Heating Pipe. Clips should be spaced approximately 500mm apart when using 20mm PEX pipe. Additional clips maybe required on bends.

Floor Make-up 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be deterimental to the pipe. Protective Layer. It is essential to prevent screed from slipping between the insulation board joints. This can be achieved by taping the joints of Uponor insulation or alternatively by using foil or polythene film. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum should additionally be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below an to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation.

Section of typical floor make up Drawing Title:

Not to Scale

Details of a Screed Floor with Pipe Installed using Kombi Klips

Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.

UPONOR LIMITED Drawing Number:

Date:

I W11

03/08/11

Rev:

D

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


50 R1

300mm Kombi clips

Polythene Envelope Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.

Wicket-Clip

The Wicket-clips are used to fasten Cliprail to insulation. The clips require a minimum of 25mm insulation depth to be fitted into.

Kombi Klip Long

Max 500mm from wall

Clip Rail

Note Where pipes are spaced at 200mm centres the pipe should be "light bulbed" to a minimum radius of 150mm.

Wicket Clips

1m

The Kombi-clips are used to fasten pipe to insulation. The clips require a minimum of 32mm insulation depth to be fitted into.

200

Heating Pipework

Plan View of Heating Pipework

Heating Pipework laid at 300mm centres unless specified in quotation and laid approximatly 150mm away from walls. Floor Make-up 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be detrimental to the pipe. 1m Length of Clip Rail positioned 1m apart with double sided tape for locating Clip Rail. Once Clip Rail is laid in position it is to be secured with pipe fixing clips. Protective Layer. It is essential to prevent screed from slipping between the insulation board joints. This can be achieved by taping the joints of Uponor insulation or alternatively by using Uponor PE Foil or polythene film. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum insulation Concrete Slab

installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated required to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation.

Section of Floor Make Up

Drawing Title

Details of Screed Floor Pex 20 Pipe using Clip Rail UPONOR LIMITED

Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems

Drawing Number:

I W12

Date:

16/01/07

Rev:

A

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


300mm

150mm

Pex 20 Pipework

Polythene Envelope Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.

Wire Ties

Floor Make-up 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be deterimental to the pipe.

Wire Tie

Plan View of Heating Pipework Heating Pipework laid at 300mm centres unless specified in quotation.

A 142 Mesh. Pipes are to be secured to mesh by using wire ties. Both the wire ties and mesh are to be supplied by others. Protective Layer. It is essential to prevent screed from slipping between the insulation board joints. This can be achieved by taping the joints of Uponor insulation or alternatively by using a foil or polythene film. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum should additionally be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below an to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation.

Section of typical floor make up

Not to Scale

Drawing Title:

Details of a Screed Floor with Pipe Installed using mesh & wire ties

Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.

UPONOR LIMITED Drawing Number:

Date:

I W14

04/01/10

Rev:

C

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


Heating Pipework fitted at 300mm centres Heat Emission Plate

Chipboard

Joists @ 300mm Centres Minimum depth of joist is 200mm to allow for notching.

Insulation (by others)

Heat Emission Plate

Underfloor Heating Pipework

Insulation

Joists @ 300mm Centres

Insulation It is essential that insulation is fitted between the joists, as close to the underside of the plates as possible, even on intermediate floors. The insulation should satisfy the requirements of Part L and Part E of the Building Regulations. Heat Emission Plates These plates are only for heat distribution and are not structural. They are easily damaged and it is very important that no other trades are allowed where the UFH is being installed. The plates should be laid accross the floor before fixing. They should only be laid on the straight runs and should be installed with a 10mm minimum gap between plates. Decking The area should be decked out immediately after completeing installation to protect the system. Temporary sheets of ply are acceptable. If necessary, the floor can be marked to show the pathway of the pipe runs to assist the floor layer fixing down the floor. Drawing Title

Details of Heat Emission Plates Pex 20 - Joists @ 300mm Centres UPONOR LIMITED

Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems

Drawing Number:

I W21

Date:

16/01/07

Rev:

A

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


Heating Pipework fitted at 200mm centres Chipboard Heat Emission Plate Joists @ 400mm Centres Minimum depth of joist is 200mm to allow for notching.

Insulation (by others)

Insulation It is essential that insulation is fitted between the joists, as close to the underside of the plates as possible, even on intermediate floors. The insulation should satisfy the requirements of Part L and Part E of the Building Regulations.

Heat Emission Plate

Insulation Underfloor Heating Pipework

Joists @ 400mm Centres

Heat Emission Plates These plates are only for heat distribution and are not structural. They are easily damaged and it is very important that no other trades are allowed where the UFH is being installed. The plates should be laid across the floor before fixing. They should only be laid on the straight runs and should be installed with a 10mm minimum gap between plates. Decking The area should be decked out immediately after completeing installation to protect the system. Temporary sheets of ply are acceptable. If necessary, the floor can be marked to show the pathway of the pipe runs to assist the floor layer fixing down the floor. Drawing Title

Details pf Heat Emission Plates Pex 20 - Joists @ 400mm Centres UPONOR LIMITED

Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems

Drawing Number:

I W22

Date:

16/01/07

Rev:

A

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


Insulation (by others)

Heating Pipework fitted at 200mm centres Chipboard

Heat Emission Plate Battens @ 411mm Centres

Block & beam / Screed slab

Insulation It is essential that insulation is fitted between the battens, as close to the underside of the plates as possible, even on intermediate floors. The insulation should satisfy the requirements of Part L and Part E of the Building Regulations.

Heat Emission Plate

Insulation Underfloor Heating Pipework

Joists @ 411mm Centres

Heat Emission Plates These plates are only for heat distribution and are not structural. They are easily damaged and it is very important that no other trades are allowed where the UFH is being installed. The plates should be laid accross the floor before fixing. They should only be laid on the straight runs and should be installed with a 10mm minimum gap between plates. Decking The area should be decked out immediately after completeing installation to protect the system. Temporary sheets of ply are acceptable. If necessary, the floor can be marked to show the pathway of the pipe runs to assist the floor layer fixing down the floor. Drawing Title

Details of Heat Emission Plates Pex 20 - Battens @ 411mm Centres UPONOR LIMITED

Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems

Drawing Number:

I W23

Date:

16/01/07

Rev:

A

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


Floor Covering Decking such as chipboard or Thermacell Heat Emission Plate

Heating Pipework fitted at 300mm centres

30mm, 50mm & 70mm Thickness

Floating Floor Panel

Additional insulation (can be above or below slab) See notes Concrete Slab

Section of typical ground floor make up

Additional Insulation Additional insulation maybe required below the Floating Floor Panels on ground floors to ensure compliance with Part L of the Building Regulations. Additional acoustic insulation maybe required on intermediate floors to comply with Part E of the Building Regulations. Heat Emission Plate

Floating Floor Panels The pre-grooved insulation panels are to be laid out accross the whole floor. It will be necessary to cut the panels in places such as doorways and near to the manifold. Underfloor Heating Pipework

Floating Floor Panel

Additional Insulation

Heat Emission Plates These plates are only for heat distribution and should cover approximately 80% of the floor. The Heat Emission Plates should be pressed into the insulation panels. Drawing Title

Details of Floating Floor Panels Pex 20 - Pipes @ 300mm Centres UPONOR LIMITED

Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems

Drawing Number:

I W31

Date:

16/01/07

Rev:

A

Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.