Uponor
Underfloor Heating Floor Schematics
Kombi Gun The new Kombi Gun is compatible with both the Kombi Klip Short and Kombi Klip Long pipe staples allowing one tool to be used to install all Uponor underfloor heating pipe to various types of insulation. These guns are recommend for regular underfloor heating installers and can dramatically reduce installation time.
Polythene Envelope Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.
Kombi Klip Short
The Kombi Klip Short are used for fixing pipework to EPS insulation (expanded polystrene) with laminated covering (e.g. Rolltec). The barbs length is 22mm and the clips require a minimum of 25mm insulation depth.
Kombi Klip Long
The Kombi Klip Long are used for fixing pipework to most types of insulation including plain EPS and foil faced PUR (polyurethane) such as Kingspan or Celotex. The barbs length is 33mm and the clips require a minimum of 35mm insulation depth.
Heating Pipework laid at 200mm centres unless specified in quotation and laid approximatly 100mm away from walls.
Kombi Klip for Heating Pipe. Clips should be spaced approximately 500mm apart when using 16mm Unipipe MLC and approximatley 300mm apart when using 15mm Wirsbo PEX. Additional clips maybe required on bends.
Floor Make-up 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be deterimental to the pipe. Protective Layer. It is essential to prevent screed from slipping between the insulation board joints. This can be achieved by taping the joints of Uponor insulation or alternatively by using foil or polythene film. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum should additionally be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below an to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation.
Section of typical floor make up Drawing Title:
Not to Scale
Details of a Screed Floor with Pipe Installed using Kombi Klips
Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.
UPONOR LIMITED Drawing Number:
Date:
I 11
04/01/10
Rev:
C
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
200mm U-Clips
Polythene Envelope
Max 500mm from wall
Clip Rail
Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.
Heating Pipework
1m
The U-clips are used to fasten Cliprail or pipework to insulation. The clips require a minimum of 25mm insulation depth to be fitted into. U-Clip
Plan View of Heating Pipework Floor Make-up 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be deterimental to the pipe.
Heating Pipework laid at 200mm centres unless specified in quotation and laid approximatly 100mm away from walls.
U-clip for securing clamp track and pipe on the bends
1m Length of Clip Rail positioned 1m apart with double sided tape for locating Clip Rail. Once Clip Rail is laid in position it is to be secured with pipe fixing clips. Protective Layer. It is essential to prevent screed from slipping between the insulation board joints. This can be achieved by taping the joints of Uponor insulation or alternatively by using a foil or polythene film. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum
Concrete Slab
should additionally be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below an to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation.
Section of Floor Make Up Drawing Title:
Not to Scale
Details of a Screed Floor with Pipe Installed using Clip Rail
Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.
UPONOR LIMITED Drawing Number:
Date:
I 12
04/01/10
Rev:
C
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
The distance from the pipe to the wall should be half of what the pipe centres are. Polythene Envelope Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.
Plate Nail The Plate Nails are used to attach the Pipe Positioning Plates to the insulation.
Plan View of Heating Pipework Heating Pipework laid at 120, 180 & 240mm centres. See quotation for details of pipe centres. 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be deterimental to the pipe. Pipe Positioning Panel These panels provide for positioning and fixation of Heating Pipes as well as a barrier against penetration of screed. The panels are joined by using the press-stud function and overlapping one row of studs onto of another row. Panels can be cut to size using a convential blade knife. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum Concrete Slab should additionally be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below an to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation. Concrete Slab
Section of typical floor make up
Drawing Title:
Details of a Screed Floor with Pipe Installed using Positioning Panels Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.
UPONOR LIMITED Drawing Number:
Date:
I 13
04/01/10
Rev:
C
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
200mm
100mm
Heating Pipework
Polythene Envelope Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.
Wire Ties
Floor Make-up 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be deterimental to the pipe.
Wire Tie
Plan View of Heating Pipework Heating Pipework laid at 200mm centres unless specified in quotation.
A 142 Mesh. Pipes are to be secured to mesh by using wire ties. Both the wire ties and mesh are to be supplied by others. Protective Layer. It is essential to prevent screed from slipping between the insulation board joints. This can be achieved by taping the joints of Uponor insulation or alternatively by using a foil or polythene film. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum should additionally be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below an to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation.
Section of typical floor make up
Not to Scale
Drawing Title:
Details of a Screed Floor with Pipe Installed using Clip Rail
Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.
UPONOR LIMITED Drawing Number:
Date:
I 14
04/01/10
Rev:
C
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
Edge Insulation Edge Insulation must be positioned around all wall edges to reduce heat loss to the walls.
Kombi Gun The new Kombi Gun is compatible with both the Kombi Klip Short and Kombi Klip Long pipe staples allowing one tool to be used to install all Uponor underfloor heating pipe to various types of insulation. These guns are recommend for regular underfloor heating installers and can dramatically reduce installation time.
Kombi Klip Short
Kombi Klip Long
The Kombi Klip Short are used for fixing pipework to EPS insulation (expanded polystrene) with laminated covering (e.g. Rolltec). The barbs length is 22mm and the clips require a minimum of 25mm insulation depth. The Kombi Klip Long are used for fixing pipework to most types of insulation including plain EPS and foil faced PUR (polyurethane) such as Kingspan or Celotex. The barbs length is 33mm and the clips require a minimum of 35mm insulation depth.
400mm Kombi Klip for Heating Pipe. Clips should be spaced approximately 500mm apart when using 16mm Unipipe MLC and approximatley 300mm apart when using 15mm Wirsbo PEX. Additional clips maybe required on bends.
Floor Covering Floor Decking Heating Pipework @ 200mm centres
Minimum 25mm 4:1 Sand/Cement Screed (non-load bearing). Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum insulation thermal be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below required to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation. Drawing Title:
Timber Floor with a Screed Infill and Kombi Klips Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.
UPONOR LIMITED Drawing Number:
Date:
I 15
04/08/11
Rev:
D
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
Heating Pipework fitted at 200mm centres Chipboard Heat Emission Plate Joists @ 400mm Centres Minimum depth of joist is 160mm to allow for notching.
Insulation (by others)
Insulation It is essential that insulation is fitted between the joists, as close to the underside of the plates as possible, even on intermediate floors. The insulation should satisfy the requirements of Part L and Part E of the Building Regulations.
Heat Emission Plate
Insulation Underfloor Heating Pipework
Heat Emission Plates These plates are only for heat distribution and are not structural. They are easily damaged and it is very important that no other trades are allowed where the UFH is being installed. The plates should be laid accross the floor before fixing. They should only be laid on the straight runs and should be installed with a 10mm minimum gap between plates. Decking The area should be decked out immediately after completeing installation to protect the system. Temporary sheets of ply are acceptable. If necessary, the floor can be marked to show the pathway of the pipe runs to assist the floor layer fixing down the floor.
Joists @ 400mm Centres
Drawing Title:
Details of a Timber Suspended Floor with Heat Emission Plates
Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.
UPONOR LIMITED Drawing Number:
Date:
I 22
04/01/10
Rev:
C
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
Kombi Gun The new Kombi Gun is compatible with both the Kombi Klip Short and Kombi Klip Long pipe staples allowing one tool to be used to install all Uponor underfloor heating pipe to various types of insulation. These guns are recommend for regular underfloor heating installers and can dramatically reduce installation time. Edge Insulation Edge Insulation must be positioned around all wall edges to reduce heat loss to the walls.
Kombi Klip Short
Kombi Klip Long
Kombi Klip for Heating Pipe. Clips should be spaced approximately 500mm apart when using 16mm Unipipe MLC and approximatley 300mm apart when using 15mm Wirsbo PEX. Additional clips maybe required on bends.
The Kombi Klip Short are used for fixing pipework to EPS insulation (expanded polystrene) with laminated covering (e.g. Rolltec). The barbs length is 22mm and the clips require a minimum of 25mm insulation depth. The Kombi Klip Long are used for fixing pipework to most types of insulation including plain EPS and foil faced PUR (polyurethane) such as Kingspan or Celotex. The barbs length is 33mm and the clips require a minimum of 35mm insulation depth.
Floor Covering Floor Decking Heating Pipework @ 200mm centres
25mm Sand/Cement Screed Infill (Non-load bearing) The insulation should satisfy the requirements of Part L and Part E of the Building Regulations.
Batten screwed to the side of the joist to support the decking and insulation.
Minimum depth of joist is 160mm to allow for notching. Support decking maybe required. Seek advice from the architect or structual engineer.
Drawing Title:
Timber Suspended Floor with Screed Infill and Kombi Klips Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.
UPONOR LIMITED Drawing Number:
Date:
I 23
04/01/10
Rev:
C
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
Floor Covering Decking such as chipboard or Thermacell Heat Emission Plate Floating Floor Panel
Heating Pipework fitted at 200mm centres
50mm
Additional insulation (can be above or below slab) See notes Concrete Slab
Section of typical ground floor make up
Additional Insulation Additional insulation maybe required below the Floating Floor Panels on ground floors to ensure compliance with Part L of the Building Regulations. Additional acoustic insulation maybe required on intermediate floors to comply with Part E of the Building Regulations. Heat Emission Plate
Underfloor Heating Pipework
Additional Insulation
Floating Floor Panels The pre-grooved insulation panels are to be laid out accross the whole floor. It will be necessary to cut the panels in places such as doorways and near to the manifold. Heat Emission Plates These plates are only for heat distribution and should cover approximately 80% of the floor. The Heat Emission Plates should be pressed into the insulation panels.
Floating Floor Panel
Drawing Title:
Details of Floating Floor System with Heat Emission Plates Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.
UPONOR LIMITED Drawing Number:
Date:
I 31
04/01/10
Rev:
C
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
Floor Covering Decking such as chipboard or Thermacell Heat Emission Plate Floating Floor Panel
Heating Pipework fitted at 125mm
15mm
Additional insulation (can be above or below base layer) See notes Existing Base Layer
Section of typical ground floor make up
Additional Insulation Additional insulation maybe required below the Floating Floor Panels on ground floors to ensure compliance with Part L of the Building Regulations. Additional acoustic insulation maybe required on intermediate floors to comply with Part E of the Building Regulations.
Pipe Feed Panel
Floating Floor Panels The pre-grooved insulation panels are to be laid out accross the whole floor. It will be necessary to cut the panels in places such as doorways and near to the manifold.
Heat Emission Plate
Heat Emission Plates These plates are only for heat distribution. The Heat Emission Plates should be pressed into the insulation panels.
Underfloor Heating Pipework Additional Insulation
Floating Floor Panel
Drawing Title
System 12 (12mm Pex) Floating Floor UPONOR LIMITED
Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems
Drawing Number:
I33
Date:
04/01/10
Rev:
C
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
Tracked Plywood Panel (13mm) Bonded Heat Emission Plate
Existing Flooring (may be timber, as shown or solid)
Insulation (by others)
Insulation It is essential that insulation is fitted below the system, even on intermediate floors. The insulation should satisfy the requirements of Part L and Part E of the Building Regulations. Finish Flooring The area should be finish floored as soon as possible after completing installation to protect the system. Temporary sheets of ply are acceptable. If necessary, the floor can be marked to show the pathway of the pipe runs to assist the floor layer fixing down the floor. Refer to installation manual for more detail.
Drawing Title
Tracked Plywood Floor UPONOR LIMITED
Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems
Drawing Number:
I 34
Date:
04/01/10
Rev:
C
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
Kombi Gun The new Kombi Gun is compatible with both the Kombi Klip Short and Kombi Klip Long pipe staples allowing one tool to be used to install all Uponor underfloor heating pipe to various types of insulation. These guns are recommend for regular underfloor heating installers and can dramatically reduce installation time.
Polythene Envelope Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.
Kombi Klip Short
The Kombi Klip Short are used for fixing pipework to EPS insulation (expanded polystrene) with laminated covering (e.g. Rolltec). The barbs length is 22mm and the clips require a minimum of 25mm insulation depth.
Kombi Klip Long
The Kombi Klip Long are used for fixing pipework to most types of insulation including plain EPS and foil faced PUR (polyurethane) such as Kingspan or Celotex. The barbs length is 33mm and the clips require a minimum of 35mm insulation depth.
Heating Pipework laid at 300mm centres unless specified in quotation and laid approximatly 150mm away from walls.
Kombi Klip for Heating Pipe. Clips should be spaced approximately 500mm apart when using 20mm PEX pipe. Additional clips maybe required on bends.
Floor Make-up 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be deterimental to the pipe. Protective Layer. It is essential to prevent screed from slipping between the insulation board joints. This can be achieved by taping the joints of Uponor insulation or alternatively by using foil or polythene film. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum should additionally be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below an to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation.
Section of typical floor make up Drawing Title:
Not to Scale
Details of a Screed Floor with Pipe Installed using Kombi Klips
Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.
UPONOR LIMITED Drawing Number:
Date:
I W11
03/08/11
Rev:
D
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
50 R1
300mm Kombi clips
Polythene Envelope Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.
Wicket-Clip
The Wicket-clips are used to fasten Cliprail to insulation. The clips require a minimum of 25mm insulation depth to be fitted into.
Kombi Klip Long
Max 500mm from wall
Clip Rail
Note Where pipes are spaced at 200mm centres the pipe should be "light bulbed" to a minimum radius of 150mm.
Wicket Clips
1m
The Kombi-clips are used to fasten pipe to insulation. The clips require a minimum of 32mm insulation depth to be fitted into.
200
Heating Pipework
Plan View of Heating Pipework
Heating Pipework laid at 300mm centres unless specified in quotation and laid approximatly 150mm away from walls. Floor Make-up 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be detrimental to the pipe. 1m Length of Clip Rail positioned 1m apart with double sided tape for locating Clip Rail. Once Clip Rail is laid in position it is to be secured with pipe fixing clips. Protective Layer. It is essential to prevent screed from slipping between the insulation board joints. This can be achieved by taping the joints of Uponor insulation or alternatively by using Uponor PE Foil or polythene film. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum insulation Concrete Slab
installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated required to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation.
Section of Floor Make Up
Drawing Title
Details of Screed Floor Pex 20 Pipe using Clip Rail UPONOR LIMITED
Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems
Drawing Number:
I W12
Date:
16/01/07
Rev:
A
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
300mm
150mm
Pex 20 Pipework
Polythene Envelope Edge Insulation 10mm Edge Insulation with self adhesive backing must be positioned around all wall edges to reduce heat loss and take up screed expansion.
Wire Ties
Floor Make-up 65-75mm 4:1 Sand/Cement Screed. Additives are not required although if used should not be deterimental to the pipe.
Wire Tie
Plan View of Heating Pipework Heating Pipework laid at 300mm centres unless specified in quotation.
A 142 Mesh. Pipes are to be secured to mesh by using wire ties. Both the wire ties and mesh are to be supplied by others. Protective Layer. It is essential to prevent screed from slipping between the insulation board joints. This can be achieved by taping the joints of Uponor insulation or alternatively by using a foil or polythene film. Insulation to comply with Part L of the Building Regulations. If insulation is already fitted below the concrete slab a recommended minimum should additionally be installed above the slab, equivalent to our 50mm Rolltec insulation. On intermediate floors with heated rooms below an to comply with BS EN 1264, equivalent to our 30mm Rolltec insulation.
Section of typical floor make up
Not to Scale
Drawing Title:
Details of a Screed Floor with Pipe Installed using mesh & wire ties
Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems at any time as part of their policy of continuous product development.
UPONOR LIMITED Drawing Number:
Date:
I W14
04/01/10
Rev:
C
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
Heating Pipework fitted at 300mm centres Heat Emission Plate
Chipboard
Joists @ 300mm Centres Minimum depth of joist is 200mm to allow for notching.
Insulation (by others)
Heat Emission Plate
Underfloor Heating Pipework
Insulation
Joists @ 300mm Centres
Insulation It is essential that insulation is fitted between the joists, as close to the underside of the plates as possible, even on intermediate floors. The insulation should satisfy the requirements of Part L and Part E of the Building Regulations. Heat Emission Plates These plates are only for heat distribution and are not structural. They are easily damaged and it is very important that no other trades are allowed where the UFH is being installed. The plates should be laid accross the floor before fixing. They should only be laid on the straight runs and should be installed with a 10mm minimum gap between plates. Decking The area should be decked out immediately after completeing installation to protect the system. Temporary sheets of ply are acceptable. If necessary, the floor can be marked to show the pathway of the pipe runs to assist the floor layer fixing down the floor. Drawing Title
Details of Heat Emission Plates Pex 20 - Joists @ 300mm Centres UPONOR LIMITED
Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems
Drawing Number:
I W21
Date:
16/01/07
Rev:
A
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
Heating Pipework fitted at 200mm centres Chipboard Heat Emission Plate Joists @ 400mm Centres Minimum depth of joist is 200mm to allow for notching.
Insulation (by others)
Insulation It is essential that insulation is fitted between the joists, as close to the underside of the plates as possible, even on intermediate floors. The insulation should satisfy the requirements of Part L and Part E of the Building Regulations.
Heat Emission Plate
Insulation Underfloor Heating Pipework
Joists @ 400mm Centres
Heat Emission Plates These plates are only for heat distribution and are not structural. They are easily damaged and it is very important that no other trades are allowed where the UFH is being installed. The plates should be laid across the floor before fixing. They should only be laid on the straight runs and should be installed with a 10mm minimum gap between plates. Decking The area should be decked out immediately after completeing installation to protect the system. Temporary sheets of ply are acceptable. If necessary, the floor can be marked to show the pathway of the pipe runs to assist the floor layer fixing down the floor. Drawing Title
Details pf Heat Emission Plates Pex 20 - Joists @ 400mm Centres UPONOR LIMITED
Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems
Drawing Number:
I W22
Date:
16/01/07
Rev:
A
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
Insulation (by others)
Heating Pipework fitted at 200mm centres Chipboard
Heat Emission Plate Battens @ 411mm Centres
Block & beam / Screed slab
Insulation It is essential that insulation is fitted between the battens, as close to the underside of the plates as possible, even on intermediate floors. The insulation should satisfy the requirements of Part L and Part E of the Building Regulations.
Heat Emission Plate
Insulation Underfloor Heating Pipework
Joists @ 411mm Centres
Heat Emission Plates These plates are only for heat distribution and are not structural. They are easily damaged and it is very important that no other trades are allowed where the UFH is being installed. The plates should be laid accross the floor before fixing. They should only be laid on the straight runs and should be installed with a 10mm minimum gap between plates. Decking The area should be decked out immediately after completeing installation to protect the system. Temporary sheets of ply are acceptable. If necessary, the floor can be marked to show the pathway of the pipe runs to assist the floor layer fixing down the floor. Drawing Title
Details of Heat Emission Plates Pex 20 - Battens @ 411mm Centres UPONOR LIMITED
Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems
Drawing Number:
I W23
Date:
16/01/07
Rev:
A
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk
Floor Covering Decking such as chipboard or Thermacell Heat Emission Plate
Heating Pipework fitted at 300mm centres
30mm, 50mm & 70mm Thickness
Floating Floor Panel
Additional insulation (can be above or below slab) See notes Concrete Slab
Section of typical ground floor make up
Additional Insulation Additional insulation maybe required below the Floating Floor Panels on ground floors to ensure compliance with Part L of the Building Regulations. Additional acoustic insulation maybe required on intermediate floors to comply with Part E of the Building Regulations. Heat Emission Plate
Floating Floor Panels The pre-grooved insulation panels are to be laid out accross the whole floor. It will be necessary to cut the panels in places such as doorways and near to the manifold. Underfloor Heating Pipework
Floating Floor Panel
Additional Insulation
Heat Emission Plates These plates are only for heat distribution and should cover approximately 80% of the floor. The Heat Emission Plates should be pressed into the insulation panels. Drawing Title
Details of Floating Floor Panels Pex 20 - Pipes @ 300mm Centres UPONOR LIMITED
Uponor reserve the right to alter specifications and operating parameters for all their Underfloor Heating Systems
Drawing Number:
I W31
Date:
16/01/07
Rev:
A
Head Office, Gilmorton Road, Lutterworth, Leicestershire LE17 4DU www.uponor.co.uk