INTEGRATED STREETSCAPES PASADENA CITY COLLEGE ARCHITECTURE 12B COLEMAN GRIFFITH SPRING 2010
Ashly Ho- Arch 10B-March Diagram
Monitor the development of the march Review and process the march route and intent
Clean up after the protest (Trash, roadblocks, etc.)
Charge or release arrested individuals
Complete March
Deal with any violence or rioting that occurs; arrest people
Monitor the March
Marching Begins
Plan for emergency situations (violence, rioting, obstructions)
Organize the necessary forces to maintain order during march
If cause/demands are not achieved, continue to protest; plan new march
See if cause/demands are achieved
Gather to discuss and/or celebrate the march
Complete March
Deal with violence or other unplanned occurances
Try to maintain a level of peace within the group and watch out for agitators
Attract attention towards your march by making noise (shouting, chanting, etc.)
Communicate your cause to bystanders
Marching Begins
Contact local media to attract more attention to your cause
Plan for emergency situations (violence, rioting, obstructions)
Organize the support (members, groups, individuals)
Apply for permission and permits from authorities
Decide on a specific route or location to begin and end at
Designate an organizational power or leader(s)
Spread the news through various mediums
Decide on your demands
Determine the cause for protest
INTEGRATED STREETSCPES
The site for this installation is located in Westwood, Los Angeles; the site incorporates a strip of the famous Westwood wrapping into Lindbrook. The current site is home to a parking garage, as well as a strip of restaurants. The main reference for the design of the pavillion was the idea of marching, because of the nearby Federal Building. Thus, the task was to create a design that would lead metro passengers from the intended metro entrance towards the Protest Square on the end of Lindbrook.
After researching on the Derry March/Massacre; the two characteristics: blockade and flow, were recognized. Their interaction results in a Gradual Accumulation. Which becomes the clear Binucular Concept.
Blockade Lamp Post Height
March Blockade
General Building Height
Billboard Height
Chase Building/Subway Entrrance Height
Skyscraper Height
Flow Accumulation Accumulation Westwood Blvd
General Building Height
Lamp Post Height
Newstand Height
Flow Newstand Height Billboard Height
Lindbrook Blvd
First Floor Height
Moderate Traffic
Low Traffic
Heavy Traffic
Ashly Ho- Arch 10B-March Diagram
Research Diagrams
Westwood Elevation
Short Sections
Floor Plan
Lindbrook Elevation
Street Designs