PCC Portfolio v.2

Page 1

Ashly Ho

Academic Portfolio 2010-2011



INTEGRATED STREETSCAPES PASADENA CITY COLLEGE ARCHITECTURE 12B COLEMAN GRIFFITH SPRING 2010


Ashly Ho- Arch 10B-March Diagram Clean up after the protest (Trash, roadblocks, etc.)

Charge or release arrested individuals

Complete March

Deal with any violence or rioting that occurs; arrest people

Monitor the March

Marching Begins

Plan for emergency situations (violence, rioting, obstructions)

Organize the necessary forces to maintain order during march

Review and process the march route and intent

Monitor the development of the march

If cause/demands are not achieved, continue to protest; plan new march

See if cause/demands are achieved

Gather to discuss and/or celebrate the march

Complete March

Deal with violence or other unplanned occurances

Try to maintain a level of peace within the group and watch out for agitators

Attract attention towards your march by making noise (shouting, chanting, etc.)

Communicate your cause to bystanders

Marching Begins

Contact local media to attract more attention to your cause

Plan for emergency situations (violence, rioting, obstructions)

Organize the support (members, groups, individuals)

Apply for permission and permits from authorities

Decide on a specific route or location to begin and end at

Designate an organizational power or leader(s)

Spread the news through various mediums

Decide on your demands

Determine the cause for protest

INTEGRATED STREETSCAPES The site for this installation is located in Westwood, Los Angeles; the site incorporates a strip of the famous Westwood wrapping into Lindbrook. The current site is home to a parking garage, as well as a strip of restaurants.

The main reference for the design of the pavillion was the idea of marching, because of the nearby Federal Building.

Thus, the task was to create a design that would lead metro passengers from the intended metro entrance towards the Protest Square on the end of Lindbrook.

Metro Rendering

Research Diagrams

After researching on the Derry March/Massacre; the two characteristics: blockade and flow, were recognized. Their interaction results in a Gradual Accumulation. Which becomes the clear Binucular Concept.

March Blockade

Ashly Ho- Arch 10B-March Diagram General Building Height

Billboard Height Skyscraper Height

Blockade Lamp Post Height

Newstand Height Chase Building/Subway Entrrance Height

Flow Accumulation Westwood Blvd

Accumulation General Building Height

Lamp Post Height

Billboard Height

Flow Newstand Height

Lindbrook Blvd

First Floor Height


Heavy Traffic

Moderate Traffic

Low Traffic

Metro Section


Metro Entrance Rendering


Floor Plan

Metro Entrance Rendering


Westwood Section

Westwood Elevation Westwood Elevation


Long Elevation


Gaylee Section

Streetscape Designs



SURFACE AND FORM PASADENA CITY COLLEGE ARCHITECTURE 12B NEIEL NORHEIM SPRING 2010


SURFACE AND FORM The site for this installation is located in Uptown New York; the site where UNStudio’s Villa-NM once stood. The now destroyed Villa NM is the main reference for the design of the pavillion, primarily in the creation of the individual tile. The tile is then turned into a module, which becomes a pavilion for the displaying of architectural projects.

TILE CONSTRUCTION DIAGRAM


FLOOR PLAN

SHORT ELEVATION


EXPLODED AXON

LONG ELEVATION

LONG SECTION



BODIES AND SKINS PASADENA CITY COLLEGE ARCHITECTURE 12B NEIEL NORHEIM SPRING 2010


BODIES & SKINS Description

Introduces the concept of NURBS modeling and the construction and refinement of self-similar curve geometries; as well as: output techniques, preparation for laser cutting, and model building.

Objective

By setting simple rule sets that are enacted in a repetitively development of architectural forms begin to take on an organic feel. Operations include drafting in rhino, rebuilding, lofting/offsetting, etc. By utilizing NURBS programs and a simple rule set, the creation of a shape not unlike those naturally found in nature are born. Development takes place in the 2-D state, beginning with a single geometric line, which is then manipulated and lofted into a 3-dimensional surface, and eventually shape.

ndering

Arch 12B- Ashly Ho


z

z

z

Y

1

Construction Diagram

2

3

4

5

6

z

Y

Y

Y

7 Line 2

Line 1

X

X

X

z

z

X

z

z

Y

Y

X

X

z

Y

Y

X

X

z

4

z

z

3 2

Y

Y

Y

X

X

z

z

z

z

X

X

2

4

3

X

X

X

X


CASE STUDY PASADENA CITY COLLEGE ARCHITECTURE 12A DIONICIO VALDEZ FALL 2010


CASE STUDY

Pasadena City College Arch12A Dionicio Valdez Fall 2010 Tessalation System Horizontal/ Grid-Slab Fram Gatti Wool Factory - P.L. Nervi - Rome, Italy - 1953

Axonometric

Construction Diagram


Floor Plan

Section A-A



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.