Ashwini Ashokkumar Design Portfolio 2022

Page 1

PORTFOLIO INTERIOR DESIGN | ARCHITECTURE

ASHWINI ASHOKKUMAR SELECTED PROJECTS FROM 2014 TO 2021


CONTENTS

Extended Design Portfolio Interior Design | Architecture | Installations | Research

0. CURRICULUM VITAE

Pg 4

1. KEW FAMILY RESTAURANT

Pg 7

Category: Hospitality Interiors Location: Royal Botanical Gardens, Kew Company: Mizzi Studio Role: Senior Designer Stages: RIBA Stages 2 to 6 Status: Completed 2021

2. TRINITY HEALTH CLUB

Pg 27

Category: Hospitality Interiors Location: St. Julliens, Malta Company: Mizzi Studio Role: Senior Designer Stages: RIBA Stages 2 to 4 Status: Project on hold (2019)

3. ALF MIZZI CORPORATE HEADQUARTERS

Pg 43

Category: Commercial Interiors Location: Marsa, Malta Company: Mizzi Studio Role: Senior Designer Stages: RIBA Stages 2 to 6 Status: Completed 2019

4. SERPENTINE COFFEE HOUSE

Pg 55

Category: Hospitality Architecture / Interiors Location: Hyde Park, London Company: Mizzi Studio Role: Project Lead Stages: RIBA Stages 2 to 6 Status: Completed 2018

5. HOLI SALONI

Pg 63

Category: Architectural Installation Location: Udaipur, India Company: Mizzi Studio Role: Project Lead Stages: RIBA Stages 2 to 6 Status: Completed 2018

6. FIREKRAKEN Category: Lighting Installation Location: King’s Cross, London Company: Mizzi Studio Role: Project Lead Stages: RIBA Stages 2 to 6 Status: Completed 2018

Pg 71


CONTENTS

Ashwini Ashokkumar Extended Design Portfolio Interior Design | Architecture | Installations | Research

7. LATIMER STUDIOS

Pg 77

Category: Commercial / Residential Architecture Location: Latimer Road, London Company: Mizzi Studio Role: Project Lead Stages: RIBA Stages 2 to 3 Status: Planning applied 2022

8. MUSCAT TOWER

Pg 85

Category: Commercial Architecture Location: Gzira, Malta Company: Mizzi Studio Role: Project Assistant Stages: RIBA Stage 2 Status: Technical Design

9. CHISWICK HOUSE SCHOOL

Pg 91

Category: Institutional Architecture Location: Pembroke, Malta Company: Mizzi Studio Role: Project Assistant Stages: RIBA Stage 2 Status: Project on hold (2020)

10. THORNHILL LIBRARY

Pg 99

Category: Institutional Interiors Location: Islington, London Company: Atmos Studio Role: Project Assistant Stages: RIBA Stage 2 to 4 Status: Project on hold (2016)

11. 222, RICHMOND HOUSE

Pg 105

Category: Residential Interiors Location: Richmond, London Company: Atmos Studio Role: Project Assistant Stages: RIBA Stage 2 to 4 Status: Project Completed 2018

12. SCHOOL OF BUILDING SCIENCE Category: Institutional Interiors Location: Ahmedabad, India Company: Aakruti Architects Role: Project Lead Stages: RIBA Stage 2 to 4 Status: Project Completed 2014

Pg 111


CONTENTS

Ashwini Ashokkumar Extended Design Portfolio Interior Design | Architecture | Installations | Research

13. DR. REDDY’S LAB CORPORATE HEADQUARTERS

Pg 119

Category: Commercial Interiors Location: Hyderabad, India Company: Chandavarkar and Thakkar Architects, Bangalore Role: Design Intern Stages: RIBA Stages 2 to 6 Status: Completed 2010

14. VEIN + MEMBRANE

Pg 123

Category: Material Research Location: London School: Architectural Association School of Architecture Role: Author, Research Team Status: Completed 2014

15. HYBRID ECOSYSTEMS

Pg 127

Category: Academic Research Location: London School: Architectural Association School of Architecture Role: Author, Research Team Status: Completed 2015

16. TWIST

Pg 133

Category: Material Research / Installation Location: London School: Architectural Association School of Architecture Role: Design Team Stages: RIBA Stage 2 to 6 Status: Completed 2015

17. CALCULATED DESIGN Category: Academic Research Location: Ahmedabad, India School: Center for Environmental Planning and Technology Role: Author Status: Completed 2012

Pg 139


Ashwini is an Interior Architect with a focus on functional design that is immersive and timeless. Her interest lies in using form, texture, colour and movement to create unique spatial experiences that is site and brief specific. Completed projects include The Serpentine Coffee House in Hyde Park where material differentiation of composite fibres were used to create an optimized manta ray inspired brass canopy; A Children’s Restaurant in The Royal Botanical Gardens, Kew where life size sculptures of funghi and plants create an immersive experience for children to learn about the journey of plant to plate; A Mud Hut village in Udaipur that is a celebration of vernacular building techniques and contemporary form building among others.


ASHWINI ASHOKKUMAR MSc. [Architecture] Architectural Association B.Des. [Interior Architecture] CEPT University

Email: ashokkumar.ashwini@gmail.com Address: NW5

WORK EXPERIENCE Architectural Designer Mizzi Studio, London (mizzi.co.uk) [Jan ‘17- Present]

Projects: • Serpentine Coffee House (Hyde Park, London) Role: Project Lead RIBA Stage 2 to 6 • Kew Family Restaurant (Kew Gardens, London) Role: Interior Designer RIBA Stage 2 to 6 • Firekraken, RABDA Awards (King’s Cross, London) Role: Project Delivery RIBA Stage 3 to 6 • Latimer Studios (Latimer Road, London) Role: Project Lead RIBA Stage 2 to 3 • Ivebury Court (Latimer Road, London) Role: Project Lead RIBA Stage 2 to 3 • Muscats Motors Tower (Gzira, Malta) Role: Project Assistant RIBA Stage 2 to 3 • Alf Mizzi Corporate Headquarters (Marsa, Malta) Role: Interior Designer RIBA Stage 2 to 6 • Trinity Health Club (St. Julliens, Malta) Role: Interior Designer RIBA Stage 2 to 4 • HoliSaloni Village (Udaipur, India) Role: Project Lead RIBA Stage 2 to 6

Architectural Assistant Atmos Studio, London (atmosstudio.co.uk) [May ‘16- Dec ‘16]

Projects: • St John’s Road Library (Richmond, London) Role: Interior Designer RIBA Stage 2 to 4 •

Freelance Designer [Oct ‘15- May ‘16]

4

Thornhill School Library (Islington, London) Role: Project Assistant RIBA Stage 2

Projects: • Sinuous wall & Dia-grid Dome (Cambridge, UK) • Think Happy Everyday Clay 3D printing Workshop (Bangalore, India) • Renovation of House in Defense Colony (Bangalore, India)


Graduate Student Assistant Architectural Association, London aaschool.ac.uk [Dec ‘14- Sep ‘15]

Projects: • Twist Pavilion Role: Workshop Assitant RIBA Stage 2 to 6

Tutor CEPT University, Ahmedabad cept.ac.in [Mar ‘13- Aug ‘14]

Subjects: • Interior Design Studio IV • Technical Representation of Drawing • Algorithms-Past & Present

Project Designer Akruti Architects, Ahmedabad aakrutiarchitects.com [Mar ‘13- Aug ‘14]

Projects: • SBST Redevelopment • Parikh Residence • CEPT Library Redevelopment

Design Intern, CNT Architects, Bangalore cnt.co.in [Apr ‘09- Oct ‘09]

Projects: • Dr Reddy’s Laboratory • Mindtree Corporate Office • Rammaiah Residence

EDUCATION Postgraduate: Master of Science in Architecture, [B] Emergent Technologies & Design, Architectural Association School of Architecture, London. Undergraduate: Bachelor of Interior Design, [B+] Faculty of Design, Center for Environmental Planning & Technology (CEPT University), Ahmedabad Best Thesis Award for “Calculated Design: The role of mathematics in defining form”

SKILLS Scripting

Grasshopper

3D Modelling

[Advanced] Rhinoceros, Autocad 3D & 2D, Google Sketchup, [Beginner] Revit

Presentation

Adobe Illustrator, Adobe Photoshop, Adobe InDesign

Traditional

Sketching, Model Making, Paper Making, Weaving, Bamboo craft, Wood Carving

REFERENCES (Available on Request) Jonathan Mizzi

Director, Mizzi Studio

Alex Haw

Director, Atmos Studio

Michael Weinstock

Director, Emergent Technologies and Design at Architectural Association 5


6

1.


FAMILY RESTAURANT KEW GARDENS, LONDON 2020-2021

Client: Royal Botanical Gardens, Kew Stage: Completed Dec 2021 Area: 1100 Sqm Design Team: Jonathan Mizzi, Matthew Chilton, Ashwini Ashokkumar Architects: HOK Interior Contractors: City Axis Installation Contractors: Firecracker Works

Left: Interior of completed restaurant showing interactive woven willow fungi sculpture by artist Tom Hare ©James McDonald Photography Top: Initial conceptual sketch showing different zones that interpret the brief Right: Mood image

Role: Senior Designer Responsibilities: RIBA Stage 2 to 6 As part of the design team I was involved in conceptual design and interior layout. Was lead designer for three key zones: Giant Garden, Autumn Garden and Spring Garden for which I was involved in all stages from client presentation to delivery. Other responsibilities included material palette selection, budgeting and value engineering, liaising with contractors, routine factory and site visits, collaborating with consultants on design intersections etc.

Project Description: The Kew Family Restaurant & Shop is part of Kew’s vision to bring clever design and functionality to help their young visitors learn more about bio-diversity, farming, food security and other areas of Kew research. Each seating zone is designed to be immersive with interactive displays and life size sculptures that aim to enrich the learning experience of the journey of plant to plate. An Enset seating sculpture highlighting Kew’s work on Ethiopia’s ‘tree against hunger’ and a mushroom banquette bringing the spotlight on Kew’s fungarium are among some of the features.

7


INTERIOR LAYOUT

Zones and their corresponding design intent

AHU ENCLOSURE 41.10 m² BoH KITCHEN 117.34 m²

DISH/POT WASH 34.01 m²

KITCHEN UNITS AND SERVICES TO KITCHEN DESIGNER DETAILS

C.O.S.H.H STORE

PLANT ROOM 34.35 m²

DRY STORE BEVERAGES

GRAB & GO

COL P 6

10 08

TRAYS

CONDIMENTS

04 SOCIAL DINING II CAPACITY: 10

GIANT GARDEN TOTAL CAPACITY: 44

01

07 06

ENSET SEATING CAPACITY: 18

06 'HARVEST' INFO HUB

03

WATER SEATING 1 CAPACITY: 16

APPLE POD CAPACITY: 6

09

UP

05

02

AUTUMN SEATING TOTAL CAPACITY: 26

MUSHROOM CANOPY ABOVE

MUSHROOM CANOPY ABOVE

MUSHROOM CANOPY ABOVE

MUSHROOM CANOPY ABOVE

SOCIAL DINING I CAPACITY: 10

BINS

Kew Family Restaurant

Kew Family Restaurant

Kew Family Restaurant

HOT MAINS

4.0 Giant Garden Seating

5.0 Autumn Seating

4.2 Seating Plan

5.2 Autumn Seating Pan

3.0 Hand Wash and Servery Laboratory 3.2 Hand Wash and Servery Laboratory Plan

HOT MAINS

GIANT GARDEN CAPACITY:44

'COOKING' INFO STATION

EXIT CORRIDOR

'COOKING' INFO STATION

DIVERSITY

PIZZA COUNTER

SALAD BAR

DESCRIPTION :

GIANT GARDEN GIANT GARDEN TOTAL CAPACITY: 34 TOTAL CAPACITY: 34

RESTAURANT • • • •• • •• ••••••••••

REV #

'COOKING' INFO STATION

SCIENCE

DATE

COOKING FOOD NUTRITION

3.0RESTAURANT Hand Wash and Servery Laboratory • • • •• • •• •••••••••• 3.2 Hand Wash and Servery Laboratory Plan

DESCRIPTION :

PIZZA COUNTER PIZZA COUNTER

SANDWICH COUNTER

Kew Family Restaurant

SANDWICH COUNTER

HARVEST 5.0 Autumn Seating PARTS OF THE PLANT 5.2 Autumn Seating Pan WOOD WIDE WEB

'HARVEST' 'HARVEST' INFO HUB HUB INFO

DATE

AUTUMN 'COOKING' 'COOKING' INFO STATION INFO STATION

HOT MAINS

COFFEE COFFEE STATION STATION

REV #

WATER SEATING I CAPACITY:16

WASTE RECYLE BINS

SALAD BAR

Kew Family Restaurant

Kew Family Restaurant

FOOD SECURITY 4.0 Giant Garden Seating CROP WILD RELATIVES 4.2 Seating Plan FUTURE AGRICULTURE

TING 18-22

HIGH TABLE CAPACITY: 6

HOT MAINS HOT MAINS

GIANT GARDEN TOTAL CAPACITY: 34

PIZZA COUNTER

AUTUMN SEATING CAPACITY:26

SANDWICH SANDWICH COUNTER COUNTER

THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS P AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE W WATER SEATIN CAPACITY: 2 STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT

SALAD BAR SALAD BAR

WATER SEATING 1 CAPACITY: 16

WASTE RECYLE BINS

' ON

HOT MAINS HOT MAINS

Mizzi Studio

MUSHROOM CANOPY CANOPY ABOVE

MUSHROOM CANOPY ABOVE ABOVE

MUSHROOM MUSHROOM CANOPY CANOPY ABOVE ABOVE

PIZZA COUNTER

ENSET SEATING ENSET SEATING CAPACITY: 18-22 CAPACITY: 18-22

RESTAURANT SEATING 2 Unit 11, WATER Latimer Studios RESTAURANT • • • •• • •• ••••••••••CAPACITY: 28 • • • •• • •• •••••••••• Latimer Road

WATER SEATING 1 CAPACITY: 16

AUTUMN SEATING TOTAL CAPACITY: 26 MUSHROOM CANOPY CANOPY ABOVE

ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON GELATERIA OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL P AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT

WASTE RECYLE BINS

HANDWASH ZONE

London W10 6RQ, UK

SANDWICH COUNTER Tel: +44

(0) 207 183 2774 Email: info@mizzi.co.uk

SALAD BAR

'HARVEST' INFO HUB 'HARVEST' INFO HUB

MUSHROOM CANOPY ABOVE

HANDWASH ZONE

SANDWICH COUNTER

'COOKING' 'COOKING' INFO STATION INFO STATION

STE YLE BINSSALAD BAR

HIGH CHAIR STORAGE

HIGH TABLE BAR STOOLS CAPACITY: 06

WATER SEATING 1 WATER SEATING CAPACITY: 16 1 CAPACITY: 16

RESTAURANT • • • •• • •• ••••••••••

SPRING SEATING CAPACITY: 32 WASTE RECYLE BINS WASTE RECYLE BINS

HIGH TABLE BAR STOOLS CAPACITY: 06

HIGH CHAIR STORAGE

AUTUMN SEATING

LE POD E POD 6 ACITY: CITY: 6

SEATING 26 RESTAURANT AUTUMN TOTAL CAPACITY: • • • •• • •• ••••••••••TOTAL CAPACITY: 26

MUSHROOM CANOPY MUSHROOM ABOVE CANOPY

'HARVEST' 'HARVEST' INFO HUB HUB INFO

MUSHROOM CANOPY MUSHROOM ABOVE CANOPY

ABOVE

ABOVE

MUSHROOM CANOPY MUSHROOM ABOVE CANOPY

MUSHROOM CANOPY MUSHROOM ABOVE CANOPY

ABOVE

PIZZA COUNTER PIZZA COUNTER

HANDWASH ZONE HANDWASH ZONE

ABOVE

SANDWICH SANDWICH COUNTER COUNTER

SALAD BAR SALAD BAR

WATER SEATING 2 CAPACITY: 28

WATER SEATING 1 CAPACITY: 16

WASTE WASTE RECYLE BINS RECYLE BINS

AUTUMN SEATING TOTAL CAPACITY:

HIGH CHAIR STORAGE HIGH CHAIR STORAGE

26

MUSHROOM CANOPY CANOPY ABOVE

MUSHROOM CANOPY ABOVE ABOVE

8

HIGH TABLE BAR STOOLS HIGH TABLE BAR STOOLS CAPACITY: 06 CAPACITY: 06

RESTAURANT RESTAURANT WATER SEATING 2 • • • •• • •• •••••••••• • • • •• • •• ••••••••••CAPACITY: 28

WATER SEATING 1 CAPACITY: 16 MUSHROOM MUSHROOM CANOPY CANOPY ABOVE ABOVE

GELATERIA

HANDWASH ZONE

'HARVEST' INFO HUB 'HARVEST' INFO HUB

HANDWASH ZONE

65

HIGH CHAIR STORAGE

MIZZI STUDIO

HIGH TABLE BAR STOOLS CAPACITY: 06

27

MIZZI STUDIO

WATER SEATING 1

MIZZI STUDIO

WATER SEATING 2 WATER SEATING CAPACITY: 28 2


06 HARVEST INFO TOWER 07 08

SALAD AND PIZZA SERVERY COOKING TUBE TOWER

11C QUEUE DIVIDER 13

WATER SEATING

14

SPRING SEATING

15

GELATERIA

09 HAND WASH STATION

BABY CHANGING 5.40 m²

OFFICE 11.09 m²

EQUIPMENT STORE 3.96 m²

LD ROOM PLANT 6.83 m²

RETAIL STORE 12.70 m²

FAMILY WC 4.40 m²

IT ROOM 6.53 m²

PUBLIC WC (F) 16.72 m²

PUBLIC AWC 5.23 m²

STAFF WC 2.66 m²

STAFF CHANGING 10.33 m²

RETAIL OFFICE 12.86 m²

FEEDING ROOM 18.25 m²

LOBBY 16.26 m²

STAFF WC 2.66 m²

PUBLIC WC (M) 18.12 m²

PUBLIC AWC 5.19 m²

CLEANERS 5.03 m²

BINS

11A

RETAIL BY OTHERS

11 SPRING SEATING CAPACITY: 32

11B

14

11C

13

WATER SEATING 1 CAPACITY: 16

15

Kew Family Restaurant

2.0 Sun Servery and Water Seating

Kew Family Restaurant

2.2 Sun Servery and Water Seating Plan

BOOKS & LEARNING

6.0 Spring Seating

FAMILY & ADULT PRODUCTS

6.2 Spring Seating WATER SEATING II CAPACITY:28

ENTRANCE CORRIDOR

TOILET CORRIDOR

SPRING SEATING CAPACITY:32 + 4

RETAIL

BOOKS & LEARNING FAMILY & ADULT PRODUCTS

WASTE RECYLE BINS

SUN & WATER

SPRING

SOURCE OF ALL ENERGY LIFE GIVING BOTANICALS

6.0 Spring Seating PLANTING GROWING 6.2 Spring Seating BOOKS & LEARNING GARDENINGER

2.0 Sun Servery and Water Seating

SPRING SEATING CAPACITY: 32

2.2 Sun Servery and Water Seating Plan

'GROWING' INFO TOTEM

'GROWING' INFO TOTEM

'GROWING' INFO TOTEM

PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI T AND MAY BE SUBJECT TO PROSECUTION.

PROJECT TITLE BOOKS & LEARNING 'GROWING' INFO TOTEM

SPRING SEATING CAPACITY: 32

CLIENT NAME

SPRING SEATING CAPACITY: 32

D. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS N THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S OF ANY WORK. WATER SEATING 2 CAPACITY: 28

GELATERIA

SHEET TITLE

UNDERGROUND

Kew Family Restaurant

Kew Family Restaurant

FAMILY & ADULT PRODUCTS

'GROWING' INFO TOTEM

203

QUEUING

FOOD SPINE

M.CHILTON

RETAIL • • • •• • •• ••••••••••

1:75

MASTERPLAN

GELATERIA

PROJECT ADDRESS

• • • •• • •• ••••••••••

CASH WRAP

12 06 2020

CHECKED BY:

DRAWN BY:

ROYAL BOTANICAL GARDENS

J.MIZZI

GELATERIA BAR STOOLS CAPACITY: 04

SPRING SEATING CAPACITY: 32

CHILDREN'S PRODUCTS

A1

STAGE:

KEW GARDENS, RICHMOND, LONDON. TW9 3AE

CASH WRAP WORMS QUEUING SOIL NUTRIENTS ROOTS RETAIL

NOTES:

DATE

PROJECT NO:

FAMILY RESTAURANT PROJECT FAMILY & ADULT PRODUCTS

FOOD SPINE

SHEET NO:

TECHNICAL DESIGN

CHILDREN'S PRODUCTS

QUEUING

FRP_203_GEN_MAS_1001

CASH WRAP

FOOD SPINE

RETAIL • • • •• • •• •••••••••• 'GROWING' INFO TOTEM

'GROWING' INFO TOTEM

GELATERIA BAR STOOLS CAPACITY: 04

QUEUING

CASH WRAP

FOOD SPINE

EATING : 32

RETAIL

CHILDREN'S PRODUCTS

• • • •• • •• •••••••••• GELATERIA

CHILDREN'S PRODUCTS

GELATERIA BAR

MIZZI STUDIO

9


GIANT GARDEN

Themes of Food Security and Crop Wild Relatives

Kew Family Restaurant

2.0 Sun Servery and Water Seating 2.2 Visual

3

2

3

1

4

5

3 1

3 1

6 8

Giant Garden visual showing a giant apple seating pod and enset seating Kew Family Restaurant

1

2

3

4

5

6

Kew Family Restaurant

4.0 Giant Garden Seating 4.12 Social Dining and Aubergine Seating DI CHROMATIC PAINT

Material Palette

GAMES ON TABLE

BANQUETTE EATING ALONG ULL LENGTH OF BACK WALL

Initial design sketches for the area 50

10

ARCYLIC LIGHTING FEATURE

VARIED SIZE, SHAPE AND COLOURED AUBERGINE ‘COUSINS’ CHAIRS

FLAX SEED-BASED UPHOLSTERY

CERAMIC MOSAICS

WARM TIMBERS

NEUTRAL CONCRETE

MIZZI STUDIO


THE ENSET (False Banana) Kew Family Restaurant

Biomimetic 4.0 Giant Garden References and technical details 4.9 Enset Schematic Elevation

Enset seating with biomimetic references to the Enset (false banana) plant of Ethiopia 56

GRP - CLASS 1 FIRE RATED OUTERSTEM WITH MILLED FOAM CORE. (CONTRACTOR TO CONFIRM COMPOSITE STRUCTURE)

25

PT 08

INNER STEM

ENSET STEM DETAIL

MIDDLE STEM

SCALE 1:2

PT 08 6 10

OUTER STEM

FA 01 PLY BACKED UPHOLSTERED BACKREST BACKREST DETAIL SCALE 1:2

0

18

100

R5

UPHOLSTERED FOAM SEAT. SPECIFICATION OF FOAM AND INFILL TO BE DISCUSSED WITH CONTRACTOR SEAT DETAIL SCALE 1:2

INDICATIVE STRUCTURE

50

PT 08

MT 14

S02

SECTION S02

Enset Section Detail 203-01-AD 1001

REV #

DATE

SCALE 1:10

DESCRIPTION :

SKIRTING DETAIL SCALE 1:2

REV #

DATE

DESCRIPTION :

THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION. Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk

ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.

PROJECT TITLE CLIENT NAME SHEET TITLE

FAMILY RESTAURANT RESTAURANT ROYAL BOTANICAL GARDENS ENSET 06: SECTION 02 DETAIL

PROJECT ADDRESS

KEW GARDENS, RICHMOND, LONDON TW9 3AE

PROJECT NO:

NOTES:

DATE

203 DRAWN BY:

12 06 2020 CHECKED BY:

A.ASHOKKUMAR

1:10 STAGE:

TECHNICAL DESIGN

J.MIZZI

CLIENT SIGN OFF:

A2 SHEET NO:

FRP_203_01_AD_8002

11


EXPLODED DIAGRAM Construction Sequence

PT 07

OF 02

PT 06

PT 08 FA 01

PLYBACKING TO UPHOLSTERED SEAT TO FIT INTO GRP COMPONENTS OF ENSET

PT 08 NEGATIVE IN GRP COMPONENT TO RECEIVE UPHOLSTERED BACKREST

ENSET EXPLODED DIAGRAM

12


13 PROJECT TITLE

PROJECT NO:

DATE

NOTES:


14

View of Enset and Apple seating within the Giant Garden ©James McDonald Photography


15


AUTUMN GARDEN

Themes of Harvest and Wood Wide Web

Kew Family Restaurant

3.0 Hand Wash and Servery Laboratory 3.1 xxxxxxxxx

3.1 Servery Laboratory Salad and Pizza Schematic

1

6

5

3 2

10

Autumn Garden visual showing Mushroom banquette and Harvest Info Tower Kew Family Restaurant

1

2

WOVEN REED

3

CLAY PLASTER CLADDING

4

TAN FAUX LEATHER UPHOLSTERY

TERRACOTTA MOSAICS

5

6

WARM TIMBERS

SPALTED BEECH

MIZZI STUDIO

Initial design sketch for the area

16

Material Palette


EXPLODED DIAGRAM

Construction Sequence and Interactive Feature

TB 05

WOVEN WILLOW AROUND METAL ARMATURE. ARTIST TO DETERMINE CONSTRUCTION METHOD

METAL ARMATURE

TB 04

METAL ARMATURE

TB 06

REFER DWG FRP-203-05-AD-8004 FOR LENGTHS

TB 04 LT 13

LED STRIP INTEGRATED INTO WOVEN WILLOW MUSHROOM STEM.

TB 07

FA 02

ALLOWANCE IN BANQUETTE FOR FIXING OF MUSHROOM

FA 01

MT 15 TB 07

LT 08

PLASMA BALL WITH TOUGHENED GLASS

LT 07

OPTICAL FIBRES ARRANGES IN BRANCHING PATTERNS TO EMULATE WOOD WIDE WEB

PLASMA TOWER FITTED HERE

EXPLODED DIAGRAM

Kew Family Restau

5.0 Autumn Seat

5.8 Autumn Seating Schematic 5.8 Autumn Seating Schem

INDICATIVE SUBSTRUCTURE

WOOD WIDE WEB -

Kew Family Restaurant

5.0 Autumn Seating

WOOD WIDE WEB -

NATURE’S SECRET NETWORKS NATURE’S SECRET NETWORKS

REV #

DATE

DESCRIPTION :

THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION. Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk

INTERACTIVE LIGHTING

ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.

PROJECT TITLE CLIENT NAME SHEET TITLE

PROJECT NO:

FAMILY RESTAURANT RESTAURANT ROYAL BOTANICAL GARDENS

12 06 2020 CHECKED BY:

J.MIZZI

A.ASHOKKUMAR

AUTUMN GARDEN 02: EXPLODED DIAGRAM

PROJECT ADDRESS

N/A

CLIENT SIGN OFF:

A2 SHEET NO:

STAGE:

KEW GARDENS, RICHMOND, LONDON TW9 3AE

NOTES:

DATE

203 DRAWN BY:

TECHNICAL DESIGN

FRP_203_05_A

INTERACTIVE LIGHTING

IR SENSOR PLASMA BALL

IR SENSOR PLASMA BALL

Interactive lighting feature within Mushroom banquette mimicking the wood wide web 73

73

MIZZI STUDIO

MIZZI STU

17


SPRING GARDEN

Themes of Growing and Nurturing

Kew Family Restaurant

3.0 Hand Wash and Servery Laboratory

4

5

1

6 2 3

12

Spring Garden visual showing rammed earth wall and info towers Kew Family Restaurant

1

2

RAMMED EARTH WALL PLASTER

3

GREEN TERRAZZO

4

NETTLE-BASED UPHOLSTERY

5

LEAF-LIKE LIGHTING FEATURES

6

WARM TIMBERS

INTERACTIVE INFO STATIONS

MIZZI STUDIO

Initial design sketch for the area

18

Material Palette


:

EXPLODED DIAGRAM

Construction Sequence and Interactive Feature

TB 06 REFER DWG FRP-203-14-AD-8003 FOR TIMBER LENGTHS

OF 03

LT 10

LE REFUGE LEAVES

LT 10

LE REFUGE LIGHT

TB 07 CONCRETE BASE FITTED INTO BANQUETTE

FA 04

Kew Family Restaurant

FA 05

SCAFFOLDING FOR VERTICAL TIMBER CLADDING

6.0 Spring Seating

PLASMA INFO TOWER

INDICATIVE BANQUETTE SUBSTRUCTURE

Kewgrowing Family Restaurant 6.8 Sowing and Illustrated

6.0 Spring Seating PLASMA INFO TOWER FITS AGAINST BANQUETTE FACE

FLEXIPLY CLADDING ON THE 6.8 Sowing andINSIDE. growing Illustrated PAINT RAL TBC

Kew Family Restaurant

6.0 Spring Seating RS 03

GARDENING -

6.8 Sowing and growing Illustrated

WHAT DO PLANTS NEED TO GROW

Construction Sequence

GARDENING GARDENING WHAT DO PLANTS NEED TO GROW WHAT DO PLANTS NEED TO GROW

SPRING EXPLODED DIAGRAM

REV #

DATE

DESCRIPTION :

THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION. Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk

ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.

PROJECT TITLE CLIENT NAME SHEET TITLE

FAMILY RESTAURANT RESTAURANT

PROJECT NO:

203 DRAWN BY:

ROYAL BOTANICAL GARDENS

12 06 2020 CHECKED BY:

A.ASHOKKUMAR

N/A

SPRING GARDEN 03: EXPLODED DIAGRAM

PROJECT ADDRESS LEARNING LEARNING KEW GARDENS, RICHMOND, LONDON TW9 3AE THROUGH THROUGH ROLE-PLAY ROLE-PLAY LEARNING THROUGH ROLE-PLAY

NOTES:

DATE

J.MIZZI

CLIENT SIGN OFF:

A2

STAGE:

TECHNICAL DESIGN

SHEET NO:

FRP_

Interactive Info tower where children can learn the important elements that contribute to plant growth

87

MIZZI STUDIO

19 87

MIZZI STUDIO


INTERACTIVE FEATURES Learning by engaging

20


APPLE POD

Immersive seating within a giant apple

21


22

View of Spring Garden ©James McDonald Photography


23


24

View of Autumn Garden from Enset Seating ©James McDonald Photography


Back to Contents

25


26

2.


TRINITY HEALTH CLUB ST. JULLIENS, MALTA 2019-Present

Client: Gregory Nasmyth Stage: Under Construction Area: 1100 Sqm

Left: Part View of Tree Cycle. A cycling studio where cycles are connected upto interactive LEDs that respond to the cycle’s speed embedded in a treelike structure at the front of the studio. Top: Interior of Spa Treatment room with brass clad arches dusty pink acoustic wall panelling and bespoke terazzo massage bed. Right: Mood images- body, nature, health and technology.

Design Team: Jonathan Mizzi, Ashwini Ashokkumar, Silvia Zanolini, Jomarie Mayo, Julia Frendo Fit-out Contractors: Contrada Group MEP Consultants: Scicluna & Associates Role: Senior Designer Responsibilities: RIBA Stage 2 to 4 As part of the design team I was involved in conceptual design and masterplan layout. Was lead designer for three key zones: Tree cycle studio, the Sauna and Steam rooms and Spa treatment for which I was involved in all stages from client presentation to technical design. Other responsibilities included material palette selection, budgeting and value engineering, liaising with contractors, detail design, prototyping etc.

Project Description: The design proposal builds on four key aspects: Nature, Body, Health and Technology. The goal is to create a space that revitalises and heals. The circulation spaces are uninterrupted and clad with warm steam bent timber while the sauna and steam rooms are immersive ceramic tile clad vortexes that elevate and ground at the same time. The tree cycle is an organic sculptural piece that combines functionality and art and housed within a full height glass enclosure also acts as a centre piece to the Club. Trinity Luxury Health Club

2.0 Master Plan 2.4 Mood

BODY

NATURE

TIMBER

12

TECH

27


INTERIOR LAYOUT

EXIS

TING

COLU

MN

Layout showing circulation and zoning

EXST. CLMN

E.O

E.O

ter

Wa

d vise d re e b ose y prop ision to y surve v b ro d p e ant sult firm con E con & &M

e alv

V

T

AF

SH

T

F HA

EX

ST

. CL

MN

S

EXIS

TIN

GC

OLU

MN

E.O

EX

IST

ING

CO

LU

MN

E.O

EXIS

TIN

GC

OLU

MN

E.O

EX

IST

ING

CO

MN LU

E.O

E

E.O

G RA

Y

ST

O

TR

EN

SH

AF

SH

T

AF

E.O

T

S

VE

6

-2.2

7

-2.1

8

-2.2

.94

-1 9

-2.1

6

-1.8

1

7

-2.1

-1.9

.04

5

-2.4

-2

6 -2.3

8

-1.9

8

-2.0

28

8

-2.1

7

-2.2

GC

EL

7

IN IST EX

SH

D LE AB OM DIS HRO T BA

-2.4

OLU

MN

D LE AB OM DIS HRO T BA


SR NO

TING EXIS

MN COLU

EXST. CLMN

01

MN COLU

02 EXIS

TING

03

EXISTING COLUMN

EXISTING

05

ING EXIST

COLU

MN

PA

EXST. CLMN

COLUMN

04

06

COLUMN

TING

COLU

MN

EXIST

ING CO

LUMN

EXISTING

EXISTING

EXST. CLMN

COLUMN

07

EXIS

TING

COLU

MN

EXIS

08

COLUMN

EXISTING EXIST

ING CO

LUMN

EXISTING

ft

sha

EXST. CLMN

COLUMN

09

LUMN G CO

10

IN EXIST

11

TING EXIS

COLU

MN

12 13

N

14

EXIS

G TIN

CO

LUM

15

Trinity Luxury Health Club

1.0 Existing Site 1.2 Existing Plan

.676 102 SFL 106.040 SCL

.646 102 .034 SFL 106 SCL

16

.304

SFL

.634 102 SFL 106.034 SCL

Lift a Are

102

9 .27 102 SFL 106.025 SCL

.624 102 .034 SFL 106 SCL

.639 102 SFL 106.040 SCL .268 102 .008 SFL 106 SCL

.638 102 SFL 106.040 SCL

.638 102 SFL 106.034 SCL .638 102 .031 SFL 106 SCL

.639 102 .034 SFL 106 SCL

.282 102 .008 SFL 106 SCL

.282 102 SFL 106.021 SCL

.309 102 .021 SFL 106 SCL

ft

sha

17

.622 102 SFL 106.040 SCL

18

.629 102 SFL 106.040 SCL

0

EXISTING PLAN - PROPOSED DEMOLITION

5

10m

EXISTING PLAN - PROPOSED CONSTRUCTION

7

MIZZI STUDIO

29


TECHNICAL DRAWINGS Spa plan and section

Section of Sauna and Steam Rooms

Plan of Sauna and Steam Rooms

30


TECHNICAL DRAWINGS Spa details and prototype

Details of Sauna and Steam Rooms

Prototype of Sauna and Steam Entrance Wall

31


32

Sauna and Steam rooms


33


TECHNICAL DRAWINGS Changing Areas plan and section

D07

06

194_06_AD 1007

194-06-AD 6002

ENTRANCE TOWEL DROP

05

08

194-06-AD 6002

194-06-AD 6002

07

D03

194-06-AD 6002

09

194_06_AD 1003

194-06-AD 6002

10

194-06-AD 6002

G10

194_GEN_AD 6904

G07

194_GEN_AD 6901

D06

WALL HUNG AC UNIT DETAIL OF FIXING TO BE DISCUSSED BETWEEN FINISHED CONTRACTOR & ID.

GREEN WALL

EXISTING COLUMN

01

EXST. CLMN

D08

FEMALE CHANGING ROOM

BENCH

TOWEL DROP AND WATER FOUNTAIN

MAKE UP VANITY

02

194-06-AD 6001

EXISTI

194_06_AD 1008

194-06-AD 6001

AC UNIT

NG CO LUMN

194_06_AD 1006

D02

194_06_AD 1002

D05

194_06_AD 1005

03

GREEN WALL

SHOWERS

194-06-AD 6001

04

194-06-AD 6002

SPA ENTRANCE

G10

194_GEN_AD 6904

BASIN VANITY

D01

D04

194_06_AD 1001

02

194-06-AL 1001

G11

194_06_AD 1004

194_GEN_AD 6905

FEMALE CHANGING ROOM - GENERAL ARRANGEMENT PLAN Scale: 1:50

Female Changing Area Plan scale 1:50

4.0m

DESCRIPTION :

REV #

DATE

DESCRIPTION :

THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION.

CONSTRUCTION ISSUE WALL WALLCAPPING CAPPING

D07 D07

MT MT03 03

Mizzi Studio

Unit 11, Latimer Studios MT MT 01 01 Road Latimer London W10 6RQ, UK

194-06-AD 194-06-AD 1007 1007

Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk

D03 D03

194-09-AD 194-09-AD 1003 1003

ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALEGLAZING FROM THE DRAWINGS. USE GIVEN DIMENSIONS LOCKER LOCKER GLAZING ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING TZ TZ 01 01 MT MT 01 01 GL GL02 02 MT MT04 04 OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.

PROJECT TITLE CLIENT NAME

PROJECT NO:

TRINITY HEALTH CLUB GREGORY NASMYTH

MT MT03 03

12 12 2019

K.WALKER

1:50

MT MT03 03

ARRANGEMENT PLAN

PROJECT ADDRESS

J.MIZZI

CLIENT SIGN OFF:

A2

MT MT 01 01

STAGE:

CONSTRUCTION

PENDER GARDENS, ST JULIANS, MALTA

SHEET NO:

THC_194_06_AL_100 CFL CFL+02.750 +02.750

CFL+02.500 +02.500 CFL ACFIXING FIXING&&ACCESS ACCESSPANELS PANELSTO TOBE BE AC SPECIFIEDBY BYM&E M&ECONTRACTOR CONTRACTOR SPECIFIED &CO-ORDINATEDWITH WITHFINISHES. FINISHES. &CO-ORDINATED

SHADOW SHADOWGAP GAPFOR FORRETURN RETURNAIR. AIR. 50MM 50MMSHADOW SHADOWGAP GAPTO TOBE BE CO-ORDINATED CO-ORDINATEDWITH WITHFINISHES FINISHES CONTRACTOR. CONTRACTOR.

FFL+00.000 +00.000 FFL

FFL FFL+00.000 +00.000

01 01

194-06-AL 194-06-AL 1001 1001

ELEVATION ELEVATION01 01 SCALE SCALE1:50 1:50

TZ TZ 01 01

MR MR01 01

MT MT04 04

TZ TZ 01 01

LOCKER LOCKER

D08 D08

TZ TZ 01 01

MT MT 01 01

TZ TZ 01 01

TZ TZ 01 01

ST ST 03 03

194-06-AD 194-06-AD 1008 1008

D05 D05

194-06-AD 194-06-AD 1005 1005

CFL CFL+02.750 +02.750 CFL+02.500 +02.500 CFL

2X 2X30MM 30MMSLOTS SLOTSININFOR FOR WALL WALLFOR FORVENTILATION VENTILATION POWERREQUIRED REQUIRED POWER FORLED LEDSTRIP STRIP FOR LIGHTINTREGRATED INTREGRATED LIGHT INTOJOINERY. JOINERY. INTO

400 400 400 400

450 450

780 780

500 500

2210 2210

POWERREQUIRED REQUIRED POWER FORLED LEDSTRIP STRIP FOR LIGHTINTREGRATED INTREGRATED LIGHT BENCH. ININBENCH. TIMBERBENCH BENCHTO TO TIMBER MATCHLOCKERS LOCKERS MATCH

FFL FFL+00.000 +00.000

02 02

194-06-AL 194-06-AL 1001 1001

POWERREQUIRED REQUIRED POWER FORHAIR HAIRDRYER. DRYER. FOR

FFL FFL+00.000 +00.000 TO TOSHOWERS SHOWERS

TO TOWC'S WC'S

ELEVATION ELEVATION02 02 SCALE SCALE1:50 1:50

PT PT 04 04 Female Changing Area Sections

D04 D04

194-06-AD 194-06-AD 1004 1004

TZ TZ 01 01

TZ TZ 01 01

ST ST 01 01

TZ TZ 01 01

SF SF 03 03

SHOWER SHOWERDOOR DOOR

GL GL03 03

G10 G10

194-GEN-AD 194-GEN-AD 6904 6904

0606

CFL CFL+02.750 +02.750

0101

CFL CFL+02.500 +02.500

GW GW02 02 POWERREQUIRED REQUIRED POWER FORLED LEDSTRIP STRIP FOR LIGHTININMIRROR. MIRROR. LIGHT

0202

OK OK

34

0.

CHECKED BY:

DRAWN BY:

WALL WALLCAPPING WALL CAPPING CAPPING FEMALE CHANGINGWALL ROOMS 02: GENERAL SHEET TITLECAPPING

1.0m

NOTES:

DATE

194

2.0m

0303


TECHNICAL DRAWINGS Changing Area details

CFL +02.500

20

2550 800

800 20

G03

TZ 01

194-GEN-AD 6901

330

330

00

R1

G06

ST 03

194-GEN-AD 6901

1370

509

700

MT 02 MR 01 SF 27

G09

SF 23 1300

194-GEN-AD 6903

ST 03 780

700

STOOL.

200

450

450

ELEVATION A

410 161

D05

194-06-AD 1005

2550

SCALE 1:20

SF 23

150

ST 03

S01

TROUGH DETAIL FOR ACCESSORIES

SLOTS IN STONE FOR TOWEL BIN ACCESS.

194-06-AD 1005

TZ 01

100

90

80

SF 23

140

130

ST 03

ST 03

50

R4

449

STOOL.

150

R5

450

ST 03

100

600

0

R50

630

150

2550

2550

450

FFL +00.000

D05

DETAIL

194-06-AD 1005

A

SCALE 1:5

194-06-AD 1005

D05

194-06-AL 1001

REV # -

S01

MAKE UP VANITY PLAN

194-06-AD 1005

SCALE 1:20

DATE

DESCRIPTION :

12/12/2019

CONSTRUCTION ISSUE

REV #

DATE

DESCRIPTION :

SECTION 01 SCALE 1:20

THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION.

Vanity Mirror Detail

ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.

Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk

PROJECT TITLE CLIENT NAME

PROJECT NO:

TRINITY HEALTH CLUB

SHEET TITLE

PROJECT ADDRESS

DRAWN BY:

NOTES:

DATE

194

GREGORY NASMYTH FEMALE CHANGING ROOM 11: D05 MAKE UP VANITY DETAIL

12 12 2019 CHECKED BY:

K.WALKER

J.MIZZI

SCALE:

CONSTRUCTION

PENDER GARDENS, ST JULIANS, MALTA

CLIENT SIGN OFF:

A2

AS SHOWN STAGE:

SHEET NO:

THC_194_06_AD_1005_CO

SF 03 CFL +02.750

SF 22

250

SHOWER HEAD ARM

SF 09

950

SHOWER HEAD

TZ 01

TZ 01

TZ 01

SF 10

2200

SOAP ACCESSORIES

SF 11

150

HAND SHOWER

GL 03 IR 01

2100

2110

2400

SF 12

SHOWER MIXER

SHOWER DOOR HANDLE

1100

1330

TZ 01

IR 02

T01

SF 39

SHOWER WASTE

FFL +00.000

MT 03

SHOWER DOOR BRACKETS

194_GEN_AD 6902

630

D02

194-06-AD 1002

D02

ELEVATION A

194-06-AD 1002

SCALE 1:20

B

194-06-AD 1002

D02

ELEVATION B

194-06-AD 1002

SCALE 1:20

TZ 09

ELEVATION D SCALE 1:20

C

SF 11

TZ 09

HAND SHOWER

SF 24

SHOWER HEAD ARM

SF 39

SF 09

SHOWER HEAD 144

1300

A

194-06-AD 1002

SCALE 1:20

245

194-06-AD 1002

SF 39

194-06-AD 1002

D02

ELEVATION C

50

3

TZ 09

TZ 09

TERRAZZO SHOWER TRAY

870

SF 04

LINEAR DRAIN

D

194-06-AD 1002

D02

194-06-AL 1001

REV #

DATE

-

12/12/2019

scale 1:20

SHOWER PLAN SCALE 1:20

1.0m

Shower Cubicle Detail DESCRIPTION :

REV #

DATE

DESCRIPTION :

THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION.

CONSTRUCTION ISSUE

Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk

ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.

PROJECT TITLE CLIENT NAME SHEET TITLE

TRINITY HEALTH CLUB GREGORY NASMYTH FEMALE CHANGING ROOM 08 D02 SHOWER DETAILS

PROJECT ADDRESS

PENDER GARDENS, ST JULIANS, MALTA

PROJECT NO:

194 DRAWN BY:

K.WALKER

1:20 STAGE:

0.5m

0.3m

0.1m

0.0m

NOTES:

DATE

12 12 2019 CHECKED BY:

J.MIZZI

CLIENT SIGN OFF:

A2

CONSTRUCTION

SHEET NO:

THC_194_06_AD_1002_CO

35


36

Female Changing Area


Male Changing Area

Male Shower Rooms

37


TECHNICAL DRAWINGS Tree Cycle plan and elevation

Elevation of Tree Cycle

Plan of Tree Cycle

38


TECHNICAL DRAWINGS

Tree Cycle details and lighting study

Details of Tree Cycle

Tree Cycle Lighting Study

39


40

Tree Cycle Studio


Back to Contents

41


42

3.


ALF MIZZI HEADQUARTERS MARSA, MALTA 2019

Client: Alf Mizzi & Sons (Marketing Group) Stage: Completed 2019 Area: 1800 Sqm Design Team: Jonathan Mizzi, Ashwini Engineers: MMP Malta Stair Manufacturer: EE Stairs

Left: The feature staircase that combines function with art. It is constructed out of sixty satin stainless steel handrails joined together ©Jonathan Mizzi Top: View of the spiral stair looking into the skylight. ©Jonathan Mizzi

Role: Senior Designer Responsibilities: RIBA Stage 2 to 6 As project designer I was involved in conceptual design and interior layout. Detail design for reception, all standard and executive cabins, conference room and feature staircase. I was involved in all stages from client presentation to technical design pack. 3D modelling, delivering tender and construction packs and liaising with contractors and stakeholders.

Project Description: The new headquarters for the Alf Mizzi and Sons Marketing group in Malta aims to signify the values and drivers of the business – sophistication, transparency and innovation. These are achieved through design in sculptural, textural and material form. The dramatic entrance is the first point of contact for visitors to the headoffice and hence was designed to create a grand impression with vortex ceiling and monolith reception desk. The central staircase sitting beneath a skylight offers a functional yet artistic feature for the employees.

Right: Mood imagessophistication, transparency and innovation

43


Alf Mizzi Southwing Office Interior

INTERIOR LAYOUT

2.0 Interior Masterplan Layout showing circulation and zoning 2.1 General Arrangement

44


45


FEATURE STAIR DRAWINGS Stair elevation and pipe bending study

3354 mm

9073 mm

1700 mm

• 1 FLOOR S CONTINUA • TOTAL HEI • NO OF TUR • TOTAL DIA • THREAD W • RISER HEI • TOTAL NUM

1

502

Elevation of Feature Stair

1

Stair Elevation

2

Scale - NA 1

2

21

18

5

12

Dwg. Title:

15

8

14

11

14

9

13

10

12

11

Stair Basic Dimensions

13

Scale: NA

Helical Pipes B Partner:

No. of Pipes: 15 Jonathan Mizzi Total Rise: 7837mm Total Radius: 750mmStructural Eng: o DRAWN DATE720 Degree of Turn:

Total Radius: 2500mm Degree REV of Turn:DESCRIPTION 360o

HELICAL PIPES A

1

2

HELICAL PIPES B

21

12

15

8

14 11

17 16

7

15

14

9

13

10

11

12

HELICAL PIPES D

ension & Location

Pipe bending quantities and dimension

46

Malta Corporate Office

Dwg. Title:

Helical Pipes - Dimension & Location

Scale: NA

No. of Pipes: 8 for each radius Rise for each radius: 1120.75mm Radii: R1=2298; R2=1937; R3=1556; R4=1197; Degree of Turn for each radius: 90o

architecture | structural engineering | interiors

Job Title:

MP studios'. It is issued in other than that for which it is

R3

Helical Pipes D

No. of Pipes: 24 Total Rise: 7837mm Total Radius: 550mm Degree of Turn: 720o

D' on site. b architect. other drawings forming part of

R2

13

Helical Pipes C

HELICAL PIPES C

R4

18

6

16

7 8

19

5

17

6

R1

20

4 18

10

21

3 19

9

1

2

20

3 4 5

����� ��������� ����

17 16

7

15

Job Title:

18

6

16

7

8

19

5

17

6

10

20

4

· This drawing is not to be 'SCALED OFF'. · All dimensions have to be 'CHECKED & VERIFIED' on site. · Any differences have to be referred back to the job architect. · This drawing must be read in conjunction with all other drawings forming part of this project. · This drawing is the sole property and design of 'MMP studios'. It is issued in confidence and must not be used for any purpose other than that for which itHelical is Pipes A issued. It should not be reproduced in whole or in part, or disclosed to any third No. of Pipes: 24 party without the written consent of 'MMP studios'. Total Rise: 3353mm

Drawn by:

Ashwini Ashokkumar

Sheet size:

A3

Scale - NA

21

3 19

9

1

2

20

3 4

Stair Plan

MMP studios

37, Dolphin Court, Blk C, Apt M, Embassy Way, Ta' Xbiex XBX 1073, Malta Mobile: + 356 21336704 Email: info@mmp.com.mt

Drawn by:

Ashwini Ashokkumar

Date:

Job Architect:

Date:

Consultant:

05/04/2017 -

Jonathan Mizzi -


FEATURE STAIR IMAGES Details and Construction

60 satin stainless steel handrails bent to form spirals and joined together to form this elegant stair that appears like wisps of liquid metal rising into the sky.

47


48

View from corridor towards offices


49


RECEPTION AREA DRAWINGS Reception Section and Isometry

Section through Reception and Corridor

FIBREGLASS CLADDING EXISTING COLUMN

1

• 11250 X 7200mm total dimension of fibreglass feature • 4 column claddings of height 4000mm integrated into the ceiling structure • 2453mm to 2126mm in height and 5567mm by 3717mm elliptical dimension skylight cladding. • 12 X Ø82mm provisions for ceiling lights. • Structure to be fixed to the ceiling by fabricator.

Feature 1 - Isometric View

Skylight and column cladding and assembly Scale - NA

50

architecture | structural engineering | interiors

Job Title:

· This drawing is not to be 'SCALED OFF'. · All dimensions have to be 'CHECKED & VERIFIED' on site. · Any differences have to be referred back to the job architect. · This drawing must be read in conjunction with all other drawings forming part of this project. · This drawing is the sole property and design of 'MMP studios'. It is issued in confidence and must not be used for any purpose other than that for which it is issued. It should not be reproduced in whole or in part, or disclosed to any third party without the written consent of 'MMP studios'.

Malta Corporate Office

MMP studios

Dwg. Title:

Feature 1 - Isometric View

Scale:

Drawn by:

Partner:

Date:

Job Architect:

Date:

Date drawn:

Structural Eng:

Date:

Consultant:

Date:

Job nr:

NA

Jonathan Mizzi

REV

DESCRIPTION

DRAWN

DATE

-

Ashwini Ashokkumar 05/04/2017 -

Jonathan Mizzi -

Sheet size:

A3

05/04/2017 05/04/2017

17/02/2017 17006

37, Dolphin Court, Blk C, Apt M, Embassy Way, Ta' Xbiex XBX 1073, Malta Mobile: + 356 21336704 Email: info@mmp.com.mt Issued: 05/04/2017

Code: -

Drawing nr: 604

Rev:


View of completed Reception Area

Detail of light and shadows at skylight

51


52

Entrance reception area showing swooping oval skylight, chevron timber floor and smoked marble reception desk.


Back to Contents

53


54

4.


SERPENTINE COFFEE HOUSE HYDE PARK, LONDON 2019

Left: Detail of Serpentine showing the sinuous curve against the Grade I listed landscape of Hyde Park. ©LukeHayes Photography Top: Front View of the smiling stingray roof of the cafe as it welcomes you from Kensington Gardens. ©LukeHayes Photography Right: Structural study of forces based on roof curvatures. ©Arup Associates

Client: The Royal Parks, Colicci Stage: Completed July 2019 Area: 150 Sqm

Shortlisted for UK Cafe and UK Biophillic Design Awards 2020 Restaurant and Bar Design Awards.

Design Team: Jonathan Mizzi, Ashwini Ashokkumar Structural Engineer: Arup Roof Manufacturer: MouldCam Fit-Out Contractors: Opus

Project Description: The Serpentine Coffee House is part of a tender won by Mizzi studio in collaboration with Italian artisan coffee brand Colicci to transform ten prestigious sites across The Royal Parks. The aim is to create an immersive architectural resting point that responds and reflects the Grade I listed landscapes of Hyde Park. The result is an undulating hand painted brass canopy that sits atop open, semi-transparent glass pavilion.

Role: Project Lead Responsibilities: RIBA Stage 2 to 6 As the project lead for the Cafe I was involved in all stages from Planning through to Construction. This included detailed 3D modelling, delivery of tender and construction packages. Liaising with stakeholders, consultants and contractors. Routine factory and site visits for quality checks. Merits: Shorlisted for Fx Awards ‘UK project of the year’, Finalist for Building Design’s Architect of the Year awards 2020,

55


CAFE DRAWINGS Elevation and Site Plan

Cafe South Elevation

Cafe Site Location Plan

1 56

SITE CONTEXT

NA

N

MIZZI STUDIOS


Interior View ©LukeHayes Photography

View towards Serpentine Bridge ©LukeHayes Photography

57


EXPLODED DIAGRAM

Construction sequence and kit of parts

ROOF 04

03

01

PA MO

02

DR

03

RO RW

04

GL RO

01

01 06 02 10

GLAZING 18

01

06

07 06 05

08 11 16

15

ROOF

04

10

03 01

06

11

02 10

06 04

03

01

07

08

01

16 10

13

04

01

08 06

01

11 16

10 10

ROOF 01 REV #

DATE

17 PATINA BRASS FINISH COMPOSITE MONOCOQUE ROOF SEGMENT (31) DESCRIPTION :

REV #

DRIP DETAIL AROUND EDGE OF ROOF.

03

ROOF FORM CONTOURS TO DRAIN INTO RWP LOCATIONS. 15 10 19 GLAZING CHANNEL CONCEALED WITHIN 12 ROOF. 09

ALUMINIUM FRAMED CLERESTORY IN TEXTURED RAL 7016

07

GLAZED DOORS IN TEXTURED RAL 7016 07

08

FIXED WINDOWS IN TEXTURED RAL 7016

09

SLIDING FOLDING ENTRANCE FACADE IN TEXTURED RAL 7016

CH

ALUMINIUM FRAMED LOUVERED 07 STORAGE DOORS IN TEXTURED RAL 7016

13

CH

06

ALUMINIUM FRAMED CLERESTORY IN TEXTURED RAL 7016

14

AN

15

CH

07

GLAZED DOORS IN TEXTURED RAL 7016

08

FIXED WINDOWS IN TEXTURED RAL 7016

09

SLIDING FOLDING ENTRANCE FACADE IN TEXTURED RAL 7016

ALUMINIUM FRAMED CLERESTORY IN TEXTURED RAL 7016 14

10

UCS 152X152X37 WELDED BOX FRAME

11

UCS 152X152X37 BEAM

12

CHS 114 STUB EMBEDDED IN ROOF

13

CHS 114 STUB FITTED ON SITE

14

ANCHOR PLATE FOR FRONTAL COLUMNS

15

CHS 114X8 CROSS BRACING MEMBERS

18

07

07 GLAZED DOORS IN TEXTURED RALMizzi7016 Studio

ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS 13 CHS 114 STUB FITTED ON SITE

08

London W10 6RQ, UK FIXED WINDOWS IN TEXTURED RAL 7016 Tel: +44 (0) 207 183 2774

14 ANCHOR PLATE FOR FRONTAL COLUMNS ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL

Unit 11, Latimer Studios Latimer Road Email: info@mizzi.co.uk

09

SLIDING FOLDING ENTRANCE FACADE IN TEXTURED RAL 7016 08 STRUCTURE

ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT 19 BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.

15

CHS 114X8 CROSS BRACING MEMBERS

UCS 152X152X37 BEAM

07

12

Latimer Road CHS 114 STUB EMBEDDED INOUTROOF ANY WORK. DISCOVERY London W10 6RQ, UK

08

07 FIXED WINDOWS IN TEXTURED RAL 7016

13

CHS 114 STUB FITTED ON SITE

SLIDING FOLDING ENTRANCE FACADE IN TEXTURED RAL 7016

14

ANCHOR PLATE FOR FRONTAL COLUMNS

15

CHS 114X8 CROSS BRACING MEMBERS

DESCRIPTION :

AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION.

17

Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk

18

19

SERPENTINE COFFEE HOUSE

CLIENT NAME

ILLUMINATED SIGNAGE

ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.

Mizzi Studio Unit 11, Latimer Studios

COLICCI

SHEET TITLE

INTERNAL WALL FINISH IN EXPLODED BLUE PERSPECTIVE CEMENTVIEW TILES PROJECT ADDRESS SERPENTINE BRIDGE, W2 2UH

EXTERNAL WALL FINISH IN ALUMINUM TEXTURED RAL 7016

MISC

10

UCS 152X152X37 WELDED BOX FRAME

11

UCS 152X152X37 BEAM

12

ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS 17 ILLUMINATED SIGNAGE Mizzi Studio CHS 114 STUBUnitEMBEDDED IN ROOF SHEET TITLE ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING 11, Latimer Studios

16

PROJECT TITLE FACETED WALNUT WOOD PANELING ON SERPENTINE COFFEE HOUSE COUNTER

THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION.

OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.

13

CHS 114 STUB FITTED ON SITE

14

ANCHOR PLATE FOR FRONTAL COLUMNS

15

CHS 114X8 CROSS BRACING MEMBERS

CLIENT NAME

COLICCI EXPLODED PERSPECTIVE VIEW

18

INTERNAL WALL FINISH BLUE CEMENT PROJECTIN ADDRESS TILES SERPENTINE BRIDGE, W2 2UH

19

EXTERNAL WALL FINISH IN ALUMINUM TEXTURED RAL 7016

16

FA CO

17

ILL

18

INT TIL

19

EX TE

FACETED WALNUT WOOD PANELING ON COUNTER PROJECT TITLE ILLUMINATEDSERPENTINE SIGNAGECOFFEE HOUSE CLIENT NAME INTERNAL WALL FINISH IN BLUE CEMENT COLICCI TILES SHEET TITLE

EXPLODED PERSPECTIVE VIEW

EXTERNAL WALL FINISH IN ALUMINUM PROJECT ADDRESS TEXTURED RAL 7016

SERPENTINE BRIDGE, W2 2UH

MISC

11

DATE

MISC

STRUCTURE

16

TEXTURED RAL 7016 14 GLAZED DOORS IN TEXTURED RAL 7016

Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk

12

05

UCS 152X152X37 BEAM

16 FACETED WALNUT WOOD PANELING ON PROJECT TITLE COUNTER UCS 152X152X37 WELDED BOX FRAME THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO

Latimer Road London W10 6RQ, UK

UC

THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO 17 AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI 12 CHS 114 OWNER STUB EMBEDDED INMAYROOF STUDIO AND/OR THE PROJECT IS A VIOLATION OF COPYRIGHT AND BE SUBJECT TO PROSECUTION.

10

REV #

11

UCS 152X152X37 WELDED BOX FRAME

ROOF FORM CONTOURS TO DRAIN INTO RWP LOCATIONS.

DESCRIPTION :

GLAZING CHANNEL CONCEALED WITHIN ROOF.

11

03

DATE

04

10

06

SL TE

UC

05

DRIP DETAIL AROUND EDGE OF ROOF. 05

09

10

DESCRIPTION :

ALUMINIUM FRAMED LOUVERED STORAGE DOORS IN TEXTURED RAL 7016

FIX

STRUCT

06 DATE

STRUCTURE 08

58

06

08

ROOF FORM CONTOURS TO DRAIN INTO RWP LOCATIONS.

11

02

09

DESCRIPTION :

ALUMINIUM FRAMED LOUVERED STORAGE DOORS IN TEXTURED RAL 7016

GL

DRIP DETAIL AROUND EDGE OF ROOF.

MISC

Construction Sequence 06 ALUMINIUM FRAMED CLERESTORY IN

1910

05

07

03

08 STRUCTURE

10 GLAZING CHANNEL CONCEALED WITHIN 15 ROOF.12 19 09 GLAZING 13 05 ALUMINIUM FRAMED LOUVERED STORAGE DOORS IN TEXTURED RAL 7016

REV #

17 11 PATINA BRASS FINISH COMPOSITE 06 MONOCOQUE ROOF SEGMENT (31) 14 05

AL TE

02

GLAZING 13

04

11 06

GLAZING

02

04

ROOF FORM CONTOURS TO DRAIN INTO RWP LOCATIONS. 15 08 GLAZING CHANNEL CONCEALED WITHIN 19 ROOF.

04

ROOF

07

05 OF ROOF. DRIP DETAIL AROUND EDGE

0903

10 06

10

02

12 06 11

18

PATINA BRASS FINISH COMPOSITE MONOCOQUE ROOF SEGMENT (31) 06

01

06

PATINA BRASS FINISH COMPOSITE MONOCOQUE ROOF SEGMENT (31)

GLAZING

ROOF

18

01

AL ST

01 01

17

19

05

PROJECT NO:

176 DRAWN BY:

A.ASHOKKUMAR

N/A STAGE:

NOTES:

DATE

26 04 2019 CHECKED BY:

J.MIZZI

CLIENT SIGN OFF:

A3 SHEET NO:

176_SCH_AD_501

PROJECT NO:

176 DRAWN BY:

A.ASHOKKUMAR

N/A STAGE:

NOTES:

DATE

26 04 2019 CHECKED BY:

J.MIZZI

CLIENT SIGN OFF:

A3 SHEET NO:

176_SCH_AD_501

PROJECT N

17

DRAWN BY

A.ASHO

N/ STAGE:


NOTE: · ALL DIMENSIONS PROVIDED FOR GUIDANCE AND TO BE CONFIRMED ON SITE BY MAIN CONTRACTOR · FOR SPECIFICATION OF STRUCTURAL ELEMENTS PLEASE VERIFY WITH ENGINEERS DWGS · CONTRACTOR TO PROVIDE GLAZING DRAWINGS FOR SIGN OFF

SELECTED DETAILS

Details for ease of assembly and conceal-ability

A0

10MM PLATE FILLETED TRIANGULAR COLUMN BASE

03 411

50

22.9

97

15M FILL TRI ANC

10MM PLATE FILLETED TRIANGULAR COLUMN BASE

.2

R3

7.7

TOP OF FLEXISTONE

+FFL [20.45]

10

+20.43

+2467

15MM PLATE FILLETED TRIANGULAR ANCHOR PLATE

200

15.0 25.0

10.0

50.0

161.3

16.1

14.0

CHS 114X8 GALVANISED METAL COLUMN

2MM GALVANISED METAL COVER PLATE. FABRICATOR TO CONFIRM

100

CONNECTION REFER ENG DRAWING 5006: Detail D

A0

CHS 114X8 GALVANISED METAL COLUMN

350

15MM PLATE BASE PLATE

421

SEALANT/FOAM (ROOF MANUFACTURER TO CONFIRM)

25.0 15.0

250.0

2MM GALVANISED METAL SLEEVE SLID OVER CONNECTION

+TOP OF PILE CAP [20.118] 500.0

10.0

CONNECTION REFER ENG DRAWING 5006: Detail B

250.0

60.0

15.0

10.0

10.0

60.0

250.0

10.0

82

.7

10.0 46.25

1

CHS 114X8 GALVANISED METAL COLUMN

FRONTAL COLUMN TOP

A3 Integrated structure within roof to connect to1:5@ column on site

2

FRONTAL COLUM BASE SIDE

3

FRONTAL COLUM BASE

1:5@ A3 Roof to structure detail with ease of assembly consideration

1:10@ A3

MIZZI STUDIOS NOTE: · ALL DIMENSIONS PROVIDED FOR GUIDANCE AND TO BE CONFIRMED ON SITE BY MAIN CONTRACTOR · FOR SPECIFICATION OF STRUCTURAL ELEMENTS PLEASE VERIFY WITH ENGINEERS DWGS · CONTRACTOR TO PROVIDE GLAZING DRAWINGS FOR SIGN OFF

GRILL EMBEDDED IN ROOF

FALLS C09 [REFER DWG 111]

MILLED FOAM

EMBEDDED GRP TUBE

EMBEDDED PLATE

+263

60.0

C09 [REFER DWG 111] 100.0

30

C09 [REFER DWG 111]

Round Flushjoint Aluminium Downpipes_RAL7016 100mm Dia POWDER COATED METAL CASING RAL 7016

UCS 152X152X37 (REFER ENGG DWGS)

Round Flushjoint Aluminium Extended Fixing Bracket

+220

OUT

C01 [REFER DWG 111]

L02 [REFER DWG 110] C01 [REFER DWG 111] 100

Detail of assembly of clerestory within large inset in roof

1

IN

30

Integrated rainwater funnels in roof attach to rainwater pipe

RAINWATER PIPE DETAIL 1:5@ A3

MIZZI STUDIOS

59


60

View from Kensington Garden exit ©LukeHayes Photography


Back to Contents

61


62

5.


HOLI SALONI RAJASTHAN, INDIA 2018

Client: Saloni Lodha Stage: Complete March 2018 Area: 1000 Sqm Design Team: Jonathan Mizzi, Ashwini Ashokkumar Contractor: RAAS Devigarh, Arjun Bhai

Left: One of the guests (Dree Hemingway) celebrating the festival of Holi outside the mud huts ©Signe Vilstrup Top: Mudhut Skylight detail ©Jonathan Mizzi Right: Woven archway entrance to Secret Garden ©Jonathan Mizzi

Role: Project Lead Responsibilities: As the project lead I was involved in all stages from conceptual design to delivery. Initial 3D modelling and client presentation from the London studio and on site construction supervision from Udaipur. Finalising the layout on site by maximizing views of surroundings within the design. Working collaboratively with the artisans to understand the traditional technique and adapt it to suit the geometries proposed in the design.

Project Description: To celebrate 10 years of her eponymous fashion brand ‘Saloni’ the client decided to host an event at the palace-converted RAAS Devigarh hotel in Udaipur on the Indian festival of Holi. The brief was to create a set that celebrates Indian vernacular architecture while giving it a Star Wars Tatooine vibe. The result is a duo of mud huts sitting as a reflection of the aravalli hills in the background with portholes to the palace. This is surrounding by multiple sculptural elements. Some plastered in mud and painted by local artists and other left bare to expose the beautiful woven texture of the construction.

Merits: Longlisted for Dezeen Awards ‘Small Project’ category 63


MUD HUT VILLAGE DRAWINGS Overall Layout and Construction diagram

0

60 0

60

1260

11000

SEATING 2

SKYLIGHT AIMED AT MOUNTAINS BEHIND

STALL 3 BUFFET

9495

SKYLIGHT AIMED AT DEVIGARH PALACE

SKYLIGHT AIMED AT DEVIGARH PALACE

LVL +-0

SECONDARY HUT

POTENTIAL EXIT FOR BACK OF HOUSE

UP

TERTIARY HUT

LVL +150 LVL +300 LVL +450

MAIN HUT

LVL +600

HOLI PYRAMID 14000

SEATING 1 BEST VIEW OF THE PALACE

LVL +600

LVL +300 LVL +450

MUD PLATFORM BESPOKE CANOPY

LVL +150

12192

MAIN TENT

TOWARDS LOOS

STALL 1

STALL 2

WELCOME DRINK LIGHT REFRESHMENTS CEREMONIAL THEEKHA /BANGLES ETC?

SNACKS CANAPES BAR FOOD

51 37

89 39

31

00

BAR

60 0

60 0

600

SIGNAGE FOR LOOS ON THIS WALL

ALIGNED WITH BAMBOO CANOPY

DJ DESK 10058

POTENTIAL EXIT FOR BACK OF HOUSE

ENTRANCE

ALIGNED WITH THE CENTRE OF CHEF'S GARDEN AXIS EXTENDED MUDWALL TO COVER VIEW ON THE RIGHT

Layout of the village showing mud huts, mud bar and other sculptural seating. Paper size:

Revisions Rev Date

Architect / Originator:

Notes: By

Checked

Description

Do not scale. All dimensions to be checked on site. This drawing is copyright.

MIZZI STUDIOS

Approved

Client:

A3

MIZZI

UNIT 202, 242 Acklam Road, Westbourne Studios, London, W10 5JJ Tel: +44 (0)7900 835 483 Email: jonathan@mizzi.co

Project:

Date of Origin:

Drawing Title:

Scale/s:

LAYOUT PLAN

R2743

Drawing Number:

24 0

11m

03.02.18

HOLI SALONI

R2100

Drawing Status:

CONSTRUCTION

200 300

14.8m 3962

1000

350

600

2312

600

1000

1161 571

2033

759

440

656

450

I 350

QUANTITY TOTAL AREA: 34m2 [366sqft]

3.63m 3.4m 2.57m 3.2m 1.8m 1.7m

Construction Guidelines Paper size:

Revisions Rev Date

Architect / Originator:

Notes: By

Description

Checked

MIZZI STUDIOS

Approved

Client:

64

A3

MIZZI

UNIT 202, 242 Acklam Road, Westbourne Studios, London, W10 5JJ Tel: +44 (0)7900 835 483 Email: jonathan@mizzi.co

Do not scale. All dimensions to be checked on site. This drawing is copyright. Drawn By:

Project:

Date of Origin:

Drawing Title:

Scale/s:

Drawing Number:

CONSTRUCTION

HOLI SALONI DOME GEOMETRY

AA

1:20

420

14.1

Drawn By:

03.02.18

AA

1:20

Drawing Status:


The mud hut duo against the backdrop of Aravalli hills with holi powder bombs emerging from portholes. ©Eva Geraldine

Entrance showing human scale ©Signe Vilstrup

Sculptural Mud Bar ©Jonathan Mizzi

65


66

Interior of one of the mud huts with sunlight pouring to the center from the portholes. ©Jonathan Mizzi


CONSTRUCTION IMAGES

Traditional mud hut artisans working with woven local reeds

The technique of construction involved creating trenches in the ground where the “Aakhdo” (Calotropis procera) - a local plant that grows in abundance - are inserted and filled with “Khemp” (hay) before being woven together. A bundles of these materials are then woven together to create structural arches to join both forms.

67


68

View from inside the woven hut with the Devigarh palace through the porthole ©Jonathan Mizzi


Back to Contents

69


70

6.


FIREKRAKEN

KING’S CROSS, LONDON 2018 Client: Restaurant and Bar Design Awards Stage: Completed Oct 2018 Area: 45 Sqm Design Team: Jonathan Mizzi, Ashwini Ashokkumar Contractor: FireCracker Works

Left: Detail of the firekraken lighting sculpture ©Matthew B Andews Photography Top: View of the Firekraken incorporating the sign ‘5’ within the given 3m cube framework.

Role: Project Lead Responsibilities: As the project lead I was involved in all stages from conceptual design to delivery. 3D modelling and client presentation. Liaising with contractors to develop design solutions for ease of assembly and creative solutions to increase impact while keeping cost of production to a minimum (pro bono project for designer and contractor). Factory and on site installation checks.

Project Description: As part of the 10th year anniversary of The Restaurant and Bar Design Awards 5 design studios were invited to interpret the theme of ‘Celebration’ within a huge three dimensional tapestry. The ‘Firekraken’ is an immersive lighting installation that freezes dancing fireworks in a moment of time and reanimates it with addressable LEDs. These are choreographed to evoke the spectacular natural phenomenon of bioluminescent organisms - a playful fusion of dancing fireworks and a family of sea creatures dancing together in the deep.

Right: Prototype testing at Firecracker works factory.

71


CONSTRUCTION IMAGES

Technical drawings showing assembly and kit of parts

732

1237

854

1787

976

2062

793

2199

488

1924

427

1374

427

1100

04 110

427

1

Front Elevation

1:25@ A2

Array of bent acrylic tubes from a single forma

Exploded Isometric View

2

Side Elevation

2

825

1:25@ A2

Various curves from Single Former 1:75@ A2

1:25@ A2

8 ACRYLIC TUBES PLASTIC WELDED TO SUPPORT ON OUTER FINS

MIZZI STUDIOS

LED STRIPS 8 ACRYLIC TUBES PLASTIC WELDED TO INNER RING SUPPORT

3 72

Plan Plan

1:25@ A2

Support Detail Support Detail 4

1:5@ A2


ELEVATION DRAWINGS

Various configuration of the concept of fireworks

Front Perspective 1

3072

3072

487

1536

673

3072

3072

SIDE

413

PLAN

480

1507

PLAN

3072

3072

3072

1795

1536

SIDE PLAN

420

1507

949

FRONT

SIDE

04 108

04 110

04 114

FRONT FRONT

04 112

1

Front Elevation

1:25@ A2

1

Side Elevation Front2 Elevation

1:25@ A2

1:25@ A2

1

5

Location Within Cube

Front Elevation Side Elevation1:25@ A2 2

1:25@ A2

Elevation of all 5 fireworks display within the 3m cube framework 8 ACRYLIC TUBES PLASTIC WELDED TO SUPPORT ON OUTER FINS

1

1:100@ A2

Side Elevation Front2 Elevation

5

1:25@ A2

8 ACRYLIC TUBES PLASTIC WELDED TO SUPPORT ON OUTER FINS

3

Plan

1:25@ A2

3

Plan4

Support Detail 1:25@ A2

LED STRIPS

8 ACRYLIC TUBES PLASTIC WELDED TO INNER RING SUPPORT

8 ACRYLIC TUBES PLASTIC WELDED TO INNER RING SUPPORT

1:5@ A2

3

Plan

1:25@ A2

1

1:100@ A2

Front Elevation Side Elevation 2

8 ACRYLIC TUBES PLASTIC WELDED TO SUPPORT ON OUTER FINS

UPPER TUBES ROTATED AWAY FROM RADIAL AXES LED STRIPS

Location Within Cube

Box 1 Front View Support 6 Detail 1:5@ A2 1:25@ A2

MIZZI STUDIOS

1:5@ A2

3

Plan 4

Box 2 Front View 1:25@ A2

1:5@ A2

1:25@ A2

1:100@ A2

2

1:25@ A2

LED STRIPS

8 ACRYLIC TUBES PLASTIC WELDED TO INNER RING SUPPORT

6 Support Detail

Location Within Cube

8 ACRYLIC TUBES PLASTIC WELDED TO SUPPORT ON OUTER FINS

LED STRIPS

4

5

3

Plan

1:5@ A2

8 ACRYLIC TUBES PLASTIC WELDED TO INNER RING SUPPORT

4

Box 3 Front View Support 6 Detail 1:25@ A2

1:5@ A2

1:5@ A2

MIZZI STUDIOS MIZZI STUDIOS

Detail View of one of the displays ©Matthew B Andews Photography

73

4


74

The final reveal at the Restaurant and Bar Design Awards 10th Anniversary celebration ©Matthew B Andews Photography


Back to Contents

75


76

7.


Kensington Memorial Park Wormwood Scrubs

Site Railway

Imperial West

Westway Sports Centre

A40 Westway

LATIMER STUDIOS LATIMER ROAD, LONDON 2019-Present

Client: Perseus International Investments Ltd. Stage: Planning Area: 1000 Sqm Design Team: Jonathan Mizzi, Ashwini Ashokkumar Planning Application: Tania Martin Building Regulation Consultants: Assent Building Control Left: South View of the building proposal from Latimer Road Top: Site Location satellite view. Site is located in the north-western part of the Royal Borough of Kensington and Chelsea, in St. Helen’s Ward. Right: Latimer Road looking north-west c.1900. 3 storey houses on west side were demolished in 1980s

Role: Project Lead Responsibilities: RIBA Stage 2 to 3 As project Lead I was involved in all stages from Site study to Planning. Massing studies, material palette, layout studies, liaising with consultants and preparing planning pack. Ensuring the design complies with guidelines from the National Planning Policy, London Plan, St.Quintins Neighbourhood Plan as well as the newly issued Design Code set out by RBKC.

Project Description: The new proposal at Unit 11 Latimer road aims to become the cornerstone of a new mixed-use vibrant ‘creative quarter’ that will set the tone for the regeneration of Latimer Road. The building consists of 2 storeys of commercial and 3 storeys of residential with the 5th floor set back such that it is not seen from street level. The massing studies informed the buildings silhouette which increased density of site without compromising on privacy. The building’s curved corners help soften it whilst the material palette is sensitive to the street context.

77


SITE CONTEXT AND CONSTRAINTS 83

6

121bc

81

1 to

6

79

1 to

8

13

23

30

Offices & Industry

1

75

16

97

73

61

59

103

12

1

43

47

42

33

21 54

25 33

35

13

64

a 111

35

8

19

3

11

21

26

123

1

11

133

1

1

18

74

11 34

125

117

135

5 33 to 9 33

2

115

Garage

149

20 1 to 12

Robinson House

1

3 33

3

1

179

32

173

Nurser

31

7 to

to 142

use ic Ho mp Oly

134

2

136

20

10

161

0 to

1 to 24

25 to 48

20

1 to

E ROAD CROWTHORN

5

BRAMLEY ROAD

8

RD OXFO

ENS GARD

14

Hall

1

1 to

Westway Sports

187

Pavilion

El Sub Sta

80

Soane House

198 196

1 to k Hou7 se

Lin

ROAD

WESTWAY

08

road) (elevated Westway Sports Centre

The Latymer Christian Centre

23

81

Windsor Court

Arthur Court

1 to 8

BRAMLEY ROAD

Dixon House

40

SILCHESTER

79

DAR FIEL D

5 9

10 13

12 15

MEWS CHARLOTTE 75 77

73

16 19

10 11

18 21

64 to 76

67 71

63

1 to 45

WE ST

57 to 63

1 to 5 15 to 19

Latymer Day Nursery

26

(Below )

39

65

301

to 339

41

TEST ERTO N

9 18

7A

7 18

ROAD

1 to

HU RS TW 40 AY

19

1

La tim er

RO AD

Ro ad

Stat ion

El Sub Sta

Frinstead House PH

63

14. 15.

(belo w)

4

10 43 9

7 to 13 21 to 27

19

El Sub Sta

1 to 80

18

13.

18 to

45

30 1 to

DRIVE SHALFLEET

Harrow Club

Gre nfell W

33 9

ntre Ce ry rse ation Nu s uc ol Ed ne ho An Sc er tim St La and

2 to 12

14 to 24

26 to 36

PH

86 to 90

12 to 17

43 to 49

92

50 to 56

1 to 1 1

DARFIELD WAY

BLECHYNDEN STREET

Hu rstwa yW alk

WAY

24 27

LE AB ST

65 69

22 25

d

ROUTE CROSS

15

Waynflete Square

38 to 48

29 to 41

68

El Sub Sta

54

Surgery

to 211

c

15

ST WE

74

Markland House

Depot

Bramley House

9

b

CR OS S RO UT E

3

20

1 2

15

22

21 21a

a

1 to 80

09 SL

11. 12.

54

WAYNFLETE SQUARE Bramley House

Tanks

SL

10.

13

15

80 to 90

Waynflete Square

Depot

8. 9.

ROAD

401 Tes to 461 terton Walk

LE AB ST

Y WA

2 6

WESTWAY

1 to 21

Whitstable House

1 to 24

Goodrich Court

WAY

road) (elevated

Kingsnorth House

1 to 80

Westway Sports Centre 27

25

201

21

9 to 12

LMER WA

201

7.

9

6 to

9

2a

s den Gar ool Oxfordary Sch Prim

20

174

Ivebury Court

32

4

25

2

210

164

4

19 67

69

ROAD

GE RID CAMB

Trin ity Mew s

1

Scamps ton Mew s

2

31

L BALLIO

14

0

22

158

Park House

Downing House

122

Walmer House

1

2

109

14

13

2 23

152

118

06

14

45

23

44

57

15

2

26

AD RO

El Sub Sta

ENS GARD

1

11

14 87

10

2

6

35 7

14

57

ER TIM LA

126

150

9

sfield Cro rt Cou

121

2

14

69

115

5

77

93

117

1

57

ROAD

109

17

3 46

1 to 14

49

CK FINSTO

1

6

07

112

1 to

1 to 6

128

Latimer Cortile

5. 6.

ENS GARD

124

140

1a

RD OXFO

120

122

Church

34

96

104

112

36

ROAD

24

68

26

94

S RDEN 'S GA LEN ST HE

26

UE AVEN

45

FORD LLING WA

VER HLE HIG

ROAD LIOL BAL

38

0

26

ENS GARD

63

49

3

10

67

RO AD

34

33

48

2 27

56

53

M AR K'S

1. 2. 3. 4.

97

15

9 47

23

1

66

3

46

51

ST

ROAD ETT BASS

56

91

13

37

33

56d

44

31

58

4 27

33

32

54

Cou

Kelfield

85

7

127

57

47

11

34

66

6 28

35

46

1ac

1bd

4

AD RO

ELD KELFI

14

ET RE D ST IEL INF SH

2

2ac

29

36

36

ET STRE

2bd

0 to

AM NH EY

OT

3ac

29

26

05

gery

Sur

El Sub Sta

18 rt 1 to

ENS GARD

20

22 28

46

16

h

ge

3

6

2

E AC PL

's Churc

138 36

St Helen's Church

ara

17

68

29

ELD KELFI

18

ER TIM LA

St Helen

Hall Hall

2

10

Depot

1

PH

02

Vic

MEWS

8

AD E RO BRIDG KINGS

1

126

105 a-e

Cowper Terrac e

5

29

04

2

PO Club

ELD KELFI

0

14

El Sub Sta

107bc 8

9

30

s

ork

W

109a

107a

20

03

s

ork

W

109bc

10

5

10

2 30

8a

29

DGE GSBRI KIN ROAD

rt Cou 35 lyn Fox1 to Eve

80

4

E OS CL

111a

1

84

lyn Fox Eve rt Cou

8

30

IEW TV WES

111bc

3bd

88

5

4 1

2a

30

113a

ST QUIN TIN AVEN UE

UE AVEN

0 31

6a 6 30

30

5

45

FORD LLING WA

92

4 31

AD RO

8

30

9

45

113bc

52a

0

ER TIM LA

01

SQU

73

115a

48

18

54

32

Day Nurse ry

ARLES ST CH

115bc

S RDEN 'S GA LEN ST HE

24

104

8

11

15

ET RE E ST AT SG AR SN

21

119bc 119a

117bc

7

0 32 33

Works

121a

117a

Immediate and surrounding context

H AD E RO

3 bc 123a

149

69

67

2

Health Centre

69

71

1

46

7

5

58

62

E AC PL ON ER LD CA

8

PCs

ST QUIN TIN AVEN UE

58

2

PH

4 66

6

16

North Pole Shopping Area St Helen’s Shopping Parade Conservation Area Site Location - 11 Latimer Ind. Estate Railway Line Oxford Gardens Primary School (7 minute walk from the site) Imperial West Development North Site Proposed Under Pass Imperial West Development South Site Latimer Road Tube Station (13 mins walk from Site) White City Living Development White City Tube Station (15 Mins walk from Site) Freston Road Employment Zone Monsoon / Talk Talk HQ BBC / Media Centre Westfield Shopping Area

5

25 to 31

18 7 to 16

23

0

16

3 1 to 14

6

35

9

25

1

2 12 7

27 25

33

19

12

18

49

5 13

a St

45

121 to 109

7 1

3

2

16

11

9

114

99

13

b

5 to

107

51

39

Su

12

46

1

37

20

44

El

42

EET M STR EVESHA

12

35

8

41

14 26

40

13

E AC H PL SLEIG AN

126

Works

92

13

24

22

1

80

14

54

AD RO

26

to 83

11

N'S AN

Sta

91

ST

56

El Sub

PH

12 91

to 18

15

13

9 7

3 7

5

4 2

6

AD AY RO REL

2

1

ER RTIM MO UARE SQ

75

3

12

1

3

71

Walk erine's St Kath

49

WAY 36

34

30 to 32

2

ARIEL

Sta

57 to g 59a b 61a 63

10

D AY ROA REL

STREET OLAF

1

4

12

3

3

4

D ER ROA SILV

Warehouse

27

25 23 21

RI

28 22

01 02

Unit 12

03

04 05

06 07

08

09

Site Constraints

3 6

Works

right. All rights reserved. Royal Borough of Kensington & Chelsea LA 086460 2000 .

78

85 74

6

Sta El Sub

OLAF STREET

Warehouse

Warehouse

El Sub

11

13

to

89

99

97

24

11

to

8

15

8

RING ROAD 7

BBC Television Centre

78

10

3

5

13

8

1 to

10

Studios

BBC Television Centre

AD N RO TO ES FR

12

D ER ROA SILV

14

104

13

25

10

ET RE H ST ELEIG STON

36

22

SE CLO

24

Y CIT

23

SL SL

83

19

61

3

35

103 105 107 109

33

12

21

E HIT W

Warehouse

El Sub Sta

Map of Surrounding Area

1 to

27

SB 13

17

131 151

143

1

St

Warehouse

2

137

0

117

28 29

13

111

13

15

129 147

8

125

13

119

2 to

13 11

7

135 155

14

T

St Francis Catholic Primary School

Nursery

35

1 3 5

159

0

15

157

4

1 16 3 16 5 16

2

6 to

14

29

27

4

0a

15

11

lose nC tio hibi Ex

(London Transport)

12

D D ROA BAR

White City Station 27

25

16

2

15

AD N RO TO ES FR

1

3

31

37

UTE S RO CROS WEST

149

36

38

Oxford Gardens Conservation Area Freston Road / Latimer Road Employment Zone

AD H RO HURC ITC WH 1

El Sub Sta

Works

43

AD Y RO CIT

LANE WOOD

ITE WH

11

Garage

BRAMLEY ROAD

33

501 to 562

61

Works

ROAD DEPOT

Unit 10

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.

B1 Photographic Studios 4 Storey Mixed Use B1 Warehouse Building Green Barrier Closet wing/loading bay 4 Storey Residential Building Building line Open Land B1 Warehouse Building Railway Green Barrier


MASSING STUDY

Stages to arrive at final building silhouette

1

Existing footprint maximised to 6 full storeys to accommodate B1 units at ground level and above. The resultant structure feels extremely overbearing.

2

Exploration of reduction in the height of the building to five storeys as per RBKC (/AR/18/08501/L3FU) and APP advice in 2018 for the site. The overbearing nature still exists.

3

Height of the building is reduced to 4 storeys with setback. Reducing the height to 4 storeys and creating setback offers a less imposing feel to the street. The fifth floor is set back to not be visible at street level.

4

The closet wing is reintroduced opening up the site. Differentiation in height allows for a more interesting and appealing architectural appearance and allows increased daylight and sunlight to the street.

5

6 full storey development of Latimer Industrial Estate would create an unacceptable sense of enclosure, diminish sky views, day light and sunlight and increase shadowing on the west side of the street.

6

4 storeys with a fifth floor set back and retaining the closet wing ensures that light and sky view factor are not compromised if replicated across the development of the Industrial Estate. 79


PLANNING DRAWINGS

Level 0 Plan (Commercial) and Front Elevation MATERIAL KEY 1. DOUBLE GLAZING 2. EXPOSED CONCRETE 3. BLACK BRICK CLADDING 4. RED BRICK RUNNING BOND PARAPET 5. RED BRICK VERTICAL STACK 6. RED BRICK RUNNING BOND 7. PERFORATED METAL GATE RAL 7016 8. BURNISHED BRASS 9. POWDER COATED METAL DOORS AND WINDOWS RAL 8029 10. LW WALL LIGHT 11. POWDER COATED METAL RAILING RAL 8004 12. BUFF BRICK RUNNING BOND 13. TOUGHENED SECURITY GLASS

A

B

C

4020

D

5336

4020

E MT 01

4463 FFL +17.000

MT 02 MT 03

ABOVE NOT VISIBLE FROM STREET FRONT

MT 04 MT 05

FFL +14.000 MT 01

MT 12

MT 03

FFL +10.675

FFL +07.350

FFL +03.600

MT 06

BOUTIQUE ONE LW

LW

LW

LW

MT 01

MT 01 MT 09

MT 09

MT 07

MT 07

MT 09 LW

MT 01

MT 06

MT 07

HEDGE LINE

FFL +00.000

RWP

REV #

DATE

PROPOSED ELEVATION 01 SCALE 1:100

DESCRIPTION :

REV #

DATE

DESCRIPTION :

THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.

Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk

A

B

C

4020

5336

RESI PLANT ROOM

PROJECT TITLE CLIENT NAME SHEET TITLE

PROJECT NO:

LATIMER STUDIOS MIZZI

09 12 2019 CHECKED BY:

J.MIZZI

A.ASHOKKUMAR

CLIENT SIGN OFF:

A3

1:100

PROPOSED ELEVATION 01

PROJECT ADDRESS

NOTES:

DATE

149 DRAWN BY:

STAGE:

SHEET NO:

UNIT 11, LATIMER ROAD

D

E02

149-AD-01 6002

149_AD_01_A_6001

E

4020

4463

COMM PLANT ROOM

1

COMM CYCLES 8 NOS

DEMISE OUTLINE

E01

149-AD-01 6001

6244

RESI CYCLES 14 NOS

COMM CORE 57 SQM

KONE MonoSpace® 500 DX

EXIT

2 00

COMM 1 130 SQM post

5616

3000

COMM ENTRY

3

E03

buzzer

00

RWP

149-AD-01 6003

RESI CORE 64.7 SQM

360L

360L

360L

360L

360L

360L

E04

LF

149-AD-01 6004

LF

2.0

4.0

6.0

149-MAS-01 1001

LF

LF LF

LF

SMOKE AND HEAT DETECTOR

10.0

S01

scale 1:100

01

LF

LF

149-AD-01 6005

PROPOSED LEVEL 0 PLAN

E01

CCTV CAMERA

S02

149-AD-01 6001

149-AD-01 6006

LF

SCALE 1:100

RECESSED FLOOR UPLIGHT

EXISTING FOOTPRINT SITE BOUNDARY PROPOSED FOOTPRINT

AREA NAME

80

TOTAL AREA (in Sqm) LOBBY + CIRCULATION CYCLE PARKING

PLANT ROOM

STAIRCASE

LIFT

BINS

TOILETS

RESI CORE

64.7

23.5

16

4.1

12.4

3.3

5.4

-

COMM CORE

59.2

37.8

2.3

4.1

6

3.3

5.4

-

COMM 1

130

-

-

-

-

-

-

8.3

PROJECT TITLE CLIENT NAME Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk

SHEET TITLE

LATIMER STUDIOS MIZZI PROPOSED LEVEL 0 PLAN

PROJECT ADDRESS

UNIT 11, LATIMER ROAD

PROJECT NO:

149 DRAWN BY:

A.ASHOKKUMAR

1:100 STAGE:

NOTES:

DATE

09 04 2021 CHECKED BY:

J.MIZZI

CLIENT SIGN OFF:

A3 SHEET NO:

149_MAS_01_A_1001

N

1.0

360L

RWP

RESI ENTRY

LF 0.0m

360L

360L

UNIT 12

4

buzzer post

UNIT 10

360L

COMM BINS

3000

RESI BINS

4272

00


PLANNING DRAWINGS

Level 3 Plan (Residential) and Section through Latimer Road MATERIAL KEY 1. DOUBLE GLAZING 2. EXPOSED CONCRETE 3. BLACK BRICK CLADDING 4. RED BRICK RUNNING BOND PARAPET 5. BUFF BRICK CLADDING 6. FLUTED CONCRETE 7. PERFORATED METAL GATE 8. BURNISHED BRASS 9. POWDER COATED RAL 7016 10. LW WALL LIGHT 11. TIMBER PRIVACY SCREEN

FFL

SLAB

625

310

130

CONCEALED SERVICES

110 75

CFL

FFL +17.000

MT 02

MT 02

1005

2700

1750

RESI

MT 01

230 750

SLAB

310

FFL +14.000

MT 09

FFL

1750

MT 03

EXPOSED SERVICES

FFL +10.675 MT 04

FFL +07.350

3000

MT 11

3200

1750

COMM

FFL +03.600

MT 05 LIFT CORE

RESI CYCLE

FFL +00.000

RESI PLANT

1100

STAIR CORE

1750

CORE i7

12 TANKS FOR GRADUAL RELEASE INTO SEWAGE SYSTEM

200

REV #

DATE

DESCRIPTION :

THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.

Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk

A

B

CLIENT NAME SHEET TITLE

PRIVACY SCREEN

PRIVACY SCREEN

BALCONY 10 SQM

J.MIZZI

CLIENT SIGN OFF:

A3

1:200

PROPOSED SECTION 01

STAGE:

SHEET NO:

UNIT 11, LATIMER ROAD

D 4020

RWP

09 04 2021 CHECKED BY:

A.ASHOKKUMAR

PROJECT ADDRESS

5336

PRIVACY SCREEN

149 DRAWN BY:

MIZZI

NOTES:

DATE

PROJECT NO:

LATIMER STUDIOS

C

4020

1

PROJECT TITLE

149_AD_01_A_6005

E 4463

BALCONY 9.2SQM

PRIVACY SCREEN

DESCRIPTION :

PRIVACY SCREEN

DATE

SCALE 1:200

RWP

RWP

BD 1 16.1 SQM

6244

BD 1 12.8 SQM

APT 4 1B2P 51.2 SQM 10500

jack-n-jill

13500

APT 5 2B4P 73.9 SQM 10500 13500

KONE MonoSpace® 500 DX

K/L/D 28.7 SQM

2

BD 2 14.4 SQM

K/L/D 34.2 SQM

RESI STAIR 20.7 SQM

5616

10500

3

en-suite

obscure window

K/L/D 39.4 SQM

jack-n-jill

APT 6 2B4P (Wheelchair User) 84.2 SQM

RWP

10500

XSIZE YSIZE

4272

13500

BD 1 14.8 SQM

0.0m

1.0

2.0

4.0

6.0

UNIT 12

UNIT 10

4

BD 2 14.8 SQM

RWP

10.0 scale 1:100

01

149-MAS-01 1004

PROPOSED LEVEL 3 PLAN SCALE 1:100

N

REV #

PROPOSED SECTION 01

PRIVACY SCREEN

S01

149-MAS-01 1001

310

UNIT 11

LATIMER ROAD

AREA NAME

TOTAL AREA (in Sqm) CAPACITY

K/ L/ D

BEDROOM 1 BEDROOM 2 BEDROOM 3 BEDROOM 4 STORAGE

51.2

1B2P

28.4

12.8

-

-

-

2

12.6

APT 5

73.9

2B4P

34.2

16.1

14.4

-

-

2.5

9.2

APT 6

84.2

(WHEELCHAIR USER)

2B4P

39

14.8

14.8

-

-

3.4

PROJECT TITLE

BALCONY

APT 4

-

CLIENT NAME Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk

SHEET TITLE

LATIMER STUDIOS MIZZI LEVEL 3 PLAN

PROJECT ADDRESS

UNIT 11, LATIMER ROAD

PROJECT NO:

149 DRAWN BY:

A.ASHOKKUMAR

1:100 STAGE:

NOTES:

DATE

09 04 2021 CHECKED BY:

J.MIZZI

CLIENT SIGN OFF:

A3 SHEET NO:

149_MAS_01_A_1004

81


82

View of the building proposal from across the site with Imperial West in the background.


Back to Contents

83


84

8.


SITE AREA of 6,403 SQM

2

MUSCAT MOTORS GZIRA, MALTA 2020-Present

Client: Muscat Motors, Malta Stage: Planning Area: 18,000 Sqm Design Team: Jonathan Mizzi, Jo Formosa, Ashwini Ashokkumar Architects: Edwin Mintoff, Malta Role: Project Assistant Responsibilities: RIBA Stage 2 As the project assistant I was involved in 3D detailed modelling and grasshopper studies for massing.

Project Description: Muscat Tower aims to be the tallest building in Malta. With rapid development in Malta becoming inevitable, Mizzi Studio’s design aims to bring an elegance to the skyline by introducing a slender tower that draws inspiration from a strong vertebral column. With soft rounded edges, backward taper and a narrow base level the building does not become overbearing within its context.

Left: View of Muscats Tower with existing Art Deco building of Muscat Showroom below. Top: Site Location Plan Right: Form inspiration of vertebral column

85


REVISION 03 (17.12.20)

MASSING STUDIES

Area calculations for various massing options

39 38 37

RESIDENTIAL II TOTAL GFA = 977 Sqm (EXCLUDING BALCONIES)

TOTAL FLOORS = 3

36

255

35 34 33 32 31 30 29 28

RESIDENTIAL I TOTAL GFA = 7268 Sqm

(EXCLUDING BALCONIES)

TOTAL FLOORS = 16

27 26 25 24 23 22 21 20 19 18 17 16 15

COMMERCIAL II TOTAL GFA = 8037 Sqm (EXCLUDING BALCONIES)

TOTAL FLOORS = 14

14 13 12 11 10 9 8 7 6 5 4

COMMERCIAL I TOTAL GFA = 2381 Sqm (EXCLUDING BALCONIES)

3

TOTAL FLOORS = 6

2 1

ISOMETRIC VIEW

TOTAL GFA (excluding balconies) = 18,655 Sqm

Final Morphology

SIDE ELEVATION

TOTAL AREA (including balconies) = 20,521 Sqm TOTAL NUMBER OF FLOORS = 39 PROJECTED FOOTPRINT = 667 Sqm SET BACK = 255mm per floor

NOTES:

REV #

SHEET NO:

DATE

DESCRIPTION :

PROJECT TITLE CLIENT NAME SHEET TITLE

MUSCATS TOWER XXXXXXXXXXXXXXXXXXXXXXXXXXXX ORIGINAL VS PROPOSED - FRONT ELEVATION

PROJECT ADDRESS

PROJECT NO:

DATE

177 DRAWN BY:

21 12 2019 CHECKED BY:

A.ASHOKKUMAR

NA

J.MIZZI

A2

STAGE:

Rue D'Argens, Il-Gira GZR 1368, Malta

Morphology studies

86

177_MMT_GEN_AD_XXXX

MIZZI Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk

THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.


PLANNING DRAWINGS Plan and Elevations

Front Elevation

Rear Elevation

Plan

87


88

View of balcony detail


Back to Contents

MMP MMPMMPMMPss tudios tudiosstst udios udios 89


90

9.


SITE RELOCATION

SITE RELOCATION

CHISWICK HOUSE SCHOOL PEMBROKE, MALTA 2020-Present

Client: Bernie Mizzi, Malta Stage: Planning Area: 14,000 Sqm Design Team: Jonathan Mizzi, Jo Formosa, Ashwini Ashokkumar Architects: MMP, Malta Role: Project Assistant Responsibilities: RIBA Stage 2 As the project assistant I was involved in concept, detailed design and 3D modelling of surrounding landscape.

Project Description: The proposed scheme is for Chiswick House School – a co-educational establishment in Malta, catering for students between the ages of two and eighteen. Their new building would see the construction of a new primary school with thirty-six classrooms and varied outdoor sport facilities. The new Chiswick House School premises will be one of the first in Europe to use the innovative pod and open-classroom concept, where children are encouraged to interact with their natural environment rather than being confined to an indoor classroom.

Left: View of Learning pods Top: Site Location Right: Circular learning

91


SITE AND DESIGN

Site photo and final design

Proposed site at Pembroke overlooking the Mediterranean Sea

92

View of School entrance with ancillary road built into the scheme.


PLANNING DRAWINGS Plan and Elevations

Sections

Plan

93


94

View of amphitheatre and sports area


95


96

Aerial view of proposed design.


Back to Contents

97


98

10.


THORNHILL SCHOOL LIBRARY ISLINGTON, LONDON 2016

Client: Thornhill Primary School Islington Stage: Conceptual Design Area: 50 Sqm Design Team: Alex Haw, Aditya Bhatt, Ashwini Ashokkumar Structural Design: Fluid Structures

Left: Interior View of the library showing the tree-like shelving, the central helical stair and the ceiling rose. All designed with CNC cut and engraved Grade A birch ply.

Role: Project Assistant Responsibilities: RIBA Stage 2 to 4 As project assistant I was involved in 3D modelling and preparing tender packages. Design detailing and liaising with potential contractors. I was also involved in creating assets for social media fundraising campaigns.

Project Description: To refurbish the existing library into a magical forest of books the design optimised the given space with wall-to-wall, floor-to-ceiling shelves. Books become like the fruit of the shelving trees, which branch to support the balconies - a ‘natural’ part of everyday life. In plan, the shelving verticals were laid out on a precise equiangular radial grid of the Dewey Decimal classification (DDC) system. The project’s design of a double staircase loop that spatially accesses all areas also echoes the DDC’s rich network of relationships between topics.

Top: Section through the library showing profile of tree-like shelving ribs that also extend to become structure for mezzanine level and seating. Right: Mood image

99


CONSTRUCTION SEQUENCE

Step-by-step construction sequence and design logic

1

3

5

100

The space is organized by a radial grid based on the Dewey Decimal system

‘Secondary’ Structural Ribs made of 2 layers of 18 mm structural plywood and 2 additional articulation layers are placed between them, halving the span.

The usable area of the library is doubled by the mezzanine reading area on split levels and the seating areas beneath them.

2

4

6

10 ‘primary’ Structural Ribs made of 2 layers of 24 mm structural plywood and 2 additional articulation layers are arranged at every alternate interval dividing the space into 10 quadrants.

Concentric Intermediary truss beams connect key loading points between the ribs providing support for the mezzanine and stairs leading up.

The 100 divisions of the grid are finally manifested into the space as tertiary ribs that form the additional supports holding up the shelves.


CONSTRUCTION SEQUENCE

Final assembly overlaid with the DDC system

The 10 major divisions produce 10 major, dominant verticals; the half-way subdivisions produce secondary “minor” supports, with the finer hundredths further visualised with ultraslender vertical filigree-work. The shelving grids can be creatively curated and colonised as desired. Emptier spaces visualise for the visitor the frontiers of knowledge not yet represented in the room. The physicality of the sculptural shelves remind us that knowledge and learning are not mere abstractions, but bear concrete relation to our real, material world.

101


102

Interior View of Library


Back to Contents

103


104

11. 10.


222, ST. JOHN’S ROAD RICHMOND, LONDON 2016

Client: Ottokar and Natalia Rosenberger Stage: Tender Area: 40 Sqm Design Team: Alex Haw, Ashwini Ashokkumar Structural Design: Fluid Structures Installation Contractors: Wilder Creative

Left: Detail of completed house at Richmond Roundabout ©Philip Doumler Top: Artistic isometric view of library system made from CNC cut and engraved Birch Ply. Right: Reference images of CNC cut and engraved birch ply from an Atmos designed project in Limehouse . ©Alex haw

Role: Project Assistant Responsibilities: RIBA Stage 2 to 4 As project assistant I was involved in 3D modelling and preparing tender and construction packages for the library within the larger residential project. Design detailing and liaising with potential contractors. Working closely with the studio director to develop a design language that is adaptable to various on site constraints yet reads as a single fluid geometric expression.

Project Description: 222, St John’s is a residential project for a couple in West London. The client is a researcher looking to build an immersive library within their home to carry out her path-breaking research in Internal Medicine. The library is designed to be an assembly of tree-like ribs holding up fluid shelves to encase a fantastic volume. The articulation and detailing include various ‘genes’ that are developed to inform the design system of the whole. These respond to on site elements like windows, skylights and room divisions.

105


Detail2

Detail1 - 1:10

Detail2 - 1:10

Detail3 - 1:10

Detail of shelves intersecting at various junctions

Detail4

106

Ground Floor Plan (Library) - 1:50

222-571

drawing no.

-

revision

scale

n/a

date

26/10/16

AA

Detail4 - 1:10

drawn by

Detail3

drawing title

Detail1

Detail Joinery - Library - Shelf plan @ 740mm

drawing no.

222-571

revision

-

scale

n/a

date

26/10/16

AA notes + prev revs: A B C-

drawn by

drawing title

Detail4 Detail Joinery - Library - Shelf plan @ 740mm

Detail3

21 St. John's Road

Detail1

project

Library Plan and Details

A3

size

AH

checked

Detail1 - 1:10

21 St. John's Road

Ground Floor Plan (Library) - 1:50

notes + prev revs: A B CDE

Detail2

project

A3

size

AH

checked

TECHNICAL DRAWINGS

Library Plan

Detail2 - 1:10

Ground Fl


Detail1 - 1:10

Detail3 - 1:10

Detail4 - 1:10 Detail2

Section B'B (Library) - 1:50

Library Transverse Section

Detail2 - 1:10

B'

Detail3

Detail1 - 1:10

Detail4

A 222-574

-

revision

drawing title

02/11/16

date

size

checked

notes A3revs: n/a + prev A B CDE

scale

AA 21 St.AHJohn's Road

project drawn by

Detail1

drawing no.

Detail4

Detail Joinery - Library - Rib - Short Section

Detail3

21 St. John's Road

222-574

-

revision

scale

n/a

date

02/11/16

AA drawing no.

drawn by

drawing title

Detail Joinery - Library - Rib - Short Section

Detail2

notes + prev revs: A B CDE

Detail1

project

A3

size

AH

checked

TECHNICAL DRAWINGS

Library Section and Details

Section B'B (Library) - 1:50

B'

Detail2 - 1:10

A

Detail of ribs intersecting at various junctions

D

Section B

107


TECHNICAL DRAWINGS Shelf to Rib Detail

108


Back to Contents

3D VIEW

Shelf to Rib Prototype

109


110

12.


SCHOOL OF BUILDING SCIENCE CEPT UNIVERSITY, AHMEDABAD 2014

Client: CEPT University, Ahmedabad Stage: Completed Area: 2520 Sqm Left: View of the renovated entrance courtyard showing the entrance staircase cum amphitheatre and double heighted reception at the rear. ©Dinesh Mehta Top: Sectional perspective through the building showing design interventions to open up the building and improve flow. Existing section shows low interaction between volumes.

Design Team: Dilip Patel, Manika Chawla, Ashwini Ashokkumar Role: Project Designer Responsibilities: RIBA Stage 2 to 6 As project designer I was involved in all stages from client presentation to delivery. Working collaboratively with students and faculty to understand the difficulties with the existing spatial configurations and presenting appropriate design solutions. Preparing tender and construction packages. Material palette and design detailing as well as on-site project management.

Project Description: Faculty of Technology is a project completed for CEPT University. Due to change in programmatic requirements, the building, designed by Pritzker winning architect B.V Doshi, was beginning to face severe light and ventilation issues. The approach is to reorganize the spaces and reassess the programmatic structure to create open spaces within the building whilst paying homage to the strong architectural context.

Right: Image of existing School of Building Science and Technology designed by B.V Doshi.

111


EXISTING SITE PHOTOS

Existing spaces and proposed interventions

Existing light and space conditions

112


Elimination of dead end corridors for more light ©Dinesh Mehta

Larger vestibules to connect multiple classrooms ©Dinesh Mehta

113


DRAWINGS AND VIEWS Layouts and design intervention

DRAWINGS AND VIEWS Legend

Layouts and images of completed project 1 Open court 2 SD studio:1

Legend 3 UG studio:5

14 Open MIEMcourt studio:1 25 SD studio:1 MIEM studio:2 36 UG studio:5 covered courtyard 47 MIEM studio:1 CPM studio:2 58 MIEM studio:2 CPM studio:1 69 covered courtyard Environmental lab 710 CPM studio:2 Material lab 811CPM Multistudio:1 purpose space 912 Environmental lab lab Survey levelling 10 lab 13 Material SD studio:2 11 purpose space 14Multi Geomatics studio:1 12 levelling lablab 15 Survey Geomatics comp. 13 SD studio:2 14 Geomatics studio:1 15 Geomatics comp. lab

Lvl 0-0 Creating access to light from all classrooms on the basement lvl Lvl 0-0

Lvl 1-1 Condensing faculty spaces to create eff Lvl 1-1

Lvl 0-0

Lvl 1-1

Creating access to light from all classrooms on the basement lvl

Existing vs. proposed circulation

Condensing faculty spaces to create ef

Existing vs. proposed circulation

Existing Circulation/ open space

114

Proposed Circulation/ open space


fective work-flows

ffective work-flows

Lvl 2-2 Creating North-South access for better light and ventilation. Lvl 2-2

Creating North-South access for better light and ventilation.

Lvl 2-2

Existing vs. proposed circulation

Post-graduate programs

Undergraduate programs

115


BEFORE 116

View from the double height reception towards the courtyard. ©Dinesh Mehta


Back to Contents

AFTER 117


118

13.


DR REDDY’S LAB CORPORATE OFFICE HYDERABAD, INDIA 2009

Client: Dr Reddy’s Lab, Hyderabad Stage: Completed Area: 17000 Sqm Design Team: Suraj Gaonkar, Sudha K, Ashwini Ashokkumar Structural Engineer: Sterling Engineering Consultancy Pvt. Ltd. Contractor: JMC Projects India Ltd. Left: View of Central Void. ©Koti Top: Schematic design of central spine of corporate headquarters that included meeting spaces, amphitheatre and history wall display. Right: Initial sketch for the design of amphitheatre.

Role: Design Intern Responsibilities: RIBA Stage 2 to 4 As design intern I was involved in overall interior layout. Key responsibilities were design detail of amphitheatre, COO, CEO, CFO, Standard Cabins and Meeting points. This included concept sketches to technical drawings.

Project Description: The office is the Corporate Headquarters for pioneering Pharmaceutical Company- Dr. Reddy’s Laboratories. The interior vision for the project was to sculpt out the mass within the building to create large central voids that act as open community spaces for the 3000 employees. The central social spine branches off to create office spaces at various levels. At the ground floor the social spine converges to become an amphitheatre.

Merits: 1st Place A+D Cera Awards

119


TECHNICAL DRAWINGS

GA Plan First Floor- Open Plan Offices and Amphitheatre

120


Back to Contents

TECHNICAL DRAWINGS

GA Plan Fourth Floor - Executive Cabins

121


122

14.


peak

level 1

valley

level 2

level 1

level 3

level 3

level 2

level 4

level 4

level 5

level 5

VEIN+MEMBRANE

ARCHITECTURAL ASSOCIATION, LONDON 2014 Course: Emergent Technologies and Design (MSc.) Tutors: Michael Weinstock, George Jeronomidis, Evan Greenberg Subject: Biomimetics Design Team: Antoniya Stoitsova, Di Zhou, Ashwini Ashokkumar

Left: Artistic View of the final design. Top: Biomimetic study of dragonfly wing. Right: Active and Passive layers to emulate the structural properties of the dragonfly wing.

Responsibilities: As part of the design team I was involved in initial biomimetic study of the dragonfly wing. This included academic research, physical model testing and computer simulations. The findings were then extrapolated into design parameters to create a simple and effective pavilion using tensile membranes and steel to mimic the structural properties of the dragonfly wing.

Project Description: The reticulate vein pattern of the dragonfly wing works in combination with cross-bracing membranes to reorganize its form as an instantaneous response when subjected to multi-directional wind loads. The stresses are transfered to the muscles at the thorax whilst undergoing constant deformations to achieve ideal forms for various load conditions. The effect of vein pattern, corrugation and variable flexibility is studied to design a system that is lightweight and capable of withstanding multiple load conditions.

Active Layer

Passive Layer

123


PHYSICAL AND DIGITAL EXPERIMENTS Load tests with various geometric parameters

Single Corrugation-Deformation under self load

Single Corrugation-Deformation under point load

z y

peak

valley

position of corrugation

x

Uz - displacement (z)

Multiple Corrugations-Effect of fold direction [m]

0

-12.9

Anchor Plane

Wind Load

Multiple Corrugations-Effect of anchor condition

124


Back to Contents

DESIGN POSSIBILITIES Deployable structures

Deployable Structure Extrapolating design parameters for collapsable frames

Fixed axis of rotation between both beams no fixed angle between them

B

B

A

20°

A

B

34°

Fixed30°angle with axis of rotation

44°

45°

A

C

C

Identical Components Replacing Valleys with Hypars

C

B

B

B

B

A

B

B

A

20° 9° 9°

B

A

45°

30°

45°

A

C

B

C C C C

Folding Pattern Collapsibility

C

C

C

C

125

B B

45°

B

C C

B 44°

30°

44°

A

B

30°

A

44°

A

34°

A

A

20°

34°

A

20°

A

34°

B

A

B A

B


126

15.


GROWTH

TAI O RIVER

REED BEDS

FISH PONDS

SOCIAL SPACE

WATER BASED SETTLEMENT

SHORE

HYBRID ECOSYSTEMS

ARCHITECTURAL ASSOCIATION, LONDON 2015 Course: Emergent Technologies and Design (MSc.) Tutors: Michael Weinstock, George Jeronomidis, Evan Greenberg Subject: Design Dissertation Design Team: Yifei Sun, Di Zhou, Achraf Mzily, Ashwini Ashokkumar

Left: Image of stilt house at Tai O with mountains behind. ©Iro Karantaki

Responsibilities: As part of the design team I was involved in research on the causal factors and potentials for solutions. This included academic research, physical model testing and computer simulations. Creating assets for documentation and design parameters for final design.

Project Description: Hybrid Ecosystem investigates the social and agricultural integration of aquaculture in coastal fishing villages affected by growing activities inland. It focuses on feedbacks from existing local cultural modalities, topographical and hydrological conditions and potentials, to drive the emergence of innovative social and agricultural organizations. The system is implemented on the test site of Tai O to provide an integrated wetland development strategy.

Top: Section through the village showing integration with wetland and sea. Right: Rainwater simulation to measure volume of collection at Tai O village.

127


TAI O

Identifying issues and potentials of Tai O village, Hong Kong

1

WATER POLLUTION

Total S.S 0.06-0.07 kg/m3

2

ECONOMIC DECLINE

450,000HKDpppa in 1960 200,000 HKD in 2015

3 FRESH WATER SHORTAGE

5000 L/day for 2000 people

N

4.5 m 4m 3.5 m 3m 2.5 m <2 m

Below Mean Tide Level

150m

Site Issues and Solutions

Site Potentials

137 Ha

1

WATER CLEANSING Reed Bed Systems

2

AQUACULTURE

Semi-Instensive Fish Ponds

3

FRESH WATER

Rainwater Harvesting

POTENTIAL WETLAND

For Aquaculture & Reed Beds

5.9 Ha

88km3/yr

WATER BASED SETTLEMENT POTENTIAL FRESH WATER For Integration with Fish Farms

Rainwater Harvesting

Stilt Houses

Fresh Water Storage

Village Consumption: 10,900m3/month

Fresh Water Requirement: 51,400m3/month Fish Ponds Fish Pond Requirement: 40,470m3/month Reed Beds Reed Bed Requirement: 16,530m3/ month

128

Polluted water Clean Sea Water Clean Fresh Water


NETWORK AND CLUSTER GENERATION

Growth of integrated house, reed bed and fish pond systems

Node A High Connectivity Largest Clusters Node B Low. Connectivity Smallest Clusters Node C Med. Connectivity Medium Clusters Node D Med. Connectivity Medium Clusters

G100_88 3. 1. 4.

5.

Cluster Area (m2) 1. 4400 2. 4100 3. 2700 4. 2250 5. 2200 6. 2500

6.

2.

Network length: 1285 m

G100_85 2. 1.

5.

4.

6.

Cluster Area (m2) 1. 4950 2. 2700 3. 1250 4. 3850 5. 3800 6. 2000

Total population: 550

Network length: 1410 m

G100_70 5. 4. 1.

6. 2.

3. 7.

Network length: 1290 m

Cluster Area (m2) 1. 4950 2. 2950 3. 3800 4. 1400 5. 1100 6 2150 7 1650

Avg. Distance to Public Space: 25.87m RB & FP Exposure: 100%

Total population: 545

G100_85

3.

G100_88

G100_70

Total population: 540

Public Space Exposure: 96.5%

Avg. Distance to Public Space: 28.43m RB & FP Exposure: 100% Public Space Exposure: 100%

Avg. Distance to Public Space: 27.42m RB & FP Exposure: 99.9% Public Space Exposure: 98.1%

129


SYSTEM DESIGN

System flows and design logic

Fresh Water Storage

Inundated Soil

SECTION AA

Integrated Wetlands

SECTION BB

Connection to Sea

Inundated Soil

A

B

130

Sea Water Supply Channel


Back to Contents

Fresh Water Storage

Semi-Intensive Aquaculture Pond

Reed Bed Farm

Polluted Water Clean Water

Open Ponds

Fresh Water Supply

Wet Reed

Sea

B

A

131


132

16.


TWIST

ARCHITECTURAL ASSOCIATION, LONDON 2014 Course: Emergent Technologies and Design (MSc.) Tutors: Michael Weinstock, George Jeronomidis, Evan Greenberg, Manja van de Worp Subject: Design and Build Design Team: AA Emtech Batch of 201415 Partners and Sponsors: Hanson Plywood; TRADA

Left: Final Pavilion assembled at Birmingham Timber Expo. ©AA EmTech Top: Prototype assembly at Hooke Park. ©Patrick Tanhuanco

Project Description: The Twist is the Design/Build project of the Emergent Technologies and Design studio at the Architectural Association executed by the batch of 2014-15. The goal of the project is to exploit the bending and twisting properties of sheet ply to create a self supporting structure following the geometry of a mobius strip.

Responsibilities: As part of the team of 31, I was responsible for the initial physical experiments from which information of material behavior was extracted, the designer of the commercial logo, the 1:10 model of the final structure as well as part of the assembly team for prototype at Hooke Park.

Right: AA EmTech batch of ‘14 at Hooke Park.

133


TWIST AND BEND

Utilizing the properties of ply to determine the form

1:10 scale model Mobius strip P8 P9

P7

P10

P11

P4 P6 P3

P12

P2 P13

P14

Construction sequence Panel assembly with double rib locators

134

P1

P5


CONSTRUCTION ELEMENTS

Form derived by varying geometric parameters Double Connection Point

Depth of Strip

Middle strip to retain geometry

Global curvature

Twist due to rib curvature

Singly curved planar strip

Material Behavior Twisting of wing determined by arched ribs

Main Spacing Element

Edge assembly

Degree of Curvature +1

-1

Wing 4 mm Ply Rib 6mm Ply Material Optimization Twist degree determined by degree of curvature of master surface

Double Rib 12mm Ply

System Components Main structural elements that stabilize the form

135


136

Final Pavilion assembled at Birmingham Timber Expo. ©AA EmTech


Back to Contents

137


138

17.


‘Bindhu’

CALCULATED DESIGN CEPT UNIVERITY, INDIA 2012

Course: Bachelor of Interior Design (B.Des) Tutors: Krishna Shastri, Kireet Patel, Anand Ramakrishnan, Snehal Nagarsheth Subject: Design Thesis Guide: Sakthiveil Ramaswamy

Left: View of the ‘Vimanam’ of Kailasanatha Temple. ©Sitara Menon Top: Symbolic meaning of the Vimanam to draw the devotees eye to infinity. ©Sitara Menon Right: Plan of temple complex. ©Alexander Rea

Abstract: Mathematics has developed as man’s way of understanding nature. ‘Calculated Design’ is a research thesis aimed at finding the relationship between nature and built-form by understanding the role of the inherent order of mathematical principles in responding to contextual pressures.

The Pallava kings of the 8th century translated this cosmomoral order through their building of temples. The temple superstructure (or Vimana) appears as a pyramidal monolith, however the closer you get more details are revealed bringing more depth to the form. The form is a result of the chains of aedicules that reduce in scale at each level following an infinite sequence. Merits: CEPT University Award for Best Research Thesis, GICEA Gold Medal

The Kailasanatha Temple is an 8th Century Shaivaite temple and therefore existed in a strong context determined by the prevalent religious setting of the reigning king. In keeping with the philosophy of the Shaivaite religion the temple symbolized the “Chain of Being”- the cycle of construction and destruction of the cosmos. 139


SHRINE TYPOLOGY

Shrine type, meaning and location

Shrine type A: This is located at the 4 cardinal directions. These have the images of Shiva in all directions except east.

Shrine type B: These shrines are placed at the corners i.e the intermediate directions and also contain images of Shiva. These shrines are where the lokpalas reside.

The Vimanam consists of 4 storeys and each storey is a chain of progressively diminishing sizes of shrines. The first layer has 2 types of shrines. Type A placed at the 4 cardinal directions and Shrine type B at the intermediate directions. The Bindhu is translated to the tip of layer 1 which consists of an octagonal plan tapering to a finial.

140


Back to Contents

VIMANAM (Temple Superstructure) Underlying Infinitite Sequence

Summation of the infinite sequence starting with a gives the total height of the structure :-

=9832.93 mm

Summation of the infinite sequence starting with b gives the side of the equilateral triangle :-

=1135.41 mm

Summation of the infinite sequence starting with c gives the diameter of the circle in which the triangle is inscribed:-

=1310.58 mm

141


Ashwini Ashokkumar 07405595767 ashokkumar.ashwini@gmail.com NW5, London

142


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.