PORTFOLIO INTERIOR DESIGN | ARCHITECTURE
ASHWINI ASHOKKUMAR SELECTED PROJECTS FROM 2014 TO 2021
CONTENTS
Extended Design Portfolio Interior Design | Architecture | Installations | Research
0. CURRICULUM VITAE
Pg 4
1. KEW FAMILY RESTAURANT
Pg 7
Category: Hospitality Interiors Location: Royal Botanical Gardens, Kew Company: Mizzi Studio Role: Senior Designer Stages: RIBA Stages 2 to 6 Status: Completed 2021
2. TRINITY HEALTH CLUB
Pg 27
Category: Hospitality Interiors Location: St. Julliens, Malta Company: Mizzi Studio Role: Senior Designer Stages: RIBA Stages 2 to 4 Status: Project on hold (2019)
3. ALF MIZZI CORPORATE HEADQUARTERS
Pg 43
Category: Commercial Interiors Location: Marsa, Malta Company: Mizzi Studio Role: Senior Designer Stages: RIBA Stages 2 to 6 Status: Completed 2019
4. SERPENTINE COFFEE HOUSE
Pg 55
Category: Hospitality Architecture / Interiors Location: Hyde Park, London Company: Mizzi Studio Role: Project Lead Stages: RIBA Stages 2 to 6 Status: Completed 2018
5. HOLI SALONI
Pg 63
Category: Architectural Installation Location: Udaipur, India Company: Mizzi Studio Role: Project Lead Stages: RIBA Stages 2 to 6 Status: Completed 2018
6. FIREKRAKEN Category: Lighting Installation Location: King’s Cross, London Company: Mizzi Studio Role: Project Lead Stages: RIBA Stages 2 to 6 Status: Completed 2018
Pg 71
CONTENTS
Ashwini Ashokkumar Extended Design Portfolio Interior Design | Architecture | Installations | Research
7. LATIMER STUDIOS
Pg 77
Category: Commercial / Residential Architecture Location: Latimer Road, London Company: Mizzi Studio Role: Project Lead Stages: RIBA Stages 2 to 3 Status: Planning applied 2022
8. MUSCAT TOWER
Pg 85
Category: Commercial Architecture Location: Gzira, Malta Company: Mizzi Studio Role: Project Assistant Stages: RIBA Stage 2 Status: Technical Design
9. CHISWICK HOUSE SCHOOL
Pg 91
Category: Institutional Architecture Location: Pembroke, Malta Company: Mizzi Studio Role: Project Assistant Stages: RIBA Stage 2 Status: Project on hold (2020)
10. THORNHILL LIBRARY
Pg 99
Category: Institutional Interiors Location: Islington, London Company: Atmos Studio Role: Project Assistant Stages: RIBA Stage 2 to 4 Status: Project on hold (2016)
11. 222, RICHMOND HOUSE
Pg 105
Category: Residential Interiors Location: Richmond, London Company: Atmos Studio Role: Project Assistant Stages: RIBA Stage 2 to 4 Status: Project Completed 2018
12. SCHOOL OF BUILDING SCIENCE Category: Institutional Interiors Location: Ahmedabad, India Company: Aakruti Architects Role: Project Lead Stages: RIBA Stage 2 to 4 Status: Project Completed 2014
Pg 111
CONTENTS
Ashwini Ashokkumar Extended Design Portfolio Interior Design | Architecture | Installations | Research
13. DR. REDDY’S LAB CORPORATE HEADQUARTERS
Pg 119
Category: Commercial Interiors Location: Hyderabad, India Company: Chandavarkar and Thakkar Architects, Bangalore Role: Design Intern Stages: RIBA Stages 2 to 6 Status: Completed 2010
14. VEIN + MEMBRANE
Pg 123
Category: Material Research Location: London School: Architectural Association School of Architecture Role: Author, Research Team Status: Completed 2014
15. HYBRID ECOSYSTEMS
Pg 127
Category: Academic Research Location: London School: Architectural Association School of Architecture Role: Author, Research Team Status: Completed 2015
16. TWIST
Pg 133
Category: Material Research / Installation Location: London School: Architectural Association School of Architecture Role: Design Team Stages: RIBA Stage 2 to 6 Status: Completed 2015
17. CALCULATED DESIGN Category: Academic Research Location: Ahmedabad, India School: Center for Environmental Planning and Technology Role: Author Status: Completed 2012
Pg 139
Ashwini is an Interior Architect with a focus on functional design that is immersive and timeless. Her interest lies in using form, texture, colour and movement to create unique spatial experiences that is site and brief specific. Completed projects include The Serpentine Coffee House in Hyde Park where material differentiation of composite fibres were used to create an optimized manta ray inspired brass canopy; A Children’s Restaurant in The Royal Botanical Gardens, Kew where life size sculptures of funghi and plants create an immersive experience for children to learn about the journey of plant to plate; A Mud Hut village in Udaipur that is a celebration of vernacular building techniques and contemporary form building among others.
ASHWINI ASHOKKUMAR MSc. [Architecture] Architectural Association B.Des. [Interior Architecture] CEPT University
Email: ashokkumar.ashwini@gmail.com Address: NW5
WORK EXPERIENCE Architectural Designer Mizzi Studio, London (mizzi.co.uk) [Jan ‘17- Present]
Projects: • Serpentine Coffee House (Hyde Park, London) Role: Project Lead RIBA Stage 2 to 6 • Kew Family Restaurant (Kew Gardens, London) Role: Interior Designer RIBA Stage 2 to 6 • Firekraken, RABDA Awards (King’s Cross, London) Role: Project Delivery RIBA Stage 3 to 6 • Latimer Studios (Latimer Road, London) Role: Project Lead RIBA Stage 2 to 3 • Ivebury Court (Latimer Road, London) Role: Project Lead RIBA Stage 2 to 3 • Muscats Motors Tower (Gzira, Malta) Role: Project Assistant RIBA Stage 2 to 3 • Alf Mizzi Corporate Headquarters (Marsa, Malta) Role: Interior Designer RIBA Stage 2 to 6 • Trinity Health Club (St. Julliens, Malta) Role: Interior Designer RIBA Stage 2 to 4 • HoliSaloni Village (Udaipur, India) Role: Project Lead RIBA Stage 2 to 6
Architectural Assistant Atmos Studio, London (atmosstudio.co.uk) [May ‘16- Dec ‘16]
Projects: • St John’s Road Library (Richmond, London) Role: Interior Designer RIBA Stage 2 to 4 •
Freelance Designer [Oct ‘15- May ‘16]
4
Thornhill School Library (Islington, London) Role: Project Assistant RIBA Stage 2
Projects: • Sinuous wall & Dia-grid Dome (Cambridge, UK) • Think Happy Everyday Clay 3D printing Workshop (Bangalore, India) • Renovation of House in Defense Colony (Bangalore, India)
Graduate Student Assistant Architectural Association, London aaschool.ac.uk [Dec ‘14- Sep ‘15]
Projects: • Twist Pavilion Role: Workshop Assitant RIBA Stage 2 to 6
Tutor CEPT University, Ahmedabad cept.ac.in [Mar ‘13- Aug ‘14]
Subjects: • Interior Design Studio IV • Technical Representation of Drawing • Algorithms-Past & Present
Project Designer Akruti Architects, Ahmedabad aakrutiarchitects.com [Mar ‘13- Aug ‘14]
Projects: • SBST Redevelopment • Parikh Residence • CEPT Library Redevelopment
Design Intern, CNT Architects, Bangalore cnt.co.in [Apr ‘09- Oct ‘09]
Projects: • Dr Reddy’s Laboratory • Mindtree Corporate Office • Rammaiah Residence
EDUCATION Postgraduate: Master of Science in Architecture, [B] Emergent Technologies & Design, Architectural Association School of Architecture, London. Undergraduate: Bachelor of Interior Design, [B+] Faculty of Design, Center for Environmental Planning & Technology (CEPT University), Ahmedabad Best Thesis Award for “Calculated Design: The role of mathematics in defining form”
SKILLS Scripting
Grasshopper
3D Modelling
[Advanced] Rhinoceros, Autocad 3D & 2D, Google Sketchup, [Beginner] Revit
Presentation
Adobe Illustrator, Adobe Photoshop, Adobe InDesign
Traditional
Sketching, Model Making, Paper Making, Weaving, Bamboo craft, Wood Carving
REFERENCES (Available on Request) Jonathan Mizzi
Director, Mizzi Studio
Alex Haw
Director, Atmos Studio
Michael Weinstock
Director, Emergent Technologies and Design at Architectural Association 5
6
1.
FAMILY RESTAURANT KEW GARDENS, LONDON 2020-2021
Client: Royal Botanical Gardens, Kew Stage: Completed Dec 2021 Area: 1100 Sqm Design Team: Jonathan Mizzi, Matthew Chilton, Ashwini Ashokkumar Architects: HOK Interior Contractors: City Axis Installation Contractors: Firecracker Works
Left: Interior of completed restaurant showing interactive woven willow fungi sculpture by artist Tom Hare ©James McDonald Photography Top: Initial conceptual sketch showing different zones that interpret the brief Right: Mood image
Role: Senior Designer Responsibilities: RIBA Stage 2 to 6 As part of the design team I was involved in conceptual design and interior layout. Was lead designer for three key zones: Giant Garden, Autumn Garden and Spring Garden for which I was involved in all stages from client presentation to delivery. Other responsibilities included material palette selection, budgeting and value engineering, liaising with contractors, routine factory and site visits, collaborating with consultants on design intersections etc.
Project Description: The Kew Family Restaurant & Shop is part of Kew’s vision to bring clever design and functionality to help their young visitors learn more about bio-diversity, farming, food security and other areas of Kew research. Each seating zone is designed to be immersive with interactive displays and life size sculptures that aim to enrich the learning experience of the journey of plant to plate. An Enset seating sculpture highlighting Kew’s work on Ethiopia’s ‘tree against hunger’ and a mushroom banquette bringing the spotlight on Kew’s fungarium are among some of the features.
7
INTERIOR LAYOUT
Zones and their corresponding design intent
AHU ENCLOSURE 41.10 m² BoH KITCHEN 117.34 m²
DISH/POT WASH 34.01 m²
KITCHEN UNITS AND SERVICES TO KITCHEN DESIGNER DETAILS
C.O.S.H.H STORE
PLANT ROOM 34.35 m²
DRY STORE BEVERAGES
GRAB & GO
COL P 6
10 08
TRAYS
CONDIMENTS
04 SOCIAL DINING II CAPACITY: 10
GIANT GARDEN TOTAL CAPACITY: 44
01
07 06
ENSET SEATING CAPACITY: 18
06 'HARVEST' INFO HUB
03
WATER SEATING 1 CAPACITY: 16
APPLE POD CAPACITY: 6
09
UP
05
02
AUTUMN SEATING TOTAL CAPACITY: 26
MUSHROOM CANOPY ABOVE
MUSHROOM CANOPY ABOVE
MUSHROOM CANOPY ABOVE
MUSHROOM CANOPY ABOVE
SOCIAL DINING I CAPACITY: 10
BINS
Kew Family Restaurant
Kew Family Restaurant
Kew Family Restaurant
HOT MAINS
4.0 Giant Garden Seating
5.0 Autumn Seating
4.2 Seating Plan
5.2 Autumn Seating Pan
3.0 Hand Wash and Servery Laboratory 3.2 Hand Wash and Servery Laboratory Plan
HOT MAINS
GIANT GARDEN CAPACITY:44
'COOKING' INFO STATION
EXIT CORRIDOR
'COOKING' INFO STATION
DIVERSITY
PIZZA COUNTER
SALAD BAR
DESCRIPTION :
GIANT GARDEN GIANT GARDEN TOTAL CAPACITY: 34 TOTAL CAPACITY: 34
RESTAURANT • • • •• • •• ••••••••••
REV #
'COOKING' INFO STATION
SCIENCE
DATE
COOKING FOOD NUTRITION
3.0RESTAURANT Hand Wash and Servery Laboratory • • • •• • •• •••••••••• 3.2 Hand Wash and Servery Laboratory Plan
DESCRIPTION :
PIZZA COUNTER PIZZA COUNTER
SANDWICH COUNTER
Kew Family Restaurant
SANDWICH COUNTER
HARVEST 5.0 Autumn Seating PARTS OF THE PLANT 5.2 Autumn Seating Pan WOOD WIDE WEB
'HARVEST' 'HARVEST' INFO HUB HUB INFO
DATE
AUTUMN 'COOKING' 'COOKING' INFO STATION INFO STATION
HOT MAINS
COFFEE COFFEE STATION STATION
REV #
WATER SEATING I CAPACITY:16
WASTE RECYLE BINS
SALAD BAR
Kew Family Restaurant
Kew Family Restaurant
FOOD SECURITY 4.0 Giant Garden Seating CROP WILD RELATIVES 4.2 Seating Plan FUTURE AGRICULTURE
TING 18-22
HIGH TABLE CAPACITY: 6
HOT MAINS HOT MAINS
GIANT GARDEN TOTAL CAPACITY: 34
PIZZA COUNTER
AUTUMN SEATING CAPACITY:26
SANDWICH SANDWICH COUNTER COUNTER
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS P AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE W WATER SEATIN CAPACITY: 2 STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT
SALAD BAR SALAD BAR
WATER SEATING 1 CAPACITY: 16
WASTE RECYLE BINS
' ON
HOT MAINS HOT MAINS
Mizzi Studio
MUSHROOM CANOPY CANOPY ABOVE
MUSHROOM CANOPY ABOVE ABOVE
MUSHROOM MUSHROOM CANOPY CANOPY ABOVE ABOVE
PIZZA COUNTER
ENSET SEATING ENSET SEATING CAPACITY: 18-22 CAPACITY: 18-22
RESTAURANT SEATING 2 Unit 11, WATER Latimer Studios RESTAURANT • • • •• • •• ••••••••••CAPACITY: 28 • • • •• • •• •••••••••• Latimer Road
WATER SEATING 1 CAPACITY: 16
AUTUMN SEATING TOTAL CAPACITY: 26 MUSHROOM CANOPY CANOPY ABOVE
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON GELATERIA OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL P AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT
WASTE RECYLE BINS
HANDWASH ZONE
London W10 6RQ, UK
SANDWICH COUNTER Tel: +44
(0) 207 183 2774 Email: info@mizzi.co.uk
SALAD BAR
'HARVEST' INFO HUB 'HARVEST' INFO HUB
MUSHROOM CANOPY ABOVE
HANDWASH ZONE
SANDWICH COUNTER
'COOKING' 'COOKING' INFO STATION INFO STATION
STE YLE BINSSALAD BAR
HIGH CHAIR STORAGE
HIGH TABLE BAR STOOLS CAPACITY: 06
WATER SEATING 1 WATER SEATING CAPACITY: 16 1 CAPACITY: 16
RESTAURANT • • • •• • •• ••••••••••
SPRING SEATING CAPACITY: 32 WASTE RECYLE BINS WASTE RECYLE BINS
HIGH TABLE BAR STOOLS CAPACITY: 06
HIGH CHAIR STORAGE
AUTUMN SEATING
LE POD E POD 6 ACITY: CITY: 6
SEATING 26 RESTAURANT AUTUMN TOTAL CAPACITY: • • • •• • •• ••••••••••TOTAL CAPACITY: 26
MUSHROOM CANOPY MUSHROOM ABOVE CANOPY
'HARVEST' 'HARVEST' INFO HUB HUB INFO
MUSHROOM CANOPY MUSHROOM ABOVE CANOPY
ABOVE
ABOVE
MUSHROOM CANOPY MUSHROOM ABOVE CANOPY
MUSHROOM CANOPY MUSHROOM ABOVE CANOPY
ABOVE
PIZZA COUNTER PIZZA COUNTER
HANDWASH ZONE HANDWASH ZONE
ABOVE
SANDWICH SANDWICH COUNTER COUNTER
SALAD BAR SALAD BAR
WATER SEATING 2 CAPACITY: 28
WATER SEATING 1 CAPACITY: 16
WASTE WASTE RECYLE BINS RECYLE BINS
AUTUMN SEATING TOTAL CAPACITY:
HIGH CHAIR STORAGE HIGH CHAIR STORAGE
26
MUSHROOM CANOPY CANOPY ABOVE
MUSHROOM CANOPY ABOVE ABOVE
8
HIGH TABLE BAR STOOLS HIGH TABLE BAR STOOLS CAPACITY: 06 CAPACITY: 06
RESTAURANT RESTAURANT WATER SEATING 2 • • • •• • •• •••••••••• • • • •• • •• ••••••••••CAPACITY: 28
WATER SEATING 1 CAPACITY: 16 MUSHROOM MUSHROOM CANOPY CANOPY ABOVE ABOVE
GELATERIA
HANDWASH ZONE
'HARVEST' INFO HUB 'HARVEST' INFO HUB
HANDWASH ZONE
65
HIGH CHAIR STORAGE
MIZZI STUDIO
HIGH TABLE BAR STOOLS CAPACITY: 06
27
MIZZI STUDIO
WATER SEATING 1
MIZZI STUDIO
WATER SEATING 2 WATER SEATING CAPACITY: 28 2
06 HARVEST INFO TOWER 07 08
SALAD AND PIZZA SERVERY COOKING TUBE TOWER
11C QUEUE DIVIDER 13
WATER SEATING
14
SPRING SEATING
15
GELATERIA
09 HAND WASH STATION
BABY CHANGING 5.40 m²
OFFICE 11.09 m²
EQUIPMENT STORE 3.96 m²
LD ROOM PLANT 6.83 m²
RETAIL STORE 12.70 m²
FAMILY WC 4.40 m²
IT ROOM 6.53 m²
PUBLIC WC (F) 16.72 m²
PUBLIC AWC 5.23 m²
STAFF WC 2.66 m²
STAFF CHANGING 10.33 m²
RETAIL OFFICE 12.86 m²
FEEDING ROOM 18.25 m²
LOBBY 16.26 m²
STAFF WC 2.66 m²
PUBLIC WC (M) 18.12 m²
PUBLIC AWC 5.19 m²
CLEANERS 5.03 m²
BINS
11A
RETAIL BY OTHERS
11 SPRING SEATING CAPACITY: 32
11B
14
11C
13
WATER SEATING 1 CAPACITY: 16
15
Kew Family Restaurant
2.0 Sun Servery and Water Seating
Kew Family Restaurant
2.2 Sun Servery and Water Seating Plan
BOOKS & LEARNING
6.0 Spring Seating
FAMILY & ADULT PRODUCTS
6.2 Spring Seating WATER SEATING II CAPACITY:28
ENTRANCE CORRIDOR
TOILET CORRIDOR
SPRING SEATING CAPACITY:32 + 4
RETAIL
BOOKS & LEARNING FAMILY & ADULT PRODUCTS
WASTE RECYLE BINS
SUN & WATER
SPRING
SOURCE OF ALL ENERGY LIFE GIVING BOTANICALS
6.0 Spring Seating PLANTING GROWING 6.2 Spring Seating BOOKS & LEARNING GARDENINGER
2.0 Sun Servery and Water Seating
SPRING SEATING CAPACITY: 32
2.2 Sun Servery and Water Seating Plan
'GROWING' INFO TOTEM
'GROWING' INFO TOTEM
'GROWING' INFO TOTEM
PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI T AND MAY BE SUBJECT TO PROSECUTION.
PROJECT TITLE BOOKS & LEARNING 'GROWING' INFO TOTEM
SPRING SEATING CAPACITY: 32
CLIENT NAME
SPRING SEATING CAPACITY: 32
D. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS N THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S OF ANY WORK. WATER SEATING 2 CAPACITY: 28
GELATERIA
SHEET TITLE
UNDERGROUND
Kew Family Restaurant
Kew Family Restaurant
FAMILY & ADULT PRODUCTS
'GROWING' INFO TOTEM
203
QUEUING
FOOD SPINE
M.CHILTON
RETAIL • • • •• • •• ••••••••••
1:75
MASTERPLAN
GELATERIA
PROJECT ADDRESS
• • • •• • •• ••••••••••
CASH WRAP
12 06 2020
CHECKED BY:
DRAWN BY:
ROYAL BOTANICAL GARDENS
J.MIZZI
GELATERIA BAR STOOLS CAPACITY: 04
SPRING SEATING CAPACITY: 32
CHILDREN'S PRODUCTS
A1
STAGE:
KEW GARDENS, RICHMOND, LONDON. TW9 3AE
CASH WRAP WORMS QUEUING SOIL NUTRIENTS ROOTS RETAIL
NOTES:
DATE
PROJECT NO:
FAMILY RESTAURANT PROJECT FAMILY & ADULT PRODUCTS
FOOD SPINE
SHEET NO:
TECHNICAL DESIGN
CHILDREN'S PRODUCTS
QUEUING
FRP_203_GEN_MAS_1001
CASH WRAP
FOOD SPINE
RETAIL • • • •• • •• •••••••••• 'GROWING' INFO TOTEM
'GROWING' INFO TOTEM
GELATERIA BAR STOOLS CAPACITY: 04
QUEUING
CASH WRAP
FOOD SPINE
EATING : 32
RETAIL
CHILDREN'S PRODUCTS
• • • •• • •• •••••••••• GELATERIA
CHILDREN'S PRODUCTS
GELATERIA BAR
MIZZI STUDIO
9
GIANT GARDEN
Themes of Food Security and Crop Wild Relatives
Kew Family Restaurant
2.0 Sun Servery and Water Seating 2.2 Visual
3
2
3
1
4
5
3 1
3 1
6 8
Giant Garden visual showing a giant apple seating pod and enset seating Kew Family Restaurant
1
2
3
4
5
6
Kew Family Restaurant
4.0 Giant Garden Seating 4.12 Social Dining and Aubergine Seating DI CHROMATIC PAINT
Material Palette
GAMES ON TABLE
BANQUETTE EATING ALONG ULL LENGTH OF BACK WALL
Initial design sketches for the area 50
10
ARCYLIC LIGHTING FEATURE
VARIED SIZE, SHAPE AND COLOURED AUBERGINE ‘COUSINS’ CHAIRS
FLAX SEED-BASED UPHOLSTERY
CERAMIC MOSAICS
WARM TIMBERS
NEUTRAL CONCRETE
MIZZI STUDIO
THE ENSET (False Banana) Kew Family Restaurant
Biomimetic 4.0 Giant Garden References and technical details 4.9 Enset Schematic Elevation
Enset seating with biomimetic references to the Enset (false banana) plant of Ethiopia 56
GRP - CLASS 1 FIRE RATED OUTERSTEM WITH MILLED FOAM CORE. (CONTRACTOR TO CONFIRM COMPOSITE STRUCTURE)
25
PT 08
INNER STEM
ENSET STEM DETAIL
MIDDLE STEM
SCALE 1:2
PT 08 6 10
OUTER STEM
FA 01 PLY BACKED UPHOLSTERED BACKREST BACKREST DETAIL SCALE 1:2
0
18
100
R5
UPHOLSTERED FOAM SEAT. SPECIFICATION OF FOAM AND INFILL TO BE DISCUSSED WITH CONTRACTOR SEAT DETAIL SCALE 1:2
INDICATIVE STRUCTURE
50
PT 08
MT 14
S02
SECTION S02
Enset Section Detail 203-01-AD 1001
REV #
DATE
SCALE 1:10
DESCRIPTION :
SKIRTING DETAIL SCALE 1:2
REV #
DATE
DESCRIPTION :
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION. Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.
PROJECT TITLE CLIENT NAME SHEET TITLE
FAMILY RESTAURANT RESTAURANT ROYAL BOTANICAL GARDENS ENSET 06: SECTION 02 DETAIL
PROJECT ADDRESS
KEW GARDENS, RICHMOND, LONDON TW9 3AE
PROJECT NO:
NOTES:
DATE
203 DRAWN BY:
12 06 2020 CHECKED BY:
A.ASHOKKUMAR
1:10 STAGE:
TECHNICAL DESIGN
J.MIZZI
CLIENT SIGN OFF:
A2 SHEET NO:
FRP_203_01_AD_8002
11
EXPLODED DIAGRAM Construction Sequence
PT 07
OF 02
PT 06
PT 08 FA 01
PLYBACKING TO UPHOLSTERED SEAT TO FIT INTO GRP COMPONENTS OF ENSET
PT 08 NEGATIVE IN GRP COMPONENT TO RECEIVE UPHOLSTERED BACKREST
ENSET EXPLODED DIAGRAM
12
13 PROJECT TITLE
PROJECT NO:
DATE
NOTES:
14
View of Enset and Apple seating within the Giant Garden ©James McDonald Photography
15
AUTUMN GARDEN
Themes of Harvest and Wood Wide Web
Kew Family Restaurant
3.0 Hand Wash and Servery Laboratory 3.1 xxxxxxxxx
3.1 Servery Laboratory Salad and Pizza Schematic
1
6
5
3 2
10
Autumn Garden visual showing Mushroom banquette and Harvest Info Tower Kew Family Restaurant
1
2
WOVEN REED
3
CLAY PLASTER CLADDING
4
TAN FAUX LEATHER UPHOLSTERY
TERRACOTTA MOSAICS
5
6
WARM TIMBERS
SPALTED BEECH
MIZZI STUDIO
Initial design sketch for the area
16
Material Palette
EXPLODED DIAGRAM
Construction Sequence and Interactive Feature
TB 05
WOVEN WILLOW AROUND METAL ARMATURE. ARTIST TO DETERMINE CONSTRUCTION METHOD
METAL ARMATURE
TB 04
METAL ARMATURE
TB 06
REFER DWG FRP-203-05-AD-8004 FOR LENGTHS
TB 04 LT 13
LED STRIP INTEGRATED INTO WOVEN WILLOW MUSHROOM STEM.
TB 07
FA 02
ALLOWANCE IN BANQUETTE FOR FIXING OF MUSHROOM
FA 01
MT 15 TB 07
LT 08
PLASMA BALL WITH TOUGHENED GLASS
LT 07
OPTICAL FIBRES ARRANGES IN BRANCHING PATTERNS TO EMULATE WOOD WIDE WEB
PLASMA TOWER FITTED HERE
EXPLODED DIAGRAM
Kew Family Restau
5.0 Autumn Seat
5.8 Autumn Seating Schematic 5.8 Autumn Seating Schem
INDICATIVE SUBSTRUCTURE
WOOD WIDE WEB -
Kew Family Restaurant
5.0 Autumn Seating
WOOD WIDE WEB -
NATURE’S SECRET NETWORKS NATURE’S SECRET NETWORKS
REV #
DATE
DESCRIPTION :
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION. Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk
INTERACTIVE LIGHTING
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.
PROJECT TITLE CLIENT NAME SHEET TITLE
PROJECT NO:
FAMILY RESTAURANT RESTAURANT ROYAL BOTANICAL GARDENS
12 06 2020 CHECKED BY:
J.MIZZI
A.ASHOKKUMAR
AUTUMN GARDEN 02: EXPLODED DIAGRAM
PROJECT ADDRESS
N/A
CLIENT SIGN OFF:
A2 SHEET NO:
STAGE:
KEW GARDENS, RICHMOND, LONDON TW9 3AE
NOTES:
DATE
203 DRAWN BY:
TECHNICAL DESIGN
FRP_203_05_A
INTERACTIVE LIGHTING
IR SENSOR PLASMA BALL
IR SENSOR PLASMA BALL
Interactive lighting feature within Mushroom banquette mimicking the wood wide web 73
73
MIZZI STUDIO
MIZZI STU
17
SPRING GARDEN
Themes of Growing and Nurturing
Kew Family Restaurant
3.0 Hand Wash and Servery Laboratory
4
5
1
6 2 3
12
Spring Garden visual showing rammed earth wall and info towers Kew Family Restaurant
1
2
RAMMED EARTH WALL PLASTER
3
GREEN TERRAZZO
4
NETTLE-BASED UPHOLSTERY
5
LEAF-LIKE LIGHTING FEATURES
6
WARM TIMBERS
INTERACTIVE INFO STATIONS
MIZZI STUDIO
Initial design sketch for the area
18
Material Palette
:
EXPLODED DIAGRAM
Construction Sequence and Interactive Feature
TB 06 REFER DWG FRP-203-14-AD-8003 FOR TIMBER LENGTHS
OF 03
LT 10
LE REFUGE LEAVES
LT 10
LE REFUGE LIGHT
TB 07 CONCRETE BASE FITTED INTO BANQUETTE
FA 04
Kew Family Restaurant
FA 05
SCAFFOLDING FOR VERTICAL TIMBER CLADDING
6.0 Spring Seating
PLASMA INFO TOWER
INDICATIVE BANQUETTE SUBSTRUCTURE
Kewgrowing Family Restaurant 6.8 Sowing and Illustrated
6.0 Spring Seating PLASMA INFO TOWER FITS AGAINST BANQUETTE FACE
FLEXIPLY CLADDING ON THE 6.8 Sowing andINSIDE. growing Illustrated PAINT RAL TBC
Kew Family Restaurant
6.0 Spring Seating RS 03
GARDENING -
6.8 Sowing and growing Illustrated
WHAT DO PLANTS NEED TO GROW
Construction Sequence
GARDENING GARDENING WHAT DO PLANTS NEED TO GROW WHAT DO PLANTS NEED TO GROW
SPRING EXPLODED DIAGRAM
REV #
DATE
DESCRIPTION :
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION. Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.
PROJECT TITLE CLIENT NAME SHEET TITLE
FAMILY RESTAURANT RESTAURANT
PROJECT NO:
203 DRAWN BY:
ROYAL BOTANICAL GARDENS
12 06 2020 CHECKED BY:
A.ASHOKKUMAR
N/A
SPRING GARDEN 03: EXPLODED DIAGRAM
PROJECT ADDRESS LEARNING LEARNING KEW GARDENS, RICHMOND, LONDON TW9 3AE THROUGH THROUGH ROLE-PLAY ROLE-PLAY LEARNING THROUGH ROLE-PLAY
NOTES:
DATE
J.MIZZI
CLIENT SIGN OFF:
A2
STAGE:
TECHNICAL DESIGN
SHEET NO:
FRP_
Interactive Info tower where children can learn the important elements that contribute to plant growth
87
MIZZI STUDIO
19 87
MIZZI STUDIO
INTERACTIVE FEATURES Learning by engaging
20
APPLE POD
Immersive seating within a giant apple
21
22
View of Spring Garden ©James McDonald Photography
23
24
View of Autumn Garden from Enset Seating ©James McDonald Photography
Back to Contents
25
26
2.
TRINITY HEALTH CLUB ST. JULLIENS, MALTA 2019-Present
Client: Gregory Nasmyth Stage: Under Construction Area: 1100 Sqm
Left: Part View of Tree Cycle. A cycling studio where cycles are connected upto interactive LEDs that respond to the cycle’s speed embedded in a treelike structure at the front of the studio. Top: Interior of Spa Treatment room with brass clad arches dusty pink acoustic wall panelling and bespoke terazzo massage bed. Right: Mood images- body, nature, health and technology.
Design Team: Jonathan Mizzi, Ashwini Ashokkumar, Silvia Zanolini, Jomarie Mayo, Julia Frendo Fit-out Contractors: Contrada Group MEP Consultants: Scicluna & Associates Role: Senior Designer Responsibilities: RIBA Stage 2 to 4 As part of the design team I was involved in conceptual design and masterplan layout. Was lead designer for three key zones: Tree cycle studio, the Sauna and Steam rooms and Spa treatment for which I was involved in all stages from client presentation to technical design. Other responsibilities included material palette selection, budgeting and value engineering, liaising with contractors, detail design, prototyping etc.
Project Description: The design proposal builds on four key aspects: Nature, Body, Health and Technology. The goal is to create a space that revitalises and heals. The circulation spaces are uninterrupted and clad with warm steam bent timber while the sauna and steam rooms are immersive ceramic tile clad vortexes that elevate and ground at the same time. The tree cycle is an organic sculptural piece that combines functionality and art and housed within a full height glass enclosure also acts as a centre piece to the Club. Trinity Luxury Health Club
2.0 Master Plan 2.4 Mood
BODY
NATURE
TIMBER
12
TECH
27
INTERIOR LAYOUT
EXIS
TING
COLU
MN
Layout showing circulation and zoning
EXST. CLMN
E.O
E.O
ter
Wa
d vise d re e b ose y prop ision to y surve v b ro d p e ant sult firm con E con & &M
e alv
V
T
AF
SH
T
F HA
EX
ST
. CL
MN
S
EXIS
TIN
GC
OLU
MN
E.O
EX
IST
ING
CO
LU
MN
E.O
EXIS
TIN
GC
OLU
MN
E.O
EX
IST
ING
CO
MN LU
E.O
E
E.O
G RA
Y
ST
O
TR
EN
SH
AF
SH
T
AF
E.O
T
S
VE
6
-2.2
7
-2.1
8
-2.2
.94
-1 9
-2.1
6
-1.8
1
7
-2.1
-1.9
.04
5
-2.4
-2
6 -2.3
8
-1.9
8
-2.0
28
8
-2.1
7
-2.2
GC
EL
7
IN IST EX
SH
D LE AB OM DIS HRO T BA
-2.4
OLU
MN
D LE AB OM DIS HRO T BA
SR NO
TING EXIS
MN COLU
EXST. CLMN
01
MN COLU
02 EXIS
TING
03
EXISTING COLUMN
EXISTING
05
ING EXIST
COLU
MN
PA
EXST. CLMN
COLUMN
04
06
COLUMN
TING
COLU
MN
EXIST
ING CO
LUMN
EXISTING
EXISTING
EXST. CLMN
COLUMN
07
EXIS
TING
COLU
MN
EXIS
08
COLUMN
EXISTING EXIST
ING CO
LUMN
EXISTING
ft
sha
EXST. CLMN
COLUMN
09
LUMN G CO
10
IN EXIST
11
TING EXIS
COLU
MN
12 13
N
14
EXIS
G TIN
CO
LUM
15
Trinity Luxury Health Club
1.0 Existing Site 1.2 Existing Plan
.676 102 SFL 106.040 SCL
.646 102 .034 SFL 106 SCL
16
.304
SFL
.634 102 SFL 106.034 SCL
Lift a Are
102
9 .27 102 SFL 106.025 SCL
.624 102 .034 SFL 106 SCL
.639 102 SFL 106.040 SCL .268 102 .008 SFL 106 SCL
.638 102 SFL 106.040 SCL
.638 102 SFL 106.034 SCL .638 102 .031 SFL 106 SCL
.639 102 .034 SFL 106 SCL
.282 102 .008 SFL 106 SCL
.282 102 SFL 106.021 SCL
.309 102 .021 SFL 106 SCL
ft
sha
17
.622 102 SFL 106.040 SCL
18
.629 102 SFL 106.040 SCL
0
EXISTING PLAN - PROPOSED DEMOLITION
5
10m
EXISTING PLAN - PROPOSED CONSTRUCTION
7
MIZZI STUDIO
29
TECHNICAL DRAWINGS Spa plan and section
Section of Sauna and Steam Rooms
Plan of Sauna and Steam Rooms
30
TECHNICAL DRAWINGS Spa details and prototype
Details of Sauna and Steam Rooms
Prototype of Sauna and Steam Entrance Wall
31
32
Sauna and Steam rooms
33
TECHNICAL DRAWINGS Changing Areas plan and section
D07
06
194_06_AD 1007
194-06-AD 6002
ENTRANCE TOWEL DROP
05
08
194-06-AD 6002
194-06-AD 6002
07
D03
194-06-AD 6002
09
194_06_AD 1003
194-06-AD 6002
10
194-06-AD 6002
G10
194_GEN_AD 6904
G07
194_GEN_AD 6901
D06
WALL HUNG AC UNIT DETAIL OF FIXING TO BE DISCUSSED BETWEEN FINISHED CONTRACTOR & ID.
GREEN WALL
EXISTING COLUMN
01
EXST. CLMN
D08
FEMALE CHANGING ROOM
BENCH
TOWEL DROP AND WATER FOUNTAIN
MAKE UP VANITY
02
194-06-AD 6001
EXISTI
194_06_AD 1008
194-06-AD 6001
AC UNIT
NG CO LUMN
194_06_AD 1006
D02
194_06_AD 1002
D05
194_06_AD 1005
03
GREEN WALL
SHOWERS
194-06-AD 6001
04
194-06-AD 6002
SPA ENTRANCE
G10
194_GEN_AD 6904
BASIN VANITY
D01
D04
194_06_AD 1001
02
194-06-AL 1001
G11
194_06_AD 1004
194_GEN_AD 6905
FEMALE CHANGING ROOM - GENERAL ARRANGEMENT PLAN Scale: 1:50
Female Changing Area Plan scale 1:50
4.0m
DESCRIPTION :
REV #
DATE
DESCRIPTION :
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION.
CONSTRUCTION ISSUE WALL WALLCAPPING CAPPING
D07 D07
MT MT03 03
Mizzi Studio
Unit 11, Latimer Studios MT MT 01 01 Road Latimer London W10 6RQ, UK
194-06-AD 194-06-AD 1007 1007
Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk
D03 D03
194-09-AD 194-09-AD 1003 1003
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALEGLAZING FROM THE DRAWINGS. USE GIVEN DIMENSIONS LOCKER LOCKER GLAZING ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING TZ TZ 01 01 MT MT 01 01 GL GL02 02 MT MT04 04 OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.
PROJECT TITLE CLIENT NAME
PROJECT NO:
TRINITY HEALTH CLUB GREGORY NASMYTH
MT MT03 03
12 12 2019
K.WALKER
1:50
MT MT03 03
ARRANGEMENT PLAN
PROJECT ADDRESS
J.MIZZI
CLIENT SIGN OFF:
A2
MT MT 01 01
STAGE:
CONSTRUCTION
PENDER GARDENS, ST JULIANS, MALTA
SHEET NO:
THC_194_06_AL_100 CFL CFL+02.750 +02.750
CFL+02.500 +02.500 CFL ACFIXING FIXING&&ACCESS ACCESSPANELS PANELSTO TOBE BE AC SPECIFIEDBY BYM&E M&ECONTRACTOR CONTRACTOR SPECIFIED &CO-ORDINATEDWITH WITHFINISHES. FINISHES. &CO-ORDINATED
SHADOW SHADOWGAP GAPFOR FORRETURN RETURNAIR. AIR. 50MM 50MMSHADOW SHADOWGAP GAPTO TOBE BE CO-ORDINATED CO-ORDINATEDWITH WITHFINISHES FINISHES CONTRACTOR. CONTRACTOR.
FFL+00.000 +00.000 FFL
FFL FFL+00.000 +00.000
01 01
194-06-AL 194-06-AL 1001 1001
ELEVATION ELEVATION01 01 SCALE SCALE1:50 1:50
TZ TZ 01 01
MR MR01 01
MT MT04 04
TZ TZ 01 01
LOCKER LOCKER
D08 D08
TZ TZ 01 01
MT MT 01 01
TZ TZ 01 01
TZ TZ 01 01
ST ST 03 03
194-06-AD 194-06-AD 1008 1008
D05 D05
194-06-AD 194-06-AD 1005 1005
CFL CFL+02.750 +02.750 CFL+02.500 +02.500 CFL
2X 2X30MM 30MMSLOTS SLOTSININFOR FOR WALL WALLFOR FORVENTILATION VENTILATION POWERREQUIRED REQUIRED POWER FORLED LEDSTRIP STRIP FOR LIGHTINTREGRATED INTREGRATED LIGHT INTOJOINERY. JOINERY. INTO
400 400 400 400
450 450
780 780
500 500
2210 2210
POWERREQUIRED REQUIRED POWER FORLED LEDSTRIP STRIP FOR LIGHTINTREGRATED INTREGRATED LIGHT BENCH. ININBENCH. TIMBERBENCH BENCHTO TO TIMBER MATCHLOCKERS LOCKERS MATCH
FFL FFL+00.000 +00.000
02 02
194-06-AL 194-06-AL 1001 1001
POWERREQUIRED REQUIRED POWER FORHAIR HAIRDRYER. DRYER. FOR
FFL FFL+00.000 +00.000 TO TOSHOWERS SHOWERS
TO TOWC'S WC'S
ELEVATION ELEVATION02 02 SCALE SCALE1:50 1:50
PT PT 04 04 Female Changing Area Sections
D04 D04
194-06-AD 194-06-AD 1004 1004
TZ TZ 01 01
TZ TZ 01 01
ST ST 01 01
TZ TZ 01 01
SF SF 03 03
SHOWER SHOWERDOOR DOOR
GL GL03 03
G10 G10
194-GEN-AD 194-GEN-AD 6904 6904
0606
CFL CFL+02.750 +02.750
0101
CFL CFL+02.500 +02.500
GW GW02 02 POWERREQUIRED REQUIRED POWER FORLED LEDSTRIP STRIP FOR LIGHTININMIRROR. MIRROR. LIGHT
0202
OK OK
34
0.
CHECKED BY:
DRAWN BY:
WALL WALLCAPPING WALL CAPPING CAPPING FEMALE CHANGINGWALL ROOMS 02: GENERAL SHEET TITLECAPPING
1.0m
NOTES:
DATE
194
2.0m
0303
TECHNICAL DRAWINGS Changing Area details
CFL +02.500
20
2550 800
800 20
G03
TZ 01
194-GEN-AD 6901
330
330
00
R1
G06
ST 03
194-GEN-AD 6901
1370
509
700
MT 02 MR 01 SF 27
G09
SF 23 1300
194-GEN-AD 6903
ST 03 780
700
STOOL.
200
450
450
ELEVATION A
410 161
D05
194-06-AD 1005
2550
SCALE 1:20
SF 23
150
ST 03
S01
TROUGH DETAIL FOR ACCESSORIES
SLOTS IN STONE FOR TOWEL BIN ACCESS.
194-06-AD 1005
TZ 01
100
90
80
SF 23
140
130
ST 03
ST 03
50
R4
449
STOOL.
150
R5
450
ST 03
100
600
0
R50
630
150
2550
2550
450
FFL +00.000
D05
DETAIL
194-06-AD 1005
A
SCALE 1:5
194-06-AD 1005
D05
194-06-AL 1001
REV # -
S01
MAKE UP VANITY PLAN
194-06-AD 1005
SCALE 1:20
DATE
DESCRIPTION :
12/12/2019
CONSTRUCTION ISSUE
REV #
DATE
DESCRIPTION :
SECTION 01 SCALE 1:20
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION.
Vanity Mirror Detail
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.
Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk
PROJECT TITLE CLIENT NAME
PROJECT NO:
TRINITY HEALTH CLUB
SHEET TITLE
PROJECT ADDRESS
DRAWN BY:
NOTES:
DATE
194
GREGORY NASMYTH FEMALE CHANGING ROOM 11: D05 MAKE UP VANITY DETAIL
12 12 2019 CHECKED BY:
K.WALKER
J.MIZZI
SCALE:
CONSTRUCTION
PENDER GARDENS, ST JULIANS, MALTA
CLIENT SIGN OFF:
A2
AS SHOWN STAGE:
SHEET NO:
THC_194_06_AD_1005_CO
SF 03 CFL +02.750
SF 22
250
SHOWER HEAD ARM
SF 09
950
SHOWER HEAD
TZ 01
TZ 01
TZ 01
SF 10
2200
SOAP ACCESSORIES
SF 11
150
HAND SHOWER
GL 03 IR 01
2100
2110
2400
SF 12
SHOWER MIXER
SHOWER DOOR HANDLE
1100
1330
TZ 01
IR 02
T01
SF 39
SHOWER WASTE
FFL +00.000
MT 03
SHOWER DOOR BRACKETS
194_GEN_AD 6902
630
D02
194-06-AD 1002
D02
ELEVATION A
194-06-AD 1002
SCALE 1:20
B
194-06-AD 1002
D02
ELEVATION B
194-06-AD 1002
SCALE 1:20
TZ 09
ELEVATION D SCALE 1:20
C
SF 11
TZ 09
HAND SHOWER
SF 24
SHOWER HEAD ARM
SF 39
SF 09
SHOWER HEAD 144
1300
A
194-06-AD 1002
SCALE 1:20
245
194-06-AD 1002
SF 39
194-06-AD 1002
D02
ELEVATION C
50
3
TZ 09
TZ 09
TERRAZZO SHOWER TRAY
870
SF 04
LINEAR DRAIN
D
194-06-AD 1002
D02
194-06-AL 1001
REV #
DATE
-
12/12/2019
scale 1:20
SHOWER PLAN SCALE 1:20
1.0m
Shower Cubicle Detail DESCRIPTION :
REV #
DATE
DESCRIPTION :
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION.
CONSTRUCTION ISSUE
Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.
PROJECT TITLE CLIENT NAME SHEET TITLE
TRINITY HEALTH CLUB GREGORY NASMYTH FEMALE CHANGING ROOM 08 D02 SHOWER DETAILS
PROJECT ADDRESS
PENDER GARDENS, ST JULIANS, MALTA
PROJECT NO:
194 DRAWN BY:
K.WALKER
1:20 STAGE:
0.5m
0.3m
0.1m
0.0m
NOTES:
DATE
12 12 2019 CHECKED BY:
J.MIZZI
CLIENT SIGN OFF:
A2
CONSTRUCTION
SHEET NO:
THC_194_06_AD_1002_CO
35
36
Female Changing Area
Male Changing Area
Male Shower Rooms
37
TECHNICAL DRAWINGS Tree Cycle plan and elevation
Elevation of Tree Cycle
Plan of Tree Cycle
38
TECHNICAL DRAWINGS
Tree Cycle details and lighting study
Details of Tree Cycle
Tree Cycle Lighting Study
39
40
Tree Cycle Studio
Back to Contents
41
42
3.
ALF MIZZI HEADQUARTERS MARSA, MALTA 2019
Client: Alf Mizzi & Sons (Marketing Group) Stage: Completed 2019 Area: 1800 Sqm Design Team: Jonathan Mizzi, Ashwini Engineers: MMP Malta Stair Manufacturer: EE Stairs
Left: The feature staircase that combines function with art. It is constructed out of sixty satin stainless steel handrails joined together ©Jonathan Mizzi Top: View of the spiral stair looking into the skylight. ©Jonathan Mizzi
Role: Senior Designer Responsibilities: RIBA Stage 2 to 6 As project designer I was involved in conceptual design and interior layout. Detail design for reception, all standard and executive cabins, conference room and feature staircase. I was involved in all stages from client presentation to technical design pack. 3D modelling, delivering tender and construction packs and liaising with contractors and stakeholders.
Project Description: The new headquarters for the Alf Mizzi and Sons Marketing group in Malta aims to signify the values and drivers of the business – sophistication, transparency and innovation. These are achieved through design in sculptural, textural and material form. The dramatic entrance is the first point of contact for visitors to the headoffice and hence was designed to create a grand impression with vortex ceiling and monolith reception desk. The central staircase sitting beneath a skylight offers a functional yet artistic feature for the employees.
Right: Mood imagessophistication, transparency and innovation
43
Alf Mizzi Southwing Office Interior
INTERIOR LAYOUT
2.0 Interior Masterplan Layout showing circulation and zoning 2.1 General Arrangement
44
45
FEATURE STAIR DRAWINGS Stair elevation and pipe bending study
3354 mm
9073 mm
1700 mm
• 1 FLOOR S CONTINUA • TOTAL HEI • NO OF TUR • TOTAL DIA • THREAD W • RISER HEI • TOTAL NUM
1
502
Elevation of Feature Stair
1
Stair Elevation
2
Scale - NA 1
2
21
18
5
12
Dwg. Title:
15
8
14
11
14
9
13
10
12
11
Stair Basic Dimensions
13
Scale: NA
Helical Pipes B Partner:
No. of Pipes: 15 Jonathan Mizzi Total Rise: 7837mm Total Radius: 750mmStructural Eng: o DRAWN DATE720 Degree of Turn:
Total Radius: 2500mm Degree REV of Turn:DESCRIPTION 360o
HELICAL PIPES A
1
2
HELICAL PIPES B
21
12
15
8
14 11
17 16
7
15
14
9
13
10
11
12
HELICAL PIPES D
ension & Location
Pipe bending quantities and dimension
46
Malta Corporate Office
Dwg. Title:
Helical Pipes - Dimension & Location
Scale: NA
No. of Pipes: 8 for each radius Rise for each radius: 1120.75mm Radii: R1=2298; R2=1937; R3=1556; R4=1197; Degree of Turn for each radius: 90o
architecture | structural engineering | interiors
Job Title:
MP studios'. It is issued in other than that for which it is
R3
Helical Pipes D
No. of Pipes: 24 Total Rise: 7837mm Total Radius: 550mm Degree of Turn: 720o
D' on site. b architect. other drawings forming part of
R2
13
Helical Pipes C
HELICAL PIPES C
R4
18
6
16
7 8
19
5
17
6
R1
20
4 18
10
21
3 19
9
1
2
20
3 4 5
����� ��������� ����
17 16
7
15
Job Title:
18
6
16
7
8
19
5
17
6
10
20
4
· This drawing is not to be 'SCALED OFF'. · All dimensions have to be 'CHECKED & VERIFIED' on site. · Any differences have to be referred back to the job architect. · This drawing must be read in conjunction with all other drawings forming part of this project. · This drawing is the sole property and design of 'MMP studios'. It is issued in confidence and must not be used for any purpose other than that for which itHelical is Pipes A issued. It should not be reproduced in whole or in part, or disclosed to any third No. of Pipes: 24 party without the written consent of 'MMP studios'. Total Rise: 3353mm
Drawn by:
Ashwini Ashokkumar
Sheet size:
A3
Scale - NA
21
3 19
9
1
2
20
3 4
Stair Plan
MMP studios
37, Dolphin Court, Blk C, Apt M, Embassy Way, Ta' Xbiex XBX 1073, Malta Mobile: + 356 21336704 Email: info@mmp.com.mt
Drawn by:
Ashwini Ashokkumar
Date:
Job Architect:
Date:
Consultant:
05/04/2017 -
Jonathan Mizzi -
FEATURE STAIR IMAGES Details and Construction
60 satin stainless steel handrails bent to form spirals and joined together to form this elegant stair that appears like wisps of liquid metal rising into the sky.
47
48
View from corridor towards offices
49
RECEPTION AREA DRAWINGS Reception Section and Isometry
Section through Reception and Corridor
FIBREGLASS CLADDING EXISTING COLUMN
1
• 11250 X 7200mm total dimension of fibreglass feature • 4 column claddings of height 4000mm integrated into the ceiling structure • 2453mm to 2126mm in height and 5567mm by 3717mm elliptical dimension skylight cladding. • 12 X Ø82mm provisions for ceiling lights. • Structure to be fixed to the ceiling by fabricator.
Feature 1 - Isometric View
Skylight and column cladding and assembly Scale - NA
50
architecture | structural engineering | interiors
Job Title:
· This drawing is not to be 'SCALED OFF'. · All dimensions have to be 'CHECKED & VERIFIED' on site. · Any differences have to be referred back to the job architect. · This drawing must be read in conjunction with all other drawings forming part of this project. · This drawing is the sole property and design of 'MMP studios'. It is issued in confidence and must not be used for any purpose other than that for which it is issued. It should not be reproduced in whole or in part, or disclosed to any third party without the written consent of 'MMP studios'.
Malta Corporate Office
MMP studios
Dwg. Title:
Feature 1 - Isometric View
Scale:
Drawn by:
Partner:
Date:
Job Architect:
Date:
Date drawn:
Structural Eng:
Date:
Consultant:
Date:
Job nr:
NA
Jonathan Mizzi
REV
DESCRIPTION
DRAWN
DATE
-
Ashwini Ashokkumar 05/04/2017 -
Jonathan Mizzi -
Sheet size:
A3
05/04/2017 05/04/2017
17/02/2017 17006
37, Dolphin Court, Blk C, Apt M, Embassy Way, Ta' Xbiex XBX 1073, Malta Mobile: + 356 21336704 Email: info@mmp.com.mt Issued: 05/04/2017
Code: -
Drawing nr: 604
Rev:
View of completed Reception Area
Detail of light and shadows at skylight
51
52
Entrance reception area showing swooping oval skylight, chevron timber floor and smoked marble reception desk.
Back to Contents
53
54
4.
SERPENTINE COFFEE HOUSE HYDE PARK, LONDON 2019
Left: Detail of Serpentine showing the sinuous curve against the Grade I listed landscape of Hyde Park. ©LukeHayes Photography Top: Front View of the smiling stingray roof of the cafe as it welcomes you from Kensington Gardens. ©LukeHayes Photography Right: Structural study of forces based on roof curvatures. ©Arup Associates
Client: The Royal Parks, Colicci Stage: Completed July 2019 Area: 150 Sqm
Shortlisted for UK Cafe and UK Biophillic Design Awards 2020 Restaurant and Bar Design Awards.
Design Team: Jonathan Mizzi, Ashwini Ashokkumar Structural Engineer: Arup Roof Manufacturer: MouldCam Fit-Out Contractors: Opus
Project Description: The Serpentine Coffee House is part of a tender won by Mizzi studio in collaboration with Italian artisan coffee brand Colicci to transform ten prestigious sites across The Royal Parks. The aim is to create an immersive architectural resting point that responds and reflects the Grade I listed landscapes of Hyde Park. The result is an undulating hand painted brass canopy that sits atop open, semi-transparent glass pavilion.
Role: Project Lead Responsibilities: RIBA Stage 2 to 6 As the project lead for the Cafe I was involved in all stages from Planning through to Construction. This included detailed 3D modelling, delivery of tender and construction packages. Liaising with stakeholders, consultants and contractors. Routine factory and site visits for quality checks. Merits: Shorlisted for Fx Awards ‘UK project of the year’, Finalist for Building Design’s Architect of the Year awards 2020,
55
CAFE DRAWINGS Elevation and Site Plan
Cafe South Elevation
Cafe Site Location Plan
1 56
SITE CONTEXT
NA
N
MIZZI STUDIOS
Interior View ©LukeHayes Photography
View towards Serpentine Bridge ©LukeHayes Photography
57
EXPLODED DIAGRAM
Construction sequence and kit of parts
ROOF 04
03
01
PA MO
02
DR
03
RO RW
04
GL RO
01
01 06 02 10
GLAZING 18
01
06
07 06 05
08 11 16
15
ROOF
04
10
03 01
06
11
02 10
06 04
03
01
07
08
01
16 10
13
04
01
08 06
01
11 16
10 10
ROOF 01 REV #
DATE
17 PATINA BRASS FINISH COMPOSITE MONOCOQUE ROOF SEGMENT (31) DESCRIPTION :
REV #
DRIP DETAIL AROUND EDGE OF ROOF.
03
ROOF FORM CONTOURS TO DRAIN INTO RWP LOCATIONS. 15 10 19 GLAZING CHANNEL CONCEALED WITHIN 12 ROOF. 09
ALUMINIUM FRAMED CLERESTORY IN TEXTURED RAL 7016
07
GLAZED DOORS IN TEXTURED RAL 7016 07
08
FIXED WINDOWS IN TEXTURED RAL 7016
09
SLIDING FOLDING ENTRANCE FACADE IN TEXTURED RAL 7016
CH
ALUMINIUM FRAMED LOUVERED 07 STORAGE DOORS IN TEXTURED RAL 7016
13
CH
06
ALUMINIUM FRAMED CLERESTORY IN TEXTURED RAL 7016
14
AN
15
CH
07
GLAZED DOORS IN TEXTURED RAL 7016
08
FIXED WINDOWS IN TEXTURED RAL 7016
09
SLIDING FOLDING ENTRANCE FACADE IN TEXTURED RAL 7016
ALUMINIUM FRAMED CLERESTORY IN TEXTURED RAL 7016 14
10
UCS 152X152X37 WELDED BOX FRAME
11
UCS 152X152X37 BEAM
12
CHS 114 STUB EMBEDDED IN ROOF
13
CHS 114 STUB FITTED ON SITE
14
ANCHOR PLATE FOR FRONTAL COLUMNS
15
CHS 114X8 CROSS BRACING MEMBERS
18
07
07 GLAZED DOORS IN TEXTURED RALMizzi7016 Studio
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS 13 CHS 114 STUB FITTED ON SITE
08
London W10 6RQ, UK FIXED WINDOWS IN TEXTURED RAL 7016 Tel: +44 (0) 207 183 2774
14 ANCHOR PLATE FOR FRONTAL COLUMNS ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL
Unit 11, Latimer Studios Latimer Road Email: info@mizzi.co.uk
09
SLIDING FOLDING ENTRANCE FACADE IN TEXTURED RAL 7016 08 STRUCTURE
ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT 19 BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.
15
CHS 114X8 CROSS BRACING MEMBERS
UCS 152X152X37 BEAM
07
12
Latimer Road CHS 114 STUB EMBEDDED INOUTROOF ANY WORK. DISCOVERY London W10 6RQ, UK
08
07 FIXED WINDOWS IN TEXTURED RAL 7016
13
CHS 114 STUB FITTED ON SITE
SLIDING FOLDING ENTRANCE FACADE IN TEXTURED RAL 7016
14
ANCHOR PLATE FOR FRONTAL COLUMNS
15
CHS 114X8 CROSS BRACING MEMBERS
DESCRIPTION :
AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION.
17
Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk
18
19
SERPENTINE COFFEE HOUSE
CLIENT NAME
ILLUMINATED SIGNAGE
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.
Mizzi Studio Unit 11, Latimer Studios
COLICCI
SHEET TITLE
INTERNAL WALL FINISH IN EXPLODED BLUE PERSPECTIVE CEMENTVIEW TILES PROJECT ADDRESS SERPENTINE BRIDGE, W2 2UH
EXTERNAL WALL FINISH IN ALUMINUM TEXTURED RAL 7016
MISC
10
UCS 152X152X37 WELDED BOX FRAME
11
UCS 152X152X37 BEAM
12
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS 17 ILLUMINATED SIGNAGE Mizzi Studio CHS 114 STUBUnitEMBEDDED IN ROOF SHEET TITLE ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING 11, Latimer Studios
16
PROJECT TITLE FACETED WALNUT WOOD PANELING ON SERPENTINE COFFEE HOUSE COUNTER
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION.
OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.
13
CHS 114 STUB FITTED ON SITE
14
ANCHOR PLATE FOR FRONTAL COLUMNS
15
CHS 114X8 CROSS BRACING MEMBERS
CLIENT NAME
COLICCI EXPLODED PERSPECTIVE VIEW
18
INTERNAL WALL FINISH BLUE CEMENT PROJECTIN ADDRESS TILES SERPENTINE BRIDGE, W2 2UH
19
EXTERNAL WALL FINISH IN ALUMINUM TEXTURED RAL 7016
16
FA CO
17
ILL
18
INT TIL
19
EX TE
FACETED WALNUT WOOD PANELING ON COUNTER PROJECT TITLE ILLUMINATEDSERPENTINE SIGNAGECOFFEE HOUSE CLIENT NAME INTERNAL WALL FINISH IN BLUE CEMENT COLICCI TILES SHEET TITLE
EXPLODED PERSPECTIVE VIEW
EXTERNAL WALL FINISH IN ALUMINUM PROJECT ADDRESS TEXTURED RAL 7016
SERPENTINE BRIDGE, W2 2UH
MISC
11
DATE
MISC
STRUCTURE
16
TEXTURED RAL 7016 14 GLAZED DOORS IN TEXTURED RAL 7016
Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk
12
05
UCS 152X152X37 BEAM
16 FACETED WALNUT WOOD PANELING ON PROJECT TITLE COUNTER UCS 152X152X37 WELDED BOX FRAME THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO
Latimer Road London W10 6RQ, UK
UC
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO 17 AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI 12 CHS 114 OWNER STUB EMBEDDED INMAYROOF STUDIO AND/OR THE PROJECT IS A VIOLATION OF COPYRIGHT AND BE SUBJECT TO PROSECUTION.
10
REV #
11
UCS 152X152X37 WELDED BOX FRAME
ROOF FORM CONTOURS TO DRAIN INTO RWP LOCATIONS.
DESCRIPTION :
GLAZING CHANNEL CONCEALED WITHIN ROOF.
11
03
DATE
04
10
06
SL TE
UC
05
DRIP DETAIL AROUND EDGE OF ROOF. 05
09
10
DESCRIPTION :
ALUMINIUM FRAMED LOUVERED STORAGE DOORS IN TEXTURED RAL 7016
FIX
STRUCT
06 DATE
STRUCTURE 08
58
06
08
ROOF FORM CONTOURS TO DRAIN INTO RWP LOCATIONS.
11
02
09
DESCRIPTION :
ALUMINIUM FRAMED LOUVERED STORAGE DOORS IN TEXTURED RAL 7016
GL
DRIP DETAIL AROUND EDGE OF ROOF.
MISC
Construction Sequence 06 ALUMINIUM FRAMED CLERESTORY IN
1910
05
07
03
08 STRUCTURE
10 GLAZING CHANNEL CONCEALED WITHIN 15 ROOF.12 19 09 GLAZING 13 05 ALUMINIUM FRAMED LOUVERED STORAGE DOORS IN TEXTURED RAL 7016
REV #
17 11 PATINA BRASS FINISH COMPOSITE 06 MONOCOQUE ROOF SEGMENT (31) 14 05
AL TE
02
GLAZING 13
04
11 06
GLAZING
02
04
ROOF FORM CONTOURS TO DRAIN INTO RWP LOCATIONS. 15 08 GLAZING CHANNEL CONCEALED WITHIN 19 ROOF.
04
ROOF
07
05 OF ROOF. DRIP DETAIL AROUND EDGE
0903
10 06
10
02
12 06 11
18
PATINA BRASS FINISH COMPOSITE MONOCOQUE ROOF SEGMENT (31) 06
01
06
PATINA BRASS FINISH COMPOSITE MONOCOQUE ROOF SEGMENT (31)
GLAZING
ROOF
18
01
AL ST
01 01
17
19
05
PROJECT NO:
176 DRAWN BY:
A.ASHOKKUMAR
N/A STAGE:
NOTES:
DATE
26 04 2019 CHECKED BY:
J.MIZZI
CLIENT SIGN OFF:
A3 SHEET NO:
176_SCH_AD_501
PROJECT NO:
176 DRAWN BY:
A.ASHOKKUMAR
N/A STAGE:
NOTES:
DATE
26 04 2019 CHECKED BY:
J.MIZZI
CLIENT SIGN OFF:
A3 SHEET NO:
176_SCH_AD_501
PROJECT N
17
DRAWN BY
A.ASHO
N/ STAGE:
NOTE: · ALL DIMENSIONS PROVIDED FOR GUIDANCE AND TO BE CONFIRMED ON SITE BY MAIN CONTRACTOR · FOR SPECIFICATION OF STRUCTURAL ELEMENTS PLEASE VERIFY WITH ENGINEERS DWGS · CONTRACTOR TO PROVIDE GLAZING DRAWINGS FOR SIGN OFF
SELECTED DETAILS
Details for ease of assembly and conceal-ability
A0
10MM PLATE FILLETED TRIANGULAR COLUMN BASE
03 411
50
22.9
97
15M FILL TRI ANC
10MM PLATE FILLETED TRIANGULAR COLUMN BASE
.2
5°
R3
7.7
TOP OF FLEXISTONE
+FFL [20.45]
10
+20.43
+2467
15MM PLATE FILLETED TRIANGULAR ANCHOR PLATE
200
15.0 25.0
10.0
50.0
161.3
16.1
14.0
CHS 114X8 GALVANISED METAL COLUMN
2MM GALVANISED METAL COVER PLATE. FABRICATOR TO CONFIRM
100
CONNECTION REFER ENG DRAWING 5006: Detail D
A0
CHS 114X8 GALVANISED METAL COLUMN
350
15MM PLATE BASE PLATE
421
SEALANT/FOAM (ROOF MANUFACTURER TO CONFIRM)
25.0 15.0
250.0
2MM GALVANISED METAL SLEEVE SLID OVER CONNECTION
+TOP OF PILE CAP [20.118] 500.0
10.0
CONNECTION REFER ENG DRAWING 5006: Detail B
250.0
60.0
15.0
10.0
10.0
60.0
250.0
10.0
82
.7
5°
10.0 46.25
1
CHS 114X8 GALVANISED METAL COLUMN
FRONTAL COLUMN TOP
A3 Integrated structure within roof to connect to1:5@ column on site
2
FRONTAL COLUM BASE SIDE
3
FRONTAL COLUM BASE
1:5@ A3 Roof to structure detail with ease of assembly consideration
1:10@ A3
MIZZI STUDIOS NOTE: · ALL DIMENSIONS PROVIDED FOR GUIDANCE AND TO BE CONFIRMED ON SITE BY MAIN CONTRACTOR · FOR SPECIFICATION OF STRUCTURAL ELEMENTS PLEASE VERIFY WITH ENGINEERS DWGS · CONTRACTOR TO PROVIDE GLAZING DRAWINGS FOR SIGN OFF
GRILL EMBEDDED IN ROOF
FALLS C09 [REFER DWG 111]
MILLED FOAM
EMBEDDED GRP TUBE
EMBEDDED PLATE
+263
60.0
C09 [REFER DWG 111] 100.0
30
C09 [REFER DWG 111]
Round Flushjoint Aluminium Downpipes_RAL7016 100mm Dia POWDER COATED METAL CASING RAL 7016
UCS 152X152X37 (REFER ENGG DWGS)
Round Flushjoint Aluminium Extended Fixing Bracket
+220
OUT
C01 [REFER DWG 111]
L02 [REFER DWG 110] C01 [REFER DWG 111] 100
Detail of assembly of clerestory within large inset in roof
1
IN
30
Integrated rainwater funnels in roof attach to rainwater pipe
RAINWATER PIPE DETAIL 1:5@ A3
MIZZI STUDIOS
59
60
View from Kensington Garden exit ©LukeHayes Photography
Back to Contents
61
62
5.
HOLI SALONI RAJASTHAN, INDIA 2018
Client: Saloni Lodha Stage: Complete March 2018 Area: 1000 Sqm Design Team: Jonathan Mizzi, Ashwini Ashokkumar Contractor: RAAS Devigarh, Arjun Bhai
Left: One of the guests (Dree Hemingway) celebrating the festival of Holi outside the mud huts ©Signe Vilstrup Top: Mudhut Skylight detail ©Jonathan Mizzi Right: Woven archway entrance to Secret Garden ©Jonathan Mizzi
Role: Project Lead Responsibilities: As the project lead I was involved in all stages from conceptual design to delivery. Initial 3D modelling and client presentation from the London studio and on site construction supervision from Udaipur. Finalising the layout on site by maximizing views of surroundings within the design. Working collaboratively with the artisans to understand the traditional technique and adapt it to suit the geometries proposed in the design.
Project Description: To celebrate 10 years of her eponymous fashion brand ‘Saloni’ the client decided to host an event at the palace-converted RAAS Devigarh hotel in Udaipur on the Indian festival of Holi. The brief was to create a set that celebrates Indian vernacular architecture while giving it a Star Wars Tatooine vibe. The result is a duo of mud huts sitting as a reflection of the aravalli hills in the background with portholes to the palace. This is surrounding by multiple sculptural elements. Some plastered in mud and painted by local artists and other left bare to expose the beautiful woven texture of the construction.
Merits: Longlisted for Dezeen Awards ‘Small Project’ category 63
MUD HUT VILLAGE DRAWINGS Overall Layout and Construction diagram
0
60 0
60
1260
11000
SEATING 2
SKYLIGHT AIMED AT MOUNTAINS BEHIND
STALL 3 BUFFET
9495
SKYLIGHT AIMED AT DEVIGARH PALACE
SKYLIGHT AIMED AT DEVIGARH PALACE
LVL +-0
SECONDARY HUT
POTENTIAL EXIT FOR BACK OF HOUSE
UP
TERTIARY HUT
LVL +150 LVL +300 LVL +450
MAIN HUT
LVL +600
HOLI PYRAMID 14000
SEATING 1 BEST VIEW OF THE PALACE
LVL +600
LVL +300 LVL +450
MUD PLATFORM BESPOKE CANOPY
LVL +150
12192
MAIN TENT
TOWARDS LOOS
STALL 1
STALL 2
WELCOME DRINK LIGHT REFRESHMENTS CEREMONIAL THEEKHA /BANGLES ETC?
SNACKS CANAPES BAR FOOD
51 37
89 39
31
00
BAR
60 0
60 0
600
SIGNAGE FOR LOOS ON THIS WALL
ALIGNED WITH BAMBOO CANOPY
DJ DESK 10058
POTENTIAL EXIT FOR BACK OF HOUSE
ENTRANCE
ALIGNED WITH THE CENTRE OF CHEF'S GARDEN AXIS EXTENDED MUDWALL TO COVER VIEW ON THE RIGHT
Layout of the village showing mud huts, mud bar and other sculptural seating. Paper size:
Revisions Rev Date
Architect / Originator:
Notes: By
Checked
Description
Do not scale. All dimensions to be checked on site. This drawing is copyright.
MIZZI STUDIOS
Approved
Client:
A3
MIZZI
UNIT 202, 242 Acklam Road, Westbourne Studios, London, W10 5JJ Tel: +44 (0)7900 835 483 Email: jonathan@mizzi.co
Project:
Date of Origin:
Drawing Title:
Scale/s:
LAYOUT PLAN
R2743
Drawing Number:
24 0
11m
03.02.18
HOLI SALONI
R2100
Drawing Status:
CONSTRUCTION
200 300
14.8m 3962
1000
350
600
2312
600
1000
1161 571
2033
759
440
656
450
I 350
QUANTITY TOTAL AREA: 34m2 [366sqft]
3.63m 3.4m 2.57m 3.2m 1.8m 1.7m
Construction Guidelines Paper size:
Revisions Rev Date
Architect / Originator:
Notes: By
Description
Checked
MIZZI STUDIOS
Approved
Client:
64
A3
MIZZI
UNIT 202, 242 Acklam Road, Westbourne Studios, London, W10 5JJ Tel: +44 (0)7900 835 483 Email: jonathan@mizzi.co
Do not scale. All dimensions to be checked on site. This drawing is copyright. Drawn By:
Project:
Date of Origin:
Drawing Title:
Scale/s:
Drawing Number:
CONSTRUCTION
HOLI SALONI DOME GEOMETRY
AA
1:20
420
14.1
Drawn By:
03.02.18
AA
1:20
Drawing Status:
The mud hut duo against the backdrop of Aravalli hills with holi powder bombs emerging from portholes. ©Eva Geraldine
Entrance showing human scale ©Signe Vilstrup
Sculptural Mud Bar ©Jonathan Mizzi
65
66
Interior of one of the mud huts with sunlight pouring to the center from the portholes. ©Jonathan Mizzi
CONSTRUCTION IMAGES
Traditional mud hut artisans working with woven local reeds
The technique of construction involved creating trenches in the ground where the “Aakhdo” (Calotropis procera) - a local plant that grows in abundance - are inserted and filled with “Khemp” (hay) before being woven together. A bundles of these materials are then woven together to create structural arches to join both forms.
67
68
View from inside the woven hut with the Devigarh palace through the porthole ©Jonathan Mizzi
Back to Contents
69
70
6.
FIREKRAKEN
KING’S CROSS, LONDON 2018 Client: Restaurant and Bar Design Awards Stage: Completed Oct 2018 Area: 45 Sqm Design Team: Jonathan Mizzi, Ashwini Ashokkumar Contractor: FireCracker Works
Left: Detail of the firekraken lighting sculpture ©Matthew B Andews Photography Top: View of the Firekraken incorporating the sign ‘5’ within the given 3m cube framework.
Role: Project Lead Responsibilities: As the project lead I was involved in all stages from conceptual design to delivery. 3D modelling and client presentation. Liaising with contractors to develop design solutions for ease of assembly and creative solutions to increase impact while keeping cost of production to a minimum (pro bono project for designer and contractor). Factory and on site installation checks.
Project Description: As part of the 10th year anniversary of The Restaurant and Bar Design Awards 5 design studios were invited to interpret the theme of ‘Celebration’ within a huge three dimensional tapestry. The ‘Firekraken’ is an immersive lighting installation that freezes dancing fireworks in a moment of time and reanimates it with addressable LEDs. These are choreographed to evoke the spectacular natural phenomenon of bioluminescent organisms - a playful fusion of dancing fireworks and a family of sea creatures dancing together in the deep.
Right: Prototype testing at Firecracker works factory.
71
CONSTRUCTION IMAGES
Technical drawings showing assembly and kit of parts
732
1237
854
1787
976
2062
793
2199
488
1924
427
1374
427
1100
04 110
427
1
Front Elevation
1:25@ A2
Array of bent acrylic tubes from a single forma
Exploded Isometric View
2
Side Elevation
2
825
1:25@ A2
Various curves from Single Former 1:75@ A2
1:25@ A2
8 ACRYLIC TUBES PLASTIC WELDED TO SUPPORT ON OUTER FINS
MIZZI STUDIOS
LED STRIPS 8 ACRYLIC TUBES PLASTIC WELDED TO INNER RING SUPPORT
3 72
Plan Plan
1:25@ A2
Support Detail Support Detail 4
1:5@ A2
ELEVATION DRAWINGS
Various configuration of the concept of fireworks
Front Perspective 1
3072
3072
487
1536
673
3072
3072
SIDE
413
PLAN
480
1507
PLAN
3072
3072
3072
1795
1536
SIDE PLAN
420
1507
949
FRONT
SIDE
04 108
04 110
04 114
FRONT FRONT
04 112
1
Front Elevation
1:25@ A2
1
Side Elevation Front2 Elevation
1:25@ A2
1:25@ A2
1
5
Location Within Cube
Front Elevation Side Elevation1:25@ A2 2
1:25@ A2
Elevation of all 5 fireworks display within the 3m cube framework 8 ACRYLIC TUBES PLASTIC WELDED TO SUPPORT ON OUTER FINS
1
1:100@ A2
Side Elevation Front2 Elevation
5
1:25@ A2
8 ACRYLIC TUBES PLASTIC WELDED TO SUPPORT ON OUTER FINS
3
Plan
1:25@ A2
3
Plan4
Support Detail 1:25@ A2
LED STRIPS
8 ACRYLIC TUBES PLASTIC WELDED TO INNER RING SUPPORT
8 ACRYLIC TUBES PLASTIC WELDED TO INNER RING SUPPORT
1:5@ A2
3
Plan
1:25@ A2
1
1:100@ A2
Front Elevation Side Elevation 2
8 ACRYLIC TUBES PLASTIC WELDED TO SUPPORT ON OUTER FINS
UPPER TUBES ROTATED AWAY FROM RADIAL AXES LED STRIPS
Location Within Cube
Box 1 Front View Support 6 Detail 1:5@ A2 1:25@ A2
MIZZI STUDIOS
1:5@ A2
3
Plan 4
Box 2 Front View 1:25@ A2
1:5@ A2
1:25@ A2
1:100@ A2
2
1:25@ A2
LED STRIPS
8 ACRYLIC TUBES PLASTIC WELDED TO INNER RING SUPPORT
6 Support Detail
Location Within Cube
8 ACRYLIC TUBES PLASTIC WELDED TO SUPPORT ON OUTER FINS
LED STRIPS
4
5
3
Plan
1:5@ A2
8 ACRYLIC TUBES PLASTIC WELDED TO INNER RING SUPPORT
4
Box 3 Front View Support 6 Detail 1:25@ A2
1:5@ A2
1:5@ A2
MIZZI STUDIOS MIZZI STUDIOS
Detail View of one of the displays ©Matthew B Andews Photography
73
4
74
The final reveal at the Restaurant and Bar Design Awards 10th Anniversary celebration ©Matthew B Andews Photography
Back to Contents
75
76
7.
Kensington Memorial Park Wormwood Scrubs
Site Railway
Imperial West
Westway Sports Centre
A40 Westway
LATIMER STUDIOS LATIMER ROAD, LONDON 2019-Present
Client: Perseus International Investments Ltd. Stage: Planning Area: 1000 Sqm Design Team: Jonathan Mizzi, Ashwini Ashokkumar Planning Application: Tania Martin Building Regulation Consultants: Assent Building Control Left: South View of the building proposal from Latimer Road Top: Site Location satellite view. Site is located in the north-western part of the Royal Borough of Kensington and Chelsea, in St. Helen’s Ward. Right: Latimer Road looking north-west c.1900. 3 storey houses on west side were demolished in 1980s
Role: Project Lead Responsibilities: RIBA Stage 2 to 3 As project Lead I was involved in all stages from Site study to Planning. Massing studies, material palette, layout studies, liaising with consultants and preparing planning pack. Ensuring the design complies with guidelines from the National Planning Policy, London Plan, St.Quintins Neighbourhood Plan as well as the newly issued Design Code set out by RBKC.
Project Description: The new proposal at Unit 11 Latimer road aims to become the cornerstone of a new mixed-use vibrant ‘creative quarter’ that will set the tone for the regeneration of Latimer Road. The building consists of 2 storeys of commercial and 3 storeys of residential with the 5th floor set back such that it is not seen from street level. The massing studies informed the buildings silhouette which increased density of site without compromising on privacy. The building’s curved corners help soften it whilst the material palette is sensitive to the street context.
77
SITE CONTEXT AND CONSTRAINTS 83
6
121bc
81
1 to
6
79
1 to
8
13
23
30
Offices & Industry
1
75
16
97
73
61
59
103
12
1
43
47
42
33
21 54
25 33
35
13
64
a 111
35
8
19
3
11
21
26
123
1
11
133
1
1
18
74
11 34
125
117
135
5 33 to 9 33
2
115
Garage
149
20 1 to 12
Robinson House
1
3 33
3
1
179
32
173
Nurser
31
7 to
to 142
use ic Ho mp Oly
134
2
136
20
10
161
0 to
1 to 24
25 to 48
20
1 to
E ROAD CROWTHORN
5
BRAMLEY ROAD
8
RD OXFO
ENS GARD
14
Hall
1
1 to
Westway Sports
187
Pavilion
El Sub Sta
80
Soane House
198 196
1 to k Hou7 se
Lin
ROAD
WESTWAY
08
road) (elevated Westway Sports Centre
The Latymer Christian Centre
23
81
Windsor Court
Arthur Court
1 to 8
BRAMLEY ROAD
Dixon House
40
SILCHESTER
79
DAR FIEL D
5 9
10 13
12 15
MEWS CHARLOTTE 75 77
73
16 19
10 11
18 21
64 to 76
67 71
63
1 to 45
WE ST
57 to 63
1 to 5 15 to 19
Latymer Day Nursery
26
(Below )
39
65
301
to 339
41
TEST ERTO N
9 18
7A
7 18
ROAD
1 to
HU RS TW 40 AY
19
1
La tim er
RO AD
Ro ad
Stat ion
El Sub Sta
Frinstead House PH
63
14. 15.
(belo w)
4
10 43 9
7 to 13 21 to 27
19
El Sub Sta
1 to 80
18
13.
18 to
45
30 1 to
DRIVE SHALFLEET
Harrow Club
Gre nfell W
33 9
ntre Ce ry rse ation Nu s uc ol Ed ne ho An Sc er tim St La and
2 to 12
14 to 24
26 to 36
PH
86 to 90
12 to 17
43 to 49
92
50 to 56
1 to 1 1
DARFIELD WAY
BLECHYNDEN STREET
Hu rstwa yW alk
WAY
24 27
LE AB ST
65 69
22 25
d
ROUTE CROSS
15
Waynflete Square
38 to 48
29 to 41
68
El Sub Sta
54
Surgery
to 211
c
15
ST WE
74
Markland House
Depot
Bramley House
9
b
CR OS S RO UT E
3
20
1 2
15
22
21 21a
a
1 to 80
09 SL
11. 12.
54
WAYNFLETE SQUARE Bramley House
Tanks
SL
10.
13
15
80 to 90
Waynflete Square
Depot
8. 9.
ROAD
401 Tes to 461 terton Walk
LE AB ST
Y WA
2 6
WESTWAY
1 to 21
Whitstable House
1 to 24
Goodrich Court
WAY
road) (elevated
Kingsnorth House
1 to 80
Westway Sports Centre 27
25
201
21
9 to 12
LMER WA
201
7.
9
6 to
9
2a
s den Gar ool Oxfordary Sch Prim
20
174
Ivebury Court
32
4
25
2
210
164
4
19 67
69
ROAD
GE RID CAMB
Trin ity Mew s
1
Scamps ton Mew s
2
31
L BALLIO
14
0
22
158
Park House
Downing House
122
Walmer House
1
2
109
14
13
2 23
152
118
06
14
45
23
44
57
15
2
26
AD RO
El Sub Sta
ENS GARD
1
11
14 87
10
2
6
35 7
14
57
ER TIM LA
126
150
9
sfield Cro rt Cou
121
2
14
69
115
5
77
93
117
1
57
ROAD
109
17
3 46
1 to 14
49
CK FINSTO
1
6
07
112
1 to
1 to 6
128
Latimer Cortile
5. 6.
ENS GARD
124
140
1a
RD OXFO
120
122
Church
34
96
104
112
36
ROAD
24
68
26
94
S RDEN 'S GA LEN ST HE
26
UE AVEN
45
FORD LLING WA
VER HLE HIG
ROAD LIOL BAL
38
0
26
ENS GARD
63
49
3
10
67
RO AD
34
33
48
2 27
56
53
M AR K'S
1. 2. 3. 4.
97
15
9 47
23
1
66
3
46
51
ST
ROAD ETT BASS
56
91
13
37
33
56d
44
31
58
4 27
33
32
54
Cou
Kelfield
85
7
127
57
47
11
34
66
6 28
35
46
1ac
1bd
4
AD RO
ELD KELFI
14
ET RE D ST IEL INF SH
2
2ac
29
36
36
ET STRE
2bd
0 to
AM NH EY
OT
3ac
29
26
05
gery
Sur
El Sub Sta
18 rt 1 to
ENS GARD
20
22 28
46
16
h
ge
3
6
2
E AC PL
's Churc
138 36
St Helen's Church
ara
17
68
29
ELD KELFI
18
ER TIM LA
St Helen
Hall Hall
2
10
Depot
1
PH
02
Vic
MEWS
8
AD E RO BRIDG KINGS
1
126
105 a-e
Cowper Terrac e
5
29
04
2
PO Club
ELD KELFI
0
14
El Sub Sta
107bc 8
9
30
s
ork
W
109a
107a
20
03
s
ork
W
109bc
10
5
10
2 30
8a
29
DGE GSBRI KIN ROAD
rt Cou 35 lyn Fox1 to Eve
80
4
E OS CL
111a
1
84
lyn Fox Eve rt Cou
8
30
IEW TV WES
111bc
3bd
88
5
4 1
2a
30
113a
ST QUIN TIN AVEN UE
UE AVEN
0 31
6a 6 30
30
5
45
FORD LLING WA
92
4 31
AD RO
8
30
9
45
113bc
52a
0
ER TIM LA
01
SQU
73
115a
48
18
54
32
Day Nurse ry
ARLES ST CH
115bc
S RDEN 'S GA LEN ST HE
24
104
8
11
15
ET RE E ST AT SG AR SN
21
119bc 119a
117bc
7
0 32 33
Works
121a
117a
Immediate and surrounding context
H AD E RO
3 bc 123a
149
69
67
2
Health Centre
69
71
1
46
7
5
58
62
E AC PL ON ER LD CA
8
PCs
ST QUIN TIN AVEN UE
58
2
PH
4 66
6
16
North Pole Shopping Area St Helen’s Shopping Parade Conservation Area Site Location - 11 Latimer Ind. Estate Railway Line Oxford Gardens Primary School (7 minute walk from the site) Imperial West Development North Site Proposed Under Pass Imperial West Development South Site Latimer Road Tube Station (13 mins walk from Site) White City Living Development White City Tube Station (15 Mins walk from Site) Freston Road Employment Zone Monsoon / Talk Talk HQ BBC / Media Centre Westfield Shopping Area
5
25 to 31
18 7 to 16
23
0
16
3 1 to 14
6
35
9
25
1
2 12 7
27 25
33
19
12
18
49
5 13
a St
45
121 to 109
7 1
3
2
16
11
9
114
99
13
b
5 to
107
51
39
Su
12
46
1
37
20
44
El
42
EET M STR EVESHA
12
35
8
41
14 26
40
13
E AC H PL SLEIG AN
126
Works
92
13
24
22
1
80
14
54
AD RO
26
to 83
11
N'S AN
Sta
91
ST
56
El Sub
PH
12 91
to 18
15
13
9 7
3 7
5
4 2
6
AD AY RO REL
2
1
ER RTIM MO UARE SQ
75
3
12
1
3
71
Walk erine's St Kath
49
WAY 36
34
30 to 32
2
ARIEL
Sta
57 to g 59a b 61a 63
10
D AY ROA REL
STREET OLAF
1
4
12
3
3
4
D ER ROA SILV
Warehouse
27
25 23 21
RI
28 22
01 02
Unit 12
03
04 05
06 07
08
09
Site Constraints
3 6
Works
right. All rights reserved. Royal Borough of Kensington & Chelsea LA 086460 2000 .
78
85 74
6
Sta El Sub
OLAF STREET
Warehouse
Warehouse
El Sub
11
13
to
89
99
97
24
11
to
8
15
8
RING ROAD 7
BBC Television Centre
78
10
3
5
13
8
1 to
10
Studios
BBC Television Centre
AD N RO TO ES FR
12
D ER ROA SILV
14
104
13
25
10
ET RE H ST ELEIG STON
36
22
SE CLO
24
Y CIT
23
SL SL
83
19
61
3
35
103 105 107 109
33
12
21
E HIT W
Warehouse
El Sub Sta
Map of Surrounding Area
1 to
27
SB 13
17
131 151
143
1
St
Warehouse
2
137
0
117
28 29
13
111
13
15
129 147
8
125
13
119
2 to
13 11
7
135 155
14
T
St Francis Catholic Primary School
Nursery
35
1 3 5
159
0
15
157
4
1 16 3 16 5 16
2
6 to
14
29
27
4
0a
15
11
lose nC tio hibi Ex
(London Transport)
12
D D ROA BAR
White City Station 27
25
16
2
15
AD N RO TO ES FR
1
3
31
37
UTE S RO CROS WEST
149
36
38
Oxford Gardens Conservation Area Freston Road / Latimer Road Employment Zone
AD H RO HURC ITC WH 1
El Sub Sta
Works
43
AD Y RO CIT
LANE WOOD
ITE WH
11
Garage
BRAMLEY ROAD
33
501 to 562
61
Works
ROAD DEPOT
Unit 10
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.
B1 Photographic Studios 4 Storey Mixed Use B1 Warehouse Building Green Barrier Closet wing/loading bay 4 Storey Residential Building Building line Open Land B1 Warehouse Building Railway Green Barrier
MASSING STUDY
Stages to arrive at final building silhouette
1
Existing footprint maximised to 6 full storeys to accommodate B1 units at ground level and above. The resultant structure feels extremely overbearing.
2
Exploration of reduction in the height of the building to five storeys as per RBKC (/AR/18/08501/L3FU) and APP advice in 2018 for the site. The overbearing nature still exists.
3
Height of the building is reduced to 4 storeys with setback. Reducing the height to 4 storeys and creating setback offers a less imposing feel to the street. The fifth floor is set back to not be visible at street level.
4
The closet wing is reintroduced opening up the site. Differentiation in height allows for a more interesting and appealing architectural appearance and allows increased daylight and sunlight to the street.
5
6 full storey development of Latimer Industrial Estate would create an unacceptable sense of enclosure, diminish sky views, day light and sunlight and increase shadowing on the west side of the street.
6
4 storeys with a fifth floor set back and retaining the closet wing ensures that light and sky view factor are not compromised if replicated across the development of the Industrial Estate. 79
PLANNING DRAWINGS
Level 0 Plan (Commercial) and Front Elevation MATERIAL KEY 1. DOUBLE GLAZING 2. EXPOSED CONCRETE 3. BLACK BRICK CLADDING 4. RED BRICK RUNNING BOND PARAPET 5. RED BRICK VERTICAL STACK 6. RED BRICK RUNNING BOND 7. PERFORATED METAL GATE RAL 7016 8. BURNISHED BRASS 9. POWDER COATED METAL DOORS AND WINDOWS RAL 8029 10. LW WALL LIGHT 11. POWDER COATED METAL RAILING RAL 8004 12. BUFF BRICK RUNNING BOND 13. TOUGHENED SECURITY GLASS
A
B
C
4020
D
5336
4020
E MT 01
4463 FFL +17.000
MT 02 MT 03
ABOVE NOT VISIBLE FROM STREET FRONT
MT 04 MT 05
FFL +14.000 MT 01
MT 12
MT 03
FFL +10.675
FFL +07.350
FFL +03.600
MT 06
BOUTIQUE ONE LW
LW
LW
LW
MT 01
MT 01 MT 09
MT 09
MT 07
MT 07
MT 09 LW
MT 01
MT 06
MT 07
HEDGE LINE
FFL +00.000
RWP
REV #
DATE
PROPOSED ELEVATION 01 SCALE 1:100
DESCRIPTION :
REV #
DATE
DESCRIPTION :
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.
Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk
A
B
C
4020
5336
RESI PLANT ROOM
PROJECT TITLE CLIENT NAME SHEET TITLE
PROJECT NO:
LATIMER STUDIOS MIZZI
09 12 2019 CHECKED BY:
J.MIZZI
A.ASHOKKUMAR
CLIENT SIGN OFF:
A3
1:100
PROPOSED ELEVATION 01
PROJECT ADDRESS
NOTES:
DATE
149 DRAWN BY:
STAGE:
SHEET NO:
UNIT 11, LATIMER ROAD
D
E02
149-AD-01 6002
149_AD_01_A_6001
E
4020
4463
COMM PLANT ROOM
1
COMM CYCLES 8 NOS
DEMISE OUTLINE
E01
149-AD-01 6001
6244
RESI CYCLES 14 NOS
COMM CORE 57 SQM
KONE MonoSpace® 500 DX
EXIT
2 00
COMM 1 130 SQM post
5616
3000
COMM ENTRY
3
E03
buzzer
00
RWP
149-AD-01 6003
RESI CORE 64.7 SQM
360L
360L
360L
360L
360L
360L
E04
LF
149-AD-01 6004
LF
2.0
4.0
6.0
149-MAS-01 1001
LF
LF LF
LF
SMOKE AND HEAT DETECTOR
10.0
S01
scale 1:100
01
LF
LF
149-AD-01 6005
PROPOSED LEVEL 0 PLAN
E01
CCTV CAMERA
S02
149-AD-01 6001
149-AD-01 6006
LF
SCALE 1:100
RECESSED FLOOR UPLIGHT
EXISTING FOOTPRINT SITE BOUNDARY PROPOSED FOOTPRINT
AREA NAME
80
TOTAL AREA (in Sqm) LOBBY + CIRCULATION CYCLE PARKING
PLANT ROOM
STAIRCASE
LIFT
BINS
TOILETS
RESI CORE
64.7
23.5
16
4.1
12.4
3.3
5.4
-
COMM CORE
59.2
37.8
2.3
4.1
6
3.3
5.4
-
COMM 1
130
-
-
-
-
-
-
8.3
PROJECT TITLE CLIENT NAME Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk
SHEET TITLE
LATIMER STUDIOS MIZZI PROPOSED LEVEL 0 PLAN
PROJECT ADDRESS
UNIT 11, LATIMER ROAD
PROJECT NO:
149 DRAWN BY:
A.ASHOKKUMAR
1:100 STAGE:
NOTES:
DATE
09 04 2021 CHECKED BY:
J.MIZZI
CLIENT SIGN OFF:
A3 SHEET NO:
149_MAS_01_A_1001
N
1.0
360L
RWP
RESI ENTRY
LF 0.0m
360L
360L
UNIT 12
4
buzzer post
UNIT 10
360L
COMM BINS
3000
RESI BINS
4272
00
PLANNING DRAWINGS
Level 3 Plan (Residential) and Section through Latimer Road MATERIAL KEY 1. DOUBLE GLAZING 2. EXPOSED CONCRETE 3. BLACK BRICK CLADDING 4. RED BRICK RUNNING BOND PARAPET 5. BUFF BRICK CLADDING 6. FLUTED CONCRETE 7. PERFORATED METAL GATE 8. BURNISHED BRASS 9. POWDER COATED RAL 7016 10. LW WALL LIGHT 11. TIMBER PRIVACY SCREEN
FFL
SLAB
625
310
130
CONCEALED SERVICES
110 75
CFL
FFL +17.000
MT 02
MT 02
1005
2700
1750
RESI
MT 01
230 750
SLAB
310
FFL +14.000
MT 09
FFL
1750
MT 03
EXPOSED SERVICES
FFL +10.675 MT 04
FFL +07.350
3000
MT 11
3200
1750
COMM
FFL +03.600
MT 05 LIFT CORE
RESI CYCLE
FFL +00.000
RESI PLANT
1100
STAIR CORE
1750
CORE i7
12 TANKS FOR GRADUAL RELEASE INTO SEWAGE SYSTEM
200
REV #
DATE
DESCRIPTION :
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.
Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk
A
B
CLIENT NAME SHEET TITLE
PRIVACY SCREEN
PRIVACY SCREEN
BALCONY 10 SQM
J.MIZZI
CLIENT SIGN OFF:
A3
1:200
PROPOSED SECTION 01
STAGE:
SHEET NO:
UNIT 11, LATIMER ROAD
D 4020
RWP
09 04 2021 CHECKED BY:
A.ASHOKKUMAR
PROJECT ADDRESS
5336
PRIVACY SCREEN
149 DRAWN BY:
MIZZI
NOTES:
DATE
PROJECT NO:
LATIMER STUDIOS
C
4020
1
PROJECT TITLE
149_AD_01_A_6005
E 4463
BALCONY 9.2SQM
PRIVACY SCREEN
DESCRIPTION :
PRIVACY SCREEN
DATE
SCALE 1:200
RWP
RWP
BD 1 16.1 SQM
6244
BD 1 12.8 SQM
APT 4 1B2P 51.2 SQM 10500
jack-n-jill
13500
APT 5 2B4P 73.9 SQM 10500 13500
KONE MonoSpace® 500 DX
K/L/D 28.7 SQM
2
BD 2 14.4 SQM
K/L/D 34.2 SQM
RESI STAIR 20.7 SQM
5616
10500
3
en-suite
obscure window
K/L/D 39.4 SQM
jack-n-jill
APT 6 2B4P (Wheelchair User) 84.2 SQM
RWP
10500
XSIZE YSIZE
4272
13500
BD 1 14.8 SQM
0.0m
1.0
2.0
4.0
6.0
UNIT 12
UNIT 10
4
BD 2 14.8 SQM
RWP
10.0 scale 1:100
01
149-MAS-01 1004
PROPOSED LEVEL 3 PLAN SCALE 1:100
N
REV #
PROPOSED SECTION 01
PRIVACY SCREEN
S01
149-MAS-01 1001
310
UNIT 11
LATIMER ROAD
AREA NAME
TOTAL AREA (in Sqm) CAPACITY
K/ L/ D
BEDROOM 1 BEDROOM 2 BEDROOM 3 BEDROOM 4 STORAGE
51.2
1B2P
28.4
12.8
-
-
-
2
12.6
APT 5
73.9
2B4P
34.2
16.1
14.4
-
-
2.5
9.2
APT 6
84.2
(WHEELCHAIR USER)
2B4P
39
14.8
14.8
-
-
3.4
PROJECT TITLE
BALCONY
APT 4
-
CLIENT NAME Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk
SHEET TITLE
LATIMER STUDIOS MIZZI LEVEL 3 PLAN
PROJECT ADDRESS
UNIT 11, LATIMER ROAD
PROJECT NO:
149 DRAWN BY:
A.ASHOKKUMAR
1:100 STAGE:
NOTES:
DATE
09 04 2021 CHECKED BY:
J.MIZZI
CLIENT SIGN OFF:
A3 SHEET NO:
149_MAS_01_A_1004
81
82
View of the building proposal from across the site with Imperial West in the background.
Back to Contents
83
84
8.
SITE AREA of 6,403 SQM
2
MUSCAT MOTORS GZIRA, MALTA 2020-Present
Client: Muscat Motors, Malta Stage: Planning Area: 18,000 Sqm Design Team: Jonathan Mizzi, Jo Formosa, Ashwini Ashokkumar Architects: Edwin Mintoff, Malta Role: Project Assistant Responsibilities: RIBA Stage 2 As the project assistant I was involved in 3D detailed modelling and grasshopper studies for massing.
Project Description: Muscat Tower aims to be the tallest building in Malta. With rapid development in Malta becoming inevitable, Mizzi Studio’s design aims to bring an elegance to the skyline by introducing a slender tower that draws inspiration from a strong vertebral column. With soft rounded edges, backward taper and a narrow base level the building does not become overbearing within its context.
Left: View of Muscats Tower with existing Art Deco building of Muscat Showroom below. Top: Site Location Plan Right: Form inspiration of vertebral column
85
REVISION 03 (17.12.20)
MASSING STUDIES
Area calculations for various massing options
39 38 37
RESIDENTIAL II TOTAL GFA = 977 Sqm (EXCLUDING BALCONIES)
TOTAL FLOORS = 3
36
255
35 34 33 32 31 30 29 28
RESIDENTIAL I TOTAL GFA = 7268 Sqm
(EXCLUDING BALCONIES)
TOTAL FLOORS = 16
27 26 25 24 23 22 21 20 19 18 17 16 15
COMMERCIAL II TOTAL GFA = 8037 Sqm (EXCLUDING BALCONIES)
TOTAL FLOORS = 14
14 13 12 11 10 9 8 7 6 5 4
COMMERCIAL I TOTAL GFA = 2381 Sqm (EXCLUDING BALCONIES)
3
TOTAL FLOORS = 6
2 1
ISOMETRIC VIEW
TOTAL GFA (excluding balconies) = 18,655 Sqm
Final Morphology
SIDE ELEVATION
TOTAL AREA (including balconies) = 20,521 Sqm TOTAL NUMBER OF FLOORS = 39 PROJECTED FOOTPRINT = 667 Sqm SET BACK = 255mm per floor
NOTES:
REV #
SHEET NO:
DATE
DESCRIPTION :
PROJECT TITLE CLIENT NAME SHEET TITLE
MUSCATS TOWER XXXXXXXXXXXXXXXXXXXXXXXXXXXX ORIGINAL VS PROPOSED - FRONT ELEVATION
PROJECT ADDRESS
PROJECT NO:
DATE
177 DRAWN BY:
21 12 2019 CHECKED BY:
A.ASHOKKUMAR
NA
J.MIZZI
A2
STAGE:
Rue D'Argens, Il-Gira GZR 1368, Malta
Morphology studies
86
177_MMT_GEN_AD_XXXX
MIZZI Mizzi Studio Unit 11, Latimer Studios Latimer Road London W10 6RQ, UK Tel: +44 (0) 207 183 2774 Email: info@mizzi.co.uk
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE FOR USE ON THIS PROJECT ONLY AND ARE THE JOINT PROPERTY OF MIZZI STUDIO AND THE PROJECT OWNER. ANY USE OF INSTRUMENTS OF SERVICE WITHOUT THE PRIOR EXPRESS WRITTEN PERMISSION OF MIZZI STUDIO AND/OR THE PROJECT OWNER IS A VIOLATION OF COPYRIGHT AND MAY BE SUBJECT TO PROSECUTION. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. DO NOT SCALE FROM THE DRAWINGS. USE GIVEN DIMENSIONS ONLY. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE VERIFIED ON THE PROJECT SITE BY THE CONTRACTOR PRIOR TO CARRYING OUT ANY WORK. DISCOVERY OF ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR FOR CLARIFICATION. THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR APPROVAL BY THE OWNER'S AUTHORIZED CONTRACT ADMINISTRATOR PRIOR TO COMMENCEMENT OF ANY WORK.
PLANNING DRAWINGS Plan and Elevations
Front Elevation
Rear Elevation
Plan
87
88
View of balcony detail
Back to Contents
MMP MMPMMPMMPss tudios tudiosstst udios udios 89
90
9.
SITE RELOCATION
SITE RELOCATION
CHISWICK HOUSE SCHOOL PEMBROKE, MALTA 2020-Present
Client: Bernie Mizzi, Malta Stage: Planning Area: 14,000 Sqm Design Team: Jonathan Mizzi, Jo Formosa, Ashwini Ashokkumar Architects: MMP, Malta Role: Project Assistant Responsibilities: RIBA Stage 2 As the project assistant I was involved in concept, detailed design and 3D modelling of surrounding landscape.
Project Description: The proposed scheme is for Chiswick House School – a co-educational establishment in Malta, catering for students between the ages of two and eighteen. Their new building would see the construction of a new primary school with thirty-six classrooms and varied outdoor sport facilities. The new Chiswick House School premises will be one of the first in Europe to use the innovative pod and open-classroom concept, where children are encouraged to interact with their natural environment rather than being confined to an indoor classroom.
Left: View of Learning pods Top: Site Location Right: Circular learning
91
SITE AND DESIGN
Site photo and final design
Proposed site at Pembroke overlooking the Mediterranean Sea
92
View of School entrance with ancillary road built into the scheme.
PLANNING DRAWINGS Plan and Elevations
Sections
Plan
93
94
View of amphitheatre and sports area
95
96
Aerial view of proposed design.
Back to Contents
97
98
10.
THORNHILL SCHOOL LIBRARY ISLINGTON, LONDON 2016
Client: Thornhill Primary School Islington Stage: Conceptual Design Area: 50 Sqm Design Team: Alex Haw, Aditya Bhatt, Ashwini Ashokkumar Structural Design: Fluid Structures
Left: Interior View of the library showing the tree-like shelving, the central helical stair and the ceiling rose. All designed with CNC cut and engraved Grade A birch ply.
Role: Project Assistant Responsibilities: RIBA Stage 2 to 4 As project assistant I was involved in 3D modelling and preparing tender packages. Design detailing and liaising with potential contractors. I was also involved in creating assets for social media fundraising campaigns.
Project Description: To refurbish the existing library into a magical forest of books the design optimised the given space with wall-to-wall, floor-to-ceiling shelves. Books become like the fruit of the shelving trees, which branch to support the balconies - a ‘natural’ part of everyday life. In plan, the shelving verticals were laid out on a precise equiangular radial grid of the Dewey Decimal classification (DDC) system. The project’s design of a double staircase loop that spatially accesses all areas also echoes the DDC’s rich network of relationships between topics.
Top: Section through the library showing profile of tree-like shelving ribs that also extend to become structure for mezzanine level and seating. Right: Mood image
99
CONSTRUCTION SEQUENCE
Step-by-step construction sequence and design logic
1
3
5
100
The space is organized by a radial grid based on the Dewey Decimal system
‘Secondary’ Structural Ribs made of 2 layers of 18 mm structural plywood and 2 additional articulation layers are placed between them, halving the span.
The usable area of the library is doubled by the mezzanine reading area on split levels and the seating areas beneath them.
2
4
6
10 ‘primary’ Structural Ribs made of 2 layers of 24 mm structural plywood and 2 additional articulation layers are arranged at every alternate interval dividing the space into 10 quadrants.
Concentric Intermediary truss beams connect key loading points between the ribs providing support for the mezzanine and stairs leading up.
The 100 divisions of the grid are finally manifested into the space as tertiary ribs that form the additional supports holding up the shelves.
CONSTRUCTION SEQUENCE
Final assembly overlaid with the DDC system
The 10 major divisions produce 10 major, dominant verticals; the half-way subdivisions produce secondary “minor” supports, with the finer hundredths further visualised with ultraslender vertical filigree-work. The shelving grids can be creatively curated and colonised as desired. Emptier spaces visualise for the visitor the frontiers of knowledge not yet represented in the room. The physicality of the sculptural shelves remind us that knowledge and learning are not mere abstractions, but bear concrete relation to our real, material world.
101
102
Interior View of Library
Back to Contents
103
104
11. 10.
222, ST. JOHN’S ROAD RICHMOND, LONDON 2016
Client: Ottokar and Natalia Rosenberger Stage: Tender Area: 40 Sqm Design Team: Alex Haw, Ashwini Ashokkumar Structural Design: Fluid Structures Installation Contractors: Wilder Creative
Left: Detail of completed house at Richmond Roundabout ©Philip Doumler Top: Artistic isometric view of library system made from CNC cut and engraved Birch Ply. Right: Reference images of CNC cut and engraved birch ply from an Atmos designed project in Limehouse . ©Alex haw
Role: Project Assistant Responsibilities: RIBA Stage 2 to 4 As project assistant I was involved in 3D modelling and preparing tender and construction packages for the library within the larger residential project. Design detailing and liaising with potential contractors. Working closely with the studio director to develop a design language that is adaptable to various on site constraints yet reads as a single fluid geometric expression.
Project Description: 222, St John’s is a residential project for a couple in West London. The client is a researcher looking to build an immersive library within their home to carry out her path-breaking research in Internal Medicine. The library is designed to be an assembly of tree-like ribs holding up fluid shelves to encase a fantastic volume. The articulation and detailing include various ‘genes’ that are developed to inform the design system of the whole. These respond to on site elements like windows, skylights and room divisions.
105
Detail2
Detail1 - 1:10
Detail2 - 1:10
Detail3 - 1:10
Detail of shelves intersecting at various junctions
Detail4
106
Ground Floor Plan (Library) - 1:50
222-571
drawing no.
-
revision
scale
n/a
date
26/10/16
AA
Detail4 - 1:10
drawn by
Detail3
drawing title
Detail1
Detail Joinery - Library - Shelf plan @ 740mm
drawing no.
222-571
revision
-
scale
n/a
date
26/10/16
AA notes + prev revs: A B C-
drawn by
drawing title
Detail4 Detail Joinery - Library - Shelf plan @ 740mm
Detail3
21 St. John's Road
Detail1
project
Library Plan and Details
A3
size
AH
checked
Detail1 - 1:10
21 St. John's Road
Ground Floor Plan (Library) - 1:50
notes + prev revs: A B CDE
Detail2
project
A3
size
AH
checked
TECHNICAL DRAWINGS
Library Plan
Detail2 - 1:10
Ground Fl
Detail1 - 1:10
Detail3 - 1:10
Detail4 - 1:10 Detail2
Section B'B (Library) - 1:50
Library Transverse Section
Detail2 - 1:10
B'
Detail3
Detail1 - 1:10
Detail4
A 222-574
-
revision
drawing title
02/11/16
date
size
checked
notes A3revs: n/a + prev A B CDE
scale
AA 21 St.AHJohn's Road
project drawn by
Detail1
drawing no.
Detail4
Detail Joinery - Library - Rib - Short Section
Detail3
21 St. John's Road
222-574
-
revision
scale
n/a
date
02/11/16
AA drawing no.
drawn by
drawing title
Detail Joinery - Library - Rib - Short Section
Detail2
notes + prev revs: A B CDE
Detail1
project
A3
size
AH
checked
TECHNICAL DRAWINGS
Library Section and Details
Section B'B (Library) - 1:50
B'
Detail2 - 1:10
A
Detail of ribs intersecting at various junctions
D
Section B
107
TECHNICAL DRAWINGS Shelf to Rib Detail
108
Back to Contents
3D VIEW
Shelf to Rib Prototype
109
110
12.
SCHOOL OF BUILDING SCIENCE CEPT UNIVERSITY, AHMEDABAD 2014
Client: CEPT University, Ahmedabad Stage: Completed Area: 2520 Sqm Left: View of the renovated entrance courtyard showing the entrance staircase cum amphitheatre and double heighted reception at the rear. ©Dinesh Mehta Top: Sectional perspective through the building showing design interventions to open up the building and improve flow. Existing section shows low interaction between volumes.
Design Team: Dilip Patel, Manika Chawla, Ashwini Ashokkumar Role: Project Designer Responsibilities: RIBA Stage 2 to 6 As project designer I was involved in all stages from client presentation to delivery. Working collaboratively with students and faculty to understand the difficulties with the existing spatial configurations and presenting appropriate design solutions. Preparing tender and construction packages. Material palette and design detailing as well as on-site project management.
Project Description: Faculty of Technology is a project completed for CEPT University. Due to change in programmatic requirements, the building, designed by Pritzker winning architect B.V Doshi, was beginning to face severe light and ventilation issues. The approach is to reorganize the spaces and reassess the programmatic structure to create open spaces within the building whilst paying homage to the strong architectural context.
Right: Image of existing School of Building Science and Technology designed by B.V Doshi.
111
EXISTING SITE PHOTOS
Existing spaces and proposed interventions
Existing light and space conditions
112
Elimination of dead end corridors for more light ©Dinesh Mehta
Larger vestibules to connect multiple classrooms ©Dinesh Mehta
113
DRAWINGS AND VIEWS Layouts and design intervention
DRAWINGS AND VIEWS Legend
Layouts and images of completed project 1 Open court 2 SD studio:1
Legend 3 UG studio:5
14 Open MIEMcourt studio:1 25 SD studio:1 MIEM studio:2 36 UG studio:5 covered courtyard 47 MIEM studio:1 CPM studio:2 58 MIEM studio:2 CPM studio:1 69 covered courtyard Environmental lab 710 CPM studio:2 Material lab 811CPM Multistudio:1 purpose space 912 Environmental lab lab Survey levelling 10 lab 13 Material SD studio:2 11 purpose space 14Multi Geomatics studio:1 12 levelling lablab 15 Survey Geomatics comp. 13 SD studio:2 14 Geomatics studio:1 15 Geomatics comp. lab
Lvl 0-0 Creating access to light from all classrooms on the basement lvl Lvl 0-0
Lvl 1-1 Condensing faculty spaces to create eff Lvl 1-1
Lvl 0-0
Lvl 1-1
Creating access to light from all classrooms on the basement lvl
Existing vs. proposed circulation
Condensing faculty spaces to create ef
Existing vs. proposed circulation
Existing Circulation/ open space
114
Proposed Circulation/ open space
fective work-flows
ffective work-flows
Lvl 2-2 Creating North-South access for better light and ventilation. Lvl 2-2
Creating North-South access for better light and ventilation.
Lvl 2-2
Existing vs. proposed circulation
Post-graduate programs
Undergraduate programs
115
BEFORE 116
View from the double height reception towards the courtyard. ©Dinesh Mehta
Back to Contents
AFTER 117
118
13.
DR REDDY’S LAB CORPORATE OFFICE HYDERABAD, INDIA 2009
Client: Dr Reddy’s Lab, Hyderabad Stage: Completed Area: 17000 Sqm Design Team: Suraj Gaonkar, Sudha K, Ashwini Ashokkumar Structural Engineer: Sterling Engineering Consultancy Pvt. Ltd. Contractor: JMC Projects India Ltd. Left: View of Central Void. ©Koti Top: Schematic design of central spine of corporate headquarters that included meeting spaces, amphitheatre and history wall display. Right: Initial sketch for the design of amphitheatre.
Role: Design Intern Responsibilities: RIBA Stage 2 to 4 As design intern I was involved in overall interior layout. Key responsibilities were design detail of amphitheatre, COO, CEO, CFO, Standard Cabins and Meeting points. This included concept sketches to technical drawings.
Project Description: The office is the Corporate Headquarters for pioneering Pharmaceutical Company- Dr. Reddy’s Laboratories. The interior vision for the project was to sculpt out the mass within the building to create large central voids that act as open community spaces for the 3000 employees. The central social spine branches off to create office spaces at various levels. At the ground floor the social spine converges to become an amphitheatre.
Merits: 1st Place A+D Cera Awards
119
TECHNICAL DRAWINGS
GA Plan First Floor- Open Plan Offices and Amphitheatre
120
Back to Contents
TECHNICAL DRAWINGS
GA Plan Fourth Floor - Executive Cabins
121
122
14.
peak
level 1
valley
level 2
level 1
level 3
level 3
level 2
level 4
level 4
level 5
level 5
VEIN+MEMBRANE
ARCHITECTURAL ASSOCIATION, LONDON 2014 Course: Emergent Technologies and Design (MSc.) Tutors: Michael Weinstock, George Jeronomidis, Evan Greenberg Subject: Biomimetics Design Team: Antoniya Stoitsova, Di Zhou, Ashwini Ashokkumar
Left: Artistic View of the final design. Top: Biomimetic study of dragonfly wing. Right: Active and Passive layers to emulate the structural properties of the dragonfly wing.
Responsibilities: As part of the design team I was involved in initial biomimetic study of the dragonfly wing. This included academic research, physical model testing and computer simulations. The findings were then extrapolated into design parameters to create a simple and effective pavilion using tensile membranes and steel to mimic the structural properties of the dragonfly wing.
Project Description: The reticulate vein pattern of the dragonfly wing works in combination with cross-bracing membranes to reorganize its form as an instantaneous response when subjected to multi-directional wind loads. The stresses are transfered to the muscles at the thorax whilst undergoing constant deformations to achieve ideal forms for various load conditions. The effect of vein pattern, corrugation and variable flexibility is studied to design a system that is lightweight and capable of withstanding multiple load conditions.
Active Layer
Passive Layer
123
PHYSICAL AND DIGITAL EXPERIMENTS Load tests with various geometric parameters
Single Corrugation-Deformation under self load
Single Corrugation-Deformation under point load
z y
peak
valley
position of corrugation
x
Uz - displacement (z)
Multiple Corrugations-Effect of fold direction [m]
0
-12.9
Anchor Plane
Wind Load
Multiple Corrugations-Effect of anchor condition
124
Back to Contents
DESIGN POSSIBILITIES Deployable structures
Deployable Structure Extrapolating design parameters for collapsable frames
Fixed axis of rotation between both beams no fixed angle between them
B
B
9°
A
20°
A
B
34°
Fixed30°angle with axis of rotation
44°
45°
A
C
C
Identical Components Replacing Valleys with Hypars
C
B
B
B
B
A
B
B
A
9°
20° 9° 9°
B
A
45°
30°
45°
A
C
B
C C C C
Folding Pattern Collapsibility
C
C
C
C
125
B B
45°
B
C C
B 44°
30°
44°
A
B
30°
A
44°
A
34°
A
A
20°
34°
A
20°
A
34°
B
A
B A
B
126
15.
GROWTH
TAI O RIVER
REED BEDS
FISH PONDS
SOCIAL SPACE
WATER BASED SETTLEMENT
SHORE
HYBRID ECOSYSTEMS
ARCHITECTURAL ASSOCIATION, LONDON 2015 Course: Emergent Technologies and Design (MSc.) Tutors: Michael Weinstock, George Jeronomidis, Evan Greenberg Subject: Design Dissertation Design Team: Yifei Sun, Di Zhou, Achraf Mzily, Ashwini Ashokkumar
Left: Image of stilt house at Tai O with mountains behind. ©Iro Karantaki
Responsibilities: As part of the design team I was involved in research on the causal factors and potentials for solutions. This included academic research, physical model testing and computer simulations. Creating assets for documentation and design parameters for final design.
Project Description: Hybrid Ecosystem investigates the social and agricultural integration of aquaculture in coastal fishing villages affected by growing activities inland. It focuses on feedbacks from existing local cultural modalities, topographical and hydrological conditions and potentials, to drive the emergence of innovative social and agricultural organizations. The system is implemented on the test site of Tai O to provide an integrated wetland development strategy.
Top: Section through the village showing integration with wetland and sea. Right: Rainwater simulation to measure volume of collection at Tai O village.
127
TAI O
Identifying issues and potentials of Tai O village, Hong Kong
1
WATER POLLUTION
Total S.S 0.06-0.07 kg/m3
2
ECONOMIC DECLINE
450,000HKDpppa in 1960 200,000 HKD in 2015
3 FRESH WATER SHORTAGE
5000 L/day for 2000 people
N
4.5 m 4m 3.5 m 3m 2.5 m <2 m
Below Mean Tide Level
150m
Site Issues and Solutions
Site Potentials
137 Ha
1
WATER CLEANSING Reed Bed Systems
2
AQUACULTURE
Semi-Instensive Fish Ponds
3
FRESH WATER
Rainwater Harvesting
POTENTIAL WETLAND
For Aquaculture & Reed Beds
5.9 Ha
88km3/yr
WATER BASED SETTLEMENT POTENTIAL FRESH WATER For Integration with Fish Farms
Rainwater Harvesting
Stilt Houses
Fresh Water Storage
Village Consumption: 10,900m3/month
Fresh Water Requirement: 51,400m3/month Fish Ponds Fish Pond Requirement: 40,470m3/month Reed Beds Reed Bed Requirement: 16,530m3/ month
128
Polluted water Clean Sea Water Clean Fresh Water
NETWORK AND CLUSTER GENERATION
Growth of integrated house, reed bed and fish pond systems
Node A High Connectivity Largest Clusters Node B Low. Connectivity Smallest Clusters Node C Med. Connectivity Medium Clusters Node D Med. Connectivity Medium Clusters
G100_88 3. 1. 4.
5.
Cluster Area (m2) 1. 4400 2. 4100 3. 2700 4. 2250 5. 2200 6. 2500
6.
2.
Network length: 1285 m
G100_85 2. 1.
5.
4.
6.
Cluster Area (m2) 1. 4950 2. 2700 3. 1250 4. 3850 5. 3800 6. 2000
Total population: 550
Network length: 1410 m
G100_70 5. 4. 1.
6. 2.
3. 7.
Network length: 1290 m
Cluster Area (m2) 1. 4950 2. 2950 3. 3800 4. 1400 5. 1100 6 2150 7 1650
Avg. Distance to Public Space: 25.87m RB & FP Exposure: 100%
Total population: 545
G100_85
3.
G100_88
G100_70
Total population: 540
Public Space Exposure: 96.5%
Avg. Distance to Public Space: 28.43m RB & FP Exposure: 100% Public Space Exposure: 100%
Avg. Distance to Public Space: 27.42m RB & FP Exposure: 99.9% Public Space Exposure: 98.1%
129
SYSTEM DESIGN
System flows and design logic
Fresh Water Storage
Inundated Soil
SECTION AA
Integrated Wetlands
SECTION BB
Connection to Sea
Inundated Soil
A
B
130
Sea Water Supply Channel
Back to Contents
Fresh Water Storage
Semi-Intensive Aquaculture Pond
Reed Bed Farm
Polluted Water Clean Water
Open Ponds
Fresh Water Supply
Wet Reed
Sea
B
A
131
132
16.
TWIST
ARCHITECTURAL ASSOCIATION, LONDON 2014 Course: Emergent Technologies and Design (MSc.) Tutors: Michael Weinstock, George Jeronomidis, Evan Greenberg, Manja van de Worp Subject: Design and Build Design Team: AA Emtech Batch of 201415 Partners and Sponsors: Hanson Plywood; TRADA
Left: Final Pavilion assembled at Birmingham Timber Expo. ©AA EmTech Top: Prototype assembly at Hooke Park. ©Patrick Tanhuanco
Project Description: The Twist is the Design/Build project of the Emergent Technologies and Design studio at the Architectural Association executed by the batch of 2014-15. The goal of the project is to exploit the bending and twisting properties of sheet ply to create a self supporting structure following the geometry of a mobius strip.
Responsibilities: As part of the team of 31, I was responsible for the initial physical experiments from which information of material behavior was extracted, the designer of the commercial logo, the 1:10 model of the final structure as well as part of the assembly team for prototype at Hooke Park.
Right: AA EmTech batch of ‘14 at Hooke Park.
133
TWIST AND BEND
Utilizing the properties of ply to determine the form
1:10 scale model Mobius strip P8 P9
P7
P10
P11
P4 P6 P3
P12
P2 P13
P14
Construction sequence Panel assembly with double rib locators
134
P1
P5
CONSTRUCTION ELEMENTS
Form derived by varying geometric parameters Double Connection Point
Depth of Strip
Middle strip to retain geometry
Global curvature
Twist due to rib curvature
Singly curved planar strip
Material Behavior Twisting of wing determined by arched ribs
Main Spacing Element
Edge assembly
Degree of Curvature +1
-1
Wing 4 mm Ply Rib 6mm Ply Material Optimization Twist degree determined by degree of curvature of master surface
Double Rib 12mm Ply
System Components Main structural elements that stabilize the form
135
136
Final Pavilion assembled at Birmingham Timber Expo. ©AA EmTech
Back to Contents
137
138
17.
‘Bindhu’
CALCULATED DESIGN CEPT UNIVERITY, INDIA 2012
Course: Bachelor of Interior Design (B.Des) Tutors: Krishna Shastri, Kireet Patel, Anand Ramakrishnan, Snehal Nagarsheth Subject: Design Thesis Guide: Sakthiveil Ramaswamy
Left: View of the ‘Vimanam’ of Kailasanatha Temple. ©Sitara Menon Top: Symbolic meaning of the Vimanam to draw the devotees eye to infinity. ©Sitara Menon Right: Plan of temple complex. ©Alexander Rea
Abstract: Mathematics has developed as man’s way of understanding nature. ‘Calculated Design’ is a research thesis aimed at finding the relationship between nature and built-form by understanding the role of the inherent order of mathematical principles in responding to contextual pressures.
The Pallava kings of the 8th century translated this cosmomoral order through their building of temples. The temple superstructure (or Vimana) appears as a pyramidal monolith, however the closer you get more details are revealed bringing more depth to the form. The form is a result of the chains of aedicules that reduce in scale at each level following an infinite sequence. Merits: CEPT University Award for Best Research Thesis, GICEA Gold Medal
The Kailasanatha Temple is an 8th Century Shaivaite temple and therefore existed in a strong context determined by the prevalent religious setting of the reigning king. In keeping with the philosophy of the Shaivaite religion the temple symbolized the “Chain of Being”- the cycle of construction and destruction of the cosmos. 139
SHRINE TYPOLOGY
Shrine type, meaning and location
Shrine type A: This is located at the 4 cardinal directions. These have the images of Shiva in all directions except east.
Shrine type B: These shrines are placed at the corners i.e the intermediate directions and also contain images of Shiva. These shrines are where the lokpalas reside.
The Vimanam consists of 4 storeys and each storey is a chain of progressively diminishing sizes of shrines. The first layer has 2 types of shrines. Type A placed at the 4 cardinal directions and Shrine type B at the intermediate directions. The Bindhu is translated to the tip of layer 1 which consists of an octagonal plan tapering to a finial.
140
Back to Contents
VIMANAM (Temple Superstructure) Underlying Infinitite Sequence
Summation of the infinite sequence starting with a gives the total height of the structure :-
=9832.93 mm
Summation of the infinite sequence starting with b gives the side of the equilateral triangle :-
=1135.41 mm
Summation of the infinite sequence starting with c gives the diameter of the circle in which the triangle is inscribed:-
=1310.58 mm
141
Ashwini Ashokkumar 07405595767 ashokkumar.ashwini@gmail.com NW5, London
142