TThis article will talk about the proper use of the metal straight edge for good quality control during paving, but we have some extra tips to point out along the way. Let’s start with the reason for having a straight edge out on the paving job.
The untrained or new laborer might not understand why the crew has an 8-footlong, 11- or 14-gauge, 2 by 4 steel tube on the deck of the paver or in the back of the work truck. This vital tool will help all the laborers—from the new guy with the rake to the foreman trying to figure yield. It helps you keep track of slope, high and low spots, crown, and proper takeoff depth in the mat. You’ll use the straight edge to check joints, match height and any number of quality control/quality assurance (QC/QA) factors that affect your pay.
Before you even begin the paving day, here are some steps we need to do first. • Step #1 null out tow point cylinders while the screed is on the ground. • Step #2 with another worker, null out the depth cranks on each side of the screed. • Step #3 on each side of the paver, make the endgates level with the screed.
With those steps done, you’ll raise the screed and place the straight edge against its underside to double-check the smoothness of the screed plate. For this quality check, make sure the slope extensions are not engaged. You’ll place the straight edge against the trailing edge of the screed for this check. A sixteenth of an inch of crown in the screed is acceptable/normal. Anything more than that is a problem. These back-to-basics steps are spelled out in detail in the online training course at https://training.theasphaltpro.com/.
CONTROLS INSPECTION SERVICES
CONTROLS INSPECTION SERVICES
CONTROLS INSPECTION SERVICES
CONTROLS INSPECTION SERVICES
CONTROLS INSPECTION SERVICES
In this picture, the crew places the straight edge transversely across the mat behind the screed to double-check the crown in the mat. The orange arrow points to the area where beginning-of-load segregation showed up in this binder course. You can minimize this if you avoid running the hopper empty between trucks.
Back in the old days, when screed plates were 36 inches wide, we had the lead crown and tail crown to consider. Don’t worry about multiple readings now that the typical screed plate is only 18 inches.
ULTRA-PORTABLE ASPHALT PLANTS PARTS
ULTRA-PORTABLE ASPHALT PLANTS PARTS
AND WE DO THIS...ULTRA-PORTABLE ASPHALT PLANTS PARTS
VOYAGER DOUBLE BARRELTM ASPHALT MIXING PLANT
Small plant footprint, big plant features. ULTRA-PORTABLE ASPHALT PLANTS PARTS
The Astec Voyager DB plants delivers full-size plant features in a compact, highly-portable configuration. Based upon
Astec’s proven Double Barrel® drum mixer, with production capacity up to 140 tonnes/hr and RAP mixing capability up to 50%, the Voyager DB plants sets the standard for portability, production, and sustainability. ULTRA-PORTABLE ASPHALT PLANTS PARTS
SALES: 423.867.4210
A unique approach to asphalt mixing technology.
MOBILITY
The modular design enhances portability and reduces setup time
EASY PLANT ERECTION
No cranes needed for set-up
RECYCLE
Can produce asphalt pavement mix with up to 50% recycle content
FLEXIBILITY
Easily adapts to the local site
When you place the straight edge parallel to the long joint, you can see where any dips or rises in the mat might affect the smoothness of the ride down the travel lane.
Once you’re ready to pave, you may be starting the project with a takeoff pad. You can read the article “Get Basics Right for Top Quality Overall” on TheAsphaltPro.com about how to build one of those in a parking lot scenario.
As the paver operator paves forward, one of the laborers needs to place the straight edge on the mat to check the fluff factor. He will place the straight edge parallel to the longitudinal joint, behind the left side of the screed first. This initial 8- or 12-foot section will let you see if there’s a dip or a bump in the mat where the screed may have settled when you took off. If you see a dip or bump, you know to adjust your angle of attack. Read the article “Check the Angle of Attack” on TheAsphaltPro.com for a primer on that.
After checking this section of the mat for quality, the laborer will move the straight edge to parallel to the longitudinal joint, but behind the right screed plate. You want to check both sides of the mat because both depth cranks are controlled independently; if one has more height in it than the other, you could have different results happening on the right and left sides of the mat.
Another element to watch out for when taking off is the beginning-of-load segregation seen in the picture on page 10. The area of segregation occurred because the crew ran out of mix in the hopper when they sat down. They moved the material to the auger while the paver was stationary. You can end up with a full auger section, but an empty hopper, if you run the augers while the paver is sitting and waiting for trucks. When the next truck arrives and charges the hopper, you introduce new, hot mix to the system. The material at the auger chamber is one temperature and one consistency. It’s not homogenized with the new material coming in. You’re introducing beginning-of-load segregation, which will show up in the mat.
Avoid beginning-of-load segregation by waiting for the truck to back into position and to charge the hopper as you simultaneously move material with the feed conveyors to the auger chamber.
Depending on the type of project, you may want a crown in the mat or a hint of slope to drain toward the shoulder or so on. In the picture on page 10, the straight edge shows that the crew has about a quarter-inch of crown in the mat. This means there’s slope in the extension. This crew is paving the first 15-foot-wide binder course pass of a 30-foot road.
When we look more closely at the space under the straight edge, we can see that we have about half an inch of discrepancy. If we didn’t want the crown in the mat, we would need to adjust the match height down the quarter inch on that side, bringing the extension level with the main screed plate. By balancing the screed all the way across, we would remove the slope. We double-check our success with the metal straight edge.
If you receive the Monday morning toolbox tips from AsphaltPro, then you know about having a wooden 2 by 4 on the paving project for supporting the uncompacted edge and other best practices. For QC/QA checks, you want your straight edge to be steel, not wood or string between a couple stakes. The metal straight edge is less likely to warp from moisture and heat than a lumber 2 by 4; it also won’t stretch the way string will. That means the metal straight edge will stay useful for checking quality.
– BY JOHN BALL
QUICK TIP: You can paint the metal straight edge a bright, safety color to reduce tripping hazards and to make it less likely to be left behind in the grass at the side of your paving project. QUICK TIP: You can build a “trough” on the back of the screed with a set of metal U-brackets to store the metal straight edge when it’s not in use. This keeps it off the paver deck so it’s less of a tripping hazard and it gives the crew an easy way to keep track of the QC device.
John Ball is the proprietor of Top Quality Paving & Training, Manchester, New Hampshire. He provides personal, on-site paving consulting services around the United States and into Canada. For more information, contact him at (603) 493-1458 or tqpaving@yahoo.com.