I would like to express my gratitude to our studio faculty Prof. Amit Gotecha and Academic associate Ar. Rishika bowen and all other faculties of the foundation studio of Masters of Planning at Cept University for their constant guidance, encouragement and constructive feedbacks which helped me enrich and enhance my knowlegde and understanding of the studio excercises to reach the final conclusion with this portfolio. I would also like to thank my family members and friends for all their support throughout the years. Lastly, I would like to thank all my fellow classmates, who stood beside and helped me in making this purpose a success. 2
PREFACE A “development plan” is an aspect of town and country planning comprising a set of documents that set out the local authority’s policies and proposals for the development and use of land in their area. The development plan guides and shapes day-today decisions as to whether or not planning permission should be granted, under the system known as development control or development management in Scotland. In order to ensure that these decisions are rational and consistent, they must be considered against the development plan adopted by the authority, after public consultation and having proper regard for other material factors. In India Development Plan process is a provincial/state subject. There are various town planning authorities under each province/ state that assess the growth of areas, identify suitable areas for housing, industry, public infrastructure and allocate budgets. Each of the metropolitan cities in India has an Agency which is responsible for Development Planning exercise of the cities.
The ‘Development Plan Studio’ aimed at preparing Development Plans of 3 cities as Rajkot, Surat and BharuchAnkaleswar. The cities were divided among the 46 students. Rajkot city, as was assigned for us, is an upcoming smart city in the country with major Industrial centres of Shaurastra. The Studio provided us liberty in planning the Development plan for the year 2041 through various approaches with certain vision instead of the conventional methods of approaching a Development plan. The publication is about the characteristics of an urban fringe area in a city like Ahmedabad , which transformed from a privately owned agricultural land use area into a fully built one in the year 2018. 3
CONTENTS 01
Precinct Planning Development Plan Comparison Study
02
03
4
Existing Situation Analysis Approach (Methodology, Vision, Objectives) Initial Concepts Proposals
Key learnings and Reflections
Overview of the precinct -
SG H ighwa y
SECTION A
Kalupur 15km
45mins
S.P. R
1. Precinct Planning
ing ro ad
Airport
The 1sq.km area chosen for me is located at the far earstern fringe of Vastral, Ahmedabad.
S.P. R
To understand the basic concepts of preparing a Development Plan, the Second semeter studio started with our understanding of the 1st semester studio work with 1sq.km area in Ahmedadabad, that was chosen for us to analyse the different layers; prepare a S.W.O.T. Analysis of the area and suggest short term as well as long term proposals for the area.
ing ro ad
60mins
-- The distance of the precinct from the Central Business district of Ahmedabad ie 15km. -- The precinct can be reached through the AMTS public bus transport or by private vehicles. -- The bus stops for AMTS bus routes 142/142S/144-1/144-1S are located 900 m towards the west and south from the center of the precinct.
Public Housing society
5
Landmarks: Vastral Lake Garden M.B. Patel Hospital
Ahmedabad Bhudan Office Torrent Power Sub-Station
Madhav School Vastral Cross Road
Mixed use buidings along SP Ring road
Gated Living
5
Strengths:
Weakness:
Opportunities:
Organized street grid and Walkable Urban blocks-
Planned but yet to be developed Infrastructure-
Lower Jantri rates-
Block perimeter ranges between 500m to 1400m,
S.P. R
ing r oad
Mean Block perimeter:
912m
Block Perimeter in meters >1000
60% of the roads are universally unaccessible due to the lack of road infrastructure and rain water catchpits.
±
600-830 980-1000 480-600 830-980
24% of lands under pulic domain, Maximum publicly owned lands under AMC-
S.P. Ring road Kaccha roads Pakka roads
Yet to be developed public transport -
0
Legend
50
100
Median market price:
Rs.33,000/sqm 200
300
400
Meters
Lower jantri rates shall attract more investments
(Rupees/sqm) 7250 7750 8000 8250 8500
Yet to be utilized FSIAMC ABO State Government AUDA
Precinct provides only gated living societies. Falls under the Affordable zone.
Precinct within 1km radius of SP Ring road Affordable zone-
S.P. Ring road R1 zone R2 zone Residential Affordable Housing zone-RAH
6
Maximum Permissible FSI:
2.75
Average consumed FSI:
1.2
0.28-0.76 0.77-1.20 1.21-2.00 2.01-3.65
pb parcel
PROPOSALS SHORT TERM PROPOSALS
LONG TERM PROPOSALS
1.
Vastral lake garden-Major recreational hub of the city
2. 3
1
2
3.
Major Tourist attraction for revenue generation
1. Landscaping, footpaths and bus stops provision on the S.P. Ring road3m wide footpath with archades
6m wide service lane with zebra crossings
9m wide footpath with landscaping
2.5m wide car parking
median with landscaping and street furniture
Bus stops upon the 9m wide footpaths
Mandatory provision of archades/sheltered paths for the developments along the S.P. Ring road through Development Control Regulations: 2. Redesigning deignated AMC Parking lot Car parking and Bicycle parking Separate with surrounding compound Cycle track wall and landscaping in AMC 2.5m wide parking lot
7.5m wide carraigeway
3. Proposed Street Design for the roads-
3m wide footpath with landscaping
7
SINGAPORE - CENTRAL REGION MASTER PLAN - 2030 SECTION A
Prepared in -
2014 (reviewed every 5 years) Area
- 133 Sq.km 2. DP Comparision Study
Prepared by - Master Plan Committee, Urban Redevelopment Authority Population
Population Density
- 9.30 Lakhs
- 6,978/sq.km
Approach to MP: 5 Planning regions
Key Plan
To understand the different approaches of preparing a Development Plan, the study and comparison of International and National Development plans was initiated among two students in each group.
55 Planning Areas, with Planning area subzones (previously, DGPs) within Combined to form one Master Plan
Among the 23 groups, our group had chosen the cases of Central region, Singapore and Chandigarh according to the various similar parameters of the two cities such as similar land area, emphasis on greens as well as sustainable approaches.
8
Before any development work is carried out, Development Control Deptt. Evaluates and grants approval for projects
Step 5
State land is then released for development through the Government Land Sales Programme
Step 4
Copies of Master Plan made available for free inspection by & for sale at reasonable price to public
Step 3
Objections and representations, and public enquiries etc, before the Master plan is amended by the Minister
Step 2
Notice of submission of Proposal to amend Master plan for Inspection after the Concept plan is made
Step 1
Key Takeaways: * Approach to DP/MP is different * Singapore and Chandigarh use land acquisition * DP process in Singapore doesnot involve people’s participation whereas Chandigarh does.
GROWTH Spatial growth pattern of Singapore:
2002 Area: 680sq.km
2010 Area: 700sq.km
Population trends of Central Region, Singapore:
2018 Area: 720sq.km
1200000 1000000 800000 600000 400000 200000 0
1980
1990
2000
2010
2020
Land reclamation began at the Marina bay area in Singapore to increase the land area of Singapore from 580sq.km to 766sq.km in the year 2030.
The population in the Central Region reduced from 13,64,000 in 1980 to 11,30,000 in the year 1990.
This will help accommodate around 6.5 million to 6.9 million residents in whole of Singapore by then, as set out in the 2013 Population White Paper and Land Use Plan.
The year 2010 shows slight increase in the population, which again declines by 0.5% in the year 2018.
Source: https://www.straitstimes.com/singapore/new-ideas-to-feed-a-growing-island
Source: The Population of Singapore: (2nd Edition),By Saw Swee-Hock pdf
Statutory base:
BENDEMEER PLANNING AREA SUBZONE (previously‘Development Guide Plan’), KALLANG PLANNING AREA
Plan prepared by - Urban Redevelopment Authority, Land Transport Authority Plan sanctioned by - The Minister of Ministry for National Development Plan prepared & sanctioned under the Act - Planning Act , 1998 Relevant sections of the Act - 6, Part-II, Section 12(1), [Section 10 of part II involves pulic participation in the planning process]
Key Plan
Implementation mechanism: Government activities including local government activities are carried out by government departments organised under ministries or by statutory boards characterised by their functions, each with its own specific terms of reference. Each statutory board is empowered with enabling legislation to implement its programmes.
Implemented by Land Acquisition
Area: 1.41sq.km 9
CHANDIGARH - PERSPECTIVE PLAN- 2031 Prepared in - 2014 Area
- 114 Sq.km
Population
- 10.56Lakhs
Prepared by - Department of Urban Planning Chandigarh Population Density
-150 PPH
Preparation of Perspective Plan 2013 Expert Committee (11 Members) 3.
Preparation of Strategy and Methodology Study of historical documents , ongoing policies and projects of the administration Interaction with various stakeholders: Traders, Industrialists, Resident welfare organizations, Municipal Councillors, etc Draft Master Plan notified by Chandigarh Administration for inviting public objections and suggestions Draft Master Plan- 2031 prepared Expert Committee deliberated and considered major issues like Preservation of original concept Presentation made by RITES regarding Comprehensive Mobility Plan for Chandigarh Urban Complex Meetings held with representatives of Government of India, State Governments of Punjab and Haryana
10
Chief Architect, Chandigarh Administration finalised the Master Plan
Source: Chandigarh Master Plan
10
Final Master Plan 2031 still pending for notification
GROWTH
2000
2008
2018
Source: generated by author
Source: Urban Progression in Chandigarh-Report
In Phase I, 36 sq Km of land was acquired by the city administration for construction of 30 sectors. Land for seventeen additional Sectors (Sector 31 to 47) was acquired and developed during the second phase to cater for a population of 350000 the predominance of 3 to 4 storey apartments in second phase provide for higher population dimension.
Chandigarh was planned for the population of half a million and present data shows that the population has grown double than planned for i.e 10, 54,686.
Development in the third phase has started in sector 48 and beyond.
Statutory base:
IMPLEMENTATION MECHANISM
Plan prepared by - Constitution of Expert Committee(11 Members) Plan sanctioned by Chandigarh Administration Plan prepared & sanctioned under the Act -‘The Punjab New Capital( Periphery) Control Act, 1952 as also the 73rd and 74th Constitutional Amendments, Not Sanctioned yet Relevant Section of the Act S 3- Power of Government to Transfer of Land and Building S4—Power to issue directions in respect of erection of buildings
(SECTOR PLANS AND PERSPECTIVE PLANS FOR POCKETS)
The perspective plan prepares for 17 Pockets along the periphery of Chandigarh. (Implemented by Land Acquisition)
The grid pattern is maintained in Phase II and III of the Masterplan.
Key Plan
Periphery Boundary
A typical sector consists primarily of residential typology with small commercial and institutional units like retail shops and healthcare, respectively.
Typical Sector Plan
Perspective Plan for 17 Pockets
Source: Chandigarh Master Plan
11
RAJKOT DEVELOPMENT PLAN-2041
SECTION B Preparation of Development Plan for the city of Rajkot, 2041
EXISTING SITUATION ANALYSIS: LOCATION & CONNECTIVITY MORBI HWY
JAM RA NAGA JKO T H RWY
KOT AD RAJ EDAB M H A Y HW
Steps followed for envisioning the Development Plan: 1. Perception and Analysis of the City from Secondary sources like Census 2011, RUDA and RMC wesites etc.
5 Talukas - Paddari, Lodhika, Tankara, Rajkot, Kotda Sangani
AD LAW A K AD RO
RGA Y NA HW AV OT BH AJK R
2. !st site visit and impressions of the city with individual transect study.
Administrative Boundaries-
3. Further site visits for individual concepts for preparing the DP through S.W.O.T. Analysis 4. Groups of 4 divided to focus on different visions for the outcome of Development Plan
Railway
GONDAL ROAD
Existing Airport Proposed Airport
RMC : Area- 104.85 sqkm, Wards- 23 RUDA: Area- 581.45 sqkm, Villages- 54 Overall Rajkot:
Area: 686 sqkm
5. Stakeholders’ perceptions of the city. 6. Preparation of final DP through frequent iterations.
12
Locational significance* Centrally located in Shaurastra region * 4th largest city in Gujarat (area) * Manufacturing and Service sector for Western Gujarat
Population- 15.35 lakhs (2011 census)
URBAN GROWTH THROUGHOUT THE YEARS
PHYSICAL CHARACTERISTICS AVERAGE ELEVATION 123M
1991-1996
2006-2011
1996-2001
2011-2016
2001-2006
2018
Lowest point of Elevation 40 Highest point of Elevation 150 The Saurashtra region is structurally a horst. It lies in Seismic Zone III, which is Moderate Risk Zone.
The city, at a macrolevel shows relatively higher elevation, also the source region for many rivers. Therefore, the city is NOT flood prone.
DEMOGRAPHY POPULATION
Urban population- 84% (Job centers, Infrastructure) Rural population- 16% (Farmlands)
WORKING POPULATION
Urban population- 35% (Service) Rural population- 41% (Agriculture and Industrial)
HOUSEHOLD SIZE
Urban population- 4.64 (Nuclear family) Rural population- 5.14 (Joint family)
CRUDE LITERACY RATE
Urban population- 78.38% (Better Education facility) Rural population- 69.17% (Lack of education facility)
Source : RUDA Report part-1 and NPTEL IIT Kharagpur Web Courses
13
ROAD NETWORK CHARACTERISTICS Road type
Length (km)
Average ROW (m)
Highways
121
22
Arterials
305
12-18
Collector & Local
1704
7.5
Outer roads
560
10
RMTS Network BRTS Existing BRTS Proposed Major Bus Stops
2291km – Total road network in Rajkot 1799km – RMC (79%), 492km – RUDA (21%) 22.98km – average road density Rajkot city has a dense road network. 14
210km – BRTS & RMTS network 10.5km – existing BRTS network 2013 – RMC began BRTS & RMTS operations Only 3% of the citizens use Public Transport
JANTRI RATES
MARKET PRICES vs JANTRI RATES
150 ft. Ring Road Airport Road
Rail Nagar
Bhavnagar Road
Nirmala Convent Road Kalawad
GIDC
Gondal Road
Takeaways: 150 ft Ring road
Rs. 10,62,000/sq.m.
Rail Nagar
Rs. 32,280/sq.m.
Nirmala Convent road
Rs. 1,56,000/sq.m.
Kalawad road
Rs. 17,200/sq.m.
Gondal Road
Rs. 32,280/sq.m.
Aji GIDC Area
Rs. 1,20,500/sq.m.
•
Jantri rates are higher along the periphery of RMC and lower in the Core city.
•
Highest jantri rates (Rs 22000) are observ ed near Kalawad road.
•
Lowest jantri rates (Rs 113) in Dhamalpar.
•
Ramnagar Industrial area - Rs 153.
Airport Road
Rs. 1,07,000/sq.m
•
Railnagar Residential area - Rs 1050
Bhavnagar road
Rs. 24,100/sq.m.
*Highest rates observed near 150 ft. Ring Road. *Lesser prices observed on the eastern side and peri-urban areas like Kalawad and ShaparVeraval. *Some areas were found to have increased land value due to new residential projects. Eg. Airport Road, Nirmala Convent Road. 15
LAND USE CHARACTERISTICS KALAWAD Transect Study -
Plaza and squares Regional institutions Wide sidewalks
Urban Core Hospital Chowk
Street lighting Large built masses
Low rise residential units Open but fallow lands Farmlands
Low density industrial units More hardscape Livestock
General urban
Sub urban
18 kms
Metoda
Transect LandUse Study The 6 major transects of Rajkot which are Kalawad road, Gondal road, Bhavnagar road, Ahmedabad road, Morbi road and the 150ft Ring road. Our group of 15 students, with 2 students for each transect were allotted. Major Takeaways:
* Kalawad Transect has the higher number of high rise structures * Maximum number of institutes are observed in Kalawad transect
42% Agriculture 7% Residential 7.2% Industrial 1% Recreation 0.91% Commercial 0.71% Public Purpose 16
ECONOMIC SCENARIOS To Morbi
2. Industries
To Morbi
1. Agriculture
To Gondal
To Gondal
APMC yard
Source : Industries Commissionerate
Area under cultivation[hectares]: Rajkot district- 561478; RUDA- 28800 Double cropped land- 1621 [5.63%] Work force participation- Rajkot district : 37%; RUDA : 10.59% Average rainfall- 820mm Net irrigated area- 34.28% Major source of irrigation- Wells/Tube wells 74% Other sources- Canal, lake
1. 2. 3. 4. 5.
Kuvadva GIDC- Hand pumps and agro AJI GIDC- Casting and bearing Bhaktinagar GIDC- agricultural equipments Shapar-Veraval- Forging and casting Lodhika GIDC- Casting and machine tools
No of establishments- Rajkot district MSME-26048; Large Scale-30 Work force participation- 41% MSME- 194248; Large scale- 24000
Major crops- Karif- Cotton and groundnut; Rabi- Wheat and cumin Other- Bajri, gram and sesame Largest producer of cotton[40%] and second largest producer of groundnut[41%] and onion[22%] in Gujarat.
Investment MSME- Rs 7330 crores [2.3% of total in Gujarat] Output MSME-Rs 15912 crores [24.62% of total in Gujarat] Large scale- Rs14600 crores
Rajkot in the hub of MSME in Saurashtra and 3rd largest cluster in Gujarat. The most preferred region to setup an enterprise due to presence of strong GIDC and GSFC unit
Source : Department of Agriculture
17
HOUSING SCENARIO Major Housing typologies in Rajkot: * Rajkot no Delo Housing Before the 90’s * Colonial Houses * Street Facing Houses * Apartments
Post 90’s Housing * Row Houses * Gated Communities * Low Rising Apartments * High Rise Apartments * Slums / Squatter Settlements
Slum Rehabilitation Housing * Awas Yojnas * Shelter for the Urban Poor * Basic Shelter for the Urban Poor
Commercial activities are sometimes included with Housing, based on Individual requirements and Location of the Residential unit. E.g : Low Rising Apartments with their ground floor leased out for shops. Similar is the case with High Rises.
6KM 3KM
WEST
VASANT VIHAR
18
EAST
HARI NAGAR
PARIKSHIT NAGAR
CORE CITY
KHATRIWAD
ARYA NAGAR
NAVAGAM
SLUMS
RUDA BUDGET Head
Estimate(in lacs)
Opening Balance (A)
11417
Revenue Income
609
Capital Income
24877
Total (B)
25487
Total A + B = C
36904
Revenue Exp.
867
Capital Exp.
26870
Total (D)
27738
Proposed expenditure for projects:
1% 19% 1%
Deposit ( E ) 948
Deposit Exp.
1424
Closing Balance (C+ E) – D = F
8689
Assets Payment Advance Payment Road Project SJMMSVY PMAY New Demand
Proposed Budget for 2019 -2020:
Rs. 24,877 (lacs)
5% 36%
Deposit Income
17%
62%
25%
62% of budget is allocated to new demand.
64% 75%
1
Housing and Road projects given priority in the budget
2
New Demand: Water supply, Ring Road, Drainage, Integrated WS schemes, ABD projects
3 87 - No of slums in Rajkot 104 - UA Census 2011 Primary survey 2018 14% - Rajkot’s population living in slum
Key Takeaways: * The budget of RUDA is low for the long term development of the city. * Currently, RUDA is more focused on the Smart City project, Cleanliness drives as well as the infrastructure demands of the city. 19
INFRASTRUCTURE 1. PHYSICAL INFRASTRUCTURE
Water Supply
Sewage Treatment Plants
Gavaridad STP 70MLD Madhapar STP 44.5MLD
Nyari II
Madhapar STP 80MLD
(Narmada Canal) 70MLD
Raiyadhar STP 56MLD Raiya STP 51MLD
Kothariya STP 15MLD
Aji I 120MLD
Pumping Station
Kothariya STP 15MLD
Nyari I 40MLD
APS
Bhadar I 45MLD
STP
STP(under planning)
Location of Pumping Stations
Institutional Framework:
Ghanteshwar WTP 13MLD
Nyari II 24km
GWSSSB
Raiyadhar WTP 50MLD Nyari WTP 32MLD
GWIL
Aji WTP 103MLD
PANCHAYAT Provision of Water
Nyari I 18km
Aji I
0km
Ribada WTP 50MLD
Bhadar I 165km
20
Provision of water Provision of infrastructure for water supply
Water Distribution (Zone wise) ZONE
DEMAND
SUPPLY
West Zone Central Zone East Zone
106MLD 59MLD 75MLD
118.8MLD 19.16MLD 8.9MLD
Institutional Framework RUDA Project Management Unit RMC Drainage Project Department
Coverage of Sewage Network
Drainage Network: 250 kms long network of collective system with 7000 manholes, 9 intermediate pumping stations.
68%
2. SOCIAL INFRASTRUCTURE
Green Cover/Spaces
Health care Services
I P Mission High School
Christ School
87
Pa ndit Deendayal Upa ddhyay Medical Col l ege
Municipal Schools
76.94%
Literacy rate
Govt. vs Private Healthcare 434, 36% Government Private 782, 64%
35,775 students in Govt. Schools
Green Space per Capita 9 sq. m (WHO)
0.15 sq. m (Rajkot)
Key Takeaways: * Good healthcare facilities are available in Rajkot
Health Facilities in Rajkot 154, 13%
579, 48% Central
296, 24%
East West Other
187, 15%
30 Parks and Gardens in RMC 19.7 ha area under Recreational and Green spaces 0.15 sq. m green space per capita
* The green cover is very low as compared to the WHO standards
21
INFERENCES FROM STAKEHOLDERS’ PERCEPTION Mira Ben, Industrial worker Metoda GIDC is a major employer of many of our households
Ajit Bhai, Businessman
APMC Official, Rajkot
The city lacks green spaces as well as there are traffic congestions.
The rainfall has decreased from 500mm in 2017 to 200mm in 2019
Lack of Recreation Spaces
Satisfied with Public Amenities and Infrastructure
280
250 Peaceful Environment
Water Scarcity 250
52
Culturally Inclusive City 44
Water Supply – Bad smell
Water Supply – Bad Taste Water Supply – Bad Colour Water Supply – TDR
Road Accident Crime
Compact Size
Women Safety
20 22
Parks & Recreational Area
Lack of Job Opportunities 198 Increase in Traffic 52 Increase in Crime Rate 25
APPROACH: GROWTH POTENTIALS AND FOCUS ON THE MAJOR ISSUES THE CITY FACES CONCERNS TO BE CATERED IN THE DP 2041: Even though there are physical barriers affecting the development in the east; to initiate development in the east and balancing the developments with west through* Preserving the water bodies to cater to water efficiency in the city * Increasing the green cover in the city to cater to the people’s concern. * Shifting the location of the proposed Smart city node and AIIMS to the eastern side * Preserving the industrial centres as well as provision of additional Industries to cater to the economy.
Green Space per Capita 9 sq. m (WHO)
Per capita green cover space 0.15 sq. m (Rajkot)
POPULATION PROJECTION: Geometric mean increase is used to find out the future increment in population, as this method gives higher values.
43,21,596
50,00,000 40,00,000 30,00,000
P2021 : 21,67,578 ; P2031 :30,60,620 ; P2041 : 43,21,596 The current population, i.e., P2019 : 20,23,056 Total Residential Built up Area, 2019 : 88.45 sq.km; Per-capita space consumption: 27 sqm. Keeping the aim of providing 35sqm per-capita space. For a Robust and Flexible Plan we are planning for a Population of 51,85,200.
30,60,620 21,67,578
20,00,000 10,00,000 0
P2021
P2031
P2041
23
VISION & OBJECTIVES “To create an interactive city focusing on the integration of environmental sustainability and transport in a mixed use environment.” IDEAS TO ACHIEVE VISION: Nakarwadi has reached its saturation level
Slums along Aji River Dumping site along water bodies
INTERLINKING THE INDUSTRIES Traffic congestion along bottlenecks
Need for regulating the unplanned expansion of Metoda GIDC in nearby Villages
24
Formation of Urban heat island on Kalawad transect
24
Industrial Pollution at Gondal
EMPHASIS ON GREENS
INITIAL CONCEPTS: 1. Vulnerabilities Identified
2. Scarcity of water as major issue (Iteration 1) Dense commercialVehicular air pollution
LOW DO LEVELS
MADHAPAR
SMART CITY HEAT ISLAND
Worst air quality dumping site.
NAKARVADI LANDFILL
DUMPING SITE
Steady decline in the air quality due to recent industrial development. CRITICAL AREAS
Source : Subhrangsu Goswami : MUP Mandatory
LOW DO LEVELS
Extended City Area
736.77 sqkm
The initial concept was to address the major concern of water scarcity through various strategies to preserve the water like check dams, drip irrigation.
3. Extension of Administrative boundary After the individual initial concepts, in a group of 4, we gathered the major concerns of the city being all related to environment.
HAPHAZARD DEVELOPMENT ALONG WATER BODY
We decided to add the villages; Rangpar, Khambala and Ishvariya to preserve the waterbody of Nyari keeping in mind to prevent the leapfrog development that has already started coming up near the stream.
LEAPFROG DEVELOPMENT
LEAPFROG INDUSTRIAL DEVELOPMENT
The village of Lothada has also been added by looking upon the industrial development as well as a huge population growth from the year 2001 to 2011 according to the census.
PRESERVE THE WATER BODY
25
4. 1st Concept after boundary extension : (Iteration 2)
6. Final Concept after boundary extension and 2 site visits : The final concept caters to a liberal apprach with emphasis on green cover, decongesting the industrial nodes, preserving the water bodies and taking care of the urban heat island within a mixed use environment. High Intensity Corridoors along the major transects.
Large recreation spaces proposed for regional level
Smart City Node kept to the East to promote development
ANANDPAR
RAMAPAR MOTA
GHODI
METODA
TARGHARI
MOTI GHODI
KHAMBHALA DHOKALIYA
VEJAGAM
RATAIYA
DEVLA
KHER
HARIPARTARVADA CHIBHADA
ABHEPAR
PIPALIYAPAL KHAMBHA
Residential Mixed use
Recreational High Intensity
VERAVALPADAVALA
SANGAMA
0
2
Light Industries Heavy Industries
4
8
12
D
ANIYALA
S
PARDI LOTHADA
SHAPUR
KOTHA PIPALIYA
VADALI
KHOKHADADAD
VIRVA
LODHIKA
UBA
DHOLARA
KUSTARBACHAN
LAMPASARI
RAVKI
MAKHAVAD
HANDLI
KALIPAT
KANGASHIYALI
BALSAR
Obnoxious Industries maintained to the end of the RUDA Boundary
THORALA
PAL
DEVGAM
PIPARCI RATANPAR
THEBACHDA MAHIKA
KANKOT JASHVANTPUR
VAGUDADRAMNAGAR
CHHAPRA
G
AMARGADH
MOTA MAVA VAJDI VIRDA VAJDI VAD
KHIRSARA & METODA
K
TARGHADIYA
ANANDPAR
ISHVARIYA TALA NANA AMRELI MUNJKA INTALA PAMBHAR HARIPAR NANA MAVDA
Liberal Zones along corridors to promote growth.
PIPALIYA RANPAR
VAJDI GADH
SUVAG
MOTA MAVDA
26
NAGALPAR KHIJADIYA
RAJGADH
JHAYANA
HADMATIYA MANHARPUR NAKARAVADIDHAMALPAR PARA PIPALIYA BEDI RONKI MADHAPAR NYARA SOKHADA GHANTESHWAR MALIYASAN
KERALA
HIDAD
V
KHANDHERI
RANGPAR
SARAPDAD
RADAD
GAVARIDAD
NARANKA
NANI GHODI
5. Scenario 2
(Increasing green cover through green networks and decongesting the industrial areas)
VIJAYNAGAR RATANPAR
BAGHI
PATI
But, after iterations, the concept still lacked the required green areas and industrial areas not addressed to prevent congestion.
KHA
RAMPARA SU SANOSARA
KHORANA
DUNGARKA
PADDHARI
The initial concept as a group was to cater to the urgent needs of the city by providing more greens and preserving the current industrial scenario of the city.
HADALA
GADHADA
MOVIA
Kilometers 16
Institutional+Residential Gamtal
PIPLANA
NARANKA
PADASAN
BHAYASAR KATHROTALOC
CHITRAVAV
PROPOSALS ROAD NETWORK and GREEN NETWORKS 1. Iteration 1 of road network proposal
Final road network proposal along with green network proposals
The initial concept was to form major nodes and put road networks around those nodes with smaller super block sizes
Proposing the roads parallel to the streams and linking through roads, cutting perpendicularly at the narrowest streams.
HADALA
GADHADA
MOVIA
DUNGARKA
PADDHARI GHODI
BAGHI METODA
PATI
TARGHARI
MOTI GHODI
KHANDHERI
RANGPAR
HADALA
GADHADA
ANANDPAR
RAMAPAR MOTA
GHODI
BAGHI METODA
PATI
TARGHARI
MOTI GHODI
GAVARIDAD
NARANKA KHANDHERI
RANGPAR
NANI GHODI SARAPDAD
RATAIYA
DEVLA
VAGUDADRAMNAGAR
CHIBHADA
ABHEPAR
DHOLARA
SHAPUR
0
2
4
8
12
VADALI
KHOKHADADAD
VERAVALPADAVALA
SANGAMA
KOTHA PIPALIYA
VAGUDADRAMNAGAR
Kilometers 16
HADMATIYA
NARANKA
PIPARCI RATANPAR
BRTS_2 BRTS
ANIYALA
SH_NH
SAMADHYALA
PIPLANA
Legend
Major Arterial (ROW 24m to 60m) RMC_Boundary
PADASAN LAKHAPAR
SARDHAR CHITRAVAVNAVAGAM
Sub-Arterial (ROW 18m to 24m) Railways
Villages
KHOKH
DHOLARA
PARDI
VIRVA
SHAPUR
PIPALIYAPAL KHAMBHA
LODHIKA
UBA
RAVKI
MAKHAVAD
HANDLI
VERAVALPA
SANGAMA
KOTHA PIPALIYA
Green network (through ROW > 8m) Census_Wards
CHIBHADA
ABHEPAR
vill
Waterbodies
BHAYASAR KATHROTALOCHIDA
PAL KANGASHIYALI
BALSAR HARIPARTARVADA
DHANDHNI DHANCHYA
LOTHADA
PIPALIYAPAL KHAMBHA
KUSTARBACHAN
PARDI
VIRVA
LODHIKA
UBA
RAVKI
MAKHAVAD
HANDLI
KALIPAT LAMPASARI
KANKOT JASHVANTPUR
DEVGAM
GADHKA DERDI
corridor
MOTA MAVA VAJDI VIRDA VAJDI VAD
KHIRSARA & METODA
THEBACHDA MAHIKA
KANGASHIYALI
HARIPARTARVADA
DEVLA
RAFALA
THORALA
PAL
DEVGAM
PIPARCI RATANPAR
PAR
CHHAPRA
AMARGADH
KANKOT JASHVANTPUR
BALSAR
SAYPAR
RATAIYA
MOTA MAVDA
KUCHIYADAD
KUVADAVA
KHERDI
MOTA MAVA VAJDI VIRDA VAJDI VAD
KHIRSARA & METODA
CHHAPRA
SATDA
GUNDA
Freight
VEJAGAM
MAGHARVADA
VEJAGAM
ISHVARIYA TALA NANA AMRELI MUNJKA INTALA PAMBHAR HARIPAR NANA MAVDA MOTA MAVDA
DHOKALIYA
ISHVARIYA TALA NANA AMRELI MUNJKA INTALA PAMBHAR HARIPAR NANA MAVDA
TARGHADIYA
ANANDPAR
VAJDI GADH
SUVAG
PIPALIYA
SOKHADA MALIYASAN
GHANTESHWAR
SUVAG
HIDAD
RAJGADH
JHAYANA
RANPAR
VAJDI GADH
DHOKALIYA
JEPUR
VANKVAD NAGALPAR KHIJADIYA
HADMATIYA NAKARAVADIDHAMALPAR BEDI
MADHAPARRONKI
NYARA KHAMBHALA RADAD
MANHARPUR
PARA PIPALIYA
KERALA
RAMPARA SULIYA SANOSARA
VIJAYNAGAR RATANPAR
KERALA
HIDAD
KHAKHANA KHORANA
DUNGARKA
PADDHARI
GHANTESHWAR
KHAMBHALA RADAD
BEDI
MADHAPARRONKI
NYARA
2. Evolution of road network proposal-
HA
MANHARPUR
PARA PIPALIYA
SARAPDAD
MOVIA
GAVARIDAD
NARANKA
NANI GHODI
Connecting the missing linkages
VIJAYNAGAR RATANPAR
ANANDPAR
RAMAPAR MOTA
0
2
4
8
12
Kilometers 16
27
PUBLIC TRANSPORT NETWORK
PHASING OF PUBLIC TRANSPORT NETWORK PHASE I
PATI
TARGHARI
NAGALPAR KHIJADIYA PIPALIYA JEPUR
RAMPARA SULIYA SANOSARA
KHANDHERI
RANGPAR
JHAYANA
RANPAR
HADMATIYA MANHARPURVANKVAD NAKARAVADIDHAMALPAR PARA PIPALIYA BEDI SARAPDAD JHAYANA SATDA NAGALPAR KHIJADIYA RONKI MADHAPAR NYARA SOKHADA GAVARIDAD RAJGADH GHANTESHWAR KHAMBHALA MALIYASAN VIJAYNAGAR RATANPAR
I GHODI NANDPAR
PIPALIYA
ANANDPAR RANPAR VAJDI GADH KUCHIYADAD HADMATIYA KUVADAVA NAKARAVADIDHAMALPAR VEJAGAM BEDI
KERALA
KHANDHERI RADAD
SATDA
KHAKHANA RAJGADH GAVARIDAD
NARANKA
KHORANA
OTI GHODI
KUCHIYADAD
KUVADAVA
GUNDA
PAR
SAYPAR
TARGHADIYA
DHOKALIYA MANHARPUR
PARA PIPALIYA SUVAG HIDAD
JEPUR
VANKVAD
BAGHI HADALA METODA
RAMPARA SULIYA SANOSARA
VIJAYNAGAR RATANPAR
ANANDPAR
RAMAPAR MOTA
GHODI
KHAKHANA KHORANA
DUNGARKA
PADDHARI
ANKA
HADALA
GADHADA
MOVIA
MAGHARVADA
KHERDI MADHAPARRONKI ISHVARIYA A LA NANA PAR SOKHADA AMRELI SAYPAR GUNDA MUNJKA AMARGADH Phase I of BRTS follows the phasing pattern of the DP INTALA PAMBHAR GHANTESHWAR MALIYASAN RAFALA HARIPAR ANA MAVDA with more connectivity to the west and the East, to TARGHADIYA ANANDPAR THEBACHDA GADH MAHIKA encourage growth along the Smart City Overlay Zone. RATAIYA MOTA MAVA MAGHARVADA MOTA MAVDA VAJDI VIRDA THORALA GADHKA GAM VAJDI VAD PHASE II KHERDI DERDI KANKOT DEVLA KHIRSARA & METODA KALIPAT MUNJKA AMARGADH JASHVANTPUR KUSTARBACHAN RAFALA DHANDHNI AR THEBACHDA VAGUDADRAMNAGAR LAMPASARI BRTS_2 HADMATIYA PAL DHANCHYA MAHIKA CHHAPRA MOTA MAVA DEVGAM RDA THORALA KANGASHIYALIGADHKA BRTS BALSAR ANIYALA VADALI RAVKI KHOKHADADAD SH_NH HARIPARTARVADA DERDI SAMADHYALA ANKOT DHOLARA KALIPAT PARDI JASHVANTPUR KUSTARBACHAN
Legend
PIPARCI RATANPAR
RAMNAGAR
PAL
ABHEPAR HANDLI RAVKI
LAMPASARI
SHAPUR
0
D
4
SHAPUR
PADASAN
8 VERAVALPADAVALA
12
Kilometers 16
BHAYASAR KATHROTALOCHIDA
NARANKA LAKHAPAR
PIPLANA transport network is laid along the major transects SARDHAR and also connects the major economic centres like the indusCHITRAVAVNAVAGAM tries and the Smart city NARANKA node.
PIPALIYAPAL KHAMBHAThe Public
Kilometers 16
12
28
BRTS_2
vill
LAKHAPAR
SAMADHYALA
PARDI
LOTHADA
2
RMC_Boundary
PADASAN
BHAYASAR BRTS VERAVALPADAVALA ANIYALA KATHROTALOCHIDA VADALI PIPLANA KHOKHADADADKHAMBHAPIPALIYAPAL SH_NH
SANGAMA
KOTHA PIPALIYA VIRVA
LOTHADA HADMATIYA DHANCHYA
VIRVA
KANGASHIYALI MAKHAVAD
DHOLARA LODHIKA
A UBA
Legend
DHANDHNI
CHIBHADA
RMC_Boundary CHITRAVAV NAVAGAM vill
Waterbodies SARDHAR
Railways Census_Wards Villages
Waterbodies Railways Census_Wards Villages
(Increasing connectivity to Smart City and industrial areas)
ROAD SECTIONS Envisioned Green network :
Sections through different layers: Section of the Industrial Street
Section
Green network as the median with trees beside the roads to keep the area cooler. Section of the Street in Mixed Use Zone
Green network as the median with shaded footpaths Section of Mixed Use zone with BRTS
Plan
Green network as the median with shaded footpaths as well as BRTS station with shelters
View
Section of the Freight bypass road
29
ZONING AND DEVELOPMENT CONTROL REGULATIONS RECREATIONAL ZONE
Area of the zone
30.1sq.km
Length of the green network
380.8km
Non Permissible uses
Dwelling1,2,3, Mercantile-1,2,3, Assembly-1,2,3, Educational-1,2, Industrial 1 & 2, Hospitality 1,2
Allowable height
3m
Maximum permissible height
3m
30
INDUSTRIAL ZONE
Area of the zone
7.9sq.km
Area of the zone
33.31sq.km
Non Permissible uses
Mercantile 2,Assembly 1,2,3
Non Permissible uses
Industrial 2,Mercantile 2,Assembly 1,2,3
Allowable height
9m
Allowable height
9m
Maximum permissible height
15m
Maximum permissible height
15m
The road side margin of a building unit in Industrial zone shall be regulated by the plot sizes not the road widths. Plot area
Front margin(m)
Side margin(m)
Up to 500sq.m
4.5
3
500 – 5000sq.m
6
4.5
5000-2000sq.m
9
6
More than 20,000sq.m
12
7.5
MIXED USE ZONE - I Road width
Road side margin for building unit area up to 750sqm
Side margin
Road side margin for building unit area above 750 sqm to 1500sqm
Side margin
Road side margin for building unit area above 1500sqm
Side margin
Up to 18m
3
3
4.5
3
6
4.5
18m – 30 m
4.5
3
4.5
3
9
4.5
30m – 60 m
4.5
3
6
4.5
12
6
Mixed use high density zone will have maximum permissible ground coverage as 60%.
Area of the zone
28.27sq.km
Non Permissible uses
Assembly-3, Educational-2, Industrial 1 & 2, Hospitality 2, Agriculture 1 & 2
Illustration of a plot size of 1200sq.m is done to explain the variation in block size according to road widths, margins and building heights.
Envisioned View
Allowable height
30m 21m
Maximum permissible height
54m 75m
Plot size : 600sq.m Height of building: 21m Maximum permissible 30m Plot size : 1200sq.m Height of building: 30m Maximum permissible 45m 3. Plot size : 1200sq.m Height of building: 45m Maximum permissible 60m
31
MIXED USE ZONE - II
MIXED USE ZONE - III
Road width
Road side margin for building unit area up to 750sqm
Side margin
Road side margin for building unit area above 750 sqm to 1500sqm
Side margin
Road side margin for building unit area above 1500sqm
Side margin
Area of the zone
45.75sq.km
Non Permissible uses
Assembly-3, Up to 18m 3 3 4.5 3 6 4.5 Educational-2, 18m – 30 m 4.5 3 4.5 3 9 4.5 Industrial 1 & 30m – 60 m 4.5 3 6 4.5 12 6 2, Hospitality 2, Agriculture 1 & Illustration of a plot size of 1200sq.m is done to explain the variation in block 2 size according to road widths, margins and building heights.
Allowable height
21m
Maximum permissible height
54m 60m
32
Road width
Road side margin for building unit area up to 750sqm
Side margin
Road side margin for building unit area above 750 sqm to 1500sqm
Side margin
Road side margin for building unit area above 1500sqm
Side margin
Up to 18m
3
3
4.5
3
6
4.5
18m – 30 m
4.5
3
4.5
3
9
4.5
30m – 60 m
4.5
3
6
4.5
12
6
Area of the zone Non Permissible uses
212.5sq.km
Mixed use high density zone will have maximum permissible ground coverage as
60%.
Illustration of a plot size of 1200sq.m is done to explain the variation in block Agriculture 1 & size according to road widths, margins 2, Industrial 1 and building heights. &2
Allowable height
9m 12m
Maximum permissible height
21m 15m
FUTURE URBANIZABLE ZONE
SMART CITY OVERLAY ZONE
Mixed Use Zone -I Mixed Use Zone -II Mixed Use Zone -III
Area of the zone
253.67sq.km
Permissible uses
Agriculture, Dwelling 1 and Dwelling 2.
Area of the 12.67sq.km overlay zone Non Permissible uses
Minimum plot size for any development :
Allowable height
3m
Maximum permissible height
3m
20,000 Sq. M.
Industrial 1 & 2, Educational 2, Agriculture 1 & 2, Mercantile -3
Ground Coverage:
Allowable height
45m
75m 60m
Future Urbanizable Zone limits
Maximum permissible height
20%
uncontrolled development beyond city limits.
Smart City Overlay Zone Industrial Zone -I Gamtal
Industrial Zone -II
Gamtal Extension Zone Recreational Zone
Green Buffer Zone: Gamtal Extension
Area Gamtal of the 9.2sq.km zone Gamtal Extension Non Future Urbanisable IndustrialZone 1& Permissible 2, Dwelling 3, State highways uses Arterial Educational 2, Assembly 2, Sub- Arterial Assembly 3. Green network Allowable height
9m
Maximum permissible height
15m
33
PROPOSALS SOLID WASTE MANAGEMENT
SEWAGE TREATMENT PLANTS
Nakarvadi landfill site STP 2 80MLD
Transfer Stations
Madhapar STP 80MLD
Gavaridad STP 70MLD Madhapar STP 44.5MLD
STP 1 60MLD
Raiyadhar STP 56MLD
Compost plants
Raiya STP 51MLD
Pumping Station
Kothariya STP 30MLD
APS STP(Proposed)
EXISTING TRANSFER STATION COMPOSED PLANTS PROPOSED TRANSFER STATION PROPOSED COMPOSED PLANT
STP
PROPOSED LANDFILL SITE
SOLID WASTE GENERATION/DAY:
450 METRIC TONNE
POPULATION for
15,35,112
For the Projected population of 51,85,200; SOLID WASTE GENERATION/DAY requirement would be:
1520 METRIC TONNE Though the Solid waste management is better managed, there is a need for compost plants as well as upgradation of the Nakarwadi landfill site. Thus, 3 no.s of Compost plants are proposed; 2 near Vavdi and one near the Bhavnagar road.
34
Current Sewage Generation:
for a
Future Sewage Generation:
for a
Thus, Additional STP required- 147
MLD
196.5 MLD 270 MLD
Population of
15.35 lakhs
Population of
51.85 lakhs
Thus, 2 new STPs have thus been proposed and existing have been proposed to be upgraded. The STPs are proposed near Kothariya and Madhapar, whereas the other existing STPs to the west has been proposed to be upgraded.
WATER TREATMENT PLANTS
SMART CITY PROPOSAL
Raiyadhar WTP 50MLD
Aji WTP 103MLD
Nyari WTP 32MLD
Smart city has an allowable height of 75m with all landuses except industries, with pan city initiatives and green cover that would make it a model for other areas of the city to grow.
Ribada WTP 50MLD
PROPOSED WTP
Requirement :
105 MLD
Projected demand :
270MLD
Existing Water Supply in Rajkot: Water Distribution (Zone wise) ZONE
DEMAND
SUPPLY
West Zone Central Zone East Zone
106MLD 59MLD 75MLD
118.8MLD 19.16MLD 8.9MLD
2 more WTP Required. 100MLD each have to be provided. The 2 new WTPs are proposed to the downstream, that is, near the Aji stream and Nyari river.
GOALS *Safe & Secure Rajkot *Solve the mobility challenge *Swachh & beautiful Rajkot *Energy efficient city *Inclusive City *World Class Tourism Centre *Sports destination Envisioned View
35
PROJECT PROPOSALS 1. AT CITY LEVEL-
Nyari Dam 2
Aji Dam 2
Implementation Strategy:
Aji Dam 1 Nyari Dam1
Since the proposed 50m green buffer along the streams has existing landuses, the proposal has to be carried out according to the BMPC Act, Rajkot wherein the land can be acquired forcibly from the owners for the public good with compensation.
View with the proposed buffer
Riparian buffer Lake front Development
Green roof
Riparian buffer
Rain garden
Riparian Buffer Mandatory 50 m buffer from the water bodies
36
50m
Plan of the Buffer zone
River and Lake front developments through proposals-
2. AT NEIGHBOURHOOD LEVELThe Development control Regulations will regulate the landscape requirements per plot and various relaxations would be proposed for those who construct roof gardens, vertical gardens etc.
The recreational zone proposed around the Aji and Nyari river as well as the lakes like lalpari lake has been proposed to have frontage developments with parks, street furnitures, jogging tracks and other spaces for recreational purposes.
To cater to the water scarcity, neighbourhood level water recharging can be proposed through DCR.
37
FINAL DEVELOPMENT PLAN
2041 PROPOSED DEVELOPMENT PLAN
0.15 SQ. M (Existing Green)
Towards Morbi
Towards Jamnagar
Towards Ahmedabad
9 SQ. M (WHO Standard)
COSTING
10.8 SQ. M (Proposed Green)
(Total: 6,300 cr )
Demand to be met: 270 MLD Cost Estimated to install the 2 WTPs: 135 Crores 135 Crores 2. Cost estimated to install 2 STPs 1.
of 50MLD each: 100 Crores Cost Estimated to upgrade Kothariya (30MLD)and Madhapur (20MLD) STPs: 100 Crores 3. Proposed Arterial and Sub-
Towards Kalawad
Mixed Use Zone -II
Industrial Zone -I
Mixed Use Zone -III Towards
Industrial Zone -II
Arterial Roads: 443 kms Mixed Use Zone -II Cost Estimated to install: Mixed Use Zone -III Smart City Overlay Zone 2086 2086 Crores Crores Industrial Zone -I 4. Proposed Green network and Industrial Zone -II proposed roads: Recreational Zone 380.8kms+443 kms Green Buffer Cost Estimated to install: Gamtal Towards Bhavnagar 164.76Crores Crores 164.76 Gamtal Extension
Gondal Smart City Overlay Zone
Recreational Zone
Future Urbanisable Zone
Mixed Use Zone -I
Industrial Zone -I
Green Buffer
State highways Arterial Sub- Arterial Green network
Mixed Use Zone -I
Mixed Use Zone -I Mixed Use Zone -II Mixed Use Zone -III
38
Mixed Use Zone -I
Smart City Overlay Zone
Mixed Use Zone -II
Industrial Zone -II
Gamtal
Mixed Use Zone -III
Recreational Zone
Gamtal Extension
Smart City Overlay Zone
Green Buffer
Future Urbanisable Zone
Industrial Zone -I
Gamtal
State highways
5. Area of proposed greens, Recreational Zone and Green buffer: 5,404 Ha Cost Estimated: 3714.41 Crores
PHASING PHASE I
Phase I opens up 265.21 sqkm land for development.
2,267.76 Crores
PHASE II
PHASE III
Phase II opens up an additional 70 sqkm land for development.
Phase III gives the Future Urbanizable Zone
1,684 Crores
1,084 Crores
KEY LEARNINGS & REFLECTIONS The Development Plan Studio was indeed initiated a great learning about the innovative approaches that can be considered while preparing a Development Plan for a city instead of the usual conventional approach. Preparation of DP requires us as planners to understand the city and the stakeholders perspectives to give proposals for their future.
Process to prepare a Development Plan for the City and it’s population requires: 1. Analysing the city through the eyes of the stakeholders as well as the publicly available documents. 2. Designing the DP according to the needs of the city with implementation strategies. 3. Making the officials as well as stakeholders understand the plan according to their considerations.
39
ENVISIONED VIEW OF THE ‘RAJKOT’ CITY
Green Networks proposed along roads of varying widths as breathing spaces and local green for the neighbourhood. Mixed Use I of high intensity kept along the west due to high demand and observed growth pattern.
40
Green Buffer of 50m kept along the streams to prevent further pollution. Mixed Use II promotes liberal growth pattern, but with medium intensity.
High intensity corridors maintained in Mixed Use Zone I according to local demand and envisioned growth pattern.
Mixed Use Zone III promotes low intensity residential and commercial development. The zone includes smaller block sizes to reduce the Urban Heat Island Effect.
Recreation Zone along the major water bodies to prevent further pollution. The zone can be a solution for the lack of city level greens.