ARCHITECTURE
PORTFOLIO
Year 2024
Ain Shams University- Faculty of Engineering- Architecture Department
Atef Mohamed Abdelrhman
CONTENT GRADUATION PROJECT
01 GRADUATION PROJECT (1)
04
05 PAVILION
30
02 GRADUATION PROJECT (2)
06
06 Compound Sky Garden
34
03 GRADUATION PROJECT (3)
14
07 Alamein Resort
38
04 Egypt School
24
08 Paradise Residence
44
ARCHITECTURAL DESIGN
ARCHITECTURAL DESIGN
ARCHITECTURAL DESIGN
BIM Diploma
2 Ain Shams University- Faculty of Engineering- Architecture Department
EDUCATION COURSE
ARCHITECTURAL DESIGN
ARCHITECTURAL DESIGN
ARCHITECTURAL DESIGN
3 Ain Shams University- Faculty of Engineering- Architecture Department
SITE :
01
GREENVILLE CITY DEVELOPMENT STRATEGIC PLAN Strategic Plan, The United States of America.
SITE ANALYSES:
Location : Greenville, South Carolina, Usa.
Part 1 from the graduation project, The project aims to develop a strategic development plan for the city of Greenville, South Carolina, in the United States of America. Part 2 from the graduation project, It is one of the projects proposed in the strategic plan, which has been fully developed until it reached its mature form. Part 3 from the graduation project, It aims to develop proposal for the Clemson University campus for automotive research to be an integrated research centre in automotive sciences.
4 Ain Shams University- Faculty of Engineering- Architecture Department
(Group Work, Jan. 202), Design project for the graduation year 20212022, Strategic Plan , America.
Used Tools :
VISION, MISSION, AND OBJECTIVES :
5 Ain Shams University- Faculty of Engineering- Architecture Department
Concept :
02
BUSINESS PARK Business Park, Cu-Icar New Campus.
- The design idea comes from studying the biological system of a sea sponge animal. - Ostia is a gate that enables water to enter the sponge body and acts as valves to regulate water’s flow into the spongokol, the water then flow as a current and exit from an upper hole in its body.
Layout Studies :
Location : Greenville, South Carolina, Usa. Used Tools :
The Business park is strengthened by its public space and inter-building connections. By integrating nature and sport into the commercial block, Triango creates a rich, synergetic environment that defines their vision for a new office experience. Working is no longer confined to the office building but instead becomes a landscape experience.
(Team Work, Jan. 2022), project for the part 2 of the Graduation project.
Layout Generation :
6 Ain Shams University- Faculty of Engineering- Architecture Department
7 Ain Shams University- Faculty of Engineering- Architecture Department
Plans:
Ground floor:
First floor:
Second floor:
Section:
8 Ain Shams University- Faculty of Engineering- Architecture Department
9 Ain Shams University- Faculty of Engineering- Architecture Department
Bank building:
Plan:
Section:
Ground floor: 10 Ain Shams University- Faculty of Engineering- Architecture Department
11 Ain Shams University- Faculty of Engineering- Architecture Department
Office buildings:
Plan:
12 Ain Shams University- Faculty of Engineering- Architecture Department
13 Ain Shams University- Faculty of Engineering- Architecture Department
03
CU-ICAR NEW CAMPUS the Clemson University campus , Cu-Icar New Campus.
Location : Greenville, South Carolina, Usa.
Development of Clemson University International Center for Automotive Research on both architecture and urban aspects.We collaborated with clemson university staff in order to find the best solutions for the challenges that faces the wide variety of users at the campus through innovation and creativity.By the end of semester we offered three different proposals each encountering the challenges from a different perspective. Our proposal focused on the User aspect.how different users interact with each others and with the site it self in order to come out with the most appropriate scenarios for all Users.
14 Ain Shams University- Faculty of Engineering- Architecture Department
(Team Work, Jan. 2022), project for the part 3 of the Graduation project.
Used Tools :
15 Ain Shams University- Faculty of Engineering- Architecture Department
16 Ain Shams University- Faculty of Engineering- Architecture Department
17 Ain Shams University- Faculty of Engineering- Architecture Department
NEIGHBORHOOD 2
NEIGHBORHOOD 3
TN3 include the Practical & Business Part of the project. The Neighborhood contains Labs, Workshops, Light Industry in the practical part that aims to serve both under and post graduate students.It also contains Headquarters offices, Technology hub,and a Training Center.This part is specialized for CUICAR partnerships and future entrepreneurs.
TN2 include the service Part of the project. The Neighborhood contains sport facilities, Gathering spaces, F&B outlets, A Medical Center, Edu-Kids Center, Showroom , and a Driving School. All the Facilities in TN2 service both the Campus Occupants & The city Visitors. This neighborhood is usually occupied with ( students –post and under graduates, researchers, academic staff, Businessmen, and Visitors ).
TN3 Will feature: -LABS -STUDENT WORKSHOPS -ASSEMBLY BUILDING -LIGHT INDYSTRY -EXHIBITION -CONVENTION CENTER -TRAINING CENTER -TECHNOLOGY HUB -HEADQUARTERS
TN2 Will feature: -SPORTS CENTER -SOCIAL HUB -FOOD COURT -MEDICAL CENTER -EDU-KIDS -SHOWROOM -DRIVING SCHOOL
PROJECTS
GYMNASIUM SECTION A-A
PROJECTS
FLEXLABS
F O R M G E N E R AT I O N
F O R M G E N E R AT I O N
EXTERIOR SHOT
EXTERIOR SHOT
GROUND FLOOR PLAN
FLOOR PLANS
GROUND FLOOR PLAN
E L E VAT I O N
SECTION A-A
INTERIOR SHOT 1
FLOOR PLANS
INTERIOR SHOT 2
SOCIAL HUB SECTION A-A
E L E VAT I O N
FLEX LABS 2
INTERIOR SHOT
F O R M G E N E R AT I O N
F O R M G E N E R AT I O N
EXTERIOR SHOT
GROUND FLOOR PLAN
EXTERIOR SHOT
FLOOR PLANS
GROUND FLOOR PLAN
E L E VAT I O N
SECTION A-A
INTERIOR SHOT 1
INTERIOR SHOT 2
SECTION A-A
18 Ain Shams University- Faculty of Engineering- Architecture Department
FLOOR PLANS
E L E VAT I O N
19 Ain Shams University- Faculty of Engineering- Architecture Department
INTERIOR SHOT
NEIGHBORHOOD 4
NEIGHBORHOOD 5
TN4 include the theoretical academic Part of the project. The dominant area in this neighborhood is the CAMPUS expecting mainly undergraduate students . The intermediate zone which includes ( main central library, post grad center and research center ) expecting different categories of user of different academic scales . This neighborhood is usually occupied with ( students –post and under graduates- and researchers academic staff ).
TN5 include the entertainment and rebranding part of the project. - TN5 is usually occupied with (workers and visitors). - The neighborhood is divided into 2 different zones Reception Zone (coffee, restaurant, and film academy). Film Making Zone (studios, CGI office and production office).
TN4 will Feature: -3 Programe Buildings -Post Grad Centre -Research Centre -Campus Administration
TN5 will feature : -6 stages -CGI office -Cafe and restaurant -Film academy
research research center center form form generation generation research center form generation
SECTION A-A
PROJECTS research research research center center form center form generation generation form generation
creating a creating horizontally a horizontally distributed distributed form along form the along thealong pointing pointing entrances out entrances by subtraction by subtraction creating a horizontally distributed form the out pointing out entrances by subtraction west-east drection west-eastsodrection that it’ssoprovided that it’swith proper proper west-east drection soprovided that it’swith provided with proper sunlight and sunlight wind onand 2sunlight different wind onand 2levels different 0.00 and 3.00 0.00levels and 3.00 wind on 2 levels different 0.00 and 3.00 due to the due land’s to the contour land’s due to contour the land’s contour
placing theplacing vertical thecirculation vertical circulation on the corners on the placing the vertical circulation oncorners the corners of the building of theofbuilding the building
RESEARCH CENTER
SECTION A-A creatingcreating a horizontally a horizontally creating distributed a horizontally distributed form along distributed formthe alongform the along pointing thepointing out entrances outpointing entrances by subtraction out by entrances subtraction by subtraction west-east west-east drectiondrection west-east so that it’s sodrection that provided it’s so provided with thatproper it’s with provided properwith proper sunlightsunlight and windand on sunlight wind 2 different onand 2 different wind levels on0.00 2levels different and0.00 3.00levels and 3.00 0.00 and 3.00 due to the dueland’s to thecontour land’s due tocontour the land’s contour
placing placing the vertical theplacing vertical circulation the circulation vertical on the corners circulation on the corners on the corners of the building of the building of the building
PROJECTS
ofwhere a massing longlabs massing are varying heights of spaces with different addition of extruded openmore officefor space for more addition ofaddition a longaddition massing of a long where arewhere disributed labslabs are disributed in disributed in in varying heights varying of heights spaces with of spaces different with functions different functionsfunctions addition ofaddition extruded ofopen extruded office open space office for space more hence, the relation between and voids allowed forexperience a more exciting user experience to sunlght hence, the hence, relation thebetween relation solids between and solids voidssolids allowed and voids allowed for a morefor exciting a more user exciting user experience exposure toexposure sunlghtexposure to sunlght the creation of roof gardens for the creation for thefor ofcreation roof gardens of roof gardens
F O R M G E N E R AT I O N
STUDIOS
additionaddition of a longofmassing addition a long massing where of a long labs where massing arelabs disributed where are disributed labs in are in disributed in varying varying heights heights of spaces varying ofwith spaces heights different with of spaces different functions withfunctions different functions additionaddition of extruded of addition extruded open office ofopen extruded space officefor open space more office for more space for more hence, the hence, relation the relation hence, between the between solids relation and solids between voids and allowed voids solidsallowed and voids allowed for a more forexciting a more exciting for usera more experience user exciting experience user experience exposureexposure to sunlght toexposure sunlght to sunlght for the creation for the creation offor roofthe gardens ofcreation roof gardens of roof gardens
F O R M G E N E R AT I O N
GROUND FLOOR PLAN
E L E VAT I O N S
1.lab aupport area 2.cooling&programming 3.augmented reality lab 4. dry lab storage 5.meeting room 6.conference room 7.meeting room 8.manger’s room 9.PR 10.secrtary 11.office 12.reception 13.data scince lab 14.digital fabrication lab 15.VR lab 16.kitchen 17.restraunt
EXTERIOR SHOT
FLOOR PLANS
SECTIONS
INTERIOR SHOT 1
INTERIOR SHOT 2
LIBRARY GROUND FLOOR PLANS
EXTERIOR SHOT
EXTERIOR SHOT
GROUND FLOOR PLAN
FAKE SCREENS STRUCTURE SYSTEM
FLOOR PLANS
E L E VAT I O N
E L E VAT I O N
SECTION A-A
20 Ain Shams University- Faculty of Engineering- Architecture Department
INTERIOR SHOT 1
SECTION A-A
INTERIOR SHOT 2
21 Ain Shams University- Faculty of Engineering- Architecture Department
INTERIOR SHOT 1
INTERIOR SHOT 2
SECTION A-A
PROJECTS
PRODUCTION OFFICES
A
F O R M G E N E R AT I O N
GROUND FLOOR PLAN
FLOOR PLANS EXTERIOR SHOTS
STUDIES Z O N E A N A LY S I S
E L E VAT I O N
INTERIOR SHOT
SECTION A-A
F O R M G E N E R AT I O N
22 Ain Shams University- Faculty of Engineering- Architecture Department
23 Ain Shams University- Faculty of Engineering- Architecture Department
04
Egypt School INTERNATIONAL SCHOOL, CAIRO.
Location : Maadi , Cairo. Used Tools :
BIM Standards:
(Team Work, Jan. 2021), project for the BIM course year 2021-2022, it is a n international schoo
This project present BIM implementation for construction sequencing and coordination for a school project. Construction sequencing and coordination through BIM improves communication process among team members and help the team resolve issues with less time required than in a conventional coordination process. It helps to avoid future conflicts between team members, avoid reworks by recreating a certain task and studying the tasks carefully before actual site implementation.
24 Ain Shams University- Faculty of Engineering- Architecture Department
The delivery team will follow the standards as requested in the EIR as follows: 1.ISO 19650-1:2018— Part 1: Concepts and principles. 2.ISO 19650-2:2018— Part 2: Delivery phase of the assets. All team members agreed on the method of data segregation. We agreed to make all buildings on the same file. The max file size for each discipline didn’t exceed 100 MB. We documented every stage of the project to avoid losing any information.
25 Ain Shams University- Faculty of Engineering- Architecture Department
Modeling:
Clash detection: Model Coordination provides a shared space to publish, review, and run clashes on your latest set of project models and upload 3D models to a centralized Model Coordination folder, and the clash service automatically locates any issues in those models.
Shop drawings: There are some of the shop drawings (Architecture, civil and MEP drawings)
26 Ain Shams University- Faculty of Engineering- Architecture Department
27 Ain Shams University- Faculty of Engineering- Architecture Department
TimeLine Scheduel (4D) :
Wind Simulation (6D):
Cost Estimation (5D) :
Heat and Cooling Loads (6D):
Sun Path & Solar Analysis (6D) :
Lighting Load Analysis (6D):
28 Ain Shams University- Faculty of Engineering- Architecture Department
29 Ain Shams University- Faculty of Engineering- Architecture Department
Concept : -The design idea comes from studying the biological system of a sea sponge animal. -Ostia is a gate that enables water to enter the sponge body and acts as valves to regulate water’s flow into the spongokol, the water then flow as a current and exit from an upper hole in its body.
05 Hamoor Pavilion Education pavilion, cairo
-Thus, the main goal is to take advantage of the ability of the OSTIA to isolate the waste, which is the body of the sponge, where the industrial cloud will be designed to close itself during the presence of rain to prevent water from reaching the covered void.
Location : Ain Shams Campus , Cairo. Used Tools :
30 Ain Shams University- Faculty of Engineering- Architecture Department
Tubular st ructure system of t he cloud
The m ain body of t he cloud t hat w ill close and open t o provide shading and rain protection
The shape of t he art ificial cloud
(Group Work, June. 2021), The final project of the ARC 341 computer applications course, The project aims to designing a pavilion at the Faculty of Engineering, Ain Shams University with a parametric thinking.
The hamoor Pavilion is designed combining contemporary architecture and traditional craftsmanship. It offers a place for relaxation and meditation in open space at faculty of engineering, ain shams university. The pavilion blends in with the surrounding landscape and forms a shaded space for student to shelter from the hot summer sun. Pavilion offers beautiful views to the surrounding nature, thus creating a communion between the sheltered space and the exterior. Filtered daylight through pavilion creates dynamic shadow patterns on the grass.
-The closing and opening process of the cloud hull depends on the use of a wooden material called fixable high density fiber-board , which is under the influence of water it bends, which will happen if it is exposed to rain.
Body of cloud in norm al condition
W hen it exposed to rainwater it starts to bend
Section in cloud
31 Ain Shams University- Faculty of Engineering- Architecture Department
Finally, it continue bending until touches each other and close the openings in the cloud
MATERIAL: FLEXIBLE HIGH-DENSITY FIBERBOARD -MECHANISM
Definition of Pores Closing
-INVENTORS
DRY
TREATED TO EXPAND WHENWET.
TREATED TO PREVENT EXPANSIONWHENWET.
WET
DAHY, Hanaa
KNIPPERS, Jan
Shots: DRY
Pipethat collect the rain
WET
NEON PVC PIPES
Environmental analysis:
PARAMETRIC DEFINITION: Definition of shape
Definition of Pattern
32 Ain Shams University- Faculty of Engineering- Architecture Department
33 Ain Shams University- Faculty of Engineering- Architecture Department
06 Tamayouz competition Athar Bavilion, BAGHDAD
Location : Baghdad , .
The Dewan competition for the ATHAR pavilion in Baghdad is an architectural design contest focused on creating a pavilion that reflects Iraq’s rich historical heritage. Named “ATHAR,” meaning “trace” or “legacy,” the pavilion aims to embody elements of Iraqi culture, history, and architectural traditions, serving as a symbol of national identity and pride. The competition challenges designers to blend ancient influences with contemporary design principles, fostering a space that both commemorates Iraq’s past and inspires future generations.
34 Ain Shams University- Faculty of Engineering- Architecture Department
(Team Work, Sep. 2024), Design project for Dewan competetion..
Used Tools :
35 Ain Shams University- Faculty of Engineering- Architecture Department
Location :
06 Compound Sky Garden Arab Contractors Club, Cairo
Layout Studies : Location : Nasr City, Cairo. Used Tools :
36 Ain Shams University- Faculty of Engineering- Architecture Department
(Team Work, May. 2024), Design project for the arab contractors club.
A Compound Sky Garden concept is an innovative architectural approach to integrate lush green spaces within high-rise residential buildings. Each floor in the block of flats is designed with a dedicated garden area, creating an interconnected series of green terraces or “sky gardens” throughout the structure. This design not only enhances the aesthetic appeal but also fosters a closer connection with nature for residents, offering fresh air, natural shade, and a serene environment directly at their doorstep.
37 Ain Shams University- Faculty of Engineering- Architecture Department
Commercial :
Green areas
Streets
pedestrian walkway
Shots :
Mall :
38 Ain Shams University- Faculty of Engineering- Architecture Department
39 Ain Shams University- Faculty of Engineering- Architecture Department
Layout :
07 Paradise Residence Compound, the new capital
Location : The new capital , Cairo. Used Tools :
The design aims to provide a modern life for the residents, offering contemporary living options that combine functionality and simplicity with the highest degree of luxury, flowing into landscapes of natural beauty that allow views and green landscapes for all to enjoy.
(Team Work, Jan. 2022), Design project for the academic year 20212022, 1st semester. it is Compound..
40 Ain Shams University- Faculty of Engineering- Architecture Department
Layout Analysis :
Hierarchy of Roads, Entrances and Exits
Parking 41 Ain Shams University- Faculty of Engineering- Architecture Department
Ramps
Main Spine
Town House :
Building
Pedestrian Ground Floor
Prototype 1 :
Water Fetures
Green areas
Trees
Seatings
Housing Unit : Villa :
Ground Floor 42 Ain Shams University- Faculty of Engineering- Architecture Department
First Floor 43 Ain Shams University- Faculty of Engineering- Architecture Department
First Floor
Prototype 2 :
44 Ain Shams University- Faculty of Engineering- Architecture Department
45 Ain Shams University- Faculty of Engineering- Architecture Department
goal of hospitality architecture is to create a welcoming, relaxing environment where vacaConcept : The tioners can come to escape and explore. The best resorts help people make memories and keep them coming back.
06 Alamein Resort Tourist Resort, Alamein
Location : Alamein , Matroh. Used Tools :
46 Ain Shams University- Faculty of Engineering- Architecture Department
(Individual Work, Jan. 2020), Design project for the academic year 2020-2021, 1st semester. it is Tourist resort..
A resort may be defined as a recreational place which can also serve as an accommodation facility. resort architecture design and resort architecture planning include coming up with most suitable location for the resort, appropriate building materials, the exteriors and interior designs of the proposed units, and deciding on the appropriate facilities.
47 Ain Shams University- Faculty of Engineering- Architecture Department
is featuring various types of units ranging from apartments to exclusive villas. each Units: Alamein community has its own theme, essence, signature views and architecture that compliments each village’s identity.
Twin house:
Clusters are designed in a dynamic way, opening voids through the buildings that make the user enjoy the sea view while walking through the main spine.
48 Ain Shams University- Faculty of Engineering- Architecture Department
The resort offers a beautiful, elegant and modern design in almost every aspect, combininh perfect mixtures of materials, and different shades of cream and beige pulling the whole look together. the levelling and simplicity combined also give a sense of uniqueness.
Chalet:
Chalets has a great views of large lakes and the accessibility of 20,000 meters of swimmable water lagoons to all residents even those who live far from the sea. Multiple facilities will also be offered. walking and cycling tracks, kids’ area where they will be highly engaged in various activities.
49 Ain Shams University- Faculty of Engineering- Architecture Department
Chapter 2
0.58
T.O.B + 13.1
0.88
CONTENTS
“Drawing takes time. A line has time in it.”
1.10 3.90
Description Earth
T.O.S + 13.1 w1
Curtain wall
2.50
w1
Second floor + 9.2
Patt.
R.C
2.49
T.O.S + 13.1
PATTERN DEFINITION:
rain gutter
0.78
T.O.P + 14.2
N
NORTH ARROW:
Aluminum composite panels 8 mm thick water proofing coating 8 mm heat insulation screed layer 5 cm thick corricated sheets
Second floor + 9.2
01
Brick waterproofing heat isolation ABBREVIATIONS:
Abb.
Description
F.F.L Finish Floor level T.O.C Top Of Concrete P.L.
Pavement level
G.F.
Ground Floor
F.F.
First Floor
S.F.
Second Floor
Car show room.
R.C. Reinforced Conc.
D.P.C Reinforced Conc.
2.45
F.L Foundation Level 2.50
13.30
4.00
16.88
ATD According to des. GS
Graph Scale
O.C
Ordinary Conc.
PF.E Platform Elevation
First floor + 5.2
2.50
WORKING
First floor + 5.2
W/
With
XXX
As Shown
Notes :
w1
- DO NOT SCALE FROM THE DRAWINGS. - ALL DIMENSIONS ARE IN METERS AND LEVELS IN METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
4.00
glass wall
- ALL DATA SHOWN ARE PRESERVED FOR THE ARCHITECT
2.51
- ALL LEVELS ARE F.F.L. OTHERWISE INDICATED
203
GS 0
2.87
1.20
1.20
1.80
P.L - 1.8
P.L - 1.8
PROJECT STATUS:
REV.
2.5
DATE
DESCRIPTION
Design Villa.
FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY ARCHITECTURAL DEPARTMENT WORKING DRAWING (1) PROJECT TITLE:
SUB_TITLE
WORKINGDRAWINGS EGYPT
DATE:
MONDAY,OCTOBER,25,2021
PROJECT NO.:
002
APPROVED BY: CHECKED BY:
ATEF_MOHAMED_ABDELRHMAN
DRAWN BY: SECTION:
WALL_SECTION_1
1.25
02
G.F + 1.2
G.F + 1.2
Zero Level ±0.00
03
B.NO.: CODE:
1600721
DRAWING TITLE:
WALL_SECTION_1
5M
DRAWING NUMBER:
A203
REV. NO. 001 001
SCALE:
SIZE:
1:50
Design & making working drawings
50 Ain Shams University- Faculty of Engineering- Architecture Department
03 Design bathroom in modern style.
51 Ain Shams University- Faculty of Engineering- Architecture Department
A1
PLANS:
01 Project Project Specification: Company: A_T architecture Type: Car showroom. Ideas & Concept: Design a car showroom and making all working drawings.
Style: Modern.
LAYOUT:
52 Ain Shams University- Faculty of Engineering- Architecture Department
53 Ain Shams University- Faculty of Engineering- Architecture Department
F.F.L Finish Floor level T.O.C Top Of Concrete
2
1
2A
ELEVATION:
3
5
4
6
1A
7
P.L.
Pavement level
G.F.
Ground Floor
ELECTRICAL: First Floor
S.F.
Second Floor
w1
C1
T.O.P + 14.2
F
E
8.00
ATD According to des.
8.73
8.00
8.00
8.00
0.13
8.00
5.25
3.79
5.25
3.26
1.88
5.25
ONE GANG SWITCH 16A
TWO GANG SWITCH EACH 16A
Graph Scale
O.C
Ordinary Conc.7
ONE GANG SWITCH, IP 56 (SAME FOR 2&3 GANG ) 16A
3.90
W/
With
XXX
As Shown
TWO WAY SWITCH 16A (UP TO THREE GANG AS INDICATED).
DP GF 1
S
WALL MOUNTED TELEPHONE OUTLET LEVEL 150cm
2
D3
0.88 0.77
D3
PROJECT STATUS:
0.77
D3
1.10 3.90
14.92
2.75
9.40 8.00
1600721
PROJECT TITLE:
SUB_TITLE
2.75
EGYPT
DATE:
MONDAY,OCTOBER,25,2021
PROJECT NO.:
002
CHECKED BY:
1.04
18.71
8.00
8.00
DRAWN BY:
ATEF_MOHAMED_ABDELRHMAN
SECTION:
03
B.NO.:
8.00
8.00
0.13
1600721
DRAWING TITLE:
LOOKING-UP-CEILING
28.11
LIGHTING
ELEVATION 1.25
2.5
5M
With
C
2
D
F
E
DRAWING NUMBER:
REV. NO.
E102
001 001
SCALE:
DRAWING NUMBER:
A202
As Shown
B
A
SIZE:
1:100
REV. NO.
A1
001 001
SIZE:
1:100
A1
4.00
- ALL DIMENSIONS ARE IN METERS AND LEVELS IN METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
B
A
C
D
F
E
40.31 8.00
8.00
Securite glass 4 mm. thick.
G.F + 1.2
N
NORTH ARROW:
3
- ALL LEVELS ARE F.F.L. OTHERWISE INDICATED
4.00
3.75
Steel rods 5x5 cm.
0.32
D3
GF 110
DESCRIPTION
FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY ARCHITECTURAL DEPARTMENT WORKING DRAWING (1)
CODE:
CODE:
Aluminium handrail 5x7 cm.
electrical room
marble tiles skirting 10 cm marble tiles 40x40x2 cm cement mortar 2cm clean sand 6 cm RC Slab 15 cm Cement plaster 2cm + acrylic paint
2.10
D3
3.00
w5
3.75
w5
9.40
DRAWING TITLE:
GS 0 PF.E Platform Elevation XXX
DATE
WORKINGDRAWINGS
- ALL DATA SHOWN ARE PRESERVED FOR THE ARCHITECT
16.88
110
light unit 10
2.10
D3
light unit 10
3.00
corridorlight unit 10
marble tiles skirting 10 cm marble tiles 40x40x2 cm cement mortar 2cm clean sand 6 cm RC Slab 15 cm Cement plaster 2cm + acrylic paint
2.10
4.00
G.F + 1.2
FF
8.73
8.00
5.25
8.00
5.25
3.79
0.13
8.00
5.25
3.26
1.88
5.25
SYMBOLS AND LEGENDS
1.65
Description
Symbol
MAIN DISTRIBUTION PANEL BOARD 220-127V
1.00
w1
ATEF_MOHAMED_ABDELRHMAN 03
B.NO.:
W/
REV.
APPROVED BY:
CHECKED BY: SECTION:
Graph Scale
7
w7
APPROVED BY:
First floor + 5.2
w1
stainless steel ornament 3cm Silicon bitumen rope dipped angle steel 2*2 cm half brick 12*6 cm polestyrene
electrical room
3.85
0.77
D3
1.65
0.88
marble tiles skirting 10 cm light unit 10 marble tiles 40x40x2 cm cement mortar 2cm clean sand 6 cm RC Slab 15 cm Cement plaster 2cm + acrylic paint
2.10
2.10
w5
First floor + 5.2
light unit 10
G.F + 1.2
D3
002
1.65
w1
D3
2.10
w1
w1
w5
3.00
0.77
First floor + 5.2
Securite glass 4 mm. thick.
3.75
corridor
Steel rods 5x5 cm.
First floor + 5.2
marble tiles skirting 10 cm light unit 10 marble tiles 40x40x2 cm cement mortar 2cm clean sand 6 cm RC Slab 15 cm Cement plaster 2cm + acrylic paint
light unit 10
light unit 10
Aluminium handrail 5x7 cm.
D3
MONDAY,OCTOBER,25,2021
DRAWN BY:
Ordinary Conc.
1 2 3 4 5 6 7 8 9 10
w1
F.L Foundation Level 001 CEILING
GS
S
20 19 18 17 16 15 14 13 12 11
EGYPT
PROJECT NO.:
w7
+1.2
ATD According to des.
O.C
DP GF 8
SUB_TITLE
WORKINGDRAWINGS
DATE:
6
DP GF 7
FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY ARCHITECTURAL DEPARTMENT WORKING DRAWING (1)
A1
PROJECT STATUS:
+1.2
DP GF 9 DP GF 4
0.87
Second Floor
5
- DO NOT SCALE FROM THE DRAWINGS.
Second floor + 9.2
3.00
w1
36.89
GF 101
2
First Floor
S.F.
GF 116
Storage
+1.2
PROJECT TITLE:
GF 111
2.75
w1
Storage
W.C
Show room
DP GF 3
S
DP GF 6
4.35
DP GF 5
S
3.20
DESCRIPTION
4.92
DATE
2.79
REV.
Description
F.F.
7.38
S
Notes :
SF 110
w7
S
S
Ground Floor
S
2.75
D2
±0.00
DP GF 15
Pavement level
4
S
GF 113
S
GF 114
DP GF 2
S
SCALE:
electrical room
Second floor + 9.2
2.10
13.30
13.30
4.00
16.88
w1
3.00
D3
T.O.S + 13.1
light unit 10
marble tiles skirting 10 cm marble tiles 40x40x2 cm cement mortar 2cm clean sand 6 cm RC Slab 15 cm Cement plaster 2cm + acrylic paint
2.10
Securite glass 4 mm. thick.
D3
light unit 10
2.10
w1
w1 Second floor + 9.2
corridor
w5
2.10
3.90
w1
Second floor + 9.2
light unit 10
w5
corridor
Steel rods 5x5 cm.
2.10
2.25
light unit 10
Aluminium handrail 5x7 cm.
0.88
w1
S
GF 112
office
manager office
S
1.65
0.77
5M Curtain wall
3.85
1.85
2.5
T.O.P + 14.2
inclined ceramic skirting 20 cm
3.75
1.25
T.O.B + 15.80
stainless steel coping
T.O.S + 13.1
2.10
0
T.O.S + 13.1
3.00
0.58
0.88
1.10
T.O.S + 13.1
GF 110
ME
T.O.P + 14.2
8.00
office GF 115
G.F.
EM EMERGENCY LIGHT
office
Earth
P.L.
w7
electrical room
S
ME
R.C
F
cement tiles skirting 10cm cement tiles 20x20x2 cm Cement mortar 2cm Water proofing memberane 2cm Thermal insulation 5cm thick sloped O.C 7cm RC Slab 15 cm Cement plaster 2cm + acrylic paint
S
S
w3
D.P.C Reinforced Conc.
cement tiles skirting 10cm cement tiles 20x20x2 cm Cement mortar 2cm Water proofing memberane 2cm Thermal insulation 5cm thick sloped O.C 7cm RC Slab 15 cm Cement plaster 2cm + acrylic paint
14.98 8.00
1
Description
R.C. Reinforced Conc.
rain gutter
GF 107
S
T.O.C Top Of Concrete
T.O.B + 13.1
GF 109
0.13
1.20
1.80
Patt.
3
office
S
DP GF 11
F.F.L Finish Floor level
ELEVATION1
DP GF 10
S
D1
Abb.
202
+3.12
S
S
heat isolation
Aluminum composite panels 8 mm thick water proofing coating 8 mm heat insulation screed layer 5 cm thick corricated sheets
12 11 10 9 8 7 6 5 4 3 2 1
DP GF 12
meeting room
GFS 104
S
D1
ABBREVIATIONS:
Aluminum composite panels 8 mm thick water proofing coating 8 mm heat insulation screed layer 5 cm thick corricated sheets
caffe
GF 106
PATTERN DEFINITION:
Zero Level ±0.00
E
office
GF 102
w3
Brick
D
GF 105
131415161718192021222324 25
office
B1
ME
office
office
GF 103
ME
4.00
4.00 1.20
2.37
S
8"x8"
N
waterproofing
C
RECESSED DOWNLIGHT WITH 1 x 18W COMPACT FLUORESCENT LAMP, LOW LOSS BALLAST, 127V, 60HZ. HOUSING IS ALUMINUM BLACK POWDER COATED. cielling surface lighting WITH 1 x 18W COMPACT FLUORESCENT LAMP, LOW
NFPA 170 FIRE SAFTY SYMBOLS
1
P.L - 1.8
B
AS ABOVE BUT EARTH LEAKAGE SOCKET TYPE IP65
OUTLET FOR EXHAUST FAN.
S
+1.2
- ALL LEVELS ARE F.F.L. OTHERWISE INDICATED
G.F + 1.2 F.F.L
A
RECEPTACLE OUTLET, 16A, 220V, GROUNDING TYPE.
6.66
D2
4.00
4.00 w1
NORTH ARROW:
SECTION:
POWER SOCKET 220V,13A FLUSH MOUNTED 2-POLE WITH GROUND
RECEPTACLE OUTLET, 16A, 127V, GROUNDING TYPE.
D1
DP GF 13
S
- ALL DATA SHOWN ARE PRESERVED FOR THE ARCHITECT
First floor + 5.2 F.F.L
P.L - 1.8
DECORATIVE WALL BRACKET LIGHT. UNIT 127V 100W INCANDESCENT LAMP
AS ABOVE BUT EARTH LEAKAGE SOCKET TYPE IP65
- ALL DIMENSIONS ARE IN METERS AND LEVELS IN METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
First floor F.F.L + 5.2
Zero Level ±0.00
CHANDELIER WITH 4 INCANDESCENT LAMPS EACH 100 WATT, 127V, 60 HZ.
1
- DO NOT SCALE FROM THE DRAWINGS.
CURTAIN WALL aluminum mullion 15x5 cm , 6 mm securite glass
G.F F.F.L + 1.2
AS ABOVE BUT WP TYPE IP65 CEILING SURFACE LIGHTIMG UNIT 127V 26W COMPACT FLUORESCENT LAMP
D1
DP GF 14
Second floor + 9.2 F.F.L
WEATHER PROOF.
SURFACE MOUNTED FUORESCENT LUMINARIES, 2x36W, 127V, 60HZ ELECTRONIC BALLAST.
0.13
GS
Description
DISTRIBUTION PANELBOARD 220-127V
1.65
Notes :
Second floor + 9.2 F.F.L
w1
SYMBOLS AND LEGENDS Symbol
MAIN DISTRIBUTION PANEL BOARD 220-127V
5.25
PF.E Platform Elevation
T.O.C + 13.1
Double facade
3.90
D
5.14
1.10 1.10
1.10 1.10
CURTAIN WALL aluminum mullion 15x5 cm , 6 mm securite glass
C 40.31
D.P.C Reinforced Conc.
0.25
0.25 T.O.S + 13.1
B
A
F.L Foundation Level T.O.B + 15.25
T.O.P + 14.2
3
R.C. Reinforced Conc.
T.O.B + 13.1
N
NORTH ARROW:
F.F.
DISTRIBUTION PANELBOARD 220-127V
G.F + 1.2
ONE GANG SWITCH 16A
0.13
1.20
0.87
0.87 2.75
PL
001
1.80
P.L - 1.8
Zero Level ±0.00
Generator
0.18
P.L - 1.8
Floor covering cement mortar 2cm clean sand 6 cm water proofing memberane 2 cm O.C Slab 20cm fill
1.88
P.L - 1.8
Floor covering cement mortar 2cm clean sand 6 cm water proofing memberane 2 cm O.C Slab 20cm fill
2.87
1.80
Zero Level ±0.00
1.20
1.20
TWO GANG SWITCH EACH 16A
7
C1
F.O
F.O
F.O
MDP GF 9
MDP GF 9
P.L - 1.8
MDP GF 1
WEATHER PROOF.
TWO WAY SWITCH 16A (UP TO THREE GANG AS INDICATED). AS ABOVE BUT WP TYPE IP65 CEILING SURFACE LIGHTIMG UNIT 127V 26W COMPACT FLUORESCENT LAMP CHANDELIER WITH 4 INCANDESCENT LAMPS EACH 100 WATT, 127V, 60 HZ.
DECORATIVE WALL BRACKET LIGHT. UNIT 127V 100W INCANDESCENT LAMP
D1
POWER SOCKET 220V,13A FLUSH MOUNTED 2-POLE WITH GROUND
5.14
PROJECT STATUS:
REV.
ONE GANG SWITCH, IP 56 (SAME FOR 2&3 GANG ) 16A
SURFACE MOUNTED FUORESCENT LUMINARIES, 2x36W, 127V, 60HZ ELECTRONIC BALLAST.
1
F.O
DATE
RECEPTACLE OUTLET, 16A, 127V, GROUNDING TYPE.
D1
DESCRIPTION
AS ABOVE BUT EARTH LEAKAGE SOCKET TYPE IP65 RECEPTACLE OUTLET, 16A, 220V, GROUNDING TYPE.
AS ABOVE BUT EARTH LEAKAGE SOCKET TYPE IP65
2
WALL MOUNTED TELEPHONE OUTLET LEVEL 150cm OUTLET FOR EXHAUST FAN. RECESSED DOWNLIGHT WITH 1 x 18W COMPACT FLUORESCENT LAMP, LOW LOSS BALLAST, 127V, 60HZ. HOUSING IS ALUMINUM BLACK POWDER COATED.
14.98
cielling surface lighting WITH 1 x 18W COMPACT FLUORESCENT LAMP, LOW
DATE
203
SUB_TITLE
0
1.25
2.5
5M
GS 0
2.5
5M
1.00
1.80
P.L - 1.8
REV.
8.00
DATE
WALL_SECTION_1
2.75 8.00 36.89 6.66
001
DESCRIPTION
7.38 2.75
MDP GF 14
5 PROJECT STATUS:
6 w7
1 2 3 4 5 6 7 8 9 10
7
20 19 18 17 16 15 14 13 12 11
w1
w7
GROUND-FLOOR
REV.
DATE
DESCRIPTION
FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY ARCHITECTURAL DEPARTMENT WORKING DRAWING (1) PROJECT TITLE:
SUB_TITLE
WORKINGDRAWINGS EGYPT
DATE:
MONDAY,OCTOBER,25,2021
PROJECT NO.:
002
14.92
2.75
CHECKED BY:
1.04
18.71
DRAWN BY:
ATEF_MOHAMED_ABDELRHMAN
SECTION:
03
B.NO.: CODE:
8.00
8.00
8.00
GS 0
1.25
2.5
5M
A
B
2
C
8.00
8.00
0.13
002 ATEF_MOHAMED_ABDELRHMAN
03
B.NO.:
1600721
CODE: DRAWING TITLE:
55 Ain Shams University- Faculty of Engineering- Architecture Department
WALL_SECTION_2
A204
REV. NO. 001 001
SCALE:
SIZE:
1:50
D
1600721
DRAWING TITLE:
ELECTRICAL_POWER
E
F
DRAWING NUMBER:
E103
A1
REV. NO. 001 001
SCALE:
SIZE:
1:100
SUB_TITLE
DRAWING NUMBER:
REV. NO.
F.O
Storage
MONDAY,OCTOBER,25,2021
SECTION:
F
+1.2
28.11
DRAWN BY:
DRAWING NUMBER:
GF 111
9.40
PROJECT STATUS:
DRAWING TITLE:
1.25
Storage
GF 116
+1.2
Zero Level ±0.00
CHECKED BY:
1600721
MDP GF 15
W.C
PROJECT NO.:
03
MDP GF 16
APPROVED BY:
DATE:
B.NO.:
D4
+1.2
002
SECTION:
F.O
GF 101
A1
MONDAY,OCTOBER,25,2021
CODE:
D3
F.O
MDP GF 17
- ALL LEVELS ARE F.F.L. OTHERWISE INDICATED
DATE:
E
Show room
w1
- DO NOT SCALE FROM THE DRAWINGS. - ALL DIMENSIONS ARE IN METERS AND LEVELS IN METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER.
APPROVED BY:
204
D3
MDP GF 18
4.35
As Shown
3.20
4.00
With
XXX
PROJECT NO.:
ATEF_MOHAMED_ABDELRHMAN
MDP GF 7
F.O
2.75
Ordinary Conc.
W/
F.O
4.92
O.C
EGYPT
DRAWN BY:
GF 113
F.O
MDP GF 13
WORKINGDRAWINGS
EGYPT
WALL_SECTION_1
D2
Graph Scale
PROJECT TITLE:
CHECKED BY:
GF 114
F.O
4
GF 112
office
manager office
9.40
WORKINGDRAWINGS
WALL_SECTION_2
±0.00
F.L Foundation Level GS
D2
G.F + 1.2
1.20
0.87
0.32 001
0.18
PL
FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY ARCHITECTURAL DEPARTMENT WORKING DRAWING (1)
54 Ain Shams University- Faculty of Engineering- Architecture Department
office
office
w7
ATD According to des.
FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY ARCHITECTURAL DEPARTMENT WORKING DRAWING (1)
APPROVED BY:
MDP GF 6
GF 115
Securite glass 4 mm. thick.
DESCRIPTION
PROJECT TITLE:
w3
4.00
3.75
0.87 REV.
Steel rods 5x5 cm.
Generator
1.88
2.75
2.87
PROJECT STATUS:
Second Floor
F.O
0.13
0.77 3.00
2.10
2.10
2.51
P.L - 1.8
First Floor
S.F.
Notes :
Aluminium handrail 5x7 cm.
GF 110
1.20
D3
F.F.
F.O
MDP GF 5
- ALL DATA SHOWN ARE PRESERVED FOR THE ARCHITECT
electrical room
- ALL LEVELS ARE F.F.L. OTHERWISE INDICATED
Ground Floor
2.79
110
- DO NOT SCALE FROM THE DRAWINGS.
marble tiles skirting 10 cm marble tiles 40x40x2 cm cement mortar 2cm clean sand 6 cm RC Slab 15 cm Cement plaster 2cm + acrylic paint
SIZE:
P.L. 1:100 Pavement level A1
F.O
3.90
3.85
G.R.C panles 10mm thickness
First floor + 5.2
- ALL DIMENSIONS ARE IN METERS AND LEVELS IN METRES UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER. light unit 10 - ALL DATA SHOWN ARE PRESERVED FOR THE ARCHITECT
GF 110
D1
T.O.C Top Of Concrete 001 G.F.
EM EMERGENCY LIGHT
electrical room
2
w1
REV. NO.
F.F.L A201 Finish Floor level 001
0.87
FF
3.85
0.77
1.65
electrical room
w7
MDP GF 12
PF.E Platform Elevation
16.88
As ShownD3
XXX
B1
Description
GF 109
GF 107 MDP GF 4
D.P.C Reinforced Conc. Second floor + 9.2
3.00
F.L Foundation Level GS Graph Scale marble tiles skirting 10 cm light unit 10 marble tiles 40x40x2 cm O.C Ordinary Conc. cement mortar 2cm clean sand 6Platform cm PF.E Elevation RC Slab 15 cm W/plaster 2cm With Cement + acrylic paint
Abb.
DRAWING NUMBER:
office
D1
R.C. Reinforced Conc.
SF 110
2.10
0.77 0.88
2.45
ATD According to des.
GF 104
GF 102
w3
heat isolation
ABBREVIATIONS:
F.O
MDP GF 8
meeting room
F.O
0.88 1.10
1.65
0.77 3.00
electrical room
Notes :
4.00 1.20
Second Floor D3
R.C. Reinforced Conc.
2.10
0.77 0.88 2.10
2.50 2.50
13.30
2.10
16.88
4.00
2.50
First floor + 5.2
G.F + 1.2
1.80
First Floor
S.F.
1
waterproofing
SECTION_1-1
F.O
office
3
131415161718192021222324 25
F.O
F.F.
Brick
office
D8
+3.12
MDP GF 11
F.O
Ground Floor
1600721
DRAWING TITLE:
12 11 10 9 8 7 6 5 4 3 2 1
caffe
GF 106 F.O
MDP GF 3
R.C
Earth
MDP GF 10
F.O
F.O
P.L - 1.8
Pavement level
G.F.
03
F.O
F.O
Description
ATEF_MOHAMED_ABDELRHMAN
SECTION:
SCALE:
G.R.C panles 10mm thickness
light unit 10
D.P.C Reinforced Conc.
glass wall
Zero Level ±0.00
P.L.
T.O.S + 13.1
F.O
F.O
Second floor + 9.2
Description
F.F.L Finish Floor level T.O.C Top Of Concrete
Patt.
DRAWN BY:
T.O.P + 14.2 inclined ceramic skirting 20 cm
MDP GF 2
1
0.78
Abb.
w1
G.F + 1.2
APPROVED BY:
office
GF 105
GF 103
002
PATTERN DEFINITION:
CODE:
T.O.B + 15.80
G.R.C coping
ABBREVIATIONS:
w1
First floor + 5.2
PROJECT NO.:
B.NO.:
heat isolation
Curtain wall
Second floor + 9.2
Description
1.65
0.58
0.88 1.10
5M
F
MONDAY,OCTOBER,25,2021
CHECKED BY:
Patt.
rain gutter
2.49
2.5
E
PATTERN DEFINITION:
cement tiles skirting 10cm cement tiles 20x20x2 cm R.C Cement mortar 2cm Water proofing memberane 2cm Earth Thermal insulation 5cm thick Brick sloped O.C 7cm RC Slab 15 cm waterproofing Cement plaster 2cm + acrylic paint
T.O.S + 13.1
3.90
1.25
T.O.S + 13.1
D
office
EGYPT
DATE:
F.O
T.O.P + 14.2
C
SUB_TITLE
WORKINGDRAWINGS
F
F.O
GS 0
T.O.B + 13.1
B
A
Aluminum composite panels 8 mm thick water proofing coating 8 mm heat insulation screed layer 5 cm thick corricated sheets
E
F.O
SECTION1-1
201
N
PROJECT TITLE:
N
NORTH ARROW:
F.O
WALL SECTION:
NFPA 170 FIRE SAFTY SYMBOLS
+1.2
FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY ARCHITECTURAL DEPARTMENT WORKING DRAWING (1) NORTH ARROW:
A1
HVAC:
FIRE FIGHTING:
N
NORTH ARROW:
N
NORTH ARROW:
FIRE FIGHTING SYMBOLS
DP
JB HVAC SYMBOLS
3'
C1
B
A
C
E
D
F
73.72 18.14
8.00
8.06
8.00
8.00
8.00
2A
2A 45.20
1:10
-1.8
5.00
10.00
10.00
5 2 4 -
3.00
10.00
7.20
7.00
5.00
5.82
EM
5.00
1
Notes :
1 5.14
This drawing shall be read in conjunction with the other mechanical drawings, electrical and architecture.
13.40
5.14
-1.8
2
44°
44°
46°
°
8.00 57.43
FM200 containers
All pipes pass through wall or slab shall be THRU pipe sleeves.
16.00
5 2 4 -
4
1.35
5.4
0.60
3.25
-1.8 PL
6.90
002
5.44
3.20
2.25
Tank
PL
3.25
004
6
2.50
8.72
D9
All fire fighting pipes shall be paint with two layers of epoxy and one layer of fire fighting pipes red color.
5
5.00
1.90
3.20
6
001
6.00
6.00
pump room PL
7.38
6.55
Generator
1.90
1
D9
5
All exposed pipes shall be properly installed according to specified installed material.
1.70
46.15
42.00
45°
8.75 3.25
14.63
7.38
Fire fighting pipes shall be black steel SCH 40 AS PES ASTM A53, under ground pipes.
co2 containers
89
42.00
8.00 57.43
8.00 2.50
46°
45°
4
Escape exit
3
45°
B1
All dimension in mm unless otherwise noted.
3.85
45°
3
24.00
(18.36-40.18)
8.00
2
Sprinklers in public and common areas with finished ceilings rooms shall be fully recessed, concealed type with factory finished cover plates.
5.00
Tank
2.40
-0.3
PL
6.00
3.00
2.40
9x.3=2.7cm
7
4.92
1.20
4.92
3.3
1 2 3 4 5 6 7 8 9 10 1.50
1.50
D8
20 19 18 17 16 15 14 13 12 11
003
7
2.90
10.30
4.83
5.00
5.00
10.00
GF 004
D9
-1.8
PROJECT STATUS:
REV.
DATE
DESCRIPTION
PIPE HANGER THR'U SLAB
15.50
1.77
29.57
PROJECT STATUS:
6.95
-1.8 1:10
5.18
Storage
3.25
10.00
5 2 4 -
1A
1A
18.17
8.06
8.00
8.00
8.00
8.00
FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY ARCHITECTURAL DEPARTMENT WORKING DRAWING (1)
73.72
3'
A1
B
A
C
E
D
REV.
DATE
F
PROJECT TITLE:
FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY ARCHITECTURAL DEPARTMENT WORKING DRAWING (1)
SUB_TITLE
WORKINGDRAWINGS
"B"
R
PROJECT TITLE:
"B"
R
EGYPT
DATE:
MONDAY,OCTOBER,25,2021
PROJECT NO.:
002
R
APPROVED BY: DRAWN BY:
ATEF_MOHAMED_ABDELRHMAN
SECTION:
03
5M
FM200 CONTAINER W/ GAS CARTRIDGE ACTUATION PACKAGE
SIZE:
C
D
B
A
C
D
F
E
40.31
8.00
8.00
0.13
8.00
8.00
8.00
8.00
8.00
0.13
8.00
HVAC SYMBOLS
5.25
5.25
3.79
5.25
3.26
1.88
5.25
FIRE FIGHTING SYMBOLS
1.65
8.73
5.25
5.25
3.79
5.25
3.26
1.88
5.25
1.65
0.13
0.13
8.73
1
7
C1
A1
N
NORTH ARROW:
F
E
001 001
SIZE:
1:100
40.31 8.00
8.00
REV. NO.
E107 SCALE:
A1
3
B
A
DRAWING NUMBER:
N
NORTH ARROW:
3
1600721
FIRE-FIGHTING-DETAILS
DETAIL OF PIPE SUPPORT THR'U WALL
DATAILS OF INSTALLATION FIRE FIGHTING SYSTEM PLAN
001
1:200
03
DETAIL 9
DETAIL 8
001
SCALE:
ATEF_MOHAMED_ABDELRHMAN
SECTION:
DRAWING TITLE:
REV. NO.
E104
DRAWN BY:
CODE:
DETAIL10
FM200 TYPICAL CYLINDER DETAIL & ACTUATION PACKAGE
2.5
002
B.NO.:
FM200 CYLINDERS MANIFOLD ARRANGEMENT
DRAWING NUMBER:
1.25
"A"
1600721
DRAWING TITLE:
FRESH_AIR_BASEMENT_FLOOR
GS 0
MONDAY,OCTOBER,25,2021
CHECKED BY:
"A"
B.NO.: CODE:
DATE: PROJECT NO.: APPROVED BY:
CHECKED BY:
PAVEMENT-LEVEL
SUB_TITLE
WORKINGDRAWINGS
EGYPT
002
DESCRIPTION
FIRE HOSE CABINET DETAIL.
1
7
C1
D1
24"x20"
3.50
5.14
5.14
3.50
D1
2
3.50
2
3.50
EM
+1.2
+1.2
8.00
GF 105
GF 103
caffe
D2
office
office
GF 105
GF 103
GF 106
24"x20"
caffe
3
Escape exit
D8
Fire Rated
co2 containers
GF 106
+3.12 131415161718192021222324 25
12 11 10 9 8 7 6 5 4 3 2 1
8.00
Escape exit
12 11 10 9 8 7 6 5 4 3 2 1
+3.12
D2
office
office
14.98
3.50
3.50
14.98
3.50
3.50
8"x8"
GF 109
office
1
office
3.47
meeting room
GF 109
GF 107
w7
8.00
3.50
36.89
3.50
D1
B1
electrical room GF 110
3.50
+1.2
7
20 19 18 17 16 15 14 13 12 11
w1
2
0.13
w7
PROJECT TITLE:
w1
DATE:
MONDAY,OCTOBER,25,2021 002
3.20
7
w7
EGYPT
PROJECT NO.:
1 2 3 4 5 6 7 8 9 10
Fire Rated 20 19 18 17 16 15 14 13 12 11
A1
SUB_TITLE
WORKINGDRAWINGS
Escape exit
APPROVED BY:
9.40
14.92
9.40
001
GROUND-FLOOR
2.75
8.00
8.00
DRAWN BY:
ATEF_MOHAMED_ABDELRHMAN
SECTION:
03
8.00
0.13
1.25
2.5
5M
A
B
2
C
D
109
FIRE_FIGHTING
F
FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY ARCHITECTURAL DEPARTMENT WORKING DRAWING (1) PROJECT TITLE:
SUB_TITLE
WORKINGDRAWINGS EGYPT
DATE:
MONDAY,OCTOBER,25,2021
PROJECT NO.:
002
DRAWING NUMBER:
E105
8.00
8.00
001
SIZE:
GS 0
1.25
2.5
CHECKED BY:
1.04
DRAWN BY:
ATEF_MOHAMED_ABDELRHMAN
SECTION:
03
B.NO.:
8.00
8.00
0.13
28.11
REV. NO. 001
SCALE:
2.75 18.71
CODE:
8.00
GROUND-FLOOR-HVAC
E
1:100
56 Ain Shams University- Faculty of Engineering- Architecture Department
14.92
9.40 1600721
DRAWING TITLE:
28.11
GS 0
9.40
B.NO.:
8.00
DESCRIPTION
APPROVED BY:
CHECKED BY:
1.04
18.71
CODE:
8.00
DATE
4.92
w7
+1.2
FACULTY OF ENGINEERING AIN SHAMS UNIVERSITY ARCHITECTURAL DEPARTMENT WORKING DRAWING (1)
REV.
2.75
FFR
0.87
2.79
1 2 3 4 5 6 7 8 9 10
PROJECT STATUS:
6
GF 101
DESCRIPTION
2.75
DATE
5
4.35
3.50
w1 REV.
+1.2
GF 116
Storage
4.92
0.87
w7
+1.2
A1
GF 111
6
GF 101
Storage W.C
Show room
PROJECT STATUS:
+1.2
7.38
7.38 2.75
+1.2
2.79
Storage
5
3.50
2
Show room
3.50
3.20
GF 111
co2 containers w7
4.35
Storage W.C
GF 116
GF 113
GF 114
D2
±0.00
4
GF 112
office
manager office
GF 115
w7
w1
office
GF 113
GF 114
D2
6.66
1
w3
GF 112
office
manager office
office
0.13
office GF 115
GF 110
Distribution valve
2.75
6.66
4
office
w3
electrical room
D1
1
D1
±0.00
3.50
3.00
3.50
36.89
D1
B1
office
GF 104
GF 102
w3
8.00
w7
3.50
GF 107
2.75
office
meeting room
3.50
office
GF 104
GF 102
24"x20"
w3
2.75
office
1
FM200 containers
3
131415161718192021222324 25
5M
A
B
2
C
A1
D
1600721
DRAWING TITLE:
FIRE_FIGHTING_GROUND_FLOOR
E
F
DRAWING NUMBER:
E109
001
SIZE:
1:100
57 Ain Shams University- Faculty of Engineering- Architecture Department
REV. NO. 001
SCALE:
A1
02 Project Project Specification: Company: A_T architecture Type: Noor school Ideas & Concept: Modeling landscape and interior walls.
Style: Modern.
58 Ain Shams University- Faculty of Engineering- Architecture Department
59 Ain Shams University- Faculty of Engineering- Architecture Department
PLANS: Owner
197.167
196.960
e
pin
N-S
197.001
NOOR SCHOOLS LOCATION KEY
SF-SG3
197.333
A3 A3
A3
A3
A3
A2
A4
A2
A3
A2
A4
A4 A4
A2
A2
Entr
SF-P2
Main
SF-SG2
ance
A4
SF-P3
SF-F2
197.200 US
B
197.278
B
197.278
S
BU
S
BU
S
BU
A4
S
BU
SF-P4
an ce
A3
A2
A2
A3
197.440
A3
197.307
03
ISSUE OF TENDER
10-2024
02
CONCEPT DESIGN
9-2024
01
CONCEPT DESIGN
8-2024
REVISIONS
DATE
NO.
OCD.2024
Eng. Asmaa Ahmed
A3
Cars
196.486
196.620
197.159 197.092
05 04
196.697 196.779
197.155 197.156
197.264
196.776
196.551
197.070 197.029 197.251 197.252
es
/Bus
196.911 196.903 196.987 196.966
197.398
es
/Bus
196.841 196.839
A3
A3
A3
03
ISSUE OF TENDER
10-2024
02
CONCEPT DESIGN
9-2024
01
CONCEPT DESIGN
8-2024
REVISIONS
DATE
NO.
TITLE
ISSUE OF TENDER SCHOOL 2
196.868
LANDSCAPE TEAM
Dr. Ayman Abdel Hamid
Cars SF-SG1
A3
A2 A3
A2
A3 APP.
ISSUE OF TENDER SCHOOL 2 LANDSCAPE TEAM
A2
197.694
TITLE
S
BU
A3
A3 A2
A2
04
197.398
SF-P5
A2
A3
197.264
S
BU
SF-F4
SF-G3 SF-G5
SF-G1
197.440 05
S
BU
SF-P1
SF-P5
SF-G2
A3
197.734
197.694
A2
SF-P5
SF-F3
A2
A2
197.307
S
BU
SF-P1 SF-SG2
A3
197.427
S
BU
SF-P1
A2
197.482
197.734
A2
A2
A3
197.602
S
BU
ce
tr En
A3 SF-P4
S
BU
ntran
A2
197.482 197.427
A2
A2
S
BU
es
A2
A2 A3
A3
BU
es
A2
A2
ry
197.548
S
A3
A3
197.523
197.602
S
BU
KG E
da
197.523 197.548
S
A2 A3
A2
an
197.469
S
A3
A2 SF-P4
A2
A3
BU
BU
A2
/Bus
e
S
A3 A2
SF-P2
A3
A3
197.565 197.647
BU
A2
A3
c Se
in
US
B
A3 A3
e in Sp E-
Sp
E-
S
BU
A2
A3
197.337
S BU
197.469
A3
S
BU
A3 SF-F4
/Bus
S BU
S BU
197.565 197.647
A2
SF-P4
SF-SG2
S
BU
A2
SF-G4
A3 A2
A3
A3
S
BU
A2
SF-G2
Cars
197.337
A3
A3
A2
A2
Cars
197.618 197.607 197.620
A4
A2 A2 A3
A2
A3
A2 A3
S
BU
SF-F3
A3 A2
A3
SF-F3
197.200
US
ROAD & TRAFFIC CONSULTANT:
es /Bus
ce
es /Bus
A2
Cars
Cars
ntran
A2
SF-P2
SF-S1
SF-F2
ry E
A3
A2
SF-P2
SF-P2
NOOR SCHOOLS MAIN CONSULTANT
enta
SF-P2
A4
A4
197.739
Elem
197.670
A2
A2
SF-SG2
SF-P2
SF-F1
A3
A3
A4
197.582
A3
A2
SF-P2
SF-F2
A4
A3
A2
A3
A3
es
/Bus
A3 A2
A3 A3
A3
197.540
197.449
A3 A3
A3
197.416 197.449
197.499
197.379
ROAD & TRAFFIC CONSULTANT:
Cars
A3
197.374 197.380
197.457 197.524
A3
A3
197.158
197.307
N-S
197.291
197.089
NOOR SCHOOLS MAIN CONSULTANT
NOOR SCHOOLS LOCATION KEY
197.250e
pin
197.043
197.233
Owner
197.208
LS-HD-00
LANDSCAPE TEAM
196.961 196.962
Owner
197.167
196.960
NOOR SCHOOLS LOCATION KEY
N-S
197.291 197.333
197.250e
NOOR SCHOOLS LOCATION KEY
T.O.W.S.198.25
Cars
T.O.W.S.198.25
197.374 197.380 T.O.W.S.198.25
197.233
T.O.W.S.198.25
197.457 197.524
T.O.W.S.198.25
ROAD & TRAFFIC CONSULTANT:
/Bus es
/Bus
ce
es
T.O.W.S.198.25
T.O.W.S.198.25
T.O.S. 198.25 B.O.S. 197.80
Cars
ntran
T.O.W.S.198.25
F.F.L. 197.80
NOOR SCHOOLS MAIN CONSULTANT
B.O.R. 197.50 T.O.C. 197.40 B.O.C. 197.25
ry E
T.O.R.197.80 F.F.L. 197.80 T.O.S. 198.25 B.O.S. 197.80
197.739
8%
Cars
T.O.S. 198.25 B.O.S. 197.80
F.F.L. 197.80
197.670
197.582
T.O.W.S.198.25
T.O.W.S.198.25
T.O.W.S.198.25
197.540
197.449
T.O.W.S.198.25
T.O.W.S.198.25
197.499
197.379
ROAD & TRAFFIC CONSULTANT:
T.O.W.S.198.25
es
/Bus
enta Elem
197.307
NOOR SCHOOLS MAIN CONSULTANT
197.416 197.449
Owner
pin
197.043
197.158
LS-F-00
197.208
197.001
197.089
LANDSCAPE TEAM
OCD.2024
F.F.L: Finish Floor Level
T.O.W.S.198.25 T.O.S. 198.25 B.O.S. 197.80
F.F.L. 197.80
G.F.L: Ground Floor Level T.O.S: Top of Stairs
G.F.L. 198.25
B.O.S: Bottom of Stairs T.O.W.S: Top of Seat Wall
Main T.O.R.197.80
5%
T.O.W: Top of WaLL
Entr
F.F.L. 197.80
B.O.W.S: Bottom of Seat Wall
B.O.R. 197.50 T.O.C. 197.35 B.O.C. 197.20
T.O.R: Top of Ramp B.O.R: Bottom of Ramp T.O.C: Top of CURB
ance
T.O.S. 198.25 B.O.S. 197.80
B.O.C: Bottom of CURB
T.O.W. 202.80 B.O.W. 197.80 T.O.W. 199.80 B.O.W. 197.80
T.O.W.S.198.25
197.200
T.O.W.S.198.25
T.O.W. 199.80 B.O.W. 197.80
S
BU
T.O.W. 198.3 B.O.W. 197.80
197.278
S
BU
S
BU
T.O.W.S.198.25
T.O.W.S.198.25
S
BU
F.F.L. 197.80
es
ary En e
F.F.L. 197.80
197.602
T.O.W.S.198.25
T.O.S. 198.25 B.O.S. 197.80
9-2024 8-2024
REVISIONS
DATE
TITLE
CONCEPT DESIGN SCHEDULE LANDSCAPE TEAM
SEP.2024
60 Ain Shams University- Faculty of Engineering- Architecture Department
LANDSCAPE TEAM
LC-01
197.398
APP.
197.264
es
/Bus
Cars
es
/Bus
196.776
196.911 196.903
F.F.L. 197.80 F.F.L. 197.80
197.070 197.029 197.159 197.092
197.251 197.252
196.486
196.987 196.966
T.O.W.S.198.25
04
CONCEPT DESIGN
S
BU
196.841 196.839
03
CONCEPT DESIGN
S
BU
S
T.O.W. 198.3 B.O.W. 197.80
05
01
S
BU
Cars
197.440 197.694
S
BU
BU
T.O.W. 199.80 B.O.W. 197.80
T.O.W.S.198.25
S
BU
F.F.L. 197.80 T.O.S. 198.25 B.O.S. 197.80
197.734
197.307
T.O.R.197.80
T.O.S. 198.25 B.O.S. 197.80
T.O.W.S.198.25
197.482 197.427
T.O.S. 198.25 B.O.S. 197.80
4%
BU
ce
nc
tra
T.O.W.S.198.25
T.O.S. 198.25 B.O.S. 197.80
G.F.L. 198.25
ntran KG E
nd
T.O.W.S.198.25
197.523 197.548
S
B.O.R. 197.40 T.O.C. 197.25 B.O.C. 197.10
ca 197.65 197.469 T.O.C. B.O.C. 197.50
S
BU
/Bus
Se
e in
Sp
E-
T.O.W.S.198.25
197.565 197.647
BU
Cars
T.O.W.S.198.25
02
S
T.O.W.S.198.25 T.O.S. 198.25 B.O.S. 197.80
197.337
NO.
S
BU
es /Bus Cars
G.F.L. 198.25
T.O.W.S.198.25
F.F.L. 197.65
196.620
05 04
196.697 196.779
197.155 197.156
196.551
03
ISSUE OF TENDER
10-2024
02
CONCEPT DESIGN
9-2024
01
CONCEPT DESIGN
8-2024
REVISIONS
DATE
NO.
TITLE
ISSUE OF TENDER SCHOOL 2
196.868 196.961 196.962
61 Ain Shams University- Faculty of Engineering- Architecture Department
LANDSCAPE TEAM
OCT.2024
Eng. Asmaa Ahmed
LANDSCAPE TEAM
Dr. Ayman Abdel Hamid
LS-GR-00
APP.
APP.
PLANS: Notes:
2
9
7
6
1.84 m
Sample Notes
1.80 m 1.70 m
0.70 m
3.57 m
D4
3.57 m
1.00 m 0.23 m
4.98 m
1.30 m 0.90 m
0.53 m
0.93 m
1.03 m
H
1
4 2
1
4 2
21.05 m
D
1
1
0.18 m 1.00 m 0.29 m
8.18 m
Dinning room 35 m²
1.00 m 0.18 m
2.25 m
1
8.00 m
2
F E
2.50 m
5.10 m
Reception 41 m²
6.98 m
4
G
3.20 m
2.02 m
2.60 m
0.53 m 1.55 m
2
0.50 m
1.98 m
0.96 m
1.62 m
2.58 m
1.40 m
D1 3.73 m
D2
0.22 m
2
0.80 m
0.80 m
0.95 m
1
4.60 m
16 17 18 19 20 21 22 23
3.09 m
2.85 m
2.06 m
1.00 m
2.20 m
1.50 m
4.86 m
1.98 m
2.00 m
1.56 m
1.40 m
1.00 m
0.08 m 1.00 m
0.44 m 1.00 m
1.00 m 0.22 m
2.34 m
2.34 m 1.18 m 1.18 m
1
I
1.38 m
Entrance 4 12 m² 1 1
4.96 m
3.98 m
2.12 m
D2
1.28 m
W.C 3 m² 1.98 m
A
2.57 m
2.00 m
1.90 m
Private
DRAWN:
CHECKED:
Atef PROJECT NAME:
4.68 m
Ground Floor
SCALE:
SHEET SIZE:
PROJECT NO:
STATUS:
0001
9
8
7
6
5
6
5
4
SHEET NO:
1 : 100
20.73 m
1 : 100
REVISION:
DATE:
Checker 02/25/24
El-Obour Villa
DRAWING TITLE:
3.30 m
5.32 m
CLIENT:
ARCHITECT:
A 1.70 m 1.20 m
8.66 m
ground floor
B
1.31 m
1.07 m
D1
0.41 m 1.59 m
4.20 m
BY DATE
Address Line 1 Address Line 2 Telephone Line Fax Line 1 www.yourspreadsheets.co.uk
2.78 m
1
1
4.00 m
4
0.25 m
2.54 m
1
2.20 m
1.42 m
1
1.90 m
1
4.40 m
Corridor 5 m²
0.48 m
4
1
D3
D1 1.00 m
3.15 m
0.80 m
1.00 m
1.50 m
maid's bedroom 24 m²
DESCRIPTION
2.65 m
3.36 m 0.60 m
4.48 m
Corridor 5 m²
D1
0.58 m
1.00 m 0.23 m
1.13 m
2.12 m
2
REV
Yo u rS p rea d s h ee t s
1.00 m
1
C 3.73 m
0.24 m 1.00 m
1
2.70 m
1.50 m
1
0.70 m
0.16 m 1.00 m
3.36 m
Kitchen 13 m²
0.48 m
1.20 m
1.36 m
1.00 m
0.50 m
15
W.C 6 m² 1
1.58 m
1
Stairs 16 m²
14
4.40 m
1.20 m
4.00 m
4.00 m
2
1.66 m
1.00 m 0.29 m
5.98 m
4.46 m
3
13
5.58 m
0.43 m
2.25 m 2.65 m
0.30 m
4
Livingroom 20 m²
3.56 m
1.20 m
2.50 m
21.05 m
B
5
12
1.36 m
1
D1
6
11
Corridor 7 m²
3.98 m
D
making all working drawings.
7
UP
4.40 m
C
8
9
10
Room 2 m²
J
0.70 m
0.18 m
1.20 m
2.18 m 1.18 m
D1
Room 14 m²
3.56 m
1.20 m
AR-204
D2
Room 3 m²
D2
D1
DN
W.C 2 m²
3.48 m
0.25 m 0.80 m 0.23 m
E
D1
1.36 m
1.48 m
1.36 m
1.18 m
0.50 m 16.60 m
F
1
0.90 m
3.20 m
1.30 m
G
Room 22 m²
1.90 m
4.50 m
1
Bathroom 4 m² 0.48 m 1.08 m
1
2.48 m
4
0.80 m 0.53 m
K
1.32 m
3.18 m
2.20 m 5.58 m
1.20 m
1.70 m
Bedroom 22 m²
0.63 m
1.46 m
H
AR-101
1
1.38 m
Entrance 3 m²
1.70 m
1.80 m
4.00 m
1
1
2 3.40 m
4.98 m
I
Style: Modern.
3
6.96 m
J
Company: A_T architecture Type: Villa. Ideas & Concept: Design a villa and
4
21.42 m
4.46 m
K
Project Specification:
5
0.10 m
1.99 m
02 Project
8
AR-205
4
3
2
1
Project Status
DRAWING NO:
AR-101
Notes:
2
8
AR-205
7
4 1
2
5.98 m
1.80 m 1.70 m
Private
0.94 m
Bathroom 5 m² 1 1 2 1
DRAWN:
62 Ain Shams University- Faculty of Engineering- Architecture Department
1 : 100
CHECKED:
Author
0.41 m 1.59 m
1.70 m 1.20 m
2.00 m
8.66 m
first floor
CLIENT:
ARCHITECT:
A 4.20 m
AR-102
21.03 m
B
1.98 m
1.90 m
PROJECT NAME:
DRAWING TITLE:
3.30 m
10.00 m
2.71 m
21.37 m
8
7
6
5
4
63 Ain Shams University- Faculty of Engineering- Architecture Department
2
1
REVISION:
El-Obour Villa First Floor
SCALE:
SHEET SIZE:
SHEET NO:
1 : 100 PROJECT NO:
3
DATE:
Checker 02/26/24
0001
9
BY DATE
Address Line 1 Address Line 2 Telephone Line Fax Line 1 www.yourspreadsheets.co.uk
1.08 m
A
1
1.30 m 0.90 m 2.50 m 2.25 m
1
1
0.80 m
0.70 m
3.20 m
3.80 m 0.45 m 2.53 m
4.98 m
1
DESCRIPTION
Yo u rS p rea d s h ee t s
4.00 m
1
2
REV
Corridor 2 m²
0.24 m0.80 m 2.80 m
1
2.48 m
4
1.08 m
4
C
1.98 m 1.26 m
1.00 m 0.20 m
Bedroom 24 m² 1
2.78 m
0.88 m
Master Bathroom 7 m²
1
D
Master bedroom 35 m² 4
F E
7.00 m
0.80 m0.22 m
1
4.48 m
5.13 m
1.00 m 0.08 m
2.36 m 4.06 m 1
1.78 m
2.45 m
1
1.94 m
2.58 m
1
2.64 m
1.65 m
4
Corridor 7 m²
Corridor 6 m² 2.82 m
3.96 m
Bedroom 16 m²
1.00 m 0.23 m
2.98 m
1.00 m 0.20 m
1.00 m 0.24 m
1.00 m 0.24 m
1.28 m
1.73 m
1.28 m
2.48 m
2.36 m
2.98 m
Corridor 8 m²
2.66 m
1.00 m 0.33 m
2.96 m
1.50 m
1.00 m 0.22 m
Corridor 6 m²
1
1
37 38 39 40 41 42 43 44
1
G
2.65 m
35
2
I H 4.98 m
0.40 m
Living Room 68 m² 4
J
0.80 m
2.28 m
3.90 m
1
36
2.97 m
0.80 m 2.30 m 0.78 m
1.02 m
2.75 m 3.98 m
0.93 m
0.23 m 1.00 m
UP
1
1.00 m
1.78 m 0.78 m 0.80 m
1.48 m
0.30 m
3.96 m
4
1.24 m
0.78 m 1.20 m
1
29 28 27 26 25 24
30
34
Bathroom 7 m²
1.20 m
3.98 m
1
4.34 m
5.58 m
1.03 m
2.25 m 2.65 m 4.00 m
4.46 m
4
2.35 m
0.98 m 1.20 m
3.20 m 16.60 m
2.50 m
20.93 m
Bedroom 22 m²
0.20 m 1.00 m 0.20 m 0.30 m
Bedroom 16 m² 1
32
4.36 m
C
B
0.80 m0.18 m
3.56 m
3.96 m
Room 3 m²
K
5.58 m
1
D
3.98 m
2
8.18 m
2
1
33
0.90 m
F E
AR-204
0.80 m0.18 m 0.78 m
1
1.76 m
2.78 m
1
2.30 m
Storage 2 m²
Kitchen 22 m² 1
1
1.68 m
1.20 m
1.83 m
1.40 m
1.00 m
1.00 m 0.20 m
1.00 m 0.25 m
2.75 m
31
1
7.86 m
Bathroom 6 m²
0.37 m 1.00 m
0.20 m 1.68 m
4
2.75 m
2.38 m
1.30 m
0.50 m
4.00 m
Storage 1 1 1 7 m²
1
Sample Notes
2.50 m 0.40 m 2.31 m
3.28 m
4.46 m
0.38 m0.28 m
1.20 m
1.80 m 1.70 m
J
G
1
1.84 m
K
H
2
21.37 m
2.00 m
I
3
0.50 m
9
DRAWING NO:
AR-102
STATUS:
Project Status
ELEVATION:
Solar Study: Notes:
1
Sample Notes
AR-204
A
B
C
D
E
F
G
H
I
J
K
11.10 m
2.40 m
3.30 m 3.90 m
0.89 m
first floor 4.50 m
2.28 m
ground floor 0.60 m
REV
DESCRIPTION
BY DATE
Yo u rS p rea d s h ee t s
0.60 m
0.50 m
2.09 m
0.50 m 0.89 m
0.08 m 2.07 m
0.50 m 0.50 m
1.03 m
1.15 m
0.72 m
0.50 m
5.35 m
0.25 m 0.89 m 0.50 m
0.08 m 2.07 m 0.08 m 2.09 m 1.20 m 0.08 m
1.40 m
0.60 m
2.07 m
0.25 m 0.89 m 0.50 m
11.25 m
0.89 m
3.13 m
1.15 m
2.28 m
1.35 m
3.90 m
10.39 m
roof 7.80 m
0.25 m 0.50 m
9.80 m
1.35 m
2.05 m
0.89 m
ground floor 0.60 m Zero level 0.00 m
3.30 m
0.90 m
3.30 m
12.10 m
0.90 m
0.91 m
roof 7.80 m
0.28 m
5.10 m 1.45 m
0.50 m
0.50 m
9.54 m
first floor 4.50 m
3.30 m
Level 5 T.O.S 11.10 m 10.87 m
3.30 m
Level 5 T.O.S 11.10 m 10.87 m
Zero level 0.00 m
Address Line 1 Address Line 2 Telephone Line Fax Line 1 www.yourspreadsheets.co.uk CLIENT:
Private ARCHITECT:
DRAWN:
1
AR-201
CHECKED:
Author
East
PROJECT NAME:
1 : 100
DRAWING TITLE:
DATE:
REVISION:
Checker 02/26/24
El-Obour Villa East
SCALE:
SHEET SIZE:
SHEET NO:
1 : 100 PROJECT NO:
STATUS:
0001
Project Status
DRAWING NO:
AR-201
SECTION: Notes: Sample Notes
3
2
0.23 m
D1
7.80 m
3.30 m
3.30 m
12.25 m
- 10 cm skirting - 2 cm floor finishing - 2 cm Cement mortar - 6 cm Clean Sand - 15 cm R.C Slab - 40 cm False Ceiling
Level 5 11.10 m
1 - 10 cm skirting - 2 cm floor finishing - 2 cm Cement mortar - 6 cm Clean Sand - 15 cm R.C Slab - 40 cm False Ceiling
4.50 m
roof 7.80 m
first floor 4.50 m
1.45 m
D2
T.O.S 10.87 m
3.07 m
D1
- 10 cm skirting - 2 cm floor finishing - 2 cm Cement mortar - 6 cm Clean Sand - 7 cm Sloped concrete - 2 cm Moisture isolation - 4 cm Thermal isolation - 15 cm RC slab - 40 cm false ceiling
5.91 m
first floor 4.50 m
1
3.05 m
- 10 cm skirting - 2 cm floor finishing - 2 cm Cement mortar - 6 cm Clean Sand - 15 cm R.C Slab - 40 cm False Ceiling
4
2.40 m
1.00 m 0.23 m
roof 7.80 m
5 - 10 cm skirting - 2 cm floor finishing - 2 cm Cement mortar - 6 cm Clean Sand - 7 cm Sloped concrete - 2 cm Moisture isolation - 4 cm Thermal isolation - 15 cm RC slab - 40 cm false ceiling
2.20 m
3.07 m
T.O.S 10.87 m
3.07 m
0.23 m
Level 5 11.10 m
6
12.25 m
7
3.30 m
8 2 AR-205
0.60 m
9
- 10 cm skirting - 2 cm floor finishing - 2 cm Cement mortar - 6 cm Clean Sand - 15 cm R.C Slab
3.90 m
D4
ground floor 0.60 m 0.60 m
0.60 m
2.20 m
2.20 m
D2
0.60 m
0.60 m
2.20 m
- 10 cm skirting D1 - 2 cm floor finishing - 2 cm Cement mortar - 6 cm Clean Sand - 15 cm R.C Slab
ground floor 0.60 m Zero level 0.00 m
3.65 m
3.90 m
3.90 m
2.54 m
Zero level 0.00 m
REV
DESCRIPTION
BY DATE
Yo u rS p rea d s h ee t s Address Line 1 Address Line 2 Telephone Line Fax Line 1 www.yourspreadsheets.co.uk CLIENT:
Private
1
AR-204
Section 1 1 : 100
ARCHITECT:
DRAWN:
CHECKED:
Author PROJECT NAME:
DRAWING TITLE:
DATE:
REVISION:
Checker 03/31/24
El-Obour Villa sec 1-1
SCALE:
SHEET SIZE:
SHEET NO:
1 : 100 PROJECT NO:
0001
STATUS:
Project Status
DRAWING NO:
AR-204
64 Ain Shams University- Faculty of Engineering- Architecture Department
65 Ain Shams University- Faculty of Engineering- Architecture Department
INTERIOR DRAWINGS:
66 Ain Shams University- Faculty of Engineering- Architecture Department
67 Ain Shams University- Faculty of Engineering- Architecture Department
DESIGN PORTFOLIO Atef Mohamed Abdelrhman
Thank You