Athina Ralli - Architecture Portfolio 2017-2019

Page 1

architectureportfolio Athina Ralli | part II architectural assistant 2017-2019



Athina Ralli | Selected Projects 2017-2019



athinaralli | part II architectural assistant

house on links parade, carnoustie

2/

house refurbishment+extension

12/

chesterhill house, dundee

high-end house renovation+extension

32/

darkfalls, broughty ferry house refurbishment

40/

mcrg pavillion community building

50/

connect, dundee science centre exhibition+interior design

1



house on links parade, carnoustie house refurbishment+extension 2017-2019

Golfers’ Retreat proposed works+responsibilities/ Proposed first floor extension (110m2) to provide additional accommodation, some reconfiguration of the existing layout and the modernisation of the facade. The purpose of the extension is to upgrade the existing property and provide additional accommodation to a standard that will attract a high level rental return. Responsibilities included: •

Drafting of information covering RIBA Stages 2-6, including preparation and submission of Planning and Building Warrant applications

Communication with regulatory bodies to discuss design and technical requirements

Collaboration with internal and external design and construction teams from concept design to completion

Regular attendance and recording of progress and technical site meetings, preparation of certificates, formal instructions and relevant notices to design / construction team and client.

3


bedroom 3 (en-suite)

terrace

bedroom 2 (en-suite)

bedroom 1 (en-suite)

snug

existing parking area retained 2000mm high wall retained 1500mm high fence retained

study

bathroom

hall

dining room

kitchen

utility room

living room

1800mm high walls retained

back garden 110m2

1800mm timber fence replaced, painted white


athinaralli | part II architectural assistant

living room - kitchen developed design/ media: Sketchup, Vray, Photoshop

proposed ground+first floor plans developed design/ media: AutoCAD

5


en-suite roof construction

landing

new wall construction

1100

2934

wall construction airflow maintained retaining of existing truss tie

900

3760

existing wall construction

retaining of existing truss tie vestibule / bag drop

new section of wall/window

new door / window

875 co

drainage from above 1400

drainage connected to existing new partitions

775 new door

775 new door

775 new door

1800

wall infill steel beam in intermediate floor

walls removed new stair

new section of wall/window/door

4no. nibs removed


athinaralli | part II architectural assistant

1 2 3 4 5 6 7 8 9

23 24 10 11 12 3 13

25 26 27 28 29

14 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32.

Insulation fitted tightly between studs per architect’s spec Min of 25mm insulation suspended within frame 12.5mm plasterboard m.r. MDF skirting Vapour control layer Allow 15mm for floor finish 22mm chipboard flooring Breather membrane lapped over DPC, cavity tray 30min intumescent cavity barrier at intermediate floor level Resilient bars at max 400mm ctrs, perpendicular to joists 100mm mineral wool insulation fitted between joists Intermediate floor joists per architect’s spec 3no. timber lintels Min of 10mm insulation behind opening reveal linings Compressible filler Window to architect’s spec and supplier’s details 200x15mm thick MDF internal sill board VCL wrapped over top and sides of timber frame and lapped with breather membrane behind window sill 15mm sw packers and insulation under sill board 45x12mm thick MDF apron Continuous insulation fitted over studs per architect’s spec Service cavity formed with 25x38mm vertical battens at maximum 400mm ctrs Render finish to architect’s spec 100mm blockwork outer leaf Weep vent above and below openings at max 900mm ctrs Self-adhesive DPC or proprietary pre-formed cavity barrier with integral DPC RC precast lintel to suit loading and spans Proprietary insulated 30min fire resisting cavity barrier with integral DPC 15mm render to reveal Precast concrete sill Min of 50mm vented cavity Breather membrane

15 16

15 17 18 19

13

20

30

21 3 22 5 1

25 24 23 31 32

intermediate floor, window head, sill construction details/ media: AutoCAD

proposed ground floor plan+cross section technical design/ media: AutoCAD

7



athinaralli | part II architectural assistant

9



athinaralli | part II architectural assistant

11



chesterhill house, dundee high-end house renovation+extension 2017-2019

Private Residence proposed works/ Proposed restoration, part demolition and extension (1,342m2) of the C-listed Chesterhill House and restoration of the walled garden, related infrastructure, services and landscaping. The proposed works involved four key areas: •

Renovation and restoration of the existing 1870s dwelling house including the removal of later extensions of neutral or negative significance

Construction of new extension to the existing dwelling including low-level garage, using design cues derived from the existing structures on site and a contemporary and complementary palette of materials

Construction of small gate house / bin store and gate at the site boundary

Renovation and rejuvenation of the existing oval walled garden including period appropriate planting

13


1870 original building 1900 extension

sc com ale bro ke plem enta n into r y se ction s

facade step back to break down the scale of the south elevation west most edge tapering into site to single storey

acco

mm

new west wing accommodation

oda

tion low-impact accommodation built into site contours or excavations

spa

gara

ge

transitional glass link between existing house and new extension

low level / low impact coach house annex / spa

removal of later extension to reveal original west facade opening+window lighting original staircase

familiar architectural language to walled garden


athinaralli | part II architectural assistant

westmost edge tapering into site to single storey

facade step back to break down the scale of the south elevation

enhanced / increased garden setting

largely concealed garage wing

Private Residence responsibilities/ Due to the scale and level of detail required, the internal design team was subdivided into two groups with distinct responsibilities. Personal duties included but were not limited to: •

Preparation and submission of Planning, Listed Building Consent and Building Warrant applications

Involvement with Listed Building processes and planning requirements as part of developing the design statement in support of the planning applications

Assistance in production of full planning, technical and tender drawing / information packs, covering RIBA Stages 2-4

Development of interior design strategy and presentation of design ideas to the client

Research and selection of external and internal materials and finishes

Working as part of an integrated team to produce information to a high standard, coordinate information with external design teams and meet deadlines.

15



athinaralli | part II architectural assistant

17



athinaralli | part II architectural assistant

19


movie room

snug

service kitchen

utility

living room

central hall dining room

kitchen

gym shower room

private courtyard pool

shower room

proposed ground floor plan developed design/ media: AutoCAD

proposed south elevation developed design/ media: AutoCAD

sauna

store

hot tub

plant


athinaralli | part II architectural assistant guest WC

guest kitchen

guest living room

boot room

glazed roof lantern

extended garden/ terrace retained feature tree

driveway

glazed roof lantern


landing bedroom 2 (en-suite)

walk-in w

en-suite

bedroom 3 (en-suite) walk-in w

en-suite

en-suite

master bedroom (en-suite)

proposed upper floor plans developed design/ media: AutoCAD

proposed west elevation developed design/ media: AutoCAD

walk-in w

terrace

study WC


athinaralli | part II architectural assistant walk-in w en-suite

guest bedroom 1 (en-suite)

tower

bridge

en-suite

walk-in w

guest bedroom 2 (en-suite)

kid’s snug

23


1 2 3

4

18

5

19

6

12 10 20 10

7 8 9 10 11 12

1

13

2

5

3

14

4

15 16 10 17 20

5

11

6

12

LOCATION OF SOLAR ARRAY

7 10 21 22 23 9 24 8 10 7 25 14 15 16 10 17

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13.

Rheinzinc cladding Single ply membrane 22mm OSB sheathing Lintherm insulation Vapour control layer 100mm trapezoidal deck 150mm purlins to engineer’s details Truss to engineer’s spec 65mm PIR 50mm PIR 25mm PIR 12mm cement board Beam to engineer’s details

14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25.

25mm timber strap 12.5mm plasterboard SHS edge beam to engineer’s details Facing stone Zinc overcladding 18mm marine ply Cope stone Bauder single ply roof system 110mm PIR Plywood deck 200mm purlins to engineer’s details 100x100mm SHS cross bracing to engineer’s details

LOCATION OF SOLAR ARRAY


athinaralli | part II architectural assistant

Roof Type 1 - Garage Intensive Green Roof 1. 2. 3. 4. 5. 6. 7. 8. 9.

Intensive green roof substrate Filter fleece DSC 40 water retention drainage layer FSM 600 protection layer PE foil separation layer BAUDER capping sheet to suit BAUDERTEC KSA Duo underlayer 50mm BAUDER insulation 150mm structural deck to engineer’s info

Roof Type 2 - Link Roof with Solar Array (U-Value 0.13W/m2K) 1. 2. 3. 4. 5. 6. 7.

BAUDER solar PV system BAUDER Thermofol PVC single ply with standing seam. Profiles at 400mm ctrs 160mm BAUDER PIR insulation Vapour control layer 18mm MR chipboard deck 150mm purlins to engineer’s spec Ceiling finish

Roof Type 3 - Flat Roof (U-Value 0.13W/m2K) 1. 2. 3. 4. 5. 6.

BAUDER Thermofol PVC single ply with standing seam. Profiles at 400mm ctrs 160mm BAUDER PIR insulation Vapour control layer Plywood deck 20mm purlins to engineer’s spec Ceiling finish

Roof Type 4 - Rheinzink Standing Seam Roof (U-Value 0.13W/m2K) 1. 2. 3. 4. 5. 6. 7. 8.

Rheinzinc roof cladding Separating layer - structured underlay Vapozinc Linitherm thermal insulation panel (22mm OSB outer face w/ 160mm insulation) - Insitu foam to any cavities Vapour control layer 100mm trapezoidal roof deck to engineer’s spec 150mm purlins to engineer’s spec Truss / primary structure Ceiling finish

typical roof types build-up comstruction details/ media: AutoCAD

roof parapet, junction detail construction details/ media: AutoCAD

25



athinaralli | part II architectural assistant

living room, master bedroom interior design/ media: Sketchup, Vray, Photoshop

central hall interior design/ media: Sketchup, Vray, Photoshop

27



athinaralli | part II architectural assistant

pool annex, day+night shots interior design/ media: Sketchup, Vray, Photoshop

pool annex interior design/ media: Sketchup, Vray, Photoshop

29



athinaralli | part II architectural assistant

31


section of floor raised and insulated new section of wall electrical consumer unit retained new opening

utility

wall infilled

new sanitaryware fixtures

kitchen

bathroom

existing hob repurposed

fireplace feature wall to be redesigned dining area

living room

new sliding door

new fixed window strip and redecorate existing window door replaced hall


darkfalls, broughty ferry house refurbishment 2019

Private Residence proposed works+responsibilities/ Refurbishment of living room, kitchen and bathroom, part reconfiguration of the internal layout and selection of new finishes. Internal works include the redesign of the existing fireplace and the selection of kitchen and bathroom fittings. Responsibilities included: •

Production of design and tender packs for submission of Planning and Building Warrant applications and invitation to tender, covering RIBA Stages 2-4

Attendance at regular client meetings to review interior design ideas regarding fittings, finishes and products

Participation in invitation and appointment of external consultants

Visits to local suppliers to investigate internal finishes

Request of supply quotations from manufacturers for discussion with client

33


external 2000x890mm doorset repurposed from kitchen new 2000x440mm radiator electrical consumer unit retained

section of floor raised and insulated

new doorset to existing opening electrical consumer unit retained

new 2000x440mm radiator new bidet and WC - drainage connected to existing new 1700x750mm slipper bath

utility

wall to be infilled

kitchen

new partitions to architect’s spec

bathroom

new sink - drainage connected to existing

underslab existing drainage run new door to new opening

50x50mm straps with 12.5mm plasterboard

new 1211x500mm towel radiator

fireplace removed and rebuilt dining area

new 800x500mm vanity unit proposed drainage connected to existing - site investigation

living room

new sliding door

wall strapped with 12.5mm plasterboard - skim plaster finish

new door to existing opening

new fixed window 2no. new 2000x520mm radiators door to be replaced hall


athinaralli | part II architectural assistant

1. 2. 3. 4. 5. 6. 7. 8. 9. 1 2 3 4

replaster

5 6 7 8

9

10. 11. 12. 13. 14. 15. 16. 17. 18. 19.

100mm blockwork inner leaf 100mm blockwork outer leaf Plasterwork formed with corner bead to match 13-18mm render/dry dash to match existing Sliding door / fixed window fully wrapped with DPC to provide continuous protection against moisture ingress and with mastic seal all around external perimeter 25mm rigid insulation Silicone bead Compressible filler Sliding door as per architect’s spec and to supplier’s details Vapour control layer Dressed timber facing piece painted to match inner frame Fixed window as per architect’s specification and to supplier’s details Precast concrete sill cut around SHS as required Treated timber packer Treated timber framing SHS to engineer’s spec 90mm rigid insulation cut and fitted as required Breather membrane Proprietary aluminium corner flashing PPC RAL 7016 Hatch indicates assumed existing construction - to be read in conjunction with general arrangement and engineer’s information

1 3 5 9 7 8 14 15

replaster

10 11

16 17 18 19

12 7 9 13 4 2

sliding door, fixed window corner jamb detail construction details/ media: AutoCAD

proposed ground floor plan developed design/ media: AutoCAD

35


new fixed window soffit to match soffit of existing window

existing pelmet carefully removed drapes carefully removed and set aside 8800 eq

eq

eq

2355

eq

400

300

2no. slim linear 2000x520mm radiators (colour: RAL 7016)

Elevation A

existing skirtings carefully removed new skirtings throughout (finish: bleached oak) new doorset to existing opening

existing pelmet carefully removed drapes carefully removed and set aside

existing timber band carefully removed 3910

2355

3930

Elevation B

Elevation C

100

400

1000

eq eq

glass panelling carefully stripped back and redecorated (finish: bleached oak)

client AV stand and TV relocated

2355

8780

50 50

eq

100

400

eq

tiles of existing fireplace stripped off refer to hearth and stone schedule for fireplace wall finishes and hearth details

Elevation D

B

D A

C

existing skirtings carefully removed new skirtings throughout (finish: bleached oak)


athinaralli | part II architectural assistant

12

4

11

5

10

7

9

8 9 3

12 11 10 9

9

14

3

1

2 15 13 10

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18.

50mm thick hearth stones 25mm thick surround stone 35mm mantelpiece 15mm thick linear stone tiles 3mm grout 20x50mm (5mm thick) steel channel around the hearth opening 12mm cementitious tile backer board 25x50mm horizontal timber packers at mid-span Feature wall surrounds 100x50x10 PFC to engineer’s details Timber packer as appropriate to allow for PFC within wall Plasterwork as required Existing wall tiles / hearth stones to be removed 35mm thick ingoe stones / tiles Masonry infill to raise height of mantelpiece as shown Concrete hearth to be retained Infill floor tile upstand Floor tiles - refer to finishes schedule

10 14 1 16 18 17

stone+hearth schedule construction details/ media: AutoCAD

living room data sheets construction details/ media: AutoCAD

37



mcrg pavilion, monifieth community building 2019

Multi-Purpose Community Space proposed works+responsibilities/ Introduction of a new public hub that will provide a multi-functional open plan area along with café and office spaces (building area: 540m2). The building aims to integrate the underused Blue Seaway expanse to the local town, enhance the interaction between local groups and create a space for new activities that will bring the Monifieth community together. Responsibilities included: •

Surveying and documentation of site conditions and preparation of site appraisal / design statement

Production of drawings / visualisations for presentation to client, local authorities and funding bodies

Drafting of full drawing / information packs up to RIBA Stage 3

Preparation of drawings / physical model for presentation to local groups and attendance at community consultation

39


a

agor

kont

v

reen

sity

ss

cce

ar a

ul ehic

ng g

bowli

xis

ge

inin

reta

iver

iod

b ting

ess

acc ular

vehic link

g istin

x

to e

e ctur

stru

te

ma roxi app line g inin ng reta buildi

sin

utili

able

t us

as g le

ing

in reta

en gre

view

ar y

estu

ty

ersi

-div

io gb

tin

exis

s

ce

spa

ay to t

y

awa

e se

blu

morning

evening

S T UA TAY E

RY


athinaralli | part II architectural assistant

store

plant

27m2

office 1 16m2

kitchen flexible space 120m

office 2

23m2

16m2

2

office 3 7m2

reception

servery flexible space 120m2

cafe

75m2

terrace

earth ramps formed from removal of mounds

raised timber floor

void

glulam beams

ground floor plan, indicative section developed design/ media: AutoCAD, Illustrator

site plan concept design/ media: AutoCAD

41


day time open shutters

night time closed shutters

entrance

prevailing wind

large rain canopy overhang

Corten steel shutters

South face masonry & glass

covered entrance - screened from prevailing wind

North East & West faces masonry


athinaralli | part II architectural assistant

1

2

3

4

1

1

2

5

2

6

3

4

3

4

6

5

6

1. Glulam Portal Siberian larch with matt wood coating. Tint shade: Rock 2. Single Ply Membrane Colour: RAL 7035 Light grey 3. Sliding Shutter Corten steel. Colour: Rusted orange 4. Brick Cladding Linear brick, horizontal rebated pointing, vertical flush pointing. Colour: Grey / White 5. Louvred Grills Colour: RAL 7044 Silk grey 6. Glazing / Curtain Walling Aluminium frames. Colour: RAL 7044 Silk grey

proposed elevations developed design/ media: AutoCAD

safety+weather protection developed design/ media: Sketchup, Illustrator

43



athinaralli | part II architectural assistant

45



athinaralli | part II architectural assistant

east entrance approach developed design/ media: Sketchup, Vray, Photoshop

cafĂŠ terrace developed design/ media: Sketchup, Vray, Photoshop

47



athinaralli | part II architectural assistant

49



connect, dundee science centre exhibition+interior design 2018-2019

Exhibition and Science Learning Suite proposed works+responsibilities/ Proposed interactive exhibition, science learning suite and café area for the existing ground floor of Dundee Science Centre, a learning resource platform which promotes the advents of science and technology. The scheme project is designed to provide a welcoming, safe and fully accessible environment that will bring people together and attract new audiences. Development of scheme design includes: •

Production of drawings / visualisations for presentation to client, funding bodies and local community

Attendance at client meetings to discuss design possibilities for proposed exhibits, activities and events

Internal team work to create a realistic and attainable programme for the production of relevant material

51


1


athinaralli | part II architectural assistant

2

3

4 5

1. West Exhibition Area (280m2) - Exhibits: 27 New exhibition; replace floor finish and lighting. This area incorporates both an under 7s to the west and a general family area to the east 2. Design IT, Build IT, Test IT, Exhibition Area (60m2) - Exhibits: 6 New activity zone, including new exhibits, replacing floor finish and addition of timber screen 3. Auditorium / Live Show - Workshop Space (70m2) Walls repaired and painted, ceiling upgraded, flooring and lighting replaced 4. Entrance Foyer (100m2) New DDA compliant reception / meet & greet point, and new waiting area and information point that includes seating, exhibit, and flooring upgrade; replaced revolving door with new pass doors 5. The Gathering Place (175m2) Incorporation of new science booths, activity walls and other exhibits, upgrade lighting in eating area, and walkway from entrance foyer, new furniture and new circular nest area

proposed ground floor plan concept design/ media: AutoCAD

cafĂŠ area concept design/ media: AutoCAD

53



athinaralli | part II architectural assistant

interactive exhibition spaces concept design/ media: Sketchup, 3ds Max, Photoshop

55



athinaralli | part II architectural assistant

57



contact 07591 747277 ralli.a.athina@gmail.com Dundee | United Kingdom



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.