Teresa Santas Portfolio-May 2015

Page 1

Portfolio

MÂŞ Teresa SantĂĄs Ciavatta

E-mail: MTSantas@gmail.com

www.interesantas.com

tlf: +1 (917)-460-6091



Index

(S) (M) (L) (M) (M) (XL) (M) (M) (S) (XL) (S) (S) (S) (L)

Sixth floor and penthouse Addition. New York 18 Units and commercial Space. Jersey City Maritime Cultural and Popular Music Center. Taiwan Hans Christian Andersen Museum. Denmark The Extension of the Court of Ponferrada “La marina� Urban Planning. Madrid 31 Public Housing in Andalusia. Malaga Torrecorona Headquarters. Madrid Retirement House in Avila Europan XI. Europe Residence Alteration and Addition. Jersey City Interior rennovation. Jersey City Acuerda and Arquidea Headquarters. Madrid Azca Complex Equipment. Madrid.

(2015) (2015) (2014) (2014) (2013) (2011-13) (2011) (2010) (2010) (2009) (2009) (2008) (2007) (2007)

4 6 8 10 14 16 20 22 26 28 30 32 34 36


Sixth Floor and Penthouse Adition. New York YEAR LOCATION SURFACE AREA PROJECT TYPE

2014 New York 3,527 sqf

Residen al, Roo op + Addi on CREDITS GRO Architects DUTIES AND RESPONSIBILITIES

Proposal design, Landmarks & DOB s ets, community board. In this project we design a oor and penthouse addi on to in an exis ng building from 1900. It is located in the Seaport District, in front of the East River and close to Brooklyn Bridge. The exceponal loca on together with the historic character of the district have in uenced strongly in the design. The project is a series of frames from which one can enjoy the stunning landscape. The rst one contains the private areas of the house.The second contains a an interior garden and a library. This space can be spa ally ‘merged’ with the third frame by opening its glass enclosure, thus the living room becomes a gardened terrace overlooking the East River. The materials we propose ‘talk’ with the character of the historic surroundings as and express the contemporaneity of the proposal.

4


SIDEWALK

FIRE STAIR

CEDAR CLOSET

FIRE STAIR

4'-3"

LAUNDRY ROOM

STORAGE 76 SF

MASTER BEDROOM

UP 17R

DN 25R

NEW ELEVATOR

KITCHEN

MASTER BATHROOM

7'-0" DN 22R

ELEVATOR MECHANICAL ROOM

SKYLIGHT

DN 19R

LUCAS BEDROOM BUILT-IN BOOKSHELF UP 22R

GREEN HOUSE (908 SF)

HOME OFFICE 96 SF

W.I.C.

LIVING ROOM

DN 5R

DN 11R

GREEN HOUSE (908 SF)

DINING ROOM

W.I.C. ROOF OF NEW SIXTH FLOOR ADDITION EL. 70'-8"

21'-1"

BATHROOM

POOL

FIFTH FLOOR RESIDENTIAL UNIT

LIVING ROOM

MASTER BEDROOM

5'-3"

LUCA'S BEDROOM (126SF)

2'-6"

FIREPLACE

FOURTH FLOOR

PLANTER

RESIDENTIAL UNIT 4B

RESIDENTIAL UNIT 4A

THIRD FLOOR

5


18 Units and Commercial Space. Jersey City YEAR LOCATION SURFACE AREA PROJECT TYPE

2014 Jersey City 23,600 SF

18 Units and commercial space CREDITS GRO Architects DUTIES AND RESPONSIBILITIES

Design, Planning Board

6


2

1

2

3

3

1

1

4

4

2 PB-25

5

5

PB-25 A F

CABANAS

CONDENSING AND MECHANICAL EQUIPMENT

ROOF DECK

C

UNIT 18

UNIT 15 H

LIVING ROOM

KITCHEN

COMMON SPACE

BATHROOM

KITCHEN

LIVING ROOM

E

UNIT 14

UNIT 11

A

COMMON SPACE

BATHROOM

KITCHEN

A

KITCHEN

LIVING ROOM

LIVING ROOM

F D

UNIT 7

KITCHEN

BATHROOM

KITCHEN

C

LIVING ROOM

COMMON SPACE

C

UNIT 10

LIVING ROOM B H E

E

UNIT 3 1

KITCHEN

LIVING ROOM

A

BATHROOM

2

COMMON SPACE

3

KITCHEN

4

LIVING ROOM

5

UNIT 6

A

No. Date

UNIT 2

F

NG

Description

D

COMMON SPACE

COMMERCIAL SPACE

C

KITCHEN

C

LIVING ROOM

B H

CRAWL SPACE

E

CRAWL SPACE

E EXISTING 3 STORY BUILDING

3

2

1

2'

4

0'

5

SECTION 1 4'

7


18 Units and Commercial Space. Jersey City T.O. ROOF 65' - 7 3/4"

3' - 6 3/4"

4' - 6"

3' - 11 1/2"

3' - 6 3/4"

T.O. ROOF 65' - 7 3/4"

1' - 8"

AMICO ARCH 'BILBAO' EXPANDED ANODIZED ALUMINUM METAL MESH

3' - 11 1/2"

1' - 8"0' - 6 1/4" 1' - 8"

4' - 3"

2' - 6"

1' - 8" 1' - 6"

STAINLESS STEEL CABLE HANDRAIL

7' - 3 1/2"

1' - 6"

TRESPA 'METEON' PANEL COLOR: LIME GREEN

4' - 5"

CALL OUT-EAST ELEVATION 1/16" = 1'-0"

FIFTH FLOOR PLAN 53' - 11 3/4"

FIFTH FLOOR PLAN 53' - 11 3/4"

1' - 8"

3

1' - 0" 1' - 4"

1' - 6"

1' - 7"

ANODIZED ALUMINUM FRAME. SECONDARY FACADE STRUCTURE

MOUNTING BRACKET

1' - 6"

7' - 3 1/4"

1' - 0" 1' - 5"

1' - 6"

1' - 6"

STUD WALL STRUCTURAL SUPPORT FOR EXTERIOR FACADE

1' - 8"

5/8" STUCCO COLOR: BENJAMIN MOORE 'CASCADE WHITE'

1' - 6"

ALUMINUM TUBE FRAME

FOURTH FLOOR PLAN 42' - 3 1/4"

4' - 5 1/4"

THIRD FLOOR PLAN 30' - 6 3/4"

Description

THIRD FLOOR PLAN 30' - 6 3/4"

SECOND FLOOR PLAN 18' - 10 1/4"

EAST FACADE - UPPER LEVEL DETAIL 1 3/8" = 1'-0"

2

1' - 8" 1' - 6" 0' - 9" 1' - 5"

3' - 8 3/4"

1' - 6"

1' - 6"

7' - 3 1/4"

1' - 6"

No. Date

1' - 8" 0' - 11" 1' - 5"

1' - 6"

1' - 6"

1' - 6"

1' - 8"

1' - 6"

1' - 8"

FOURTH FLOOR PLAN 42' - 3 1/4"

SECOND FLOOR PLAN 18' - 10 1/4"

EAST FACADE - UPPER LEVEL DETAIL 2 3/8" = 1'-0" OWNERSHIP OF DOCUMENTS NOTICE

8

3

CA 1/


FOURTH FLOOR PLAN 42' - 3 1/4"

AMICO ARCH 'BILBAO' EXPANDED ANODIZED ALUMINUM METAL MESH FLASHING WITH 3% MIN SLOPE STEEL 'T' PROFILE TRESPA 'METEON' PANEL COLOR: LIME GREEN

AMICO ARCH 'BILBAO' EXPANDED ANODIZED ALUMINUM METAL MESH

TRESPA 'METEON' PANEL COLOR: LIME GREEN 2 X 6 WOOD STUD WALL 16" O.C. W/R-19 BATT INSULATION 2 X 4 WOOD STUD WALL 16" O.C. W/R-19 BATT INSULATION

ANODIZED ALUMINUM FRAME. SECONDARY FACADE STRUCTURE

STAINLESS STEEL CABLE HANDRAIL

STAINLESS STEEL CABLE HANDRAIL

AMICO ARCH 'BILBAO' EXPANDED ANODIZED ALUMINUM METAL MESH

2 X12 WOOD JOIST 16" O.C. W/ R-38 PERIMETER INSULATION DOUBLE 2 X12 PERIMETER BANDS STAINLESS STEEL GRATE

STEEL 'T' PROFILE

ANODIZED ALUMINUM FRAME. SECONDARY FACADE STRUCTURE AMICO ARCH 'BILBAO' EXPANDED ANODIZED ALUMINUM METAL MESH

THIRD FLOOR PLAN 30' - 6 3/4"

TRESPA 'METEON' PANEL COLOR: LIME GREEN

WINDOW DETAIL- SECTION 1" = 1'-0"

1

WINDOW DETAIL - ELEVATION 1" = 1'-0"

No. Dat

STAINLESS STELL GRATE

TRESPA 'METEON' PANEL COLOR: LIME GREEN 2 X 6 WOOD STUD WALL 16" O.C. W/R-19 BATT INSULATION

2 X 6 WOOD STUD WALL 16" O.C. W/R-19 BATT INSULATION

TRESPA 'METEON' PANEL COLOR: LIME GREEN

2 X 4 WOOD STUD WALL 16" O.C. W/R-19 BATT INSULATION

STAINLESS STEEL CABLE HANDRAIL

ANODIZED ALUMINUM FRAME. SECONDARY FACADE STRUCTURE

4' - 7" AMICO ARCH 'BILBAO' EXPANDED ANODIZED ALUMINUM METAL MESH

1' - 1"

3

4

WINDOW DETAIL-PLAN VIEW 1" = 1'-0" 0'

1'

2'

4'

8'

9






Hans Christian Andersen Museum.Denmark YEAR 2013 Odense, Denmark LOCATION 39,800 sqf SURFACE AREA PROJECT TYPE Compe on, Museum. KnitKnot Architects: CREDITS Sandra Javera, Gonzalo Jose Lopez, Alexander Malagelada, Tania Oramas, Federica Russo, Teresa Santas, Alfonso Simelio DUTIES AND RESPONSIBILITIES

Co-author Concept diagrams

The conceptual de ni on of the project is based on a spa al interpreta on of the structure of Andersen’s fairy tales, which leads to the considera on of a dual world: the real and the fantas c. The ‘real world’ is predominantly situated at the surface-level of the site, and is represented by exis ng buildings, Lotze’s Garden and the entrance to the ‘fairy tales world’. On the other hand, the ‘fantas c world’, is located underground and mainly integrated by the exhibi on spaces. As in Andersen’s stories, ‘nature’ cons tutes the interface between these two worlds: vegeta on, water and light are the key elements shaping the visitors’ experience. Obtaining inspira on from fairy tales such as ‘The Li le Mermaid’ or ‘The Ugly Duckling’, water is considered to be the gateway to the fantas c world. A smooth ramp piercing a shallow lake transports visitors to a world of magic and explora on. Nevertheless, during their journey through this seemingly isolated world, visitors are con nuously aware of the real world above them, albeit from a diīerent perspec ve, through what the project named as the Ar facts. A er going through the fantas c world, visitors nally expverience what the project refers to as the ‘Moral Space’, which returns them back to reality while revealing new knowledge about some aspect of human complexity.

14

View: Moral Space

Site Plan


The Canopy

The Lantern

The Voyeur

Saxophone

The Storyteller

The Microscope

Path sec on

15


The Extension of the Court of Ponferrada. Spain. YEAR 2010 LOCATION Ponferrada. León SURFACE AREA 37,675 SF / 3.500m² PROJECT TYPE Winner. Na onal Tender CREDITS

Enrique Bardají y Asociados. S.L. DUTIES AND RESPONSIBILITIES

Tender, Schema c Design, Design Development, Construc on Documents and Detailed Study

The design of the building has to ensure that it is representa ve of its func on. This contrasts with the domes c look of its surroundings by the Sil riverbank. The simplicity, clarity and eĸcient layout of the design together with the incorporaon energy-saving measures support its representa ve nature. The adaptability of the building relies on its regular, simple and ra onal structural grid. This disposure allows the alloca on of communica on, facility and storage areas in the northern band of the building. The working areas are bright open spaces whose layout can be easily changed according to the demands over me. The project is commi ed energy saving strategies, which are ingrained in its design, as it is showed by the greenhouse in the ground oor, solar panels in its roof terrace and the double facade that reduces the ven la on and cooling loans.

16


17


The Extension of the Court of Ponferrada. Spain.

ARCHIVO

ESCALERA

VOLUMENES GENERALE

Construction Document Sample. VENDING ASEO 2

DISTRIBUIDOR ASEO 1 DISTRIBUIDOR

DESPACHO DE FISCAL 7

TERRAZA

COMISARIA

DISTRIBUIDOR

SECRETARIA

DESPACHO DE FISCAL 2

DESPACHO DE FISCAL 3

EJES DE ESTRUCTURA

DESPACHO DE FISCAL 1

Sup. util: 5,26m²

DESPACHO DE FISCAL 6

DISTRIBUIDOR

DESPACHO DE FISCAL DIRECTOR

VOLUMENES GENERALES

DESPACHO DE FISCAL 4

DESPACHO DE FISCAL 5

VOLUMENES PARCIALES SALA DE REUNIONES

HUECOS DE FACHADA EJES DE ESTRUCTURA

Floor Materials

ESCALERA Sup. util: 22,33 m² ARCHIVO

ESCALERA

DISTRIBUIDOR Sup. util: 7,65 m²

ARCHIVO Sup. util: 13,14m² ASEO 1

ASEO 2 Sup. util: 5,26m²

VOLUMENES PARCIALES

SALA POLIVALENTE

VENDING Sup. util: 7,08 m²

VENDING ASEO 2

DISTRIBUIDOR

DISTRIBUIDOR Sup. util: 7,19 m²

ASEO 1 DISTRIBUIDOR

DESPACHO DE FISCAL 7

TERRAZA DISTRIBUIDOR

SALA POLIVALENTE

SECRETARIA

DESPACHO DE FISCAL DIRECTOR

DESPACHO DE FISCAL 1

TERRAZA Sup. util: 33,43 m²

DESPACHO DE FISCAL 6

DISTRIBUIDOR

DESPACHO DE FISCAL 2

DESPACHO DE FISCAL 3

DESPACHO DE FISCAL 4

DESPACHO DE FISCAL 7 Sup. util: 17,91 m²

DISTRIBUIDOR Sup. util: 23,36 m²

DESPACHO DE FISCAL 5

SALA DE REUNIONES

SALA POLIVALENTE Sup. util: 38,26m²

SECRETARIA Sup. util: 41,46 m²

DISTRIBUIDOR Sup. util: 105,00 m²

Floor Tiles V3

B

V2

V2

V1 ARCHIVO

ESCALERA

R B

MP.4

DISTRIBUIDOR

R

VENDING

MP.4

PM.1

PI.P2

DESPACHO DE FISCAL DIRECTOR Sup. util: 2 5 , 2 2 m²

V1V010 PM.1

PI.P2

R

FM.3

PM.1

DISTRIBUIDOR

PI.3

R

R

V6

V1 ASEO 2

ASEO 1

B

FM.4

FM.5

PMa.1

DESPACHO DE FISCAL 1 Sup. util: 1 8 , 6 0 m²

DESPACHO DE FISCAL 2 Sup. util: 1 8 , 8 5 m²

DESPACHO DE FISCAL 3 Sup. util: 1 8 , 6 0 m²

V6

DESPACHO DE FISCAL 7

TERRAZA

DESPACHO DE FISCAL 6 Sup. util: 17,86 m²

_ 12,60 _ 12,45

DESPACHO DE FISCAL 4 Sup. util: 1 8 , 8 5 m²

DESPACHO DE FISCAL 5 Sup. util: 15,57 m²

DISTRIBUIDOR

B PMa.1 PMa.1

V6

SALA DE REUNIONES Sup. util: 42,13m²

PMa.1

SALA POLIVALENTE

SECRETARIA

PMa.1

V6

DESPACHO DE FISCAL 6

DISTRIBUIDOR

V6

PMa.1 PMa.1

DESPACHO DE FISCAL 1

PMa.1

DESPACHO DE FISCAL 2

PMa.1

PMa.1

DESPACHO DE FISCAL 3

DESPACHO DE FISCAL 4

PMa.1

V6

V6

SALA DE REUNIONES

V6r

V6

VOLUMENES GENERALES

V6

V6

V6

DESPACHO DE FISCAL 5

PMa.3

V6r

Wall Materials ARCHIVO

ESCALERA

EJES DE ESTRUCTURA

DESPACHO DE FISCAL DIRECTOR

VOLUMENES PARCIALES

B

CASA DE

EJES DE ESTRUCTURA

VENDING ASEO 2

DISTRIBUIDOR

VOLUMENES PARCIALES

ASEO 1 DISTRIBUIDOR

VOLUMENES GENERALES DESPACHO DE FISCAL 7

TERRAZA DISTRIBUIDOR

SALA POLIVALENTE

SECRETARIA

DESPACHO DE FISCAL DIRECTOR

DESPACHO DE FISCAL 1

DESPACHO DE FISCAL 2

3 FLOOR PLAN

DESPACHO DE FISCAL 6

DISTRIBUIDOR

DESPACHO DE FISCAL 3

DESPACHO DE FISCAL 4

DESPACHO DE FISCAL 5

SALA DE REUNIONES

Ceiling Materials

18

CULTURA


Construction Document Sample.

19


“La Marina” Urban Planning. Spain YEAR LOCATION

2009

S.Sebas án de los Reyes. Madrid 91.43 ac / 37 Ha SURFACE AREA PROJECT TYPE Na onal Tender, Urban Planning CREDITS

Enrique Bardají y Asociados. S.L. León 11 DUTIES AND RESPONSIBILITIES

Assistance in Design. Development of Tender Drawings

20


2.0 CITY

In this Master Plan we state and apply the principles of “2.0 city”. These principles defend essen al points to be considered in modern developments of ci es. It resumes the best features of tradi onal developments and the characteris cs of the nowadays-urban plans. UNSATURATED CITY. The development design is not sta c, its layout and use will change over me. We impulse its evolu on by establishing possible guidelines for its growth and those are supported by the designed structure. We want to promote its development. 3D CITY: The 2.0 city must have 3D tools for its de ni on. The compa bility of uses will address the third dimension. PERMEABLE CITY: Accessibility from diīerent heights, no sectors, no fences or barriers, no “crust” pavements... COMPACT CITY: human scale, mixed uses, a layout that promotes neighborhoods, everything accessible within a short-walk distance... CITY AS EVOLUTION: Its design is based on ra onal criteriathe history of the city, its topography and its inhabitants. TESTABLE CITY: Ci zens will play a bigger part in the design of the city. This will be allowed through the transparency and publicity of planning processes

21


31 Public Housing in Andalusia. Spain. YEAR LOCATION SURFACE AREA PROJECT TYPE CREDITS

2011 Málaga, Spain 24,168 SF /2.245m² Tender

Enrique Bardají y Asociados. S.L. DUTIES AND RESPONSIBILITIES

Design and Development of the project in a team. Drawings and Documents of Compe on.

The site is in Malaga’s Historical Centre. This loca on and the shape of the site are decisive in the composi on and display of the buildings. But, despite the crooked shape of the plots the buildings proposed are arranged in an orthogonal array. This geometric con gura on generates pa os of diīerent sizes and regular shapes. These pa os are similar to the ones found in the city oor plan and t nicely in this conceptual pa ern. The sharp plain walls confer a solid presence to the buildings transmi ng to the pedestrians and occupants a cool feeling which is suitable for such a hot place like Málaga. Another characteris c element in the composi on is the light footbridges which are used to enter the apartments. These are covered with semitransparent synthe c fabrics which subtly block the peripheral vision of the pedestrians but keep the inner space ven lated.

22


ESQUEMAS DE DISTRIBUCIÓN Y

3.00

2.95

V15A

V14B

3.00

PLANTA SEGUNTA Y ATICO

3.15

3.00 2.75

3.00 3.75

3.00 3.05

3.00 4.20

3.50

3.00

V13B V15B

V1B

V2B V12A

SECCIÓN A-A

V5B

V12B

V12C

V6B

V8B V14A V13A

V7B V12D V9B

PLANTA PRIMERA

V4B

V1A V2A

V3A

V5A

V3B

V3C

V6A

V11A

V8A V1OA

V7A V3D V9A

PLANTA BAJA.

V4A

21


Adif Headquarters. Spain YEAR LOCATION SURFACE AREA PROJECT TYPE

2008 Madrid. Spain. 2000 m2 Oĸce implementaƟon. Corporate Interiors.

CREDITS Arquidea DUTIES AND RESPONSIBILITIES From Preliminary Design to ConstrucƟon Documents.

32


25


Retirement House in Avila. Spain YEAR LOCATION SURFACE AREA PROJECT TYPE

2010 Ávila. Spain 1,022 sqf/ 95m² 13 10

Arqlan a Tender 3ºplace

A'

CREDITS 11

Mª Teresa Santás Ciava a Alexandre Malagelada Prats

10'

DUTIES AND RESPONSIBILITIES

12

Co-author

A

B

The building is located in a 20 x 20 m2 plot. Its entrance is in the north side of the plot and at its easten side there is a river. The two story house we present is east west oriented in order to have its longest facade looking towards the river. The posi on of the house in the plot divides the surrounding space in two areas, the entrance area and the garden, that is close to the riverbank. The gross oor area was limited to to 95m2, so we designed the layout of the house in a way that maximized all the rooms space whereas connec on and corridor areas were reduced to the minimum. The kitchen, the dinning room and living room share the same space and the shape of the roof visually divides them. Addi onally, all the main rooms of the house have a river view.

26

D C 8 9 2

5

7 1 3

4

6

E

INTERIOR SPACES 1. Living room 2.Kitchen 3.Corridor 4.Terrace 5.Bedroom 6.Bedroom 7.Bathroom 8.Shower 9. Stairs 10. Master Bedroom 11. Bathroom 12.Terrace 13. Stairs 10'. Reading area EXTERIOR SPACES A. Entry B. Entry area C. House entry D. Perimeter pavement E. varden


Roof

Clerestory window

ƪ

ƪ

27


Europam X. Europe YEAR LOCATION

2009

Nyon, Vardo, Valverde, Tallin, Riga, Graz SURFACE AREA diverse PROJECT TYPE Tender-Compe on Zoohaus Team CREDITS DUTIES AND RESPONSIBILITIES Co-author of proposals. Development of Tallinn and Nyon projects. Drawings produc on.

28


10 years of Europan as a se ng of ideas and a pla orm for a European contemporary urbanism and architecture debate. With the ambi on of becoming a research network, connec ng every concern and interest of every plot and every country par cipa ng. A global statement, that’s the Europan, includes all the statements of each plot. A pla orm that solves problems by turning them into exercises, genera ng interes ng and realis c debates. In view of this, we propose a symmetric response in coming to the problem and in the developments. We respond from a common and global propose, and from that common stand, we discuss and develop new statements for the plots we chose. We become coordinators of diīerent networking teams, sharing tools and ar cula ng a common proposal adapted to each plot requirements. In each plot we promote solu ons toward… … An architecture that learns from society and foresee its needs. … An evolu onal development of projects …An urban laboratory … A new saving culture … A density that allows nego a ons … A urbanism grounded on its infrastructure.

29


Residence Alteration and Addition. Jersey City YEAR 2015 LOCATION Jersey City, New York SURFACE AREA 774 SF PROJECT TYPE Residence. Altera on & Addi on CREDITS GRO Architects DUTIES AND RESPONSIBILITIES From Preliminary Design to Construc on Documents.

3' - 3"

25' - 0"

EXISTING TWO STORY FRAME DWELLING (NOT IN CONTRACT)

27' - 5"

DN

32' - 3 1/2"

100' - 4"

AREA OF WORK

UP DN 4R FD

6' - 11 1/2"

37' - 5"

ONE STORY BLOCK BUILDING (NOT IN CONTRACT)

30

12' - 4"

5' - 8 1/2"

GRAVEL


T.O. PARAPET

2x6 EXTERIOR STUD WALL 1 HOUR FIRERATED (BOTH SIDES) WOOD STUDS @ 16" O.C. W/R-19 BATT INSULATION

DN 15R

ROOFING CAP

T.O. ROOF STRUCTURE 19' - 7"

TJI 110 SERIES X 9-1/2" JOIST @12"O.C. W/R-38 INSULATION

1'-3"

BATH

21' - 6"

PARAPET COPING 2x6 PARAPET WALL WOOD STUDS @ 16" O.C.

ROOF EXISTING 18' - 2 3/4"

TYP.RIM JOIST DIMENSION LUMBER 1"X10" BLOCKING 8" ON CENTER

BEDROOM

5/8" GYPSUM BOARD CEILING

7'-3"

7'-3 1/2"

EXTERIOR CLADDING - 'NICHIHA FIBER CEMENT BOARD 6'X18'X5/8" COLOR: 'WHITE'

BEDROOM 2x6 EXTERIOR STUD WALL WOOD STUDS @ 16" O.C. W/R-19 BATT INSULATION

3'-5 1/2"

BATHROOM

REAR PARAPET EXISTING

11' - 2 3/4"

TJI 230 SERIES X 9-1/2" JOIST @16"O.C. W/R-38 PERIMETER INSULATION

SECOND FLOOR

9' - 6 3/4"

REF.

TYP.RIM JOIST DIMENSION LUMBER 1"X10" BLOCKING 8" ON CENTER DN 15R

KITCHEN

LIVING/DINING

GRAY STUCCO

8'-4 1/2"

STAIR

KITCHEN-LIVING

TJI 230 SERIES X 9-1/2" JOIST @16"O.C. W/R-38 INSULATION

UP 15R

FIRST FLOOR LANDING LEVEL 1' - 7 7/16"

CL

TYP.RIM JOIST DIMENSION LUMBER 1"X10" BLOCKING 8" ON CENTER

FIRST FLOOR REAR

0' - 2 1/2"

FIRST FLOOR

NEW 8" CMU WALL

BLUESTONE CAP

STORAGE SPACE

7'-2”

6' - 4"

-0' - 2 3/4"

BLUESTONE PAVEMENT

GRADE - REAR -5' - 2 3/4"

4" CONCRETE SLAB WATERPROOF MEMBRANE BITUTHENE 3000 EXISTING FOOTING TO REMAIN

STORAGE

5'-2"

REAR STORAGE -6' - 11 1/4"

FILTER MEMBRANE

6 MIL. POLY VAPOR BARRIER GRANULAR SUBBASE ENGINEER FILTER MEMBRANE

2'-8"

GRANULAR SUBBASE AS DIRECTED BY ENGINEER UP

2'-6"

6 MIL. POLY VAPOR BARRIER

BASEMENT

8" CONCRETE RETAINING WALL -7' - 6 1/2" #5 HEPOXY COATED REBAR 24" ON CENTER GRAVEL FILL FOR DRAIN

DRAINAGE PIPING SLOPED TO OUTLET AWAY FROM WALL 30" x 12" DEEP CONT. FOOTING #4@8" EACH WAY TOP OF FOOTING TO BE @ FROST LINE. MIN 3' DEEP

"

24" x 12" DEEP CONT. FOOTING . #4@8" EACH WAY

31


4 3/4"

3"

METALLIC ROUND HANDRAIL PAINTED METALLIC GRAY 1-1/4"

4 3/4"

3"

1/2" STAINLESS STEEL ROD

4 3/4"

3"

METALLIC STRINGER PAINTED METALLIC GRAY

3 A-404

3"

WOOD STEPS TO MATCH EXISTING HARDWOOD FLOOR COLOR 9-1/4" X 1-1/2"

4 3/4"

YEAR 2015 LOCATION Jersey City, New York SURFACE AREA 1.472 SF PROJECT TYPE Residence. Interior Renova on CREDITS GRO Architects DUTIES AND RESPONSIBILITIES From Preliminary Design to Construc on Documents

4 3/4" 2"

Interior Rennovatiom. Jersey City

4 3/4"

3"

4 3/4"

3"

4 3/4"

3"

1/2" STAINLESS STEEL ROD

4 3/4"

3"

4 A-404

4 3/4"

3'-0"

4 3/4"

3"

2'-11 3/4" 7 3/4"

7 1/2"

3"

6 A-404

1"

3"

3'-0 1/2"

4 3/4"

3"

4 3/4"

1"

2'-8"

1" WOOD STEPS TO MATCH EXISTING HARDWOOD FLOOR COLOR 9-1/4" X 1-1/2"

METALLIC STRINGER PAINTED METALLIC GRAY

32

3'-0 1/2"

1/2" STAINLESS STEEL ROD

3"

1/2" STAINLESS STEEL ROD

1-1/4" METALLIC ROUND HANDRAIL METALLIC GRAY

No. Date

Description

UP 14R

9 1/4"

1 1/2"

WOOD STEP TO MATCH EXISTING HARDWOOD FLOOR 9-1/4" X 1-1/2"

2'-3 3/4"

1/2" STAINLESS STEEL ROD

1"

3" 1/4" 3"

7 3/4"

METALLIC STRINGER PAINTED METALLIC GRAY

2'-3 3/4"

2'-3 3/4"

1 1/2"

2'-3 1/2"

9 1/4"

9 1/4"

9 1/4"

9 1/4"

9 1/4"


W.I.C

. .

MASTER BATHDROOM

W

W.I.C

DN 14R

MASTER BEDROOM

BEDVROOM

(NOT IN SCOPE)

(NOT IN SCOPE)

35 TH FLOOR

CL.

CL.

OFFICE / GUEST ROOM

KITCHEN

LIVING ROOM (NOT IN SCOPE)

34 TH FLOOR

33


Acuerda and Arquidea Headquarters. Spain. YEAR 2007 LOCATION Madrid, Spain SURFACE AREA 1,830 sqf/ 170 m² PROJECT TYPE Oĸce Implementa on CREDITS Arquidea S. L. DUTIES AND RESPONSIBILITIES

Design, Dra ing, Preliminary Design, Design & Development and Construc on Documents

aseo 1 KITCHENETTE

BATHROOM BATHROOM BATHROOM

34


b'

nevera

armario

acuerda

b

1

35



This project is located in one of the most important Įnancial centers of the city and the second largest block in Madrid. The site has oĸces, commercial areas, housing and several networked parks and squares. This area is used below its possibiliƟes because of; its layout, its poor internal connecƟons and a the lack of safety in the area. This area is 20 Ha big, and 10 of this Ha are exterior areas with poor pedestrian connecƟons between them. Further more, there are also several underground passages in the area poorly illuminated and controlled, which help increasing the unsafe feeling when taking a walk in the area. Therefore, the project aims to remodeling the area in order to increase its use by ciƟzens and solve its safety problems. This goal will be reached by implemenƟng the program that comes from a sustainable urbanism analysis of the area that also aims to: match the need of equipments in the area; acƟvate the area 24h/day and increase its importance as a city hub.

37


Azca Complex Equipment. Spain. As a result of the analysis we propose a program of 200.000m2 divided into a “horizontal” and “ver cal” developments. Horizontally we create con nuous parkplaza (136.600m ²) which has commercial and cultural areas as well as sports facili es. In the proposal we eliminate the underground walkways. This ParkPlaza is highly adaptable to mul ple events both with local or metropolitan importance. At the southern area, we propose a hybrid building with mul ple uses and equipments. It will be the entrance to the park and the most visible part of the complex. It is 80.000m ² and has several public squares (each at diīerent height) and a Sports Area, a Library, a Leisure Centre, Oĸces, a Community Center, an Educa onal Zone and Commercial areas. The building is highly adaptable to host a wide range of events both metropolitan or local.

38



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.