BELGRAVIA DEVELOPMENT: 11571 – 80 AVE – Belgravia, Edmonton AB
+1-587-400-0110 +1-877-270-5775 info@novhaus.com
www.novhaus.com #201,1230 91Street SW Edmonton, AB T6X 0P2
Sophisticated ultra-modern and sustainable Single Family Home in the heart of Belgravia Community and 3 minutes from the University of Alberta. This extraordinary home offers an easy open layout barrier-free, exquisite and innovative design concept with a hybrid elevator allowing access to all floors. The living room features oversized windows, a modern heating system, a reclaimed wood accent wall, and refined white oak wood floors. The kitchen blends white lacquer upper cabinets and an oversized wood island with a waterfall quartz counter. Perfect master suite offers a sun-drenched master bedroom and a gorgeous master bathroom with a free-standing tub and a spa shower. Guest bathroom features a free-standing shower. Basement offers great space for entertaining: a rec room with a wet bar and a fully equipped home theater. Enjoy sunny days on roof deck complete with pergola. The garage roof features a Solar PV system allowing you to reduce your electricity bill. The insulated 2-car garage comes with a level 2 EV Charging station for your Tesla.
1st Floor: 922 Sq. Ft. Great Room Kitchen Nook
2nd Floor: 1014 Sq. Ft. Master Bedroom WIC Master Bath Guest Suite Guest Bath
Basement: 734 Sq. Ft. Two (2) Bedrooms Bathx Media Room Mech. Room
Garage: 380 Sq. Ft. Insulated Double Cars Solar PV
Sustainability: LEED Platinum List Price Starting At: $1,150,000 Highlights ● Open Floor Plan with 8 to 9’ Ceiling ● Large 4 bedrooms with 3.5 baths ● State-Of-The Art 5-Channel Home Theater ● Custom Designer Cabinetry Throughout ● Reclaimed Wood Walls Architectural Detail ● Roof Top Deck / Solar PV ● EV Charger ● Hybrid Elevator ● Large Two-Car Garage
3D Site plan
3D Site plan
9'-0"
TOP OF STAIRWELL PARAPET ELEVATION 133'-3"
13'-0"
TOP OF PARAPET ELEVATION 127'-9" TOP OF ROOF ELEVATION 123'-9 3/4"
2'-0"
GLASS RAILING
1'-6"
SGIWALL HORIZONTAL SIDING
8'-2"
ACRYLIC STUCCO
ANODIZED ALUMINUM BATTENS BLACK
1'-10"
27'-0"
SECOND FLOOR ELEVATION 112'-1 7/8"
SMOOTH FACE BRICK
MAIN FLOOR ELEVATION 100'-0"
1
FRONT ELEVATION Scale: 3/16" = 1'-0"
8'-6"
WALL AREA 1531 SQ. FT. ALLOWABLE GLAZING AT 7% = 107 SQ.FT. ACTUAL GLAZING 44 SQ. FT. 1
RIGHT ELEVATION Scale: 3/16" = 1'-0"
10'-0"
12'-0"
5'-10"
25'-6"
2'-0"
9'-4"
1'-6"
SAGIWAL HORIZ. SIDING
14'-0" ACRYLIC STUCCO ACRYLIC STUCCO
METAL RAILING C/W GLASS INSERTS
1
REAR ELEVATION Scale: 3/16" = 1'-0"
GLASS RAILING
ACRYLIC STUCCO
ACRYLIC STUCCO ACRYLIC STUCCO
ACRYLIC STUCCO
EXPOSED AGGREGATE CONCRETE STEPS 8X8 GLASS BLOCK
1
LEFT ELEVATION Scale: 3/16" = 1'-0"
WALL AREA 1631 SQ.FT. ALLOWABLE GLAZING 7% = 114 SQ. FT. ACTUAL GLAZING 72 SQ. FT.
PARGING WINDOW WELLS AS REQUIRED
3'-0" 10'-0"
WIC
9'-6"
11'-8 1/2"
CASEMENT 60" x 24"
A: 1,014 sq ft H: 10'-0"
3'-8 1/2"
18'-6"
1'-3 1/2"
3'-2 1/2"
MAKE UP TABLE
LINEN
108"x42" WALK IN SHOWER - TILE BASE, WALLS, & CEILING
TILE
ENSUITE
96" x 96" CASEMENT
HDW
5'-4"
HDW
MASTERBEDROOM
SLIDING GLASS DOOR
9'-7 1/2"
RAIN HEAD
28" 96"
GUEST SUITE
5'-11"
TILED BENCH
10 MIL GLASS
3'-9 1/2"
SHELVING/ SHOE RACK
HDW
11'-2 1/2"
CASEMENT 84" x 60"
UP 19 R
TILE
40"X60" TILED SHOWER
5'-6"
30" x 96" CASEMENT
9'-0"
10 MIL GLASS
ENSUITE
UPPER CABINETS
W
LAUNDRY TILE
DR
ROD
4'-2" DN 18 R
1'-6"
1'-6"
2'-0"
TILE
2'-6"
6'-2"
5'-0 1/4"
TILE
12'-0"
108" x 108" CASEMENT
GREAT ROOM
GAS COOK TOP
TILE
KITCHEN
MAIN FLOOR AREA H: 11'-0"
3'-1" MICRO/OVEN
LINE OF SECOND FLOOR ABOVE
A: 922 sq ft
CASEMENT 108" x 84"
DECK
6" DROPPED BULKHEAD C/W ROPE LIGHTING
NOOK
2'-8 1/2"
1'-6"
3'-0"
METAL RAILING WITH GLASS INSERTS
TILE
GUEST BATH
2'-3"
5'-2"
4'-2"
DN 15 R
ENTRY
36" 96"
UP 18 R
TILE
6'-6"
5'-0"
1'-2"
1'-6"
2'-0"
BENCH
2'-10 1/2"
BENCH
LOCKERS
1'-0"
20'-11"
12'-0" ALL WIDOWS TO MAIN FLOOR AT 8 FOOT HEADER HT TRANSOM WINDOWS AT 10 FOOT HEADER HT
6" DROPPED BULKHEAD
36" 80"
2'-7 1/2"
TILE
MUDRM.
LINE OF SECOND FLOOR ABOVE
17'-0"
17'-0"
4'-4 1/2"
2'-0"
FLUSH EATING BAR
WIC 16'-10" 2'-4"
16'-6 1/2" 4'-3 1/2"
32" 96" GLASS RAILING
7'-10" 5'-10 1/2" 3'-1 1/2"
6'-7"
FLOOR TO CEILING GLASS WALL
17'-0"
PANTRY
96" 28" 96"
5'-9 1/2"
5-6X3-0 SOAKER TUB
SECOND FLOOR AREA
1'-6"
3'-10" 12'-9"
2'-0"
16'-4 1/2"
3'-11 1/2" 2'-3 1/2"
28'-11 1/2" 2'-4 1/2"
2'-0" 6'-0"
17'-1" 3'-9"
20'-10" 20'-10" 6'-8"
5'-9 1/2"
28" 96"
24" 96" 32" 96" 6'-8 1/2" 6'-7"
32" 96"
16'-0"
14'-4" 1'-0" 19'-3" 1'-0" 17'-9"
21'-5" 9'-7 1/2" 3'-0"
3'-0" 10'-0" 35'-4" 10'-0" 1'-6"
14'-6" 15'-11"
7'-0" TRANSOM 72" x 24" TRANSOM 72" x 24" CASEMENT 24" x 108"
24" x 48" CASEMENT 72" x 24" CASEMENT
4'-0"
F LINEAR FIREPLACE
32"
36"
44'-4" 10'-0" 4'-0"
96"
13'-10" 17'-4 1/2"
1'-0" 10'-0" 5'-3 1/2" 4'-8 1/2"
14'-6" 8'-0" 8'-6"
SECOND FLOOR PLAN Scale: 3/16" = 1'-0"
41'-4" 10'-0"
1
2'-0"
1 DW
MAIN FLOOR PLAN Scale: 3/16" = 1'-0"
53'-4"
53'-4"
58'-4"
14'-4"
7'-0" 53'-4"
H: 11'-0"
A: 922 sq ft
MAIN FLOOR AREA
PL
PL
KITCHEN
PL
TILE
12'-0"
108" x 108" CASEMENT
PL
PL
GREAT ROOM
PL
PL
GAS COOK TOP
TILE
5'-0 1/4"
PL
3'-1" MICRO/OVEN
L
L
L
L
L
3'-0"
CASEMENT 108" x 84"
6" DROPPED BULKHEAD C/W ROPE LIGHTING
LINE OF SECOND FLOOR ABOVE
PL
2'-6"
2'-8 1/2"
TILE
NOOK
PL
6'-2"
DECK
L
L
WP
PL
PL
L
TILE
GUEST BATH
PL
2'-3"
5'-2"
4'-2"
SD
DN 15 R
36" 96"
ENTRY
PL
PL
PL
UP 18 R
TILE
6'-6"
5'-0" PL
1'-2"
1'-6"
WP
2'-0"
BENCH
2'-10 1/2"
BENCH
LOCKERS
1'-0"
L
ALL WIDOWS TO MAIN FLOOR AT 8 FOOT HEADER HT TRANSOM WINDOWS AT 10 FOOT HEADER HT
PL
FP
PL
FP
PL
L
PL
MUDRM. TILE
2'-7 1/2"
6" DROPPED BULKHEAD
PL
PL
PL
36" 80"
GARAGE
2x4 EXTERIOR WALL
LINE OF SECOND FLOOR ABOVE
17'-0"
17'-0"
72" x 24" CASEMENT
METAL RAILING WITH GLASS INSERTS
1'-6"
ENG. DOOR HEADER
4'-4 1/2"
20'-0" 12'-0"
16'-0"x7'-0" overhead garage door
FLUSH EATING BAR
4" RADON MITIGATION PIPE EMBEDDED IN 8" GRAVEL, CAPPED & LABELED FOR FUTURE CONNECTION TO FAN - SEE DETAIL
4'-0" 13'-11 1/2" 8'-8"
19'-0"
3'-5" HWT FRN
HWT FRN
1'-0"
VENTING LOCATION SEE DETAIL
FOUNDATION PLAN Scale: 3/16" = 1'-0" H: 9'-0"
A: 734 sq ft
32" 80"
PL
12'-0"
L
TILE
BATH
L
CARPET
17'-0"
CLEARANCE TO EXT. WALL
30" L 80"
MECHANICAL ROOM
BEDROOM
ENG DECK JOISTS
BSMT DEVELOPMENT
1'-2"
L
CRPET
LINE OF DUCTS ABOVE
PL
9'-4 1/2"
PL
MEDIA ROOM
PL
17'-0"
15'-0"
ENG DECK BEAM
CARPET
5'-0"
BEDROOM
30" 80"
PL
SD
PL
3'-2 1/2"
PL
PL
PL
SD
4'-5"
60" 80"
5'-8" 1'-0"
3'-4 1/2"
UP 15 R
SUMP
6'-7 1/2"
PL
1'-0"
11'-0"
53'-4" 53'-4"
DECK PILES TYP.
4" CONC. SLAB C/W FIBERMESH SYNTHETIC FIBEROUS REINF 6X6 WIRE MESH ON 6 MIL POLY ON 8" COMPACTED GRAVEL
24" X 8" CONC. FOOTINGS R/W 3 ROWS OF 15 MM CONT. REBAR WITH I 15 MM REBAR TRANSVERSE & TIED TO LONGTITUDINAL REBAR
8' X 9'-0" CONC FOUNDATION WALL R/W 4 ROWS OF 2 - 15 MM HORIZ. AND CONT. REBAR C/W SNAP TIES WALLS TO BE DAMP PROOFED INT. & EXT.
12" DIAM. CONC. PILES 12' - 0' INTO GROUND W/ 2 - 10M REBAR FULL LENGTH OF PILES EXTEND REBAR INTO PILE CAP OR CONC. PAD MIN 18"
2'-0"
L
7'-10" 5'-10 1/2" 3'-1 1/2"
96" 28" 96"
GFI
PANTRY FLOOR TO CEILING GLASS WALL
96" x 24" GLASS BLOCK FURNACE
L
16'-0"
1'-0" 19'-3" 1'-0" 17'-9"
32"
21'-5" 9'-7 1/2" 3'-0"
TRANSOM 72" x 24" TRANSOM 72" x 24" CASEMENT 24" x 108"
24" x 48" CASEMENT 72" x 24" CASEMENT
1'-2" 1'-2"
ENTERTAINMENT CENTRE
30" 80"
L
51'-4"
36" 80" LINEAR FIREPLACE
13'-10" 17'-4 1/2"
4'-0"
F HDMI
20'-11" 14'-6" 8'-0"
GFI 96"
16'-2"
FRONT ACCESS APPROX. 30" CLEAR
60" 80"
8'-0" CASEMENT 60" x 24" CASEMENT 60" x 24"
1'-0" 10'-0" 5'-3 1/2" 4'-8 1/2"
14'-6" 15'-11"
36"
41'-4" 10'-0" 2'-0"
DW 8'-6"
30" 80"
2'-8" 11'-0" 6'-1" 10'-11 1/2"
INSULATED RIMJOIST FOR MECH. ROOM
6'-2"
GFI
2'-0"
20'-11" 10'-6" 10'-8"
1'-0"
9'-3"
Main FLOOR Scale: 1/8" = WP
1 FD
1 HRV
4'-3"
HDMI
19'-0" ASPHALT SHIMGLES
19'-0" 2X6 EXTERIOR WALL
DOOR BUCK
ENG. DOOR HEADER
16'-0"x7'-0" overhead garage door
ACRYLIC STUCCO
1'-6"
BUILT OUT WALL 6"
CJ
10'-0"
20'-0"
20'-0" 7'-0"
PICTURE 60" x 24"
16'-10"
CONCRETE SLAB
ACRYLIC STUCCO
PICTURE 60" x 24"
5"SLAB ON GRADE R/W 10 M @ 16" O/C EACH WAY ON 6 MIL POLY ON 8" COMPACTED CRUSHED GRAVEL PROVIDE 1/4" X 1 3/4" DEEP SAW CUT CONTROL JOINTS (CJ) AS SHOWN. FILL C/J WITH MASTIC
GARAGE
4'-0"
6'-3"
RIGHTELEVATION
36" 80"
2x4 EXTERIOR WALL 4/12 ROOF SLOPE
72" x 24" CASEMENT
DOOR BUCK
3'-1 1/2"
CONCRETE SLAB
ACRYLIC STUCCO
FLOOR PLAN 16'-10"
1'-0"
PREFIN. METAL FLASHING TO PROVIDE MECH. AND MOISTURE PROTECTION FOR RIGID INSU.
10M REBAR@ 16" O/C E/W
BUILT OUT WALL 6"
5" REINFORCED CONCRETE SLAB
10'-0"
TREATED BASE PLATE 1/2" DIAM. X6" ANCHOR BOLTS @ 48" O/C
4-15M LONGTITUDINAL REBAR
10'-0"
6" WIDE X 6" HIGH CONCRETE CURB R/W 1-15M REBAR IN CURB
6 MIL POLY UNDER SLAB INSTALL MIN. 7" COMPACTED GRAVEL BACKFILL ONTO UNDISTERBED SOIL
6" MIN. CLEARENCE SLOPE FINISHED GRADE MIN 1%
16'-10"
INSTALL 2' X 2" WIDE RIGID INSU. HORIZONTALLY ALONG PERIMRTER OF FOUNDATION 16" WIDE X 12" DEEP THICKENED EDGE 10M VERTICAL REBAR @ 48" O/C INSTALLED TO SUPPORT LONGITUDINAL REBAR
GARAGE SLAB ELEVATION 100'-0"
7" 1'-4"
FRONTLANE ELEVATION
10'-0"
9'-1 1/8"
2x4 WALL
REAR ELEVATION
1'-6" 6"
BOTTOM OF FRAMED WALL 5" REINFORCED CONC. SLAB - SEE ENGINEERED DETAIL
1'-4"
THICKENED SLAB - SEE ENGINEERED DETAIL
16'-4"
1'-4"
19'-0"
SECTION
7 ASPEN LOT 26 A BLOCK 2 PLAN 2831 HW
BELGRAVIA
9 IVORY HALO PINE
1 BRANDON ELM
LANDSCAPE LEDGEND
7 SLOWMOUND MUGO PINE
MAIN FLOOR (2) Scale: 1/8" = 1'-0"
1
4'-0"
20'-0" 1'-6"
108" x 108" CASEMENT
GREAT ROOM
TILE
GAS COOK TOP
TILE
KITCHEN
MICRO/OVEN
DECK
NOOK
A: 922 sq ft H: 11'-0"
12'-0" 53'-4" 24'-0"
29'-0"
20'-0"
4'-0"
106'-4"
MAIN FLOOR (2) Scale: 3/32" = 1'-0"
MAIN FLOOR AREA
3'-0"
4'-0"
36" 80"
1
80TH STREET
CONCRETE WALK
TILE
ENTRY
36" 96"
UP 18 R
DN 15 R
TILE
GUEST BATH
BENCH
PROPERTY LINE
72" x 24" CASEMENT
36" 80"
2'-7 1/2"
2'-3"
BENCH
LOCKERS
5'-2"
MUDRM.
TILE
GARAGE ENG. DOOR HEADER
2x4 EXTERIOR WALL
CASEMENT 72" x 24"
19'-0"
16'-0"x7'-0" overhead garage door
CASEMENT 108" x 84"
TILE
CASEMENT 72" x 24"
METAL RAILING WITH GLASS INSERTS
F
LAWN SPACE
LINEAR FIREPLACE CASEMENT 24" x 108"
19'-0"
PANTRY
32" 96"
25'-0"
FLOOR TO CEILING GLASS WALL
1'-2"
24" x 48" CASEMENT
28" 96"
LANE
36" 96"
72" x 24" CASEMENT FLUSH EATING BAR
LAWN SPACE
3'-0"
130'-4"
DW
Kitchen
Bathrooms
Cabinetry:
First Floor Powder Room:
●
White Lacquer Cabinets / Wood-Veneer Island With Waterfall Countertop Feature
●
Cabinet Hardware: Finger-Pull Brushed Finish Handle
Countertop / Backsplash: ●
Kitchen Counters: White Quartz with 1-1/4” Eased Edge
●
Kitchen Island: White Quartz A 1-1/4” Eased Edge, Overhang, Waterfall Feature
●
Full Tile Backsplash: White Porcelain Tile
● Modern Floating Vanity Cabinet ● Vanity Cabinet Hardware: Finger-Pull Brushed Chrome Hardware
● Porcelain Under-Mount Sink ● Vanity Faucet: Modern Single Handle In Brushed Nickel Finish
● ● ● ●
Faucet / Sink/ Disposal
Toilet: Dual-Flush Gerber Toilet Mirror : Decorative Framed Mirror Designer Lighting As Installed Bathroom Developer
Accessories:
As
installed
By
Master Bathroom:
●
Kitchen Faucet: Single Handle Pull-Out
●
Kitchen Faucet in Chrome
●
Kitchen Sink: Stainless Steel Sink With A Garbage Disposal
Appliances:
● Modern Floating Double Vanity Cabinet ● Vanity Hardware: Finger-Pull Brushed Chrome Hardware
● Countertop: Carrara Marble With A Eased Polished Edge
●
Refrigerator: Liebherr Refrigerator (French Style With 2 Drawers)
●
In-Wall Double Oven: DCS 30” Double Wall Oven
●
36” Cooktop
●
Integrated Exhaust Hood
●
Microwave: Sharp 24” Stainless Steel
●
Microwave Drawer
●
Dishwasher
● Sinks: (2) Square Under-Mount Sinks ● Sink Faucets: (2) Widespread, Modern Faucets In Brushed Nickel
● Shower Trim: Hand-Held And Ceiling-Mounted Rain Head
● Shower Door: 3/8” Tempered Clear Frameless Glass Shower Panels
● ● ● ●
Lower Level Dry Bar ●
Combination of Wood Horizontal Glass Cabinets
●
Dry Bar Countertop: Quartz Eased Edge and No Backsplash
●
Under Counter Wine Refrigerator or Beverage Center
Base
and
Upper
Free Standing Tub: 62” Soaker Tub, Toilet: Dual-Flush Gerber Tile: Porcelain And/Or Marble Tile Mirror: Wall Mirrors Are Placed Above The Entire Vanity Cabinet
● Designer Lighting: Lighting As Installed ● Bathroom Accessories: As Installed Guest Bathroom:
● Modern Floating Double Vanity Cabinet ● Vanity Hardware: Finger-Pull Brushed Chrome Hardware
● Countertop: Quartz With A “Eased Polished Laundry Room Second Floor ●
Side-By-Side Washer And Dryer Hook-Ups Will be Provided for Buyers Future Use
●
Laundry Storage: Upper and Base Cabinets in White Melamine
●
Built-In Laundry Sink
●
Washer And Dryer Allowance - $1500. One Set To be Provided By The Developer – To Be Installed in One of the Two Locations.
Edge
● Sink: (1) Square Under-Mount Sink ● Sink Faucets: (1) Widespread Modern Faucets In Brushed Nickel
● ● ● ●
Tub/Shower: Built-in 5ft White Tub Toilet: Dual-Flush Gerber Toilet Tile : Porcelain And/Or Marble Tile Mirror: Wall Mirror Are Placed Above The Entire Vanity Cabinet
● Designer Lighting: Lighting As Installed ● Bathroom Accessories: As Installed
Basement Guest Bathroom:
● Modern Floating Vanity Cabinet ● Vanity Hardware: Finger-Pull Brushed Chrome
Windows
● Wood Aluminium – Clad Low-E Windows, All Operable Windows Supplied With Screens
Hardware
● Countertop: Marble Countertop With Eased Polished Edge
● ● ● ● ● ●
Sink: White Under Mount Sink Sink Faucet: Single Handle, Brushed Nickel Oversized Shower Tile: Porcelain And/Or Marble Tile
Doors/Door Hardware
● Main Entry Door: Jenn-Wen Full Lite Glass Door With Glass Transom
● Rear Entry Door: Jenn-Wen Full Lite Glass Door With Glass Transom
● All Interior Doors: Solid Core Double Panel Door
Toilet: Dual-Flush Gerber Toilet Mirror : Wall Mounted Mirror Extending Over The Width Of The Countertop And Equal To The Height Of The Wall Tile
● Designer Lighting: As Installed ● Bathroom Accessories: As Installed Insulation/Drywall/Paint Insulation:
● Exterior – Open And Closed-Cell Spray Foam Insulation
● Interior – Open And Closed-Cell Spray Foam Insulation
Drywall:
● Sheetrock To Be U.S. Gypsium Or Equal On All Wall And All Ceilings 5/8”
Mechanicals Heating & Air Conditioning:
● Lenox High Efficiency Heat Pump With 2 -3 Ton Ac Compressors
● Thermostats: As Installed Plumbing:
● New 1-1/2”Water Service Is Provided – With New Cast Iron Sewer To Street Main Line
● All Inside Rought Plumbing-Combination Of Copper & PVC
● Rheem Power-Vent 75 Gal, Gas Water Hetaer
● Sump Pump And Ejector Pump Installed ● Drain Tile System Installed At Lower Level Floor Plan
Paint:
● All Rooms: Painted With A Flat Paint Finish By
Elevator
● Closets & Ceilings: White With A Flat Finish By
Hybrid Elevator: The Hybrid Drive system, barrierfree, is the only belt driven, low voltage and ondemand power system.
● Trim And Interior Doors: White With A Semi-
● Belt Driven: featuring noise and vibration
Developer Developer
Gloss Finish By Developer
Trim/Closets Trim:
dampening properties as well as increased efficiency, makes travelling large distances simple and economical
● Low Voltage: one of a kind technology
● Door & Window Trim: 3” Decorative Casement Painted White
● Baseboards: 5” Decorative Profile Wood Painted White
● Closets - $4500 Allowance Flooring
● 4 ½ Inch White Rubio Monocoat Finish ● Basement: Porcelain Tile;
saves our customers both in operating costs as well as in electrical infrastructure investment
● Battery
Operated: on-demand power system providing sustainable, consistent and reliable performance, even in adverse operating conditions such as power outages
● Eco-friendly: and operable off the grid
through alternative power sources such solar, wind or water
Electrical
Exterior
Service:
Elevation:
● All Electrical Wiring Is In Accordance With
The City of Edmonton and Alberta Building Code 2014
● 200 Amps New Service Fire & Carbon Monoxide
● Hard Wired Smoke Detectors And Carbon Monoxide
Structured Cabling For Telephone, Internet & TV Security System:
● Standard Standalone Scalable System With
Keypad, Remote Control – Battery Back-up System. The Buyer To Contract Monitoring Services Post Closing. Activation And Monitoring Fees Are Not Included. Any Enhancement, Additions or Upgrades To Standard System Shall Be At Additional Cost Responsibility Of Purchaser.
Theater System:
● Home Theater System Includes 5.1 Surround Sound, Av Equipment, 110” Screen And Projector
● Brick Or Tile, Metal, And Cedar Planks Decorative Details
● Side And Rear Elevation: Metal – Advanced Panels (30 Year Warranty)
● Garage Elevation: Metal – Advanced Panels (30 Year Warranty)
Landscaping:
● Landscaping: As Installed Rear Metal Stair And Deck:
● Reard Deck With Metal Stairs To The Deck: Provided And Installed By Developer, All Surfaces Will be Cleaned, Primed And Two Coat Painted
Main House And Garage Roof:
● Deck And Pergola On the Roof Deck (Optional Rooftop Garden)
● Roof Access Garage:
● 2-Car Garage Insulated With Electric Remote Opener
Speaker Installed:
● ● ● ● ●
Living Room: 2 Speakers Kitchen / Great Room: 4 Speakers
● Solar PV System ● Level 2 EV Charging Station
Theatre – Basement Master Bedroom: 2 Speakers Master Bathroom: 2 Speakers
Surface Mounted Designer Lighting – As Installed
Solar PV System
● Fully Operational Solar Photovoltaic System, Material, Accessories (2.6 to 5 kW System)
● 315W Cell Monocrystaline LG Solar PV Modules
4” Recessed cans With Silver Trim – As Installed
● Enphase Microinverters and Accessories ● Enlighten Advanced Monitoring System & Envoy Unit
● ● ● ●
Mounting System and Accessories Wiring, Cabling and Accessories Installation and Labour Turn Key Installation and Service
Car: Tesla Optional
+1-587-400-0110 +1-877-270-5775 info@novhaus.com
www.novhaus.com #201,1230 91Street SW Edmonton, AB T6X 0P2