KEY PLAN .
.
704.5
705.5
.
706
706
Tk
TK
704
TK
697.7
TK
TK
TK
703.8 704.7
TK
705.6
TK Tk702.6 Tk
TK TK
704.8 697.1 703.9
703.3
TK
TK
E RVIC
JALAN S UNIARAJ A
IN SE
OUT
SERV
ICE
703.4
701.3
TK
703.4
702.7
704.2
TK
699.1
703.2 Tk
695.8
TK
700.6
701.9 TK
700.2
699.5 698.3
702.9
702.6
700.7
700.6
701.8 701.4
Tk
695.7 702.8
700.2 701.8
+ Trafo l Pane
TK
699.2
TK
698.8
699.1 TK 700.8
699.8
702.5
Tk
701.7 698.7
702.1 Tk
698.6
ls Retai0 ±0.0
KETERANGAN C
C ls Retai0 ±0.0
D
B
GA
oom ker R0 Wor±0 .0
IN
JAL
RA AN B
ls Retai ±0.00
G
A
Bar ±0.00
OUT
ucks Starb.00 ±0
ls Retai0 ±0.0
k t Des Transi 0 ±0.0
Wet ge Dry ge Garba0 ba ±0.0 mi- Gar 0 Com y ±0.0 sionar ±0.00
H
B
TAMAN
C
OUTDOOR RETAIL
D
TEMPAT DUDUK OUTDOOR
E
ENTRANCE STREET MARKET
F
AKSES MASUK KENDARAAN
G
AKSES KELUAR KENDARAAN
H
DROPOFF
I
AKSES KE BASEMENT
J
AKSES DARI BASEMENT
K
VOID
L
AKSES SERVIS
F H
R.Lin
ge Stora 0 ±0.0
all Lift H 0 ±0.0
DATA PROYEK
E
C
ls Retai 0 ±0.0
ls Retai 0 ±0.0
L.Keb
C JUDUL TUGAS
HOTEL
JENIS HOTEL
LEISURE HOTEL
BINTANG
P
pa Pom ompa
A
B
nd Grou r Wate s n a T k
Parkir tara n Seme is Serv
J
de ekun una S Pengg .00 ±0
Bar ±0.00
ving Recei 0 ±0.0
asing Purch ±0.00
ay ing B Load ±0.00
ls Retai ±0.00
er Lock ±0.00
Load
ing -1.00
Docks
E K
nding Grou
I
ls Retai0 ±0.0
er Lock 0 ±0.0
oom rm R Unifo±0.00
ls Retai0 ±0.0
ls Retai ±0.00
L
A
Jalur
ls Retai ±0.00
all Lift H 0 ±0.0
E
r
Gens
et
STP
D
AKSES PEDESTRIAN
B
oor Outd Food Court
D
C
A
**** (EMPAT) 2
LUAS TAPAK
5052 M
KDB
70 %
3.536,4 M2
KLB
2.5
12.630 M2
KDH
20%
1.010,4 M2
GSB
0 M, 0 M, 3 M, 3 M
JUMLAH LANTAI
12+2
JUMLAH KAMAR
100
JUMLAH PARKIR MOBIL
61
JUMLAH PARKIR MOTOR
40
FASILITAS
RESTAURANT STREET MARKET LOUNGE MEETING ROOMS CONVENTION CENTRE KOLAM RENANG GYM SPA OUTDOOR RETAIL BAR TOUR & TRAVEL
RENCANA TAPAK
CONVENIENCE STORE
SKALA 1 : 500 TINGGI BANGUNAN : 48.00 M
UNIVERSITAS
KATOLIK
PARAHYANGAN FAKULTAS TEKNIK JURUSAN ARSITEKTUR
SPA 6 TAR 306 2016 /2017 DOSEN PJ DOSEN KELAS ASISTEN DOSEN
DR. IR. ALWIN S. MT DR. IR. Y. BASUKI,M.SC IR. YOHAN SUWANDI, MT
NAMA
AURELIUS AARON
NPM
2014420157
NPM
B3
TUGAS TAHAP 2
TEMATIK HOTEL
GAMBAR
LEGALISASI
NOMOR LEMBAR
RENCANA TAPAK SKALA
SKALA 1 : 500 DIPERIKSA
JUMLAH LEMBAR
KEY PLAN
D
E
F + Trafo Panel
OUT
CE SERVI
C
CE
B
IN SERVI
A
Retails ±0.00
B C Retails ±0.00
D
Sekunder
B
Retails ±0.00
Lift Hall ±0.00
Retails ±0.00
E A
Retails ±0.00
Room Uniform ±0.00
I
Retails ±0.00
±0.00
Bar ±0.00
±0.00
E
±0.00
±0.00
Retails ±0.00
±0.00 -1.00
Pengguna ±0.00
D
STP
t Gense
or Outdo Food Court
C D
C
Jalur
40.00
OUT
Retails ±0.00
IN
Bar ±0.00
Room Worker ±0.00
F
Storage ±0.00
Lift Hall ±0.00
L.Keb
Retails ±0.00
E
C
Retails ±0.00
Pompa
A
B C
d Groun Water Tanks
Pompa
ing Ground
G
A H H
R.Lin
J
Starbuck ±0.00
Retails ±0.00
±0.00
8.00
Wet Garbage ±0.00
8.00
Dry Garbage ±0.00
2.60
Commisionary ±0.00
4.50
Servis
2.60
K
Parkir tara Semen
13.00
s
L
1 Commisionary ±0.00
Storage ±0.00
Dry Garbage ±0.00
Wet Garbage ±0.00
Loading Docks -1.00
E.
F.
G.
K. Loading Bay ±0.00 B. SIRKULASI PENGGUNA
2 A.
Lift Hall ±0.00
A.
Transit Desk ±0.00
Worker Room ±0.00
Purchasing ±0.00
Receiving ±0.00
Uniform Room ±0.00
SIRKULASI SERVIS
I. Retails ±0.00
Retails ±0.00 J. Retails ±0.00
3
A.
LIFT PENGUNJUNG
B.
LIFT KEBAKARAN
C.
KAMAR STANDAR
D.
KAMAR SUITE
E.
ROOM BOY STATION
F.
RESTROOM MEN
G.
RESTROOM LADIES
H.
ENTRANCE
I.
EXIT
J.
AHU ROOM
K.
EMERGENCY EXIT
Retails ±0.00
Retails ±0.00
Bar ±0.00
Bar ±0.00
Retails ±0.00
40.00
H.
4
Lift Hall ±0.00
Retails ±0.00
33.50
J.
KETERANGAN A.
Retails ±0.00
F.
A.
Retails ±0.00
5
K. G. Retails
Retails
H.
Retails
B.
Retails
6
STREET MARKET SKALA 1 : 200
UNIVERSITAS
KATOLIK
PARAHYANGAN FAKULTAS TEKNIK JURUSAN ARSITEKTUR
SPA 6 TAR 306 2016 /2017 DOSEN PJ DOSEN KELAS ASISTEN DOSEN
DR. IR. ALWIN S. MT DR. IR. Y. BASUKI,M.SC IR. YOHAN SUWANDI, MT
NAMA
AURELIUS AARON
NPM
2014420157
NPM
B3
TUGAS TAHAP 2
TEMATIK HOTEL
GAMBAR
LEGALISASI
NOMOR LEMBAR
DENAH STREET MARKET SKALA
SKALA 1 : 200 DIPERIKSA
JUMLAH LEMBAR
KEY PLAN
D
E
F + Trafo Panel
OUT
CE SERVI
C
CE
B
IN SERVI
A
40.00
Retails ±0.00
B C Retails ±0.00
D
Retails ±0.00
Lift Hall ±0.00
Retails ±0.00
Retails ±0.00
Room Uniform ±0.00
Retails ±0.00
±0.00
Bar ±0.00
±0.00 ±0.00
±0.00
Retails ±0.00
±0.00 -1.00
s Retails ±0.00
G
Room Worker ±0.00
IN
Bar ±0.00
A H
F
R.Lin
Storage ±0.00
H Lift Hall ±0.00
L.Keb
Retails ±0.00
E
C
Retails ±0.00
Pompa
A
B C
d Groun Water Tanks
Pompa
ing Ground
Starbuck ±0.00
Retails ±0.00
±0.00 Wet Garbage ±0.00
J
OUT
8.50
Dry Garbage ±0.00
11.50
Commisionary ±0.00
4.10
K
Servis
4.40
A I
E
L
Parkir tara Semen
11.35
Pengguna ±0.00
Sekunder
B
E
Jalur
D
STP
t Gense
or Outdo Food Court
C D
C
8.00
1 IT & Personal +4.00
E. K.
Area Cuci +4.00
ME Room +4.00
Clean Linen +4.00
Dirty Linen +4.00
Training Room +4.00
Worker Room +4.00
Area Dryer +4.00
B.
2
3.50
A. Lift Hall +4.00
2.25
2.25
SIRKULASI PENGGUNA
A.
J.
Satellite Cafe +4.00
3.00
3
40.00
SIRKULASI SERVIS
Main Storage +4.00
Canteen +4.00
Meeting Room +4.00
G.
F.
Executive Office +4.00
Bakery +4.00
4.10
3.00
RETAILS
4
Drug Store +4.00
Void
Internet Cafe +4.00
Lobby +4.00
Entrance +4.00
H.
A.
LIFT PENGUNJUNG
B.
LIFT KEBAKARAN
C.
KAMAR STANDAR
D.
KAMAR SUITE
E.
ROOM BOY STATION
F.
RESTROOM MEN
G.
RESTROOM LADIES
H
ENTRANCE
I.
EXIT
J.
AHU ROOM
K.
EMERGENCY EXIT
Drop Off +3.60
Souvenir +4.00
Tour & Travel +4.00
5.60
Lift Hall +4.00
3.00
J.
KETERANGAN
A.
F.
Lounges +4.00
11.20
5
A.
Front Desk +4.00
Lounges +4.00
5.60
K. G.
Back Office +4.00
Marketing +4.00
Sales +4.00
B.
6
LOBBY SKALA 1 : 200
UNIVERSITAS
KATOLIK
PARAHYANGAN FAKULTAS TEKNIK JURUSAN ARSITEKTUR
SPA 6 TAR 306 2016 /2017 DOSEN PJ DOSEN KELAS ASISTEN DOSEN
DR. IR. ALWIN S. MT DR. IR. Y. BASUKI,M.SC IR. YOHAN SUWANDI, MT
NAMA
AURELIUS AARON
NPM
2014420157
NPM
B3
TUGAS TAHAP 2
TEMATIK HOTEL
GAMBAR
LEGALISASI
NOMOR LEMBAR
DENAH LOBBY SKALA
SKALA 1 : 200 DIPERIKSA
JUMLAH LEMBAR
KEY PLAN
D
E
F + Trafo Panel
OUT
CE SERVI
C
CE
B
IN SERVI
A
40.00
Retails ±0.00
B C Retails ±0.00
D
Retails ±0.00
Lift Hall ±0.00
Retails ±0.00
Retails ±0.00
Room Uniform ±0.00
Retails ±0.00
±0.00
Bar ±0.00
±0.00 ±0.00
±0.00
Retails ±0.00
±0.00
s Starbuck ±0.00
Retails ±0.00
±0.00
Retails ±0.00
IN
Bar ±0.00
Room Worker ±0.00
F
Storage ±0.00
Lift Hall ±0.00
L.Keb
Retails ±0.00
E
C
Retails ±0.00
Pompa
A
B C
d Groun Water Tanks
Pompa
ing Ground
G
A H H
R.Lin
J
OUT
4.00
-1.00
4.00
Wet Garbage ±0.00
4.00
Dry Garbage ±0.00
4.00
Commisionary ±0.00
8.50
K
Servis
4.50
A I
E
L
Parkir tara Semen
11.35
Pengguna ±0.00
Sekunder
B
E
Jalur
D
STP
t Gense
or Outdo Food Court
C D
C
E. K.
Worker Room +10.00
8.00
1
Live Cooking
B.
+10.00
2.25 2.25 3.50
A.
Wet Waste +10.00 Dry Waste +10.00
Cold Storage +10.00
Dish Washing +10.00
Lift Hall +10.00
16.50
2
General Storage +10.00
G.
F.
Wet Storage +10.00
Dry Storage +10.00
Kitchen Areas +10.00
SIRKULASI PENGGUNA SIRKULASI SERVIS
Main Kitchen +10.00
A.
Beverages +10.00
J.
Pastry +10.00
3
40.00
G. Void F.
4
A.
LIFT PENGUNJUNG
B.
LIFT KEBAKARAN
C.
KAMAR STANDAR
D.
KAMAR SUITE
E.
ROOM BOY STATION
F.
RESTROOM MEN
G.
RESTROOM LADIES
H
ENTRANCE
I.
EXIT
J.
AHU ROOM
K.
EMERGENCY EXIT
J.
Convention Lift Hall +10.00
24.50
+10.00 A.
KETERANGAN
A.
+10.00
Pre Function +10.00
Meeting Room +10.00
Pre Function
Meeting Room +10.00
5
K.
B.
6
CONVENTION SKALA 1 : 200
UNIVERSITAS
KATOLIK
PARAHYANGAN FAKULTAS TEKNIK JURUSAN ARSITEKTUR
SPA 6 TAR 306 2016 /2017 DOSEN PJ DOSEN KELAS ASISTEN DOSEN
DR. IR. ALWIN S. MT DR. IR. Y. BASUKI,M.SC IR. YOHAN SUWANDI, MT
NAMA
AURELIUS AARON
NPM
2014420157
NPM
B3
TUGAS TAHAP 2
TEMATIK HOTEL
GAMBAR
LEGALISASI
NOMOR LEMBAR
DENAH CONVENTION SKALA
SKALA 1 : 200 DIPERIKSA
JUMLAH LEMBAR
KEY PLAN
D
E
F + Trafo Panel
OUT
CE SERVI
C
CE
B
IN SERVI
A
Retails ±0.00
B C Retails ±0.00
D
Retails ±0.00
Lift Hall ±0.00
Retails ±0.00
A
Retails ±0.00
Room Uniform ±0.00
I
Retails ±0.00
±0.00
Bar ±0.00
±0.00
E
±0.00
±0.00
Retails ±0.00
±0.00 -1.00
Pengguna ±0.00
Sekunder
B
E
Jalur
D
STP
t Gense
or Outdo Food Court
C D
C
Retails ±0.00
IN
Room Worker ±0.00
Storage ±0.00
L.Keb
Retails ±0.00
E
C
Retails ±0.00
Pompa Pompa
4.50
F
A
B C
d Groun Water Tanks
ing Ground
3.50
Lift Hall ±0.00
8.00
G
H H
R.Lin
J
A
Bar ±0.00
Dry Garbage ±0.00
Commisionary ±0.00
Servis
Parkir tara Semen
Wet Garbage ±0.00
±0.00
Retails ±0.00
K
Starbuck ±0.00
s
L
OUT
40.00
K.
2
Dining Area
A.
Lift Hall +15.00
2.25
A.
2.25
Amenities
Janitor + Cleaning Tool
SIRKULASI PENGGUNA
Selasar +15.40
+15.00
SIRKULASI SERVIS
Jacuzzi +14.70
J.
Void
Swimming Pool +14.00
4.00
SPA +15.00
Swimming Pool +14.00
4.00
40.00
3.50
Open Space +15.00
Restroom
B.
3
Lockers Lockers +15.40 +15.40
E.
Chemical Shelf
8.00
1
GYM +15.00
4
LIFT PENGUNJUNG
B.
LIFT KEBAKARAN
C.
KAMAR STANDAR
D.
KAMAR SUITE
E.
ROOM BOY STATION
F.
RESTROOM MEN
G.
RESTROOM LADIES
H
ENTRANCE
I.
EXIT
J.
AHU ROOM
K.
EMERGENCY EXIT
J.
Children Swimming Pool +14.70
8.00
A.
Lift Hall +15.00
+15.00
Selasar +15.40
A.
KETERANGAN
A.
8.00
5 Open Space +15.00
Restroom +15.00
Restroom +15.00
Sauna
Sauna
K.
B.
6
SWIMMING POOL SKALA 1 : 200
UNIVERSITAS
KATOLIK
PARAHYANGAN FAKULTAS TEKNIK JURUSAN ARSITEKTUR
SPA 6 TAR 306 2016 /2017 DOSEN PJ DOSEN KELAS ASISTEN DOSEN
DR. IR. ALWIN S. MT DR. IR. Y. BASUKI,M.SC IR. YOHAN SUWANDI, MT
NAMA
AURELIUS AARON
NPM
2014420157
NPM
B3
TUGAS TAHAP 2
TEMATIK HOTEL
GAMBAR
LEGALISASI
NOMOR LEMBAR
DENAH SWIMMING POOL SKALA
SKALA 1 : 200 DIPERIKSA
JUMLAH LEMBAR
KEY PLAN
D
E
F + Trafo Panel
OUT
CE SERVI
C
CE
B
IN SERVI
A
Retails ±0.00
B C Retails ±0.00
D
Retails ±0.00
Lift Hall ±0.00
Retails ±0.00
Retails ±0.00
Room Uniform ±0.00
Retails ±0.00
±0.00
Bar ±0.00
±0.00 ±0.00
±0.00
OUT
Retails ±0.00 Room Worker ±0.00
IN
Bar ±0.00
Dry Garbage ±0.00
Commisionary ±0.00 Storage ±0.00
Pompa
Retails ±0.00
L.Keb
C
d Groun Water Tanks
Pompa
A
B E
C
Retails ±0.00
Servis
Starbuck ±0.00
s ±0.00 Wet Garbage ±0.00
4.50
F H
R.Lin
4.00
ing Ground
4.50
G
A H
Lift Hall ±0.00
3.50
Retails ±0.00
K
J
8.00
Retails ±0.00
±0.00 -1.00
24.00
A I
E
L
Parkir tara Semen
25.00
Pengguna ±0.00
Sekunder
B
E
Jalur
D
STP
t Gense
or Outdo Food Court
C D
C
1 Pillows
Food + Bar Extra Bed Storage
C.
2
C.
Dining Area
A.
Janitor + Cleaning Tool
SIRKULASI PENGGUNA
Lift Hall +20.00
2.25
A.
2.25
Amenities
SIRKULASI SERVIS
C.
4.00
C.
C.
C.
B.
LIFT KEBAKARAN
C.
KAMAR STANDAR
D.
KAMAR SUITE
E.
ROOM BOY STATION
F.
RESTROOM MEN
G.
RESTROOM LADIES
H
ENTRANCE
I.
EXIT
J.
AHU ROOM
K.
EMERGENCY EXIT
J. C.
Lift Hall +20.00
4.00 4.00
LIFT PENGUNJUNG
C.
16,50 16.00
4.00
Void
4
A.
C. J.
32.00
3.50
C.
Restroom
B.
3
E.
T
K. Chemical Shelf
8.00
N
Clean Blanket+Towel
Lift Service
C.
A.
KETERANGAN
A.
8.00
5
C.
C.
C.
C.
K.
B.
6
LANTAI 5 SKALA 1 : 200
UNIVERSITAS
KATOLIK
PARAHYANGAN FAKULTAS TEKNIK JURUSAN ARSITEKTUR
SPA 6 TAR 306 2016 /2017 DOSEN PJ DOSEN KELAS ASISTEN DOSEN
DR. IR. ALWIN S. MT DR. IR. Y. BASUKI,M.SC IR. YOHAN SUWANDI, MT
NAMA
AURELIUS AARON
NPM
2014420157
NPM
B3
TUGAS TAHAP 2
TEMATIK HOTEL
GAMBAR
LEGALISASI
NOMOR LEMBAR
DENAH LANTAI 5 SKALA
SKALA 1 : 200 DIPERIKSA
JUMLAH LEMBAR
+ 51.50 ROOFTOP +48.00
ROOFTOP +48.00
+ 48.00
TH
12 +44.50
+ 44.50
TH
11 +41.00
+ 41.00
TH
10 +37.50
+ 37.50
TH
9 +34.00
+ 34.00
8TH +30.50
+ 30.50
ROOFTOP +48.00
12TH +44.50 STANDAR +44.50 11TH +41.00
STANDAR +41.00
10TH +37.50
STANDAR +37.50
SLAB BETON 30cm
9TH +34.00 STANDAR +34.00
KACA LOW E 3mm
8TH +30.50
STANDAR +30.50
KOLOM BETON BERTULANG 7TH +27.00
+ 27.00
6TH +23.50
+ 23.50
5TH +20.00
+ 20.00
7TH +27.00
STANDAR +27.00
6TH +23.50 STANDAR +23.50 5TH +20.00
KABEL BAJA TARIK STANDAR +20.00
SIRKULASI +15.40
+ 15.00
PLAFOND GYPSUM
SLAB BETON 30cm
OPEN SPACE +15.00
KANOPI BETON BERTULANG
SWIMMING POOL +14.00
+ 14.00 RAMP BETON BERTULANG DINING AREA +10.00
+ 10.00
KITCHEN +10.00
SLOOF BETON BERTULANG BATU KALI DAN PASIR URUG CANTEEN +4.00
SIRKULASI SERVIS +4.00
MAIN STORAGE +4.00
+ 4.00
RAMP MOBIL +3.60
TANAH KERAS PILE CAP
ENTRANCE / EXIT ±0.00
STREET MARKET ±0.00
± 0.00
PONDASI TIANG PANCANG
BASEMENT 1 -3.50
- 3.50
BASEMENT 2 -7.00
- 7.00
- 10.50
- 13.00
POTONGAN A-A' SKALA 1 : 250
UNIVERSITAS
KATOLIK
PARAHYANGAN FAKULTAS TEKNIK JURUSAN ARSITEKTUR
SPA 6 TAR 306 2016 /2017 DOSEN PJ DOSEN KELAS ASISTEN DOSEN
DR. IR. ALWIN S. MT DR. IR. Y. BASUKI,M.SC IR. YOHAN SUWANDI, MT
NAMA
AURELIUS AARON
NPM
2014420157
NPM
B3
TUGAS TAHAP 2
TEMATIK HOTEL
GAMBAR
LEGALISASI
NOMOR LEMBAR
POTONGAN BANGUNAN A SKALA
SKALA 1 : 250 DIPERIKSA
JUMLAH LEMBAR
KEY PLAN
8.50
8.50
8.50
Pillows
Food + Bar Extra Bed Storage
Clean Blanket+Towel
Lift Service
T
Roomboy Station
Restroom
Dining Area
Chemical Shelf
5.20
5.20
5.20
Amenities
A 6 3
A 6 2
A 6 1
Janitor + Cleaning Tool
Void
Foyer ±0.00
2,85
2,85
BED AREA +0.20
2,85
Foyer ±0.00
FOYER ±0.00
Bed Area +0.20
Bath Room -0.05
Bath Room -0.05
+0.20
A 5 3
A' 5 2
Bath Room -0.05 Bed Area +0.20
2,33
2,33
A 5 2
Foyer ±0.00
±0.00
A' 5 3
Bath Room -0.05 Bed Area +0.20
2,33
A' 5 1
-0.05
1,01
1,01
1,01
BATHROOM -0.05
A 5 1
Bed Area +0.20
Foyer ±0.00
SIRKULASI PENGGUNA
DENAH STANDAR SKALA 1 : 150
POLA LANTAI
1 6
TITIK LAMPU
2 6
SKALA 1 : 150
SKALA 1 : 150
SIRKULASI SERVIS
LAMPU LED STRIP INDIRECT LIGHT COLOR : YELLOW
3 6
LAMPU DOWNLIGHT DIFUSE LED COLOR WARM WHITE LAMPU DOWNLIGHT SPREAD LAMPU GANTUNG SAKLAR KARTU MCB
PANEL MBC RUANGAN
ARMATUR LAMPU
LINE TV CABLE
8.50 T
5.20
LINE TELEPHONE
RANGKA GANTUNG
STOP KONTAK
PLAFOND GYPSUM
A 6 4
DUCTING AC VRV
SAKLAR TUNGGAL +3.80 +3.50
KACA FILM 3mm +3.80 +3.50
SAKLAR GANDA
+2.90
2,85
+2.90
+2.40
GYPSUM STANDAR 12mm RANGKA BATTEN + 3.00 GYPSUM STANDAR 12mm RANGKA BATTEN + 3.00
1,01
SLAB BETON 30cm
+0.50
HALLWAY +0.20
BED AREA +0.40
FOYER +0.20
+0.30 ±0.00
A 5 4
+0.50 +0.30 ±0.00
A' 5 4
GYPSUM STANDAR 12mm RANGKA BATTEN + 3.00 GYPSUM STANDAR 12mm RANGKA BATTEN + 3.00
2,33
KETERANGAN
+2.40
PLINT 20cm DEK KAYU 20cm
POTONGAN A-A' SKALA 1 : 150
PLAFOND
A 1 5
TAMPAK A SKALA 1 : 150
4 6
SKALA 1 : 150
A 1 6
DETAIL KAMAR STANDAR SKALA 1 : 150
UNIVERSITAS
KATOLIK
PARAHYANGAN FAKULTAS TEKNIK JURUSAN ARSITEKTUR
SPA 6 TAR 306 2016 /2017 DOSEN PJ DOSEN KELAS ASISTEN DOSEN
DR. IR. ALWIN S. MT DR. IR. Y. BASUKI,M.SC IR. YOHAN SUWANDI, MT
NAMA
AURELIUS AARON
NPM
2014420157
NPM
B3
TUGAS TAHAP 2
TEMATIK HOTEL
GAMBAR
LEGALISASI
NOMOR LEMBAR
DETAIL KAMAR STANDAR SKALA
SKALA 1 : 150 DIPERIKSA
JUMLAH LEMBAR
8.50
KEY PLAN
8.50 8.50
A 5 1
A 5 3
A 5 2
Pillows
Food + Bar Extra Bed Storage
Clean Blanket+Towel
Lift Service
T
Roomboy Station
Restroom
Chemical Shelf
Dining Area
2.00
Foyer ±0.00
Foyer ±0.00
Dining Area +0.20
A 6 1
Living Room +0.20
3.40
Living Room +0.20
Bath Room +0.15
3.10
Bath Room +0.15
3.40
Bed Room +0.20
Void
8.50
8.50 Living Room +0.20
3.40
Dining Area +0.20
3.10
Bath Room +0.15
Bed Room +0.20
Bed Room +0.20
A 6 3
A 6 2
A' 5 1
Janitor + Cleaning Tool
Foyer ±0.00
Dining Area +0.20
3.10
8.50
2.00
2.00
Amenities
SIRKULASI PENGGUNA
A' 5 3
A' 5 2
SIRKULASI SERVIS
LAMPU LED STRIP INDIRECT LIGHT COLOR : YELLOW
DENAH SUITE
POLA LANTAI
1 6
SKALA 1 : 150
TITIK LAMPU
2 6
SKALA 1 : 150
SKALA 1 : 150
LAMPU DOWNLIGHT DIFUSE LED COLOR WARM WHITE
3 6
LAMPU DOWNLIGHT SPREAD LAMPU GANTUNG SAKLAR KARTU MCB
8.50
ARMATUR LAMPU
PANEL MBC RUANGAN
ELECTRIC PAN
LINE TV CABLE
PLAFOND GYPSUM
KACA FILM 3mm
T
A 5 4
LINE TELEPHONE
SLAB BETON 30cm
STOP KONTAK SAKLAR TUNGGAL
2.00
DINDING BETON PRE CAST +3.80 +3.50
GYPSUM STANDAR 12mm RANGKA BATTEN + 3.00
PEIL LANTAI 20cm
SAKLAR GANDA
DEK KAYU 20cm
+2.90
KETERANGAN 3.10
8.50
+2.40 GYPSUM STANDAR 12mm RANGKA BATTEN + 3.00
GYPSUM STANDAR 12mm RANGKA BATTEN + 3.00
LIVING ROOM +0.20
3.40
+0.50
DINING AREA +0.20
+0.30 ±0.00
GYPSUM STANDAR 12mm RANGKA BATTEN + 3.00
+3.80 +3.50
POTONGAN A-A'
A 6 4 A' 5 4
SKALA 1 : 150
PLAFOND SKALA 1 : 150
+2.90
A 1 5
+2.40
+0.50 +0.30 ±0.00
4 6
TAMPAK A SKALA 1 : 150
DETAIL KAMAR SUITE
A 1 6
SKALA 1 : 150
UNIVERSITAS
KATOLIK
PARAHYANGAN FAKULTAS TEKNIK JURUSAN ARSITEKTUR
SPA 6 TAR 306 2016 /2017 DOSEN PJ DOSEN KELAS ASISTEN DOSEN
DR. IR. ALWIN S. MT DR. IR. Y. BASUKI,M.SC IR. YOHAN SUWANDI, MT
NAMA
AURELIUS AARON
NPM
2014420157
NPM
B3
TUGAS TAHAP 2
TEMATIK HOTEL
GAMBAR
LEGALISASI
NOMOR LEMBAR
DETAIL KAMAR SUITE SKALA
SKALA 1 : 150 DIPERIKSA
JUMLAH LEMBAR