Architectural construction // Commercial structural and services design // 2017

Page 1

By

TDG

ARCI 421 - INTEGRATED TECHNOLOGIES PROJECT THREE - CONSTUCTION

“The Hub” Office + Retail Complex

Lydney Place, Porirua, Wellington

Drawn by: Austin D’souza 300327560

Issue date: 20.10.17 Design shown is a copyright of TDG


Design shown is a copyright of TDG

Notes:

N

All materials selected have been chosen to the NZ market, making it resonably readily available. Manufacturers and contractors have been chosen due to previous similar projects and experience in the field. All works on site shall comply with the NZBC, all relevant local authority bylaws, and all applicable standards Refer to structural engineer’s and interior architect’s drawings where stated

DN

All mechanical and services equipment is visual representation, consult with respective engineers for finalized drawings

-

Project Image

Section A103-04

All structure should be cross-referenced to engineers drawings

Project description: This project is of a office and retail mixed-use complex located in Porirua, Wellington. It is part of the Design component of the Masters part of the Architecture program at Victoria University of Wellington, NZ

The section runs through the office part of the development, and the focus will only be on this part for this project CONTENTS: A001 - Cover A002 - Overview A003 - Section Part 1 A004 - Section Part 2 A005 - Detail Roof DN

A006 - Detail Interior / Structure A007 - Detail Window

Project Image

GROUND FLOOR PLAN

There will be three areas that will be detailed. One will focus on the roof and deck, the other on the internal walls and structure and finally the window system.

A008 - Assembly Drawing

17000 Level 4

By

TDG

13000 Level 3

Project Num: 003

Project:

“The Hub” There will be two parts of the section shown on the right in order to fit it to 1:50 scale on A3.

9000 Level 2

9000 Level 1

Address: Lydney Place, Porirua, Wellington

Client: Fabricio Chicca Issue date: 20.10.17 Drawn by: Austin D’souza *Drawings not to scale

SECTION OVERVIEW

9000

Project Overview

Ground

Sheet:

A002


Design shown is a copyright of TDG

Notes:

Unex glass ballustrade system to be housed by aluminium casing that is then bolted to the plywood top and vertical framing structure with Ramset TruBolt stud anchors, refer to manufaturer’s specs

Viking Buzon proprietary system, 75mm to house the timber joists and let water pass through the roof and into gutter, refer to manufaturer’s specs

Removable timber decking on furred joists (for cleaning and maintenance) made of pine with varnish finish

Viking Epiclad torch on membrane roof, glued with Viking EPDM adhesive to treated plywood top

Flashing one single piece Coloursteel Maxx 1055BMT flashing on clips, fixed to timber framing with Climaseal 12g x 65mm screws @ 600 crs

Carpet, refer to interior architect’s specifications

Top panels on each level curtain wall will be frosted in a metalic red colour to hide the services that lie behind it. This has been done as an architectural feature, refer to manufacturer’s specifications, only use licenced installer

All materials selected have been chosen to the NZ market, making it resonably readily available. Manufacturers and contractors have been chosen due to previous similar projects and experience in the field. Water proof sealant (EP 740 Epoxy) is to be applied to all external areas where concrete is present to ensure that water does not penetrate back in past flashings as required by engineers specifications All mechanical and services equipment is visual representation, consult with respective engineers for finalized drawings

1 A005

17000

Level 5

All structure should be cross-referenced to engineers drawings

600mm x 1200mm ceiling panels

3

OUTSIDE

2 A005

A005

INSIDE

Rondo exposed grid hanging false ceiling on metal battens, refer to interior architect’s specifications

13000 Level 3

600mm x 300mm reinforced concrete beam in-situ acting as both gravity and lateral loadresisting structure

9000

Level 2

Double glazed glass panels to customized size, produced by Fletcher glass, refer to manfacturer’s specifications for material qualities.

Concrete to be fire rated in accordance to structural engineers specifications Balusrade system complies with NZBC clauses B1 stucture and B1/VM1 and F4 safety from falling, subject to: -All products specified meeting the required level of performance -Site installation is carried out in accordance with intent of this drawing or equivelent to engineers drawing Refer to structural engineer’s and interior architect’s drawings where stated All works on site shall comply with the NZBC, all relevant local authority bylaws, and all applicable standards

Plan Key:

1 A103-04

20mm topping screed to tie precast floor panels together, smooth finish, refer to engineers specifications

5000 Level 1

200mm reinforced concrete precast slab flooring, spanning shorted distance of building, refer to engineer’s specifications

300mm reinforced concrete in-situ slab floor, formwork to be built by contractor and ready for manufacturer to pour, refer to engineer’s specifications

0 Ground

MaxRaft concrete insulation block to stop heat escaping through the slab, two slab pices connected with reinforced rods every 1m refer to engineer’s specifications

By

TDG Project Num: 003

Project:

“The Hub” Address: Lydney Place, Porirua, Wellington

Client: Fabricio Chicca Issue date: 20.10.17 Drawn by: Austin D’souza Scales

1:50

Section East to West AA - Part 1

Sheet:

A003


Design shown is a copyright of TDG

Notes:

Top panels on each level curtain wall will be frosted in a metalic red colour to hide the services that lie behind it. This has been done as an architectural feature, refer to manufacturer’s specifications, only use licenced installer

Internal finish, 9mm GIB superline painted finish, refer to interior architect’s specifications

Flashing one single piece Coloursteel Maxx 1055BMT flashing on clips, fixed to timber framing with Climaseal 12g x 65mm screws @ 600 crs

Carpet, refer to interior architect’s specifications

Aluminium mullions to be shown on outside to help express the architecture intent, smooth finish, refer to manufacturers specifications and use licenced installer only

Rondo exposed grid 600mm x 1200mm, hanging false ceiling on metal battens, refer to interior architect’s specifications

17000 Level 4

INSIDE

OUTSIDE

Double 13mm GIB Superline Plasterboard on 100mm timber frame wall with 75mm acoustic insulation on Speedwall panels

13000 Level 3

600mm x 300mm reinforced concrete beam in-situ acting as both gravity and lateral loadresisting structure

7 A007

Double glazed glass panels to customized size, produced by Fletcher glass, refer to manfacturer’s specifications for material qualities.

9000

Level 2

5

All materials selected have been chosen to the NZ market, making it resonably readily available. Manufacturers and contractors have been chosen due to previous similar projects and experience in the field. Water proof sealant (EP 740 Epoxy) is to be applied to all external areas where concrete is present to ensure that water does not penetrate back in past flashings as required by engineers specifications All mechanical and services equipment is visual representation, consult with respective engineers for finalized drawings All structure should be cross-referenced to engineers drawings Concrete to be fire rated in accordance to structural engineers specifications Balusrade system complies with NZBC clauses B1 stucture and B1/VM1 and F4 safety from falling, subject to: -All products specified meeting the required level of performance -Site installation is carried out in accordance with intent of this drawing or equivelent to engineers drawing Refer to structural engineer’s and interior architect’s drawings where stated All works on site shall comply with the NZBC, all relevant local authority bylaws, and all applicable standards

Plan Key:

A006

1 A103-04

8 A007

20mm topping screed to tie precast floor panels together, smooth finish, refer to engineers specifications 200mm reinforced concrete precast slab flooring, spanning shorted distance of building, refer to engineer’s specifications

5000

Level 1

4

300mm reinforced concrete in-situ slab floor, formwork to be built by contractor and ready for manufacturer to pour, refer to engineer’s specifications

A006

6 A007

0

Ground

MaxRaft concrete insulation block to stop heat escaping through the slab, two slab pices connected with reinforced rods every 1m refer to engineer’s specifications

By

TDG Project Num: 003

Project:

“The Hub” Address: Lydney Place, Porirua, Wellington

Client: Fabricio Chicca Issue date: 20.10.17 Drawn by: Austin D’souza Scales

1:50

Section East to West AA - Part 2

Sheet:

A004


Top wall height and construction to comply with clauses F4 & E2

Additional flashing over Coloursteel Maxx 1055BMT to complete capping, fixed to metal battens with revits

Design shown is a copyright of TDG

21mm min thick plywood to fall

Notes: All materials selected have been chosen to the NZ market, making it resonably readily available. Manufacturers and contractors have been chosen due to previous similar projects and experience in the field.

Timber blocking supporting gutter system

20mm x 24mm cavity batten

190mm x 70mm Timber rafter to hold up roof @ 900 crs max

H3 ply packer 5 degree pitch min

OUTSIDE 100mm min

Water proof sealant (EP 740 Epoxy) is to be applied to all external areas where concrete is present to ensure that water does not penetrate back in past flashings as required by engineers specifications

Viking Epiclad torch on membrane roof, glued with Viking EPDM adhesive to treated plywood top

10mm min chamfer for fall

Angled packers to support gutter membrane fall

Flashing one single piece Coloursteel Maxx 1055BMT flashing on clips, fixed to timber framing with Climaseal 12g x 65mm screws @ 600 crs

20mm Plywood to complete bottom of roof system INSIDE

Building wrap to separate capping and timber, extends to end of flashing on mullion

PinkBatts Ultra R2.8 wall insulation

Roof - Parapet and Gutter system

1

1:5

Fletcher aluminium curtain wall system built in NZ to customized specifications Unex glass ballustrade system to be housed by aluminium casing that is then bolted to the plywood top and vertical framing structure with Ramset TruBolt stud anchors, refer to manufaturer’s specs Vertical roof frame system on edge of deck Resene aquaclear varnish on timber decking, refer to manufacturer’s specs

Unex glass ballustrade system to be housed by aluminium casing that is then bolted to the plywood top and vertical framing structure with Ramset TruBolt stud anchors, refer to manufaturer’s specs

*Top wall heigh and construction to comply with clauses F4 & E2

OUTSIDE

Fall in outward direction to guide water away from balluster housing and down the capped side

Resene aquaclear varnish on timber decking, refer to manufacturer’specs

100mm min

100mm min height to comply with NZBC E2

Removable timber decking on furred joists (for cleaning and maintenance) made of pine with varnish finish

INSIDE

Viking Buzon proprietary system, 75mm to house the timber joists and let water pass through the roof and into gutter, refer to manufaturer’s specs

2

Roof - Deck and Gutter system 1:5

INSIDE

Industrial carpet in circulation areas, refer to interior architect’s specifications

20mm topping concrete to tie precast floor panels together, smooth finish, refer to engineers specifications

600mm x 300mm Reinforced concrete in-situ beam, to support the precast floor slabs and roof

Viking Buzon proprietary system, 75mm to house the timber joists and let water pass through the roof and into gutter, refer to manufaturer’s specs

600mm x 300mm Reinforced concrete in-situ beam, to support the precast floor slabs and roof

Curtain wall system to be attached to bottom of vertical roof structure, with flashing extending over the mullion edge *Balcony deck to be built on top of membrane roof, with glass baluster housing to be hidden to create an architectural feature, refer to manufacturer’s specs, certified installers only

All mechanical and services equipment is visual representation, consult with respective engineers for finalized drawings All structure should be cross-referenced to engineers drawings Concrete to be fire rated in accordance to structural engineers specifications Balusrade system complies with NZBC clauses B1 stucture and B1/VM1 and F4 safety from falling, subject to: -All products specified meeting the required level of performance -Site installation is carried out in accordance with intent of this drawing or equivelent to engineers drawing Refer to structural engineer’s and interior architect’s drawings where stated All works on site shall comply with the NZBC, all relevant local authority bylaws, and all applicable standards

30mpa 200 mm reinforced precast concrete slab, topped with 20mm concrete, refer to engineers specifications

Double membrane tape laid where decking joists sit to allow for extra wear and tear in that area

*Roof structure same as above detail

Building wrap to separate capping and timber, extends to end of flashing on mullion

OUTSIDE

*Roof structure same as above detail

Double membrane tape laid where proprietary legs sit to allow for extra wear and tear in that area

*Vertical roof edge same as detail above

Aluminium mullions to be shown on outside to help express the architecture intent, smooth finish, refer to manufacturers specifications and use licenced installer only

100mm min

100mm height to comply with NZBC E2

Gutter laid to fall to outlet, use only certified specialists

3

Floor slab to deck roof

Timber joists that house decking to have neck sticking out over the flashing so that deck spans all the way to the mullion face giving users a smooth transition By

1:5

TDG Project Num: 003

Project:

“The Hub” Address: Lydney Place, Porirua, Wellington

Client: Fabricio Chicca Issue date: 20.10.17 Drawn by: Austin D’souza Scales

1:5

Roof system details Sheet:

A005


Design shown is a copyright of TDG

Notes:

600mm round reinforced concrete column with painted finish, see engineer and interior architect’s specifications Industrial carpet in circulation areas, refer to interior architect’s specifications

Timber skirting, painted, with smooth finish Carpet, refer to interior architect’s specifications

Speedwall C track

5000

Level 2

20mm topping screed to tie precast floor panels together, smooth finish, refer to engineers specifications

5000

All materials selected have been chosen to the NZ market, making it resonably readily available. Manufacturers and contractors have been chosen due to previous similar projects and experience in the field. Water proof sealant (EP 740 Epoxy) is to be applied to all external areas where concrete is present to ensure that water does not penetrate back in past flashings as required by engineers specifications All mechanical and services equipment is visual representation, consult with respective engineers for finalized drawings All structure should be cross-referenced to engineers drawings

Level 2

Acoustic sealant

30mpa 200 mm reinforced precast concrete slab, topped with 20mm concrete, refer to engineers specifications

Speedwall fire rated sealant 30mpa 200 mm reinforced precast concrete slab, topped with 20mm concrete, refer to engineers specifications

Metal dynabolt housing refer to manufacturers specifications

Speedwall C track

Concrete to be fire rated in accordance to structural engineers specifications Balusrade system complies with NZBC clauses B1 stucture and B1/VM1 and F4 safety from falling, subject to: -All products specified meeting the required level of performance -Site installation is carried out in accordance with intent of this drawing or equivelent to engineers drawing Refer to structural engineer’s and interior architect’s drawings where stated

600mm Reinforced concrete beam

600mm x 300mm Reinforced concrete in-situ beam, to support the precast floor slabs

75mm Pink Batts Silencer Acoustic Insulation

All works on site shall comply with the NZBC, all relevant local authority bylaws, and all applicable standards

FRR 30 speedwall 600mm x 300mm Reinforced concrete in-situ beam, to support the precast floor slabs

Deflection head dwang

Rondo exposed grid hanging false ceiling on metal battens, refer to interior architect’s specifications

Rondo pin joint ceiling rods at 900crs 600mm round reinforced in-situ concrete column with painted finish, see engineer and interior architect’s specifications

Suspended ceiling to be offset from wall to allow lateral movement, angle trim to cover gap and give seamless look, attached to dwang

Rondo metal ceiling battens

Rondo metal ceiling batten clamps

Timber dwang at ceiling level to allow joining of metal rondo batten

Rondo 1200mm x 600mm exposed grid hanging false ceiling on metal battens, refer to interior architect’s specifications

600mm x 1200mm ceiling panels OFFICE

By

TDG Project Num: 003

Project:

“The Hub” Address: Lydney Place, Porirua, Wellington

RISER Client: Fabricio Chicca Issue date: 20.10.17 Drawn by: Austin D’souza

4

Office to Riser 1:5

5

Column and Beam to Floor Slab

Scales

1:5

1:5

Interior stucture details Sheet:

A006


Firth Palermo paver 50mm, layed on the outside of the building, use certified installer only

Double glazed glass panels to customized size, produced by Fletcher glass, refer to manfacturer’s specifications for material qualities.

INSIDE

OUTSIDE

Curtain wall system to be fastened down to concrete floor with Ramset Ankascrew on top of DPC, refer to manufacturer’s specs

Aluminium mullions to be shown on outside to help express the architecture intent, smooth finish, refer to manufacturers specifications and use licenced installer only

150mm

Timber packing to support mullions and metal flashing

Concrete to be polished in all areas on the ground floor

Expol Thermaslab insulation panels, refer to engineer’s specs, only to be installed by dealer

300mm reinforced concrete in-situ slab floor, formwork to be built by contractor and ready for manufacturer to pour, refer to engineer’s specifications

6

Expol Polythene to be stuck with adhesive to bottom of insulation panels, only to be installed by dealer

100mm in-situ concrete slab on ground for the outside floor, refer to engineer’s specifications

Metal flashing to run over the edge of the slab, ensuring that no water gets back into floor

Pavers to be installed on slight angel away from the building to aloow water to roll and drain away from the slab, refer to maufacturer’s specifications DPC to be installed between bottom of transom and slab, DPC to fold over slab edge

Mullion to Ground Slab

Aluminium mullions and flashing to be shown on outside to help express the architecture intent, smooth finish, refer to manufacturers specifications and use licenced installer only

Treated wood skirting, painted with smooth finish, refer to interior architect’s specifications

600mm x 300mm reinforced concrete beam in-situ acting as both gravity and lateral loadresisting structure

Top panels on each level curtain wall will be frosted in a metalic red colour to hide the services that lie behind it. This has been done as an architectural feature, refer to manufacturer’s specifications, only use licenced installer

Rondo exposed grid hanging false ceiling on metal battens, refer to interior architect’s specifications

PinkBatts wool blanket insulation to be fitted my manfacturers specifications inside wall as well as in gap between mullion and concrete wall

Rondo pin joint ceiling rods at 900crs

600mm x 1200mm ceiling panels

Fletcher aluminium curtain wall system built in NZ to customized specifications

7

1:2

All materials selected have been chosen to the NZ market, making it resonably readily available. Manufacturers and contractors have been chosen due to previous similar projects and experience in the field. Water proof sealant (EP 740 Epoxy) is to be applied to all external areas where concrete is present to ensure that water does not penetrate back in past flashings as required by engineers specifications All mechanical and services equipment is visual representation, consult with respective engineers for finalized drawings All structure should be cross-referenced to engineers drawings Concrete to be fire rated in accordance to structural engineers specifications Balusrade system complies with NZBC clauses B1 stucture and B1/VM1 and F4 safety from falling, subject to: -All products specified meeting the required level of performance -Site installation is carried out in accordance with intent of this drawing or equivelent to engineers drawing Refer to structural engineer’s and interior architect’s drawings where stated

Double glazed glass panels to customized size, produced by Fletcher glass, refer to manfacturer’s specifications for material qualities.

INSIDE

A007

8

PinkBatts wool blanket insulation to be fitted my manfacturers specifications inside wall as well as in gap between mullion and concrete wall

Mullion on painted timber sill on DPC with flashing overlapping past the edge of the slab, E2

9mm GIB Superline Plasterboard on 40mm timber packing glued to in-situ concrete wall edge

Horizontal mullion housing curtain wall glazing, fastened to slab with Ramset M12 screws, refer to the manufacturer’s specifications

Internal finish, 9mm GIB superline painted finish, refer to interior architect’s specifications

40mm concrete topping to tie in precast slab flooring, refer to engineer’s specifications

200mm reinforced concrete precast slab flooring, spanning shorted distance of building, refer to engineer’s specifications

2mm galvinized Ramset steel bracket mounted to concrete and packing with M12 threaded ramset bolt

Fletcher aluminium curtain wall system built in NZ to customized specifications

MaxRaft concrete insulation block to stop heat escaping through the slab, two slab pices connected with reinforced rods every 1m refer to engineer’s specifications

Silka silicone sealant for waterproofing

OUTSIDE

STL fire proof anchors

Line of slab, note how it extends front of mullion, as architectural intent

OUTSIDE

All works on site shall comply with the NZBC, all relevant local authority bylaws, and all applicable standards

Carpet, refer to interior architect’s specifications

Curtain wall to be sitting on floor slab and going up to the bottom of the floor slab above, again as an architectural feature.

Curtain system intended to be thin and ‘light’ and expose the concrete slab it sits on as an architectural feature

Fletcher windows fire rated gaskets

Notes:

A007

INSIDE

Aluminium mullions to be shown on outside to help express the architecture intent, smooth finish, refer to manufacturers specifications and use licenced installer only

Double glazed glass panels to customized size, produced by Fletcher glass, refer to manfacturer’s specifications for material qualities.

Design shown is a copyright of TDG

C bracket aluminium housing for vertical end mullion attached to concrete with M12 bolts with blocking and PinkBatts Ultra sheet insulation inbetween, building paper on the exterior edge with selant at end of flashing, refer to manufacturers specs, only to be installed by licenced dealer

By

7

1:2

Project Num: 003

Project:

“The Hub” Address: Lydney Place, Porirua, Wellington

Client: Fabricio Chicca

8

Window system to slab 1 : 10

Issue date: 20.10.17 Drawn by: Austin D’souza Scales

Window Mullion Jamb

TDG

1:2 , 1:10

Curtain wall system details Sheet:

A007


Design shown is a copyright of TDG

FACADE DESIGN

FACADE EXPLODED

FACADE ASSEMBLY ORDER

Notes: All materials selected have been chosen to the NZ market, making it resonably readily available. Manufacturers and contractors have been chosen due to previous similar projects and experience in the field. Refer to structural engineer’s and interior architect’s drawings where stated All works on site shall comply with the NZBC, all relevant local authority bylaws, and all applicable standards All mechanical and services equipment is visual representation, consult with respective engineers for finalized drawings All structure should be cross-referenced to engineers drawings

1 - In-Situ concrete colums and beams

Concrete to be fire rated in accordance to structural engineers specifications

2 - Precast concrete floor slabs, with 20mm topping and commercial carpet

FACADE COMPOSITION 2

6

1

3 4

7 9

10

5 8 3 - Glazing system from floor to floor

By

TDG Project Num: 003

Project:

1 - 600mm concrete column 2 - Carpet

“The Hub”

3 - Topping screed 4 - 200mm precast floor slab 5 - Thermal break 6 - Double glazed glass

Address:

7 - Aluminium mullions

Lydney Place, Porirua, Wellington

8 - Frosted glass 9 - 600x300mm concrete beams 10 - False suspended ceiling In-situ reinforced concrete columns and beams, with Fletcher custom glazing system for exterior, with false ceiling to hide structure and services

4 - False ceiling, 600mm x 1200mm grid

Client: Fabricio Chicca Issue date: 20.10.17 Drawn by: Austin D’souza *Not to scale

Assembly Drawing - Facade

Sheet:

A008


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.