MONTHLY REPORT Department:
Product management
Month/period:
Up to April 21, 2011
Written by:
Peter Schut
Date:
21-04-2011
Last periods’ action items:
Progress:
SynView2 ACP2 NAB preparations 4 pre NAB webinars
Still in draft, Draft is defined Done Done
High/Low-lights last period:
Action items:
High AVB Nab
AVB is getting to a critical mass in directions and what our role can be Positive and energetic show
Low: NAB travelling
6 hours delay
Priorities next period:
Action items:
SynView2 ACP2 Decision on 3Gb/s Teranex CRD’s
Full extended Description of a new OctetViewer Full spec in progress, needs Go/No go SPG, Teranex, AVB Node
Axon Digital Design B.V.
- CONFIDENTIAL -
page 1 of 1